Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

MULTILANE (Vissim)

AM HCM 2000 HCM 2010 PM HCM 2000 HCM 2010


Vw, Total Density *Vw, Density Vw, Total Density *Vw, Density
V, Total Vol Weaving Vol (pcu/km/l Total (pcu/km/l V, Total Vol Weaving Vol (pcu/km/l Total (pcu/km/l
Year Bound (pcu/hr) (pcu/hr) VR n) LOS Weaving VR n) V/c LOS Year Bound (pcu/hr) (pcu/hr) VR n) LOS Weaving VR n) V/c LOS
W1 (PSI IC) 4 lanes,(EB=305m,WB=285m) Weaving Type: Type C Weaving Type: 2 Sided W1 (PSI IC) 4 lanes,(EB=305m,WB=285m) Weaving Type: Type C Weaving Type: 2 Sided
2030 EB 969 315 0.33 3 A 208 0.21 3 0.16 A 2030 EB 2093 950 0.45 7 A 672 0.32 8 0.38 B
2030 WB 1895 984 0.52 7 A 295 0.16 7 0.31 A 2030 WB 1915 854 0.45 7 A 194 0.10 7 0.31 A
2040 EB 4768 3333 0.70 24 E 207 0.04 18 0.74 C 2040 EB 3832 2324 0.61 17 C 225 0.06 14 0.60 B
2040 WB 4653 3012 0.65 22 D 299 0.06 18 0.73 C 2040 WB 5437 3929 0.72 29 F 322 0.06 22 0.85 D
2050 EB 5686 3738 0.66 29 F 221 0.04 22 0.88 D 2050 EB 3988 2366 0.59 18 C 301 0.08 15 0.63 C
2050 WB 4403 2887 0.66 21 D 211 0.05 17 0.69 C 2050 WB 6355 4295 0.68 34 F 246 0.04 26 0.99 E
2060 EB 6342 4127 0.65 33 F 221 0.03 25 0.98 E 2060 EB 3984 2270 0.57 17 C 326 0.08 15 0.63 C
2060 WB 4289 2862 0.67 20 D 158 0.04 16 0.67 C 2060 WB 5961 3874 0.65 31 F 205 0.03 23 0.93 E
W2 (JKR Flyover) 4 lanes,(EB=300m,WB=400m) Weaving Type: Type A Weaving Type: 1 Sided W2 (JKR Flyover) 4 lanes,(EB=300m,WB=400m) Weaving Type: Type A Weaving Type: 1 Sided
2030 EB 3535 2302 0.65 19 C 0.65 16 0.96 C 2030 EB 3475 2186 0.63 18 C 0.63 15 0.91 C
2030 WB 3035 1548 0.51 13 B 0.51 12 0.65 B 2030 WB 3831 2107 0.55 18 C 0.55 17 0.88 C
2040 EB 5201 1236 0.24 21 D 0.24 23 0.77 E 2040 EB 4256 1046 0.25 16 C 0.25 17 0.63 C
2040 WB 5482 2102 0.38 25 E 0.38 27 0.88 E 2040 WB 6894 2308 0.33 31 F 0.33 38 1.05 F
2050 EB 5735 1562 0.27 24 E 0.27 27 0.86 E 2050 EB 4129 1230 0.30 17 C 0.30 17 0.63 C
2050 WB 5234 1971 0.38 23 E 0.38 25 0.82 E 2050 WB 7405 2678 0.36 35 F 0.36 45 1.14 F
2060 EB 6228 1613 0.26 27 F 0.26 30 0.93 E 2060 EB 4030 1253 0.31 16 C 0.31 17 0.61 C
2060 WB 5077 1507 0.30 20 D 0.30 23 0.76 E 2060 WB 6896 2632 0.38 33 F 0.38 40 1.10 F
W3 (2nd Bridge) 3 lanes,(EB=217m,WB=500m) Weaving Type: Type A Weaving Type: 1 Sided W3 (2nd Bridge) 3 lanes,(EB=217m,WB=500m) Weaving Type: Type A Weaving Type: 1 Sided
BY EB 4210 1971 0.47 34 F 0.47 33 1.01 F BY EB 2260 1124 0.50 16 C 0.50 14 0.55 B
BY WB 2769 1807 0.65 20 C 0.65 18 0.75 C BY WB 3117 1450 0.47 20 C 0.47 20 0.71 D
2030 EB 5209 3277 0.63 50 F 0.63 57 1.40 F 2030 EB 4926 2711 0.55 44 F 0.55 46 1.25 F
2030 WB 5514 3623 0.66 48 F 0.66 68 1.51 F 2030 WB 4260 2149 0.50 30 F 0.50 33 1.00 E
W3 (2nd Bridge) 3 lanes,(EB=217m,WB=130m) Weaving Type: Type A Weaving Type: 1 Sided W3 (2nd Bridge) 3 lanes,(EB=217m,WB=130m) Weaving Type: Type A Weaving Type: 1 Sided
BY WB_v2 2769 1807 0.65 26 F 0.65 19 0.77 C BY WB_v2 3117 1450 0.47 25 F 0.47 22 0.76 D
2030 WB_v2 5514 3623 0.66 60 F 0.66 73 1.55 F 2030 WB_v2 4260 2149 0.50 39 F 0.50 35 1.07 F

