DJ 302 O en SCO 00 0006 - Basement MEP Coordination Part 2

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

4

KEY PLAN
M
5 100 mmø CHWS PRESSURE VESSEL 4 AUTOMATIC DOSING SYSTEM 3
(B.O.P. =1855) PRESSURIZATION UNIT 100 DIA CHWPR 110 mmø VP 50 mmx50 mm Power Trunking
BOP+740 B.O.T. : +3645mm OPENING 3000X3000mm
150x100 FAD 20 mmø CHWS
100 mmø CHWR
ENERGY TRANSFER STATION PUMP ROOM(ETS) -01
(B.O.P. =1855)
200x500 SAD GF SSL K
OFFICE
250x150 SAD
L8 47030
3000
HEX-2 20 mmø CWS
CHWP-S1 100x100 FAD 150x1400 SAD
150 mmø CHWR HANGAR
(B.O.P. =3216) L8 150x150 EAD
L8 L8
L8

N
CDP, T/B 450 mmx50 mm Power 25 mmø CDP
150 mmø CHWS 100 mmø CHWR
25ø SRP L8 B.O.T. : +3475mm
(B.O.P. =2035) A
(B.O.P. =3216) (B.O.P. =3920) 20 mmø CHWS 200x700 SAD
ENERGY TRANSFER STATION PUMP ROOM(ETS) -02 13 01
(B.O.P. =3858) QIBLA
150 mmø CHWS 100 mmø CHWS
FCU-B 20 mmø CHWR CHWP-S2
(B.O.P. =3216) (B.O.P. =306) BOU+3448 (B.O.P. =3996) GENERAL NOTES
150 mmø CHWR HEX-1 150 mmø CHWS

3930

3385
3685

3100
3645

2940

3060
3055

3835

2920
3080

2795

3715
3735

3025
3725

3350
(B.O.P. =3215)

BOU+3450
(B.O.P. =3136) 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED

FCU-B
25ø SRP 150 mmø CHWR OTHERWSE
CDP, T/B (B.O.P. =3920) (B.O.P. =3136) 6 SMDB-UPS 2. ALL LEVELS ARE IN METERS
3. DO NOT SCALE THE DRAWING. FOLLOW WRITTEN
25 mmø CDP DJ-302-O-EN-SCO-00-0006 DIMENSIONS ONLY
125 mmø CHWR
(B.O.P. =3415) 4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL
(B.O.P. =3700) JOCKY PUMP-01
150 mmø CHWS OTHER RELATED DRAWINGS
(B.O.P. =3795) 5. LEVEL ±0.00 BULDING LEVEL IS CORRESPONDING TO +47.360

1245
25ø SRP
(B.O.P. =3920) LOBBY NADD.
150 mmø CHWR 100x100mm EAD 150 mmø CHWS
(B.O.P. =3795) L8 L8 BOD+3398 L8 L8 (B.O.P. =3687) L8 UPS ROOM
150 mmø CHWS BF SSL
(B.O.P. =3136)
42560
CHWP-S2
AIR SEPARATOR MEP COLOR CODE
40ø SRP 32 mmø CHWS
(B.O.P. =3561) (B.O.P. =3638)

T
100x100mm EAD
BOD+3450
100x100mm FAD
T
50 mmx50 mm Power Trunking
B.O.T. : +3645mm Section-5 SOIL PIPE

