DAILY SHIFT REPORT

DATE: December 04, 2023


SHIFT: Night Shift (7:00PM –7:00AM)
MANPOWER

1. Peter Consebido - Project Engineer

Chiller Operators:
1. Elmer Gica
2. Johann Francis Evangelista

HVAC Technicians:
1. Randy Santos — Trouble Call
2. Harley Balanoba — Trouble Call
3. Ryan Gatbonton — Trouble Call
4. Mark Gil Rizan — Trouble Call
3. Benidick W. Buyayo — Area Temp. /Inspector

OPERATION HIGHLIGHTS

ROUTINE ACTIVITIES

1.Chiller 2 & 4 Hourly Parameter Monitoring. (See Attached Readings)


2.Parameter Monitoring of Chiller Reading 2 & 4 Every Two-Hours. (See Attached Readings)
3.Temperature Reading at Various Areas. Every 3 Hours. (See Attached Readings)
4. Conduct Preventive Maintenance on VAC Equipment.
5.Attended Service Calls. ( See Table Below)

Unit Designation Location Status Action Taken Remarks

Operational/
Chiller No. 1 Chiller Plant Re-conditioning Done Operational
Stand-by mode

True-Temp Corp. www.truetempcorp.com


Unit Designation Location Status Action Taken Remarks

Monitoring of parame-
Chiller No. 2 Chiller Plant Operational ters Operational

Chiller No. 3 Chiller Plant Stand-by mode Operational/Stand-by


Fixed Delta P

Monitoring of parame-
Chiller No. 4 Chiller Plant Operational ters Operational

Monitoring of parame-
Chiller No. 5 Chiller Plant Operational ters Operational

Under Repair (Defective Reported to NAIA-T3


Non-
Chiller No. 6 Chiller Plant Compressor). For Fur-
Operational Eng’g Department
ther Troubleshooting

PUMPS

Unit Designation Location Status Action Taken Remarks

Operational (Standby Daily monitoring Under Good Condition


ChWP No.1 Chiller Plant
-Mode)
Operational Daily monitoring Running in Good Condition
ChWP No.2 Chiller Plant
(Running)
Operational (Standby Daily monitoring Under Good Condition
ChWP No.3 Chiller Plant

Operational Daily monitoring Running in Good Condition


ChWP No.4 Chiller Plant
(Running)
Operational Daily monitoring Under Good Condition
ChWP No.5 Chiller Plant
(Running)
Stand-by Mode Daily monitoring Under Good Condition
ChWP No.6 Chiller Plant

Operational (Standby Daily monitoring Under Good Condition


CoWP No.1 Chiller Plant -Mode)

CoWP No.2 Chiller Plant Operational Daily monitoring Running in Good Condition

Operational (Standby Daily monitoring Under Good Condition


CoWP No.3 Chiller Plant -Mode)
Operational Daily monitoring Under Good Condition
CoWP No.4 Chiller Plant

Operational Daily monitoring Under troubleshooting


CoWP No.5 Chiller Plant

Operational (Standby Daily monitoring Under Good Condition


CoWP No.6 Chiller Plant

True-Temp Corp. www.truetempcorp.com


COOLING TOWERS

Unit Designation Location Status Action Taken Remarks

COOLING Operational Reported to NAIA-T3


Cooling Tower No.1 TOWER AR- (Running)
Eng’g Department
EA
COOLING Operational Note: Applicable for All Cooling Reported to NAIA-T3
Cooling Tower No.2 TOWER AR- (Running) Towers
Eng’g Department
EA
COOLING Operational Replacement of Return Valves, Bal- Reported to NAIA-T3
Cooling Tower No.3 TOWER AR- (Running) ancing Valves, Fillers,
Eng’g Department
EA

COOLING Operational Float Ball-Bronze Type, Automatic Reported to NAIA-T3


Cooling Tower No.4 TOWER AR- (Running) Chemical Feeders, &
Eng’g Department
EA
COOLING Operational Automatic Water Softener Reported to NAIA-T3
Cooling Tower No.5 TOWER AR- (Running)
Eng’g Department
EA
COOLING Under Worn out Pillow Block Bearings and Reported to NAIA-T3
Cooling Tower No.6 TOWER AR- Mis-aligned Motor Pulley
Eng’g Department
EA Repair

TROUBLE CALL

UNIT
DESIGNA- LOCATION Team ACTION TAKEN STATUS REMARKS
TION

Syphoned FCU drain pan and Operational Done


FCU Dear John’s TC drain line.
Office

Assembled blower-Shaft as-


sembly and re-installed to-
AHU 23011 gether with new pillow block
M.R. 2.1.06 TC Operational Done
bearings (motor side and back
side).

True-Temp Corp. www.truetempcorp.com


TROUBLE SHOOTING

UNIT
DESIGNA- LOCATION Team ACTION TAKEN STATUS REMARKS
TION

Gangway TC Checked & Re-insulated Operational Done


FCU
Departure 110 Chilled water supply pipe.
Water Leak

Checked / vacuumed FCU


1st Level TC drain pan and drain line. Not-fully Newly Installed
FCU Electrical Shut-off chilled water supply operational FCU
Water Leak Stock room valve to avoid condensation
(ducting installation not yet
completed).

11PM - Re-set AHUs hooked


Various Ma- to Genset affected by sched-
chine Rooms uled power interruption at 1st
TC
FCUs, AHUs, And Electrical to 3rd level south wings.
All VAC Done
EFs & related 2:25 AM– Re-set all affected
Rooms units back to
VAC Equip- VAC units at South Wings operation
ments level 1st to 3rd as power re-
sumed from Gen-set to Meral-
co power.

PREPARED BY: CHECKED BY: NOTED BY:

Peter B. Consebido, PME Engr. Rodney Paguio Engr. Romeo Dolores


Project Engineer Mechanical Engineer Head of Engineering Dept. T3