PT.

SARI DUMAI SEJATI


DEPT. MAINTENANCE Bill Of Quantity
BOQ Install PRCV to Reduce MPs To LPs Oleo Plant

No Material Specification Uom Quantity Material By Price (Material) Labour Total Total Price
1 Spiral Wound Gasket DNlOO PN40 Pcs 2 SDO Rp 750.000 Rp 300.000 Rp 1.050.000 Rp 2.100.000
2 Flange SO RF DN100/4" CS PN 40 Pcs 2 SDO Rp 1.550.000 Rp 750.000 Rp 2.300.000 Rp 4.600.000
3 Bolt and Nut 3/4 x4 " Pcs 100 SDO Rp 35.000 Rp 15.000 Rp 50.000 Rp 5.000.000
4 Pipe4", CS. Sch 40 lgt 3 SDO Rp 250.000 Rp 100.000 Rp 350.000 Rp 1.050.000
5 Elbow4 inch, CS sch 40 EA 9 SDO Rp 175.000 Rp 25.000 Rp 200.000 Rp 1.800.000
6 Globe Valve, 4 Inch PN 40, Carbon Steel, Buttweld Connection. EA 4 SDO Rp 1.250.000 Rp 150.000 Rp 1.400.000 Rp 5.600.000
7 U-Channel Strucktur MS 150x50x50x 6 Mter Pcs 3 SDO Rp 150.000 Rp 50.000 Rp 200.000 Rp 600.000
8 Isolasi Rockwall 2 inch Meter 3 Contractor Rp 281.850 Rp 74.250 Rp 356.100 Rp 1.068.300
9 lsolasl Aluminium 12 inch Meter 3 Contractor Rp 301.500 Rp 136.500 Rp 438.000 Rp 1.314.000
10 lolasi Aluminium elbow 12" Pcs 2 Contractor Rp 301.500 Rp 136.500 Rp 438.000 Rp 876.000
11 Plate Floor/Checkered plate 5mmx 4'x8' Pcs 2 SDO Rp 150.000 Rp 45.000 Rp 195.000 Rp 390.000
12 U-Channel Strucktur MS 100x50x50x 6 Mter Pcs 3 SDO Rp 250.000 Rp 125.000 Rp 375.000 Rp 1.125.000
13 Angle Sructur 50 x50x 5 mm x 6 meter Pcs 2 SDO Rp 175.000 Rp 75.000 Rp 250.000 Rp 500.000
14 Pipe Glv 1.5 inch x 6 M lgt 3 SDO Rp 301.500 Rp 136.500 Rp 438.000 Rp 1.314.000
15 Pipe SS 304 size 1/2 inch sch 10 Lgt 3 SDO Rp 301.500 Rp 56.700 Rp 358.200 Rp 1.074.600
16 Elbow SS 304 size 1/2 inch sch 10 Pcs 4 SDO Rp 750.000 Rp 25.000 Rp 775.000 Rp 3.100.000
17 Ball Viv 5S304 size 1/2 inch, screwed Pcs 2 SDO Rp 1.250.000 Rp 78.000 Rp 1.328.000 Rp 2.656.000
18 Nipple pipe SS304, Double Size 1/2 inch Pcs 4 SDO Rp 575.000 Rp 75.000 Rp 650.000 Rp 2.600.000
19 Globe control valve DNlOO PN40, Splrax Sarco type KE43PTP1USS.2 Kv80 Unit 1 SDO Rp 1.250.000 Rp 150.000 Rp 1.400.000 Rp 1.400.000

20 Tools and Consumable lot 1 Contractor


21 Mobilization lot 1 Contractor Rp 48.250.000 Rp 48.250.000 Rp 48.250.000
Total Rp 86.417.900
PT. SARI DUMAI SEJATI
DEPT. MAINTENANCE Bill Of Quantity
BOQ Fabrication line feed from T02 Cluster 81 to feed HPS Line

