DAILY SHIFT REPORT

DATE: November 30, 2023


SHIFT: Night Shift (7:00PM –7:00AM)
MANPOWER
1. Peter Consebido - Project Engineer

Chiller Operators:
1. Johann Francis Evangelista

HVAC Technicians:
1. Randy Santos — PMS/Trouble Call 1
2. Mark Gil Rizan — PMS/ Trouble Call 1
3. Reymund Olivera — PMS/Trouble Call 2
4. Harley Balanoba — PMS/Trouble Call 2
5. Benidick Buyayo —Area Temp./Inspector

OPERATION HIGHLIGHTS

ROUTINE ACTIVITIES

1.Chiller 2 & 4 Hourly Parameter Monitoring. (See Attached Readings)


2.Parameter Monitoring of Chiller Reading 2 & 4 Every Two-Hours. (See Attached Readings)
3.Temperature Reading at Various Areas. Every 3 Hours. (See Attached Readings)
4. Conduct Preventive Maintenance on VAC Equipment.
5.Attended Service Calls. ( See Table Below)

CHILLERS

Unit Designation Location Status Action Taken Remarks

Operational/
Chiller No. 1 Chiller Plant Re-conditioning Done Operational
Stand-by mode

True-Temp Corp. www.truetempcorp.com


Unit Designation Location Status Action Taken Remarks

Monitoring of parame-
Chiller No. 2 Chiller Plant Operational ters Operational

Chiller No. 3 Chiller Plant Stand-by mode Operational/Stand-by


Fixed Delta P

Monitoring of parame-
Chiller No. 4 Chiller Plant Operational ters Operational

Monitoring of parame-
Chiller No. 5 Chiller Plant Operational ters Operational

Under Repair (Defective Reported to NAIA-T3


Non-
Chiller No. 6 Chiller Plant Compressor). For Fur-
Operational Eng’g Department
ther Troubleshooting

PUMPS

Unit Designation Location Status Action Taken Remarks

Operational (Standby Daily monitoring Under Good Condition


ChWP No.1 Chiller Plant
-Mode)
Operational Daily monitoring Running in Good Condition
ChWP No.2 Chiller Plant
(Running)
Operational (Standby Daily monitoring Under Good Condition
ChWP No.3 Chiller Plant
-Mode)
Operational Daily monitoring Running in Good Condition
ChWP No.4 Chiller Plant
(Running)
Operational Daily monitoring Under Good Condition
ChWP No.5 Chiller Plant
(Running)
Stand-by Mode Daily monitoring Under Good Condition
ChWP No.6 Chiller Plant

Operational (Standby Daily monitoring Under Good Condition


CoWP No.1 Chiller Plant -Mode)
Operational Daily monitoring Running in Good Condition
CoWP No.2 Chiller Plant
(Running)
Operational (Standby Daily monitoring Under Good Condition
CoWP No.3 Chiller Plant -Mode)
Operational Daily monitoring Under Good Condition
CoWP No.4 Chiller Plant
(Running)
Operational Daily monitoring Under troubleshooting
CoWP No.5 Chiller Plant
(Running)
Operational (Standby Daily monitoring Under Good Condition
CoWP No.6 Chiller Plant
-Mode)

True-Temp Corp. www.truetempcorp.com


COOLING TOWERS

Unit Designation Location Status Action Taken Remarks

COOLING Operational Reported to NAIA-T3


Cooling Tower No.1 TOWER AR- (Running)
Eng’g Department

COOLING Operational Note: Applicable for All Cooling Reported to NAIA-T3


Cooling Tower No.2 TOWER AR- (Running) Towers
Eng’g Department

COOLING Operational Replacement of Return Valves, Bal- Reported to NAIA-T3


Cooling Tower No.3 TOWER AR- (Running) ancing Valves, Fillers,
Eng’g Department
EA

COOLING Operational Float Ball-Bronze Type, Automatic Reported to NAIA-T3


Cooling Tower No.4 TOWER AR- (Running) Chemical Feeders, &
Eng’g Department

COOLING Operational Automatic Water Softener Reported to NAIA-T3


Cooling Tower No.5 TOWER AR- (Running)
Eng’g Department

COOLING Not Opera- Under Repair : Worn-out Pillow Reported to NAIA-T3


Cooling Tower No.6 TOWER AR- tional Block Bearings & Mis-alligned Mo-
Eng’g Department
EA tor Pulley

TROUBLESHOOTING

UNIT
LOCA- RE-
DESIGNA- Team ACTION TAKEN STATUS
TION MARKS
TION
Checked & aligned Blower, Evalu-
ated fan blower pillow block bear- Need to
ings condition –Fan Blower Opera- pulldown
AHU 23011 M.R. 2.1.06 TC 1 For Repair
tion unbalanced/wiggling; need to blower assy.
replace motor side and back pillow
block bearings.
Re-set /Start up AHU 23015
and observed the operation-ok
M.R. 2.2.26 (Note: The Units were shut down
AHU 23015,
& TC 1 at the main breaker by the Electri- Operational
AHU 23014 &
cal Dept. for their maintenance
22048 M.R.2.1.24
routine prior to scheduled power
interruption last Nov. 28, 2023)

True-Temp Corp. www.truetempcorp.com


TROUBLESHOOTING
LOCATION Team ACTION TAKEN STATUS REMARKS
UNIT
DESIGNA-
TION
Diagnosed FCUs and
found

FCU 116- Gate 116 TC 2 Error codes 15,1,38 & Operational Done
001,002,004 8– Reset the control
International Depar-
switch button at main
ture
PCB of the outdoor
units–ok
Diagnosed FCU and
found

FCU 114- Gate 114 TC 2 Error code 24.1– Reset Operational Done
001 the control switch but-
International
ton at main PCB of the
Departure
outdoor unit–ok

FCU Dear John TC 1 Rectify Ceiling Water- Corrected Done


11012 Stockroom leak: Syphoned and
unclogged drain line
of the unit

PREPARED BY: CHECKED BY: NOTED BY:

Peter B. Consebido, PME Engr. Rodney Paguio Engr. Romeo Dolores


Project Engineer Mechanical Engineer Head of Engineering Dept. T3

True-Temp Corp. www.truetempcorp.com