*Weaving value difference due to Vrr *Weaving value difference due to Vrr

EXPRESSWAY (Vissim)

AM HCM 2000 HCM 2010 PM HCM 2000 HCM 2010


Vw, Total Density *Vw, Density Vw, Total Density *Vw, Density
V, Total Vol Weaving Vol (pcu/km/l Total (pcu/km/l V, Total Vol Weaving Vol (pcu/km/l Total (pcu/km/l
Year Bound (pcu/hr) (pcu/hr) VR n) LOS Weaving VR n) V/c LOS Year Bound (pcu/hr) (pcu/hr) VR n) LOS Weaving VR n) V/c LOS
W1 (PSI IC) 4 lanes,(EB=305m,WB=285m) Weaving Type: Type C Weaving Type: 2 Sided W1 (PSI IC) 4 lanes,(EB=305m,WB=285m) Weaving Type: Type C Weaving Type: 2 Sided
2030 EB 895 291 0.33 3 A 192 0.21 3 0.13 A 2030 EB 1928 869 0.45 7 B 615 0.32 8 0.30 B
2030 WB 1721 900 0.52 6 B 264 0.15 6 0.25 A 2030 WB 1775 790 0.45 6 B 175 0.10 6 0.25 A
2040 EB 4384 3048 0.70 21 D 198 0.05 16 0.61 C 2040 EB 3574 2170 0.61 16 C 213 0.06 13 0.50 C
2040 WB 4290 2776 0.65 20 D 277 0.06 16 0.60 C 2040 WB 5068 3648 0.72 26 E 305 0.06 20 0.71 D
2050 EB 5280 3442 0.65 26 E 213 0.04 20 0.73 D 2050 EB 3731 2217 0.59 16 C 287 0.08 14 0.52 C
2050 WB 4096 2697 0.66 19 D 195 0.05 15 0.57 C 2050 WB 6004 4046 0.67 32 F 234 0.04 24 0.83 E
2060 EB 5906 3819 0.65 30 F 212 0.04 23 0.81 E 2060 EB 3724 2121 0.57 16 C 310 0.08 14 0.52 C
2060 WB 4031 2705 0.67 19 D 147 0.04 15 0.56 C 2060 WB 5624 3645 0.65 29 F 195 0.03 22 0.78 D
W2 (JKR Flyover) 4 lanes,(EB=300m,WB=400m) Weaving Type: Type A Weaving Type: 1 Sided W2 (JKR Flyover) 4 lanes,(EB=300m,WB=400m) Weaving Type: Type A Weaving Type: 1 Sided
2030 EB 3205 2094 0.65 17 C 0.65 14 0.87 C 2030 EB 3235 2041 0.63 17 C 0.63 14 0.85 C
2030 WB 2823 1473 0.52 12 C 0.52 11 0.61 B 2030 WB 3586 1989 0.55 17 C 0.55 16 0.83 C
2040 EB 4769 1115 0.23 18 D 0.23 20 0.63 D 2040 EB 3972 964 0.24 15 C 0.24 16 0.52 C
2040 WB 5080 1931 0.38 22 E 0.38 24 0.80 E 2040 WB 6430 2142 0.33 29 F 0.33 34 0.89 E
2050 EB 5283 1426 0.27 22 D 0.27 24 0.71 E 2050 EB 3867 1142 0.30 15 C 0.30 16 0.52 C
2050 WB 4892 1819 0.37 21 D 0.37 23 0.76 E 2050 WB 6984 2499 0.36 33 F 0.36 40 1.04 F
2060 EB 5763 1481 0.26 24 E 0.26 27 0.77 E 2060 EB 3768 1165 0.31 15 C 0.31 15 0.51 C
2060 WB 4767 1396 0.29 19 D 0.29 21 0.63 D 2060 WB 6489 2451 0.38 30 F 0.38 36 1.02 F
W3 (2nd Bridge) 3 lanes,(EB=217m,WB=500m) Weaving Type: Type A Weaving Type: 1 Sided W3 (2nd Bridge) 3 lanes,(EB=217m,WB=500m) Weaving Type: Type A Weaving Type: 1 Sided
BY EB 3867 1845 0.48 31 F 0.48 29 0.79 E BY EB 2072 1026 0.50 14 C 0.50 12 0.43 C
BY WB 2556 1681 0.66 18 D 0.66 16 0.70 C BY WB 2911 1360 0.47 18 D 0.47 19 0.57 D
2030 EB 4816 3068 0.64 46 F 0.64 47 1.28 F 2030 EB 4603 2555 0.56 41 F 0.56 41 1.06 F
2030 WB 5224 3428 0.66 44 F 0.66 56 1.43 F 2030 WB 4024 2037 0.51 28 F 0.51 30 0.85 E
W3 (2nd Bridge) 3 lanes,(EB=217m,WB=130m) Weaving Type: Type A Weaving Type: 1 Sided W3 (2nd Bridge) 3 lanes,(EB=217m,WB=130m) Weaving Type: Type A Weaving Type: 1 Sided
BY WB_v2 2556 1681 0.66 23 E 0.66 17 0.70 C BY WB_v2 2911 1360 0.47 23 E 0.47 20 0.60 D
2030 WB_v2 5224 3428 0.66 56 F 0.66 61 1.43 F 2030 WB_v2 4024 2037 0.51 36 F 0.51 32 0.85 E

