KEY PLAN
M
5 100 mmø CHWS PRESSURE VESSEL 4 AUTOMATIC DOSING SYSTEM 3
(B.O.P. =1855) PRESSURIZATION UNIT 100 DIA CHWPR 110 mmø VP 50 mmx50 mm Power Trunking
BOP+740 B.O.T. : +3645mm OPENING 3000X3000mm
150x100 FAD 20 mmø CHWS
100 mmø CHWR
ENERGY TRANSFER STATION PUMP ROOM(ETS) -01
(B.O.P. =1855)
200x500 SAD GF SSL K
OFFICE
250x150 SAD
L8 47030
3000
HEX-2 20 mmø CWS
CHWP-S1 100x100 FAD 150x1400 SAD
150 mmø CHWR HANGAR
(B.O.P. =3216) L8 150x150 EAD
L8 L8
L8
N
CDP, T/B 450 mmx50 mm Power 25 mmø CDP
150 mmø CHWS 100 mmø CHWR
25ø SRP L8 B.O.T. : +3475mm
(B.O.P. =2035) A
(B.O.P. =3216) (B.O.P. =3920) 20 mmø CHWS 200x700 SAD
ENERGY TRANSFER STATION PUMP ROOM(ETS) -02 13 01
(B.O.P. =3858) QIBLA
150 mmø CHWS 100 mmø CHWS
FCU-B 20 mmø CHWR CHWP-S2
(B.O.P. =3216) (B.O.P. =306) BOU+3448 (B.O.P. =3996) GENERAL NOTES
150 mmø CHWR HEX-1 150 mmø CHWS
3930
3385
3685
3100
3645
2940
3060
3055
3835
2920
3080
2795
3715
3735
3025
3725
3350
(B.O.P. =3215)
BOU+3450
(B.O.P. =3136) 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED
FCU-B
25ø SRP 150 mmø CHWR OTHERWSE
CDP, T/B (B.O.P. =3920) (B.O.P. =3136) 6 SMDB-UPS 2. ALL LEVELS ARE IN METERS
3. DO NOT SCALE THE DRAWING. FOLLOW WRITTEN
25 mmø CDP DJ-302-O-EN-SCO-00-0006 DIMENSIONS ONLY
125 mmø CHWR
(B.O.P. =3415) 4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL
(B.O.P. =3700) JOCKY PUMP-01
150 mmø CHWS OTHER RELATED DRAWINGS
(B.O.P. =3795) 5. LEVEL ±0.00 BULDING LEVEL IS CORRESPONDING TO +47.360
1245
25ø SRP
(B.O.P. =3920) LOBBY NADD.
150 mmø CHWR 100x100mm EAD 150 mmø CHWS
(B.O.P. =3795) L8 L8 BOD+3398 L8 L8 (B.O.P. =3687) L8 UPS ROOM
150 mmø CHWS BF SSL
(B.O.P. =3136)
42560
CHWP-S2
AIR SEPARATOR MEP COLOR CODE
40ø SRP 32 mmø CHWS
(B.O.P. =3561) (B.O.P. =3638)
T
100x100mm EAD
BOD+3450
100x100mm FAD
T
50 mmx50 mm Power Trunking
B.O.T. : +3645mm Section-5 SOIL PIPE
2150
5
4300
2795
4050
3650
500x200mm SAD DJ-302-O-EN-SCO-00-0006
BOD+3100 FIRE FIGHTING
450 mmx50 mm Power 150x150mm SEAD 900 mmx125 mm Power BLADDER TANK
B.O.T. : +3745mm BOD+4015 B.O.T. : +2938mm
3385
3045
2785
1550
1550
2075
2185
2985
3200
3390
3495
BLADDER TANK GRP TANK
FRESH AIR DUCT
600 mmx50 mm Power
B.O.T. : +3535mm M T L8 750x200mm SAD FOAM ROOM
4
BOD+3099
400
DJ-302-O-EN-SCO-00-0006 BF SSL
325
325
T EXHAUST AIR DUCT
BOU+3297
FCU-4
FCU-2
BOU+3000
300
600x200mm RAD
(B.O.P. =3571) BOD+3100 (B.O.P. =4400) 20 mmø CWS LIGHT
900 mmx50 mm Power Ladder Layer-2 65 mmø CWS
100x100mm EAD B.O.T. : +3575mm (B.O.P. =-548) 300x400 RAD 65ø SRP
BOD+3883 900 mmx50 mm Power Ladder Layer-1 FCU-2
300 mmx50 mm POWER 100x50mm GI TRUNKING
150 mmx50 mm Power B.O.T. : +3415mm
20 mmø CWS FOR LIGHTING GI TRUNKING FOR LIGHTING &
B.O.T. : +3745mm 25ø SRP FCU-4 32 mmø CHWR
(B.O.P. =3947) SMALL POWER RUN AT H/L (TYPICAL)
(B.O.P. =3568) B.O.T. : +3725mm
M 150 mmø CHWS REVISION
WATER BOOSTER PUMPSET
(1DUTY & 1STAND BY)
CONTROL ROOM 200x150mm EAD DUTY: 2L/s @ 4bar.
