DAILY SHIFT REPORT

DATE: November 22, 2023


SHIFT: Night Shift (7:00PM –7:00AM)
MANPOWER
1. Peter Consebido - Project Engineer

Chiller Operators:
1. Elmer Gica
2. Johann Francis Evangelista

HVAC Technicians:
1. Luisito Bandiola — PMS 1/Trouble Call
2. Randy Santos — PMS 1/Trouble Call
3. Mark Gil Rizan . — PMS 2/Trouble Call
4. Ryan Gatbonton — PMS 2/Trouble Call
5. Raymund Olivera — PMS 2/Trouble Call
6. Benidick Buyayo —Area Temp./Inspector

OPERATION HIGHLIGHTS

ROUTINE ACTIVITIES

1.Chiller 2 & 4 Hourly Parameter Monitoring. (See Attached Readings)


2.Parameter Monitoring of Chiller Reading 2 & 4 Every Two-Hours. (See Attached Readings)
3.Temperature Reading at Various Areas, Every Three Hours. (See Attached Readings)
4. Conduct Preventive Maintenance on VAC Equipment. ( See Table Below)
5.Attended Service Calls. ( See Table Below)

Unit Designation Location Status Action Taken Remarks

Operational/
Chiller No. 1 Chiller Plant Re-conditioning Done Operational/ Stand-by
Stand-by

True-Temp Corp. www.truetempcorp.com


Unit Designation Location Status Action Taken Remarks

Monitoring of parame-
Chiller No. 2 Chiller Plant Operational ters Operational/Running

Chiller No. 3 Chiller Plant Stand-by mode Operational/Stand-by


Fixed Delta P

Monitoring of parame-
Chiller No. 4 Chiller Plant Operational ters Operational/Running

Monitoring of parame-
Chiller No. 5 Chiller Plant Operational ters Operational/Running

Under Repair (Defective Reported to NAIA-T3


Non-
Chiller No. 6 Chiller Plant Compressor). For Fur-
Operational Eng’g Department
ther Troubleshooting

PUMPS

Unit Designation Location Status Action Taken Remarks

Operational (Standby Daily monitoring Under Good Condition


ChWP No.1 Chiller Plant
-Mode)
Operational Daily monitoring Running in Good Condition
ChWP No.2 Chiller Plant
(Running)
Operational (Standby Daily monitoring Under Good Condition
ChWP No.3 Chiller Plant
-Mode)
Operational Daily monitoring Running in Good Condition
ChWP No.4 Chiller Plant
(Running)
Operational Daily monitoring Under Good Condition
ChWP No.5 Chiller Plant
(Running)
Stand-by Mode Daily monitoring Under Good Condition
ChWP No.6 Chiller Plant

Operational (Standby Daily monitoring Under Good Condition


CoWP No.1 Chiller Plant -Mode)
Operational Daily monitoring Running in Good Condition
CoWP No.2 Chiller Plant
(Running)
Operational (Standby Daily monitoring Under Good Condition
CoWP No.3 Chiller Plant -Mode)
Operational Daily monitoring Under Good Condition
CoWP No.4 Chiller Plant
(Running)
Operational Daily monitoring Under troubleshooting
CoWP No.5 Chiller Plant
(Running)
Operational (Standby Daily monitoring Under Good Condition
CoWP No.6 Chiller Plant
-Mode)

True-Temp Corp. www.truetempcorp.com


COOLING TOWERS

Unit Designation Location Status Action Taken Remarks

COOLING Operational Reported to NAIA-T3


Cooling Tower No.1 TOWER AR- (Running)
Eng’g Department

COOLING Operational Note: Applicable for All Cooling Reported to NAIA-T3


Cooling Tower No.2 TOWER AR- (Running) Towers
Eng’g Department

COOLING Operational Replacement of Return Valves, Bal- Reported to NAIA-T3


Cooling Tower No.3 TOWER AR- (Running) ancing Valves, Fillers,
Eng’g Department
EA

COOLING Operational Float Ball-Bronze Type, Automatic Reported to NAIA-T3


Cooling Tower No.4 TOWER AR- (Running) Chemical Feeders, &
Eng’g Department

COOLING Operational Automatic Water Softener Reported to NAIA-T3


Cooling Tower No.5 TOWER AR- (Running)
Eng’g Department

COOLING Operational Reported to NAIA-T3


Cooling Tower No.6 TOWER AR- (Running)
Eng’g Department

PREVENTIVE MAINTENANCE

UNIT
LOCA- RE-
DESIGNA- Team ACTION TAKEN STATUS
TION MARKS
TION
ACCU BB Outdoor: Cleaning of coils,
109-001 & Ramp 109 PMS 1 accessories & Operational Done
002 ACCU Body
Outdoor Unit
Outdoor: Cleaning of Coils ,
ACCU BB
110-001 &110 Ramp 110 PMS 1 accessories & Operational Done

Outdoor Unit ACCU Body

ACCU BB Outdoor: Cleaning of coils,


111-001 & Ramp 111 PMS 1 accessories & Operational Done
002 ACCU Body
Outdoor Unit
ACCU BB Outdoor: Cleaning of coils,
112-001 & Ramp 112 PMS 1 accessories & Operational Done
002 ACCU Body
Outdoor Unit

True-Temp Corp. www.truetempcorp.com


UNIT
DESIGNA- LOCATION Team ACTION TAKEN STATUS REMARKS
TION

ACCU BB Ramp 113 Outdoor: Cleaning of coils,


113-001 & PMS 1 accessories Operational Done
002 & ACCU Body
Outdoor Unit
FCU 111- International. Indoor: Cleaning of coil, air
001,,002,003 Departure PMS 2 filters, accessories & FCU Operational Done
&004 Boarding body, syphoning of drain
Indoor Unit Gate 111 pan.

FCU 112- International. Indoor: Cleaning of coil, air


001,001,003 Departure PMS 2 filters, accessories & FCU Operational Done
& 004 Boarding body, syphoning of drain
Indoor Unit Gate 112 pan.

TROUBLE CALL

LOCATION Team ACTION TAKEN STATUS REMARKS


UNIT
DESIGNA-
TION
FCU BG-
002 Bus Gate TC 2 Syphoned FCU drain Corrected Done
(condensate Pan & drain pipe
water leak)

PREPARED BY: CHECKED BY: NOTED BY:

Peter B. Consebido, PME Engr. Rodney Paguio Engr. Romeo Dolores


Project Engineer Mechanical Engineer Head of Engineering Dept. T3