DAILY SHIFT REPORT

DATE: November 21, 2023


SHIFT: Night Shift (7:00PM –7:00AM)
MANPOWER
1. Peter Consebido - Project Engineer

Chiller Operators:
1. Elmer Gica
2. Johann Francis Evangelista

HVAC Technicians:
1. Luisito Bandiola — PMS/Trouble Call
2. Randy Santos — PMS/Trouble Call
3. Mark Gil Rizan . — PMS/Trouble Call
4. Benedick Buyayo — PMS/Trouble Call
5. Ryan Gatbonton —Area Temp./Inspector

OPERATION HIGHLIGHTS

ROUTINE ACTIVITIES

1.Chiller 2 & 4 Hourly Parameter Monitoring. (See Attached Readings)


2.Parameter Monitoring of Chiller Reading 2 & 4 Every Two-Hours. (See Attached Readings)
3.Temperature Reading at Various Areas, Every Three Hours. (See Attached Readings)
4. Conduct Preventive Maintenance on VAC Equipment. ( See Table Below)
5.Attended Service Calls. ( See Table Below)

CHILLERS

Unit Designation Location Status Action Taken Remarks

Operational/
Chiller No. 1 Chiller Plant Re-conditioning Done Operational/ Stand-by
Stand-by

True-Temp Corp. www.truetempcorp.com


Unit Designation Location Status Action Taken Remarks

Monitoring of parame-
Chiller No. 2 Chiller Plant Operational ters Operational/Running

Chiller No. 3 Chiller Plant Stand-by mode Operational/Stand-by


Fixed Delta P

Monitoring of parame-
Chiller No. 4 Chiller Plant Operational ters Operational/Running

Monitoring of parame-
Chiller No. 5 Chiller Plant Operational ters Operational/Running

Under Repair (Defective Reported to NAIA-T3


Non-
Chiller No. 6 Chiller Plant Compressor). For Fur-
Operational Eng’g Department
ther Troubleshooting

PUMPS

Unit Designation Location Status Action Taken Remarks

Operational (Standby Daily monitoring Under Good Condition


ChWP No.1 Chiller Plant
-Mode)
Operational Daily monitoring Running in Good Condition
ChWP No.2 Chiller Plant
(Running)
Operational (Standby Daily monitoring Under Good Condition
ChWP No.3 Chiller Plant

Operational Daily monitoring Running in Good Condition


ChWP No.4 Chiller Plant
(Running)
Operational Daily monitoring Under Good Condition
ChWP No.5 Chiller Plant
(Running)
Stand-by Mode Daily monitoring Under Good Condition
ChWP No.6 Chiller Plant

Operational (Standby Daily monitoring Under Good Condition


CoWP No.1 Chiller Plant -Mode)
Operational Daily monitoring Running in Good Condition
CoWP No.2 Chiller Plant

Operational (Standby Daily monitoring Under Good Condition


CoWP No.3 Chiller Plant -Mode)
Operational Daily monitoring Under Good Condition
CoWP No.4 Chiller Plant

Operational Daily monitoring Under troubleshooting


CoWP No.5 Chiller Plant

Operational (Standby Daily monitoring Under Good Condition


CoWP No.6 Chiller Plant

True-Temp Corp. www.truetempcorp.com


COOLING TOWERS

Unit Designation Location Status Action Taken Remarks

COOLING Operational Reported to NAIA-T3


Cooling Tower No.1 TOWER AR- (Running)
Eng’g Department
EA
COOLING Operational Note: Applicable for All Cooling Reported to NAIA-T3
Cooling Tower No.2 TOWER AR- (Running) Towers
Eng’g Department
EA
COOLING Operational Replacement of Return Valves, Bal- Reported to NAIA-T3
Cooling Tower No.3 TOWER AR- (Running) ancing Valves, Fillers,
Eng’g Department
EA

COOLING Operational Float Ball-Bronze Type, Automatic Reported to NAIA-T3


Cooling Tower No.4 TOWER AR- (Running) Chemical Feeders, &
Eng’g Department
EA
COOLING Operational Automatic Water Softener Reported to NAIA-T3
Cooling Tower No.5 TOWER AR- (Running)
Eng’g Department
EA
COOLING Operational Reported to NAIA-T3
Cooling Tower No.6 TOWER AR- (Running)
Eng’g Department
EA

PREVENTIVE MAINTENANCE

UNIT
LOCA- RE-
DESIGNA- Team ACTION TAKEN STATUS
TION MARKS
TION

Cleaning of coil with chemical,


M.R. 3.4.05 PMS Cleaning of AHU body, syphoning Operational Done
AHU 32038
of drain pan and cleaning of air fil-
ters & house keeping

True-Temp Corp. www.truetempcorp.com


TROUBLE CALL

UNIT
LOCATION Team ACTION TAKEN STATUS REMARKS
DESIGNA-

FCU Immigration Office / Trouble Call Checked/pulled down Operational; Done


(Low air- Departure blower motor assem- Unit with
flow) bly– too much dirt dilapidated
build up. Cleaned & re cooling coils
-installed.
AHU 44005
(warm temp. MR 4.3.10 Trouble Call Checked & found 2 Unit opera- Done
at 4th floor Pcs. SPA 1332LW V tional
hall way & Belts cracked &
Cute Offic- frayed. Performed
es) belts replacement.

PREPARED BY: CHECKED BY: NOTED BY:

Peter B. Consebido, PME Engr. Rodney Paguio Engr. Romeo Dolores


Project Engineer Mechanical Engineer Head of Engineering Dept. T3