Shift Report - November 29, 2023-2nd Shift
Shift Report - November 29, 2023-2nd Shift
Shift Report - November 29, 2023-2nd Shift
Chiller Operators:
1. Elmer Gica
2. Johann Francis Evangelista
HVAC Technicians:
1. Randy Santos — PMS/Trouble Call
2. Reymund Olivera — PMS/Trouble Call
3. Ryan Gatbonton — PMS/Trouble Call
4. Benidick Buyayo —Area Temp./Inspector 1
5. Mark Gil Rizan —Area Temp./Inspector 2
OPERATION HIGHLIGHTS
ROUTINE ACTIVITIES
Operational/
Chiller No. 1 Chiller Plant Re-conditioning Done Operational
Stand-by mode
Monitoring of parame-
Chiller No. 2 Chiller Plant Operational ters Operational
Monitoring of parame-
Chiller No. 4 Chiller Plant Operational ters Operational
Monitoring of parame-
Chiller No. 5 Chiller Plant Operational ters Operational
PUMPS
PREVENTIVE MAINTENANCE
UNIT
LOCA- RE-
DESIGNA- Team ACTION TAKEN STATUS
TION MARKS
TION
Bus Gates
Air Curtains
131,132, PMS Checked Air curtain performance Operational Done
(2 Units each
133A,133B and operation. Cleaned Blower and
Gates)
& 134A cover
10 Units total
11-30-2023 ; 0001H-0300H
Scheduled Power Interruption:
-Shut down Chillers no.2,4 &
Chiller 1,2,4 Mechanical Chiller 5 and all Cooling Towers Done Done
&5 12:01am.
Chiller Operators
Room -Put CT1 and Chiller no.1 in op-
eration (12:05am to
2:31am ,Powered by Gen-set ;
2:35am to 4:40am, powered by
Meralco)
-Put Chillers no. 2,4 & 5 and all
Cooling Towers back to operation
4:45am onwards.
TROUBLESHOOTING