DAILY SHIFT REPORT

DATE: November 29, 2023


SHIFT: Night Shift (7:00PM –7:00AM)
MANPOWER
1. Peter Consebido - Project Engineer

Chiller Operators:
1. Elmer Gica
2. Johann Francis Evangelista

HVAC Technicians:
1. Randy Santos — PMS/Trouble Call
2. Reymund Olivera — PMS/Trouble Call
3. Ryan Gatbonton — PMS/Trouble Call
4. Benidick Buyayo —Area Temp./Inspector 1
5. Mark Gil Rizan —Area Temp./Inspector 2

OPERATION HIGHLIGHTS

ROUTINE ACTIVITIES

1.Chiller 2 & 4 Hourly Parameter Monitoring. (See Attached Readings)


2.Parameter Monitoring of Chiller Reading 2 & 4 Every Two-Hours. (See Attached Readings)
3.Temperature Reading at Various Areas. Every 3 Hours. (See Attached Readings)
- Every hour reading was executed from 10:00PM up to 4:00AM.
4. Conduct Preventive Maintenance on VAC Equipment. ( See Table Below)
5.Attended Service Calls. ( See Table Below)

Unit Designation Location Status Action Taken Remarks

Operational/
Chiller No. 1 Chiller Plant Re-conditioning Done Operational
Stand-by mode

True-Temp Corp. www.truetempcorp.com


Unit Designation Location Status Action Taken Remarks

Monitoring of parame-
Chiller No. 2 Chiller Plant Operational ters Operational

Chiller No. 3 Chiller Plant Stand-by mode Operational/Stand-by


Fixed Delta P

Monitoring of parame-
Chiller No. 4 Chiller Plant Operational ters Operational

Monitoring of parame-
Chiller No. 5 Chiller Plant Operational ters Operational

Under Repair (Defective Reported to NAIA-T3


Non-
Chiller No. 6 Chiller Plant Compressor). For Fur-
Operational Eng’g Department
ther Troubleshooting

PUMPS

Unit Designation Location Status Action Taken Remarks

Operational (Standby Daily monitoring Under Good Condition


ChWP No.1 Chiller Plant
-Mode)
Operational Daily monitoring Running in Good Condition
ChWP No.2 Chiller Plant
(Running)
Operational (Standby Daily monitoring Under Good Condition
ChWP No.3 Chiller Plant
-Mode)
Operational Daily monitoring Running in Good Condition
ChWP No.4 Chiller Plant
(Running)
Operational Daily monitoring Under Good Condition
ChWP No.5 Chiller Plant
(Running)
Stand-by Mode Daily monitoring Under Good Condition
ChWP No.6 Chiller Plant

Operational (Standby Daily monitoring Under Good Condition


CoWP No.1 Chiller Plant -Mode)
Operational Daily monitoring Running in Good Condition
CoWP No.2 Chiller Plant
(Running)
Operational (Standby Daily monitoring Under Good Condition
CoWP No.3 Chiller Plant -Mode)
Operational Daily monitoring Under Good Condition
CoWP No.4 Chiller Plant
(Running)
Operational Daily monitoring Under troubleshooting
CoWP No.5 Chiller Plant
(Running)
Operational (Standby Daily monitoring Under Good Condition
CoWP No.6 Chiller Plant
-Mode)

True-Temp Corp. www.truetempcorp.com


COOLING TOWERS

Unit Designation Location Status Action Taken Remarks

COOLING Operational Reported to NAIA-T3


Cooling Tower No.1 TOWER AR- (Running)
Eng’g Department

COOLING Operational Note: Applicable for All Cooling Reported to NAIA-T3


Cooling Tower No.2 TOWER AR- (Running) Towers
Eng’g Department

COOLING Operational Replacement of Return Valves, Bal- Reported to NAIA-T3


Cooling Tower No.3 TOWER AR- (Running) ancing Valves, Fillers,
Eng’g Department
EA

COOLING Operational Float Ball-Bronze Type, Automatic Reported to NAIA-T3


Cooling Tower No.4 TOWER AR- (Running) Chemical Feeders, &
Eng’g Department

COOLING Operational Automatic Water Softener Reported to NAIA-T3


Cooling Tower No.5 TOWER AR- (Running)
Eng’g Department

COOLING Operational Reported to NAIA-T3


Cooling Tower No.6 TOWER AR- (Running)
Eng’g Department

PREVENTIVE MAINTENANCE

UNIT
LOCA- RE-
DESIGNA- Team ACTION TAKEN STATUS
TION MARKS
TION
Bus Gates
Air Curtains
131,132, PMS Checked Air curtain performance Operational Done
(2 Units each
133A,133B and operation. Cleaned Blower and
Gates)
& 134A cover
10 Units total

PMS Checked Air curtain performance Operational Done


Air Curtains
Bus Gate and operation. Cleaned Blower and
1 Units
cover
134B

True-Temp Corp. www.truetempcorp.com


UNIT
DESIGNA- LOCATION Team ACTION TAKEN STATUS REMARKS
TION

11-30-2023 ; 0001H-0300H
Scheduled Power Interruption:
-Shut down Chillers no.2,4 &

Chiller 1,2,4 Mechanical Chiller 5 and all Cooling Towers Done Done
&5 12:01am.
Chiller Operators
Room -Put CT1 and Chiller no.1 in op-
eration (12:05am to
2:31am ,Powered by Gen-set ;
2:35am to 4:40am, powered by
Meralco)
-Put Chillers no. 2,4 & 5 and all
Cooling Towers back to operation
4:45am onwards.

TROUBLESHOOTING

LOCATION Team ACTION TAKEN STATUS REMARKS


UNIT
DESIGNA-
TION
Fan Motor Stuck up:
Checked motor circuit Not opera- For repair
AHU 21010 M.R. 2.2.26 PMS using Megger – tional
shorted, Bearing worn
out. Pulled down mo-
tor assy. for Motor
Coil re-winding.
PREPARED BY: CHECKED BY: NOTED BY:

Peter B. Consebido, PME Engr. Rodney Paguio Engr. Romeo Dolores


Project Engineer Mechanical Engineer Head of Engineering Dept. T3

True-Temp Corp. www.truetempcorp.com