150 mmø CHWR


BOD+3710 50ø SRP
(B.O.P. =3555) 5 1 : 50
5 4
(B.O.P. =2782) M
VENT PIPE
GF SSL
25ø SRP 110 mmø VP 200ø DRP
UNINTERRUPTIBLE POWER SUPPLY ROOM(UPS) 450 mmx50 mm Power
L8 100x100mm FAD B.O.T. : +3475mm 47030
BOD+3710 L8 L FCU-B WASTE PIPE
150x150mm EAD 250x150mm SAD
M BOD+3409 150ø WRP
BOD+3375
L8 100x100mm FAD
L8 L8 200ø SRP
BOD+3740 FCU-4
BOU+3080
WATER SUPPLY
3000X3000mm OPENING FCU-6
BOU+3058 450 mmx50 mm POWER 100x50mm GI TRUNKING
150 mmø CHWS
500x200mm SAD FOR LIGHTING GI TRUNKING FOR LIGHTING &
SMALL POWER RUN AT H/L (TYPICAL) 50ø WRP
BOD+3100
M M B.O.T. : +3475mm 100 mmø CDP
225 mmx50 mm Power ELEC. RM. STORM WATER
B.O.T. : +3745mm

2150
5

4300

2795
4050

3650
500x200mm SAD DJ-302-O-EN-SCO-00-0006
BOD+3100 FIRE FIGHTING
450 mmx50 mm Power 150x150mm SEAD 900 mmx125 mm Power BLADDER TANK
B.O.T. : +3745mm BOD+4015 B.O.T. : +2938mm

3385

3045
2785
1550

1550
2075

2185
2985

3200
3390
3495
BLADDER TANK GRP TANK
FRESH AIR DUCT
600 mmx50 mm Power
B.O.T. : +3535mm M T L8 750x200mm SAD FOAM ROOM
4
BOD+3099

400
DJ-302-O-EN-SCO-00-0006 BF SSL

325

325
T EXHAUST AIR DUCT

BOU+3297
FCU-4

FCU-2
BOU+3000

400x300mm RAD 42560


BOD+3050
SUPPLY AIR DUCT
900 mmx125 mm Power Ladder Layer-1
B.O.T. : +3738mm

150 mmx50 mm Power 32 mmø CHWR


900 mmx125 mm Power Ladder Layer-2
B.O.T. : +3578mm Section-3
M
M

750 mmx50 mm Power B.O.T. : +3745mm RETURN AIR DUCT


B.O.T. : +3535mm 1400x150mm SAD
BOD+3125 2
T (B.O.P. =2991)
32ø WRP
K
3 1 : 50
(B.O.P. =3658) 4 4
DJ-302-O-EN-SCO-00-0006 40 mmø CHWS
(B.O.P. =3240) 32 mmø CHWS
(B.O.P. =2991) ST-02(L) 65 mmø CWS 100x100 FAD 25ø SRP 100x200 FAD
600x200mm RAD GF SSL CABLE TRAY
BOD+3100 32 mmø CDP GF SSL FILLING LINE 100x150 EAD 250x200 SEAD 250x150 SAD
L8 L8 M (B.O.P. =2929) 110 mmø VP 47030
150ø BIP T 25ø SRP 47030

300
600x200mm RAD
(B.O.P. =3571) BOD+3100 (B.O.P. =4400) 20 mmø CWS LIGHT
900 mmx50 mm Power Ladder Layer-2 65 mmø CWS
100x100mm EAD B.O.T. : +3575mm (B.O.P. =-548) 300x400 RAD 65ø SRP
BOD+3883 900 mmx50 mm Power Ladder Layer-1 FCU-2
300 mmx50 mm POWER 100x50mm GI TRUNKING
150 mmx50 mm Power B.O.T. : +3415mm
20 mmø CWS FOR LIGHTING GI TRUNKING FOR LIGHTING &
B.O.T. : +3745mm 25ø SRP FCU-4 32 mmø CHWR
(B.O.P. =3947) SMALL POWER RUN AT H/L (TYPICAL)
(B.O.P. =3568) B.O.T. : +3725mm
M 150 mmø CHWS REVISION
WATER BOOSTER PUMPSET
(1DUTY & 1STAND BY)
CONTROL ROOM 200x150mm EAD DUTY: 2L/s @ 4bar.
BOD+3859 FCU-B
L8 L8

4000
BOU+3450

3645
65 mmø CWS
(B.O.P. =-437)

