Numeros Generadores
OBRA
UBICACIÓN
REALIZO
CONTRATO
LOCALIZACION DIMENSIONES
CONCEPTO
EJE TRAMO TIPO LARGO
LIMPIEZA
1-3 A-D 4.3
TRAZO Y NIVELACIÓN
A 1-3 4.3
B 1-3 4.3
C 1-3 4.3
D 1-3 4.3
1 A-D
2 A-D
3 A-D
EXCAVACIÓN
A 1-3 4.3
B 1-3 4.3
C 1-3 4.3
D 1-3 4.3
1 A-B 1.43
1 B-C 0.48
1 C-D 1.91
2 A-B 1.43
2 B-C 0.48
3 A-B 1.43
3 B-C 0.48
3 C-D 1.91
CIMENTACION CONCRETO
ZAPATA
SOLADO DE CONCRETO SIMPLE CORRIDA
A 1-3 4.3
B 1-3 4.3
C 1-3 4.3
D 1-3 4.3
1 A-B 1.43
1 B-C 0.48
1 C-D 1.91
2 A-B 1.43
2 B-C 0.48
3 A-B 1.43
3 B-C 0.48
3 C-D 1.91
ZAPATA
A 1-3 4.3
B 1-3 4.3
C 1-3 4.3
D 1-3 4.3
1 A-B 1.43
1 B-C 0.48
1 C-D 1.91
2 A-B 1.43
2 B-C 0.48
3 A-B 1.43
3 B-C 0.48
3 C-D 1.91
CONTRATRABE
A 1-3 4.3
B 1-3 4.3
C 1-3 4.3
D 1-3 4.3
1 A-B 1.43
1 B-C 0.48
1 C-D 1.91
2 A-B 1.43
2 B-C 0.48
3 A-B 1.43
3 B-C 0.48
3 C-D 1.91
ACARREO
A-B 1-2 1.8
A-C 2-3 2.5
B-C 1-2 1.8
C-D 1-3 4.3
RELLENO
A 1-3 4.3
B 1-3 4.3
C 1-3 4.3
D 1-3 4.3
1 A-B 1.43
1 B-C 0.48
1 C-D 1.91
2 A-B 1.43
2 B-C 0.48
3 A-B 1.43
3 B-C 0.48
3 C-D 1.91
castillos A 1-2 0.15
A 2-3 0.15
B 1-2 0.15
C 2-3 0.15
D 1-3 0.15
cadena
A 1-2 1.5
A 2-3 2.2
B 1-2 1.5
C 2-3 2.2
D 1-3 4
1 A-B 1.83
1 B-D 3.49
2 A-B 1.83
2 B-C 0.88
3 A-C 3.01
3 C-D 2.31
RADORES
FECHA
HOJA
DIMENSIONES RESULTADOS
PZA UNIDAD
ANCHO ALTO PARCIAL TOTAL
4.3 ml
4.3 ml
4.3 ml
4.3 ml
5.9 5.9 ml
5.9 5.9 ml
5.9 5.9 ml
0.15 0.225 ML
0.15 0.33 ML
0.15 0.225 ML
0.15 0.33 ML
0.15 0.6 ML
0.15 0.2745 ML
0.15 0.5235 ML
0.15 0.2745 ML
0.15 0.132 ML
0.15 0.4515 ML
0.15 0.3465 ML