No Material Specification Uom Quantity Material By Price (Material) Labour Total Total Price
1 Pipe 3 Inch Material SS304 Sch 10 Seamless. lgt 20 SDO Rp 90.000 Rp 25.000 Rp 115.000 Rp 2.300.000
2 Elbow - Pipe, 3 Inch Material SS304 Sch 10 Seamless. EA 30 SDO Rp 650.000 Rp 35.000 Rp 685.000 Rp 20.550.000
3 Wafer Disc Check Valve, 3 inch, Material SS304. EA 1 SDO Rp 300.000 Rp 50.000 Rp 350.000 Rp 350.000
4 Flange 3 inch, SORF, Material SS304, ANSI Class 150 EA 14 SDO Rp 750.000 Rp 75.000 Rp 825.000 Rp 11.550.000
5 Bolt/Nut, Size 5/8 x 3 inch, Full Thread EA 250 SDO Rp 25.000 Rp 10.000 Rp 35.000 Rp 8.750.000
6 Ball Valve, Size 3 Inch, 2 Pcs Body Connection flange, SS304, Flange ANSl150, PTFE Seat EA 6 SDO Rp 650.000 Rp 35.000 Rp 685.000 Rp 4.110.000
7 Tube Brass, 3/8" Roll 30 SDO Rp 45.000 Rp 25.000 Rp 70.000 Rp 2.100.000
8 Union, Connector tube, Brass 3/8 Inch. EA 200 SDO Rp 45.000 Rp 25.000 Rp 70.000 Rp 14.000.000
9 Tee, Connector brass, 3/8 inch EA 100 SDO Rp 250.000 Rp 40.000 Rp 290.000 Rp 29.000.000
10 Ball valve, size 1 inch, 3 pc body, SS316, Weld. EA 5 SDO Rp 75.000 Rp 50.000 Rp 125.000 Rp 625.000
11 Pipe 1 Inch Material SS304 Sch 10 Seamless. lgt 4 SDO Rp 250.000 Rp 45.000 Rp 295.000 Rp 1.180.000
12 Elbow Pipe 1 Inch Material SS304 Sch 10 Seamless. EA 10 SDO Rp 200.000 Rp 50.000 Rp 250.000 Rp 2.500.000
13 Ball Valve, Size 4 Inch, 2 Pcs Body Connection flange, SS304, Flange ANSI15O, PTFE Seat EA 1 SDO Rp 750.000 Rp 75.000 Rp 825.000 Rp 825.000
14 Flange 4 inch, SORF, Material SS304, ANSI Class 150 EA 4 SDO Rp 1.250.000 Rp 250.000 Rp 1.500.000 Rp 6.000.000
15 Ball valve, size 1/2 inch, 3 pc body, SS316, Thread Connection EA 6 SDO Rp 250.000 Rp 75.000 Rp 325.000 Rp 1.950.000
16 Ball Valve, Size 2 Inch, 2 Pcs Body Connection flange, SS304, Flange ANSl150, PTFE Seat EA 8 SDO Rp 300.000 Rp 75.000 Rp 375.000 Rp 3.000.000
17 Flange 2 inch, SORF, Material SS304, ANSI Class 150 EA 16 SDO Rp 375.000 Rp 125.000 Rp 500.000 Rp 8.000.000
18 Pipe Insulation (50mm Thk, Rockwool 100kg/m3, alumunium sheet cover 0.8mm thk) Lot 1 SDO Rp 450.000 Rp 150.000 Rp 600.000 Rp 600.000
19 Presure gauge 0-10 Bar, 1/2 inch, complete with syphone and valve EA 2 Contractor Rp 3.300.000 Rp 1.300.000 Rp 4.600.000 Rp 9.200.000
20 Pipe 4 Inch Material 5S304 Sch 10 Seamless. EA 1 SDO Rp 3.300.000 Rp 1.300.000 Rp 4.600.000 Rp 4.600.000
21 Blind Flange 4 inch, SORF, Material S$304, ANSI Class 150 EA 2 SDO Rp 1.250.000 Rp 175.000 Rp 1.425.000 Rp 2.850.000
22 Filter Bag. Unit 1 SDO Rp 3.500.000 Rp 1.500.000 Rp 5.000.000 Rp 5.000.000
23 Mobilization Lot 1 Contractor Rp 25.000.000 Rp 1.000.000 Rp 26.000.000 Rp 26.000.000
24 Tools and Consumable (Electr ode, Travo welding, Drill Hand & etc) Lot 1 Contractor Rp 35.000.000 Rp 2.500.000 Rp 37.500.000 Rp 37.500.000
Total Rp 202.540.000
PT. SARI DUMAI SEJATI
DEPT. MAINTENANCE Bill Of Quantity
Fabrication Guardhouse at Tank farm Refenery and Cluster 80/81
\

No Material Specification Uom Quantity Material By Price (Material) Labour Total Total Price
1 Angie Structure, MS, 50x50x 6 Meter Lgt 40 SDO Rp 750.000 Rp 150.000 Rp 900.000 Rp 36.000.000
2 U-Channel Strucure, MS, 100x50x6 Meter. Lgt 24 SDO Rp 550.000 Rp 125.000 Rp 675.000 Rp 16.200.000
3 Plat Floor, Checkered, MS, 5 mm x4"x8" Sheet 18 SDO Rp 650.000 Rp 150.000 Rp 800.000 Rp 14.400.000
4 Plate Metal, Mild Steel, 2 mm x4"x8" Sheet 48 SDO Rp 785.000 Rp 175.000 Rp 960.000 Rp 46.080.000
5 Seng, 0.9 x 1.8M, warna Green RAL 6019 Sheet 72 SDO Rp 575.000 Rp 125.000 Rp 700.000 Rp 50.400.000
6 Ra bung seng, 40 cm x2Meter, warna Green RAL 6019 Sheet 14 SDO Rp 500.000 Rp 125.000 Rp 625.000 Rp 8.750.000
7 Painting luar dan dalam lot 1 Contractor Rp 3.800.000 Rp 1.670.000 Rp 5.470.000 Rp 5.470.000
8 Engsel Pintu/Jendela Lot 1 Contrator Rp 1.800.000 Rp 1.320.000 Rp 3.120.000 Rp 3.120.000
9 Tools and Consumable lot 1 Contractor Rp 15.000.000 Rp 7.500.000 Rp 22.500.000 Rp 22.500.000
10 Mobilization lot 1 Contractor Rp 48.250.000 Rp 48.250.000 Rp 48.250.000
Total Rp 251.170.000