BOD+3859 FCU-B
L8 L8
4000
BOU+3450
3645
65 mmø CWS
(B.O.P. =-437)
4220
3050
3725
3735
2780
2990
3030
3295
3930
3350
3915
3320
3995
3715
3825
3010
3800
3000
3645
3570
3795
3550
3355
3785
3415
3575
2990
3725
2780
150 mmø CHWR 00 REVISED AS PER COMMENTS 17-07-2023 AFK BAK MSA
2950
3425
3240
(B.O.P. =2782) L8 L8 REV DESCRIPTION DATE DRW CHK APP
500ø WRP 25ø SRP 225 mmx50 mm Power 110 mmø VP 100 mmx50 mm Power
(B.O.P. =300) (B.O.P. =4040) B.O.T. : +3725mm (B.O.P. =-745) CLIENT
B.O.T. : +3725mm
20 mmø CWS T PUMP ROOM
LOBBY
(B.O.P. =4235) LOBBY
110 mmø
(B.O.P. =3745) FOAM ROOM 300x150mm FAD
110 mmø
65 mmø CWS
(B.O.P. =-447) BF SSL BF SSL HKVK AVAIATION DWC-LLC
BOD+4040
(B.O.P. =3386) 200x200mm SMAD
BOD+3750 42560 42560
L8 L8 500ø WRP
(B.O.P. =-1764)
L8 L8 CONSULTANT :
200ø SRP 65 mmø CWS
(B.O.P. =3385) (B.O.P. =-447)
Section-2 Section-4 arkiplan
50ø WRP
(B.O.P. =3043)
40 mmø CWS
(B.O.P. =-4056)
40 mmø CWS
(B.O.P. =-4056) 2 1 : 50 4 1 : 50 consulting architects & engineers
110 mmø WP p.o. box. 96763, dubai, uae
BLADDER 110 mmø WP
(B.O.P. =4005) (B.O.P. =3022) 5 4 3 tel. 04 397 3553 . fax. 04 397 3552 . arkiplan@eim.ae
TANK 200X200 SMAD, F/A
200ø DRP 250X200 SEAD, T/A
450 mmx50 mm Power CONSULTANT :
(B.O.P. =3385) 150 mmø CHWS 150 mmø CHWS 25ø SRP 25ø SRP B.O.T. : +3475mm GF SSL
300X150 FAD, F/A
200ø DRP 150 mmø CHWR 150 mmø CHWR 150 mmø CHWR 25ø SRP
(B.O.P. =3385)
T 47030
200X150 EAD, T/A
L8 L8
ø150 WRP T/A DOMESTIC WATERTANKS
3 480 525 480 150 mmø CHWS
ø200 DRP T/A FCU-B FCU-B
DJ-302-O-EN-SCO-00-0006
ø200 DRP T/A
MAIN CONTRACTOR:
ø200 DRP T/A 25 mmø CDP
1085
ø200 SRP T/A
J
200ø SRP 150 mmø WP 200ø DRP 200ø DRP GRP TANK HEX-1
(B.O.P. =3385) (B.O.P. =-627) (B.O.P. =3385) (B.O.P. =3385)
3275
3935
3450
3940
3135
3475
3450
PROJECT DESCRIPTION:
4220
2040
BASEMENT MEP COORDINATION LAYOUT PART-2 AIRCRAFT HANGAR & OFFICE BUILDING
1
3940
2025
CHWP-S2
ON PLOT NO. AC-C39 AT
1 : 50 DUBAI SOUTH -DUBAI
1250
ENERGY TRANSFER STATION PUMP ROOM(ETS) -02
ENERGY TRANSFER STATION PUMP ROOM(ETS) -01
50 mmø WP DRAWING TITLE:
BF SSL
305
200