WA08

You might also like

Download as pdf
Download as pdf
You are on page 1of 1
RE-PAD CUT FROM PARENT PIPE SUPPLED ON PING 'SOMETRC. cre) RE-PAD CUT ALONG. LENGTH AND WELDED AFTER FORUNG Pe Size | “1 = LENeTH OF RE-PAD ¥ x0 +" “30 0 ° 0 10" 0 2 0 i. 50 6 0 1s x0 ~ x0 a ‘00 we 00 (SEE TABLE PPE SE BASED WAST. AFTER: FABRCATION AND ‘Testne. ‘SUPPORT STANOAROS\GUPP. OnG\WB-WarB030-02-20-00 WS) SaiBoL STATON: Ta-WaoS—L PPE SZ Notes: 4. Smm WELD FOR PAD THICKNESS UPTO 7mm. & Gmim WELD FOR PAD THICKNESS &men ‘ib 806 2. WELD MUST NOT PENETRATE PIE. 3. FOR GENERAL NOTES REFER TO DOCUMENT No. W3—WaF—80S0~02-24-00-0006. lever NOW MOS, SwGOL LLUSTRATON: wadS—TE-L PPE Se Sen ————_| me ~~ RE=PAD HORIZONTAL OR VERTICAL (CUT FROM PIPE) 6” TO 30” ‘STANDARD. SUPPORT WAO3 (SHT 1 OF 1) ‘CONTRACT Nor 154260 PRM SCALE (M4) = NTS. 0 [R/eajompernonn FoR Comm NR] AS_[ ST Bi_[ie/io/o7ssuen FoR be ‘ew | pr |_KH ev | ATE REVSION RN | CHR | APP | APP RENSION an | Cae | AE | aE nationalgrid |wersoso CUENT CONTRAGT No NATIONAL GRID GRAIN LNG wuiTED | DRAWING Ne: GRAIN” EXPANSION PROJECT | 99-001-058. oO | 5 3 i i

You might also like