16 DECEMBER 2023 MPT Report Metro Rail
Tested Area. MPT has been done in 100% Accessible area of the welding area.
Observation MPT has been carried out on high important area of the job weld surface then no any linear or nonlinear
relevant type indication observed on weld surface.
Remarks So as per STD job was MPT Found satisfactory- Accepted As per attached Annexure-I
Tested By Mr. Vishnu Prajapati NDT LEVEL II (UT, RT, MT, PT)
For
NDT INSPECTION SERVICES
MAGNETIC PARTICLE EXAMINATION REPORT
ANNEXURE-I
Job Details
Sr.no PART NAME MATERIAL INSPECTED QTY OK
QTY
01 JOB NAME: - SAGMNET LIFTER REAR BEAM M.S 85 NOS 85 NOS