*Weaving value difference due to Vrr *Weaving value difference due to Vrr

TGM (Vissim)

AM HCM 2000 HCM 2010 PM HCM 2000 HCM 2010


Vw, Total Density *Vw, Density Vw, Total Density *Vw, Density
V, Total Vol Weaving Vol (pcu/km/l Total (pcu/km/l V, Total Vol Weaving Vol (pcu/km/l Total (pcu/km/l
Year Bound (pcu/hr) (pcu/hr) VR n) LOS Weaving VR n) V/c LOS Year Bound (pcu/hr) (pcu/hr) VR n) LOS Weaving VR n) V/c LOS
W1 (PSI IC) 4 lanes,(EB=305m,WB=285m) Weaving Type: Type C Weaving Type: 2 Sided W1 (PSI IC) 4 lanes,(EB=305m,WB=285m) Weaving Type: Type C Weaving Type: 2 Sided
2030 EB 828 269 0.32 3 A 176 0.21 3 0.12 A 2030 EB 1783 773 0.43 6 B 542 0.30 7 0.28 B
2030 WB 1558 837 0.54 6 A 225 0.14 5 0.23 A 2030 WB 1657 730 0.44 6 A 150 0.09 6 0.23 A
2040 EB 4006 2737 0.68 19 D 187 0.05 15 0.55 C 2040 EB 3501 2114 0.60 15 C 199 0.06 13 0.49 C
2040 WB 4063 2651 0.65 19 D 251 0.06 15 0.57 C 2040 WB 4798 3436 0.72 24 E 287 0.06 19 0.67 D
2050 EB 4878 3113 0.64 23 E 202 0.04 18 0.67 D 2050 EB 3674 2173 0.59 16 C 270 0.07 14 0.51 C
2050 WB 3999 2680 0.67 19 D 178 0.04 15 0.55 C 2050 WB 5779 3880 0.67 30 F 218 0.04 23 0.80 E
2060 EB 5527 3527 0.64 28 F 200 0.04 21 0.76 D 2060 EB 3710 2120 0.57 16 C 289 0.08 14 0.52 C
2060 WB 4080 2793 0.68 19 D 137 0.03 15 0.56 C 2060 WB 5424 3513 0.65 27 F 183 0.03 21 0.75 D
W2 (JKR Flyover) 4 lanes,(EB=300m,WB=400m) Weaving Type: Type A Weaving Type: 1 Sided W2 (JKR Flyover) 4 lanes,(EB=300m,WB=400m) Weaving Type: Type A Weaving Type: 1 Sided
2030 EB 2796 1823 0.65 14 C 0.65 12 0.76 B 2030 EB 3048 1909 0.63 16 C 0.63 13 0.80 C
