Shift Report - November 30, 2023-2nd Shift
Shift Report - November 30, 2023-2nd Shift
Shift Report - November 30, 2023-2nd Shift
Chiller Operators:
1. Johann Francis Evangelista
HVAC Technicians:
1. Randy Santos — PMS/Trouble Call 1
2. Mark Gil Rizan — PMS/ Trouble Call 1
3. Reymund Olivera — PMS/Trouble Call 2
4. Harley Balanoba — PMS/Trouble Call 2
5. Benidick Buyayo —Area Temp./Inspector
OPERATION HIGHLIGHTS
ROUTINE ACTIVITIES
CHILLERS
Operational/
Chiller No. 1 Chiller Plant Re-conditioning Done Operational
Stand-by mode
Monitoring of parame-
Chiller No. 2 Chiller Plant Operational ters Operational
Monitoring of parame-
Chiller No. 4 Chiller Plant Operational ters Operational
Monitoring of parame-
Chiller No. 5 Chiller Plant Operational ters Operational
PUMPS
TROUBLESHOOTING
UNIT
LOCA- RE-
DESIGNA- Team ACTION TAKEN STATUS
TION MARKS
TION
Checked & aligned Blower, Evalu-
ated fan blower pillow block bear- Need to
ings condition –Fan Blower Opera- pulldown
AHU 23011 M.R. 2.1.06 TC 1 For Repair
tion unbalanced/wiggling; need to blower assy.
replace motor side and back pillow
block bearings.
Re-set /Start up AHU 23015
and observed the operation-ok
M.R. 2.2.26 (Note: The Units were shut down
AHU 23015,
& TC 1 at the main breaker by the Electri- Operational
AHU 23014 &
cal Dept. for their maintenance
22048 M.R.2.1.24
routine prior to scheduled power
interruption last Nov. 28, 2023)
FCU 116- Gate 116 TC 2 Error codes 15,1,38 & Operational Done
001,002,004 8– Reset the control
International Depar-
switch button at main
ture
PCB of the outdoor
units–ok
Diagnosed FCU and
found
FCU 114- Gate 114 TC 2 Error code 24.1– Reset Operational Done
001 the control switch but-
International
ton at main PCB of the
Departure
outdoor unit–ok