4220
3050

3725
3735

2780

2990
3030

3295
3930

3350

3915

3320
3995
3715

3825

3010
3800
3000
3645

3570

3795
3550
3355

3785

3415
3575

2990
3725

2780
150 mmø CHWR 00 REVISED AS PER COMMENTS 17-07-2023 AFK BAK MSA

2950
3425
3240
(B.O.P. =2782) L8 L8 REV DESCRIPTION DATE DRW CHK APP
500ø WRP 25ø SRP 225 mmx50 mm Power 110 mmø VP 100 mmx50 mm Power
(B.O.P. =300) (B.O.P. =4040) B.O.T. : +3725mm (B.O.P. =-745) CLIENT
B.O.T. : +3725mm
20 mmø CWS T PUMP ROOM
LOBBY
(B.O.P. =4235) LOBBY
110 mmø
(B.O.P. =3745) FOAM ROOM 300x150mm FAD
110 mmø
65 mmø CWS
(B.O.P. =-447) BF SSL BF SSL HKVK AVAIATION DWC-LLC
BOD+4040
(B.O.P. =3386) 200x200mm SMAD
BOD+3750 42560 42560
L8 L8 500ø WRP
(B.O.P. =-1764)
L8 L8 CONSULTANT :
200ø SRP 65 mmø CWS
(B.O.P. =3385) (B.O.P. =-447)
Section-2 Section-4 arkiplan
50ø WRP
(B.O.P. =3043)
40 mmø CWS
(B.O.P. =-4056)
40 mmø CWS
(B.O.P. =-4056) 2 1 : 50 4 1 : 50 consulting architects & engineers
110 mmø WP p.o. box. 96763, dubai, uae
BLADDER 110 mmø WP
(B.O.P. =4005) (B.O.P. =3022) 5 4 3 tel. 04 397 3553 . fax. 04 397 3552 . arkiplan@eim.ae
TANK 200X200 SMAD, F/A
200ø DRP 250X200 SEAD, T/A
450 mmx50 mm Power CONSULTANT :
(B.O.P. =3385) 150 mmø CHWS 150 mmø CHWS 25ø SRP 25ø SRP B.O.T. : +3475mm GF SSL
300X150 FAD, F/A
200ø DRP 150 mmø CHWR 150 mmø CHWR 150 mmø CHWR 25ø SRP
(B.O.P. =3385)
T 47030
200X150 EAD, T/A
L8 L8
ø150 WRP T/A DOMESTIC WATERTANKS
3 480 525 480 150 mmø CHWS
ø200 DRP T/A FCU-B FCU-B
DJ-302-O-EN-SCO-00-0006
ø200 DRP T/A
MAIN CONTRACTOR:
ø200 DRP T/A 25 mmø CDP
1085
ø200 SRP T/A
J
200ø SRP 150 mmø WP 200ø DRP 200ø DRP GRP TANK HEX-1
(B.O.P. =3385) (B.O.P. =-627) (B.O.P. =3385) (B.O.P. =3385)

3275

3935
3450

3940

3135
3475
3450
PROJECT DESCRIPTION:
4220

THREE PHASE ISOLATOR


3215

2040

BASEMENT MEP COORDINATION LAYOUT PART-2 AIRCRAFT HANGAR & OFFICE BUILDING
1
3940
2025

CHWP-S2
ON PLOT NO. AC-C39 AT
1 : 50 DUBAI SOUTH -DUBAI

1250
ENERGY TRANSFER STATION PUMP ROOM(ETS) -02
ENERGY TRANSFER STATION PUMP ROOM(ETS) -01
50 mmø WP DRAWING TITLE:
BF SSL
305

200

42560 BASEMENT MEP COORDINATION


LAYOUT PART-2
GRATING 1000 x 300mm WIDTH GRATING 1000X300mm WIDTH
CPG CPG
AMANA DWG. NO: REV.:
DJ-302-O-EN-SCO-00-0006
Section-6 CLIENT DWG. NO:
00

6 1 : 50 CAD REF. SCALE-As indicated SHEET A1

You might also like