2030 WB 2621 1388 0.53 11 B 0.53 10 0.58 B 2030 WB 3360 1868 0.56 16 C 0.56 14 0.78 C
2040 EB 4334 957 0.22 16 C 0.22 18 0.57 D 2040 EB 3896 898 0.23 14 C 0.23 15 0.51 C
2040 WB 4805 1729 0.36 20 D 0.36 22 0.72 E 2040 WB 6058 1956 0.32 26 E 0.32 30 0.82 E
2050 EB 4829 1251 0.26 19 D 0.26 21 0.64 D 2050 EB 3832 1081 0.28 15 C 0.28 16 0.51 C
2050 WB 4744 1630 0.34 20 D 0.34 21 0.68 D 2050 WB 6691 2298 0.34 30 F 0.34 36 0.96 E
2060 EB 5349 1313 0.25 22 D 0.25 24 0.71 E 2060 EB 3785 1108 0.29 15 C 0.29 15 0.51 C
2060 WB 4749 1268 0.27 18 D 0.27 20 0.62 D 2060 WB 6243 2264 0.36 28 F 0.36 33 0.94 E
W3 (2nd Bridge) 3 lanes,(EB=217m,WB=500m) Weaving Type: Type A Weaving Type: 1 Sided W3 (2nd Bridge) 3 lanes,(EB=217m,WB=500m) Weaving Type: Type A Weaving Type: 1 Sided
BY EB 3410 1681 0.49 26 E 0.49 24 0.71 E BY EB 1878 913 0.49 12 C 0.49 11 0.39 B
BY WB 2282 1515 0.66 16 C 0.66 14 0.63 C BY WB 2692 1271 0.47 17 C 0.47 17 0.53 C
2030 EB 4340 2810 0.65 41 F 0.65 38 1.17 F 2030 EB 4338 2449 0.56 38 F 0.56 36 1.02 F
2030 WB 4928 3211 0.65 41 F 0.65 48 1.34 F 2030 WB 3833 1951 0.51 26 E 0.51 28 0.81 E
W3 (2nd Bridge) 3 lanes,(EB=217m,WB=130m) Weaving Type: Type A Weaving Type: 1 Sided W3 (2nd Bridge) 3 lanes,(EB=217m,WB=130m) Weaving Type: Type A Weaving Type: 1 Sided
BY WB_v2 2282 1515 0.66 20 D 0.66 15 0.63 C BY WB_v2 2692 1271 0.47 21 D 0.47 18 0.56 D
2030 WB_v2 4928 3211 0.65 52 F 0.65 52 1.34 F 2030 WB_v2 3833 1951 0.51 34 F 0.51 30 0.81 E

*Weaving value difference due to Vrr *Weaving value difference due to Vrr

Weaving Summary TP_(VISSIM) DS / Sum_All 17/4/2023 8:43 AM

You might also like