DAILY SHIFT REPORT

DATE: December 02, 2023


SHIFT: Night Shift (7:00PM –7:00AM)
MANPOWER

1. Peter Consebido - Project Engineer

Chiller Operators:
1. Elmer Gica
2. Johann Francis Evangelista

HVAC Technicians:
1. Randy Santos — PMS/Trouble Call
2. Harley Balanoba — PMS/Trouble Call
4. Mark Gil Rizan — PMS/Trouble Call
3. Benidick W. Buyayo — Area Temp. /Inspector

OPERATION HIGHLIGHTS

ROUTINE ACTIVITIES

1.Chiller 2 & 4 Hourly Parameter Monitoring. (See Attached Readings)


2.Parameter Monitoring of Chiller Reading 2 & 4 Every Two-Hours. (See Attached Readings)
3.Temperature Reading at Various Areas. Every 3 Hours. (See Attached Readings)
4. Conduct Preventive Maintenance on VAC Equipment. (See Attached Readings)
5.Attended Service Calls. ( See Table Below)

CHILLERS

Unit Designation Location Status Action Taken Remarks

Operational/
Chiller No. 1 Chiller Plant Re-conditioning Done Operational
Stand-by mode

True-Temp Corp. www.truetempcorp.com


Unit Designation Location Status Action Taken Remarks

Monitoring of parame-
Chiller No. 2 Chiller Plant Operational ters Operational

Chiller No. 3 Chiller Plant Stand-by mode Operational/Stand-by


Fixed Delta P

Monitoring of parame-
Chiller No. 4 Chiller Plant Operational ters Operational

Monitoring of parame-
Chiller No. 5 Chiller Plant Operational ters Operational

Under Repair (Defective Reported to NAIA-T3


Non-
Chiller No. 6 Chiller Plant Compressor). For Fur-
Operational Eng’g Department
ther Troubleshooting

PUMPS

Unit Designation Location Status Action Taken Remarks

Operational (Standby Daily monitoring Under Good Condition


ChWP No.1 Chiller Plant
-Mode)
Operational Daily monitoring Running in Good Condition
ChWP No.2 Chiller Plant
(Running)
Operational (Standby Daily monitoring Under Good Condition
ChWP No.3 Chiller Plant

Operational Daily monitoring Running in Good Condition


ChWP No.4 Chiller Plant
(Running)
Operational Daily monitoring Under Good Condition
ChWP No.5 Chiller Plant
(Running)
Stand-by Mode Daily monitoring Under Good Condition
ChWP No.6 Chiller Plant

Operational (Standby Daily monitoring Under Good Condition


CoWP No.1 Chiller Plant -Mode)

CoWP No.2 Chiller Plant Operational Daily monitoring Running in Good Condition

Operational (Standby Daily monitoring Under Good Condition


CoWP No.3 Chiller Plant -Mode)
Operational Daily monitoring Under Good Condition
CoWP No.4 Chiller Plant

Operational Daily monitoring Under troubleshooting


CoWP No.5 Chiller Plant

Operational (Standby Daily monitoring Under Good Condition


CoWP No.6 Chiller Plant

True-Temp Corp. www.truetempcorp.com


COOLING TOWERS

Unit Designation Location Status Action Taken Remarks

COOLING Operational Reported to NAIA-T3


Cooling Tower No.1 TOWER AR- (Running)
Eng’g Department
EA
COOLING Operational Note: Applicable for All Cooling Reported to NAIA-T3
Cooling Tower No.2 TOWER AR- (Running) Towers
Eng’g Department
EA
COOLING Operational Replacement of Return Valves, Bal- Reported to NAIA-T3
Cooling Tower No.3 TOWER AR- (Running) ancing Valves, Fillers,
Eng’g Department
EA

COOLING Operational Float Ball-Bronze Type, Automatic Reported to NAIA-T3


Cooling Tower No.4 TOWER AR- (Running) Chemical Feeders, &
Eng’g Department
EA
COOLING Operational Automatic Water Softener Reported to NAIA-T3
Cooling Tower No.5 TOWER AR- (Running)
Eng’g Department
EA
COOLING Under Worn out Pillow Block Bearings and Reported to NAIA-T3
Cooling Tower No.6 TOWER AR- Mis-aligned Motor Pulley
Eng’g Department
EA Repair

PREVENTIVE MAINTENANCE

UNIT
DESIGNA- LOCATION Team ACTION TAKEN STATUS REMARKS
TION

AHU
Cleaning of coil, housekeep- Operational Done
32037,32010
M.R. 3.4.05 PMS ing, Cleaning of AHU body,
& 32053
siphoning of drain pan and
cleaning of air filters

Rectify water spillage on the


entire machine room area.
Water Spill- Vacuum water on floor and
M.R. 3.4.46 TC Corrected Done
age vacuum drain line of AHU
units

True-Temp Corp. www.truetempcorp.com


TROUBLE CALL

UNIT
DESIGNA- LOCATION Team ACTION TAKEN STATUS REMARKS
TION

Immigration Installed 1 pc. 60 x 60 cm


Gypsum
Level 2 TC Gypsum Board ceiling at Im- Done
Board
Ceiling/ & Arrival migration 2nd level and at
Acoustics Gate 109 Arrival Gate 109

AHU cooling coils


Cleaned Y-strainer. Installed newly replaced;
AHU 33027 M.R. 3.4.46 TC Chilled water supply and re- Done Cooling perfor-
turn thermometer dial gauge. mance under ob-
servation
Proceed to the location to
North Coastal TC Checked and verify– Door Stock Room
Electrical was locked. confirmed leak For continua- Door key not with
FCU 11142
(flowing outside door). Shut tion the shift on duty.
Stock Room
Water Leak down power Supply located at on Monday
bus gate to avoid further 12/04/2023
leakage.

PREPARED BY: CHECKED BY: NOTED BY:

Peter B. Consebido, PME Engr. Rodney Paguio Engr. Romeo Dolores


Project Engineer Mechanical Engineer Head of Engineering Dept. T3