DAILY WORK MANAGEMENT(MIPL)

PARTS NAME SLEEVE(A55 (YOKE-


RESPONSIBILIT YOKE(A7149 YOKE(A7105 YOKE(50422 YOKE(A8740 YOKE(A1161 YOKE(A0720
S.NO 65-867-XP- K23H)A9046
Y -579-00) -582-00) -341-00) -400-00) -473-00) -679-00)
DOCUMENT GO) -402-XP-A0

TARGET DATE
Skill Matrix Monitoring
1 Mrs. Kamna done
sheet

2 Monthly Training Plan Mrs. Kamna done


partially
Customer/In house done(In
complaint Register house
3 Mr. Kuldeep
&Customer complaint complaint
update on board. register
pending
4 OK & NG Sample Mr. Kuldeep

5 In-Process Report Mr. Javed

6 Operation Standard Mr. Javed done

7 Poka Yoke Monitoring Sheet Mr. Anil done

8 Work Instruction Mr. Javed done


Partially
done(In
Calibration house
9 Mr. Javed/Anil
Gauge/Instrument complaint
register
10 Tool History Card Mr. Ashok pending)
done

11 Machine History Card Mr. Ashok done

12 Incoming Inspection Report Mr. Javed

Incoming Inspection
13 Mr. Javed done
Standard

14 RM 3rd Party Testing Plan Mr. Sanjeev done

15 Lux Level Monitoring Sheet Mr. Ashok done

16 Bin Cleaning Plan Mrs. Kamna

17 Packing Standard Mr. Anil done

18 SPC,MSA PLAN Mr. Javed

19 SPC,MSA REPORT Mr. Javed done

20 Final Inspection Std. Mr. Kuldeep done

Pre-Dispatch Inspection
21 Mr. Kuldeep
Report

22 4M Change Mr. Ashok done

23 Rework Register Mr. Javed

24 Rework Inspection Report Mr. Javed

Customer complaint C'


25 Mr. Kuldeep
Measures

In-House Complaint C'


26 Mr. Javed
Measures

All defects will be displayed


in colored and clear vision
27 Mr. Kuldeep done
with severity as per
customer end.
Precise inspection will be
used and inspection
method for ID will revise
Mr. Kuldeep &
28 from air gauge to CMM. done
Anil
Control plan and inspection
operation standard will be
updated.

Yoke ID 13+0.018mm will


be implemented to check at
29 the time of setup in the Mr. Javed done
daily inspection check
sheet.

Process setup approval


method through CMM will
30 be revised to n=4 height in Mr. Javed & Anil done
ID 13.0mm and start
inspection at 5.0mm height.

Conveyer system in shop


31 ……
floor

gauge
Gauge for Yoke height available for
32 Mr. Kuldeep
checking height 58.0 +
0.1 checking.

Monthly data of air gauge


33 master ID value will be Mr. Kuldeep will shared
recording started.

Yoke ID 13mm air gauge


inspection will be
implemented at height Air gauge not
34 2.5mm(n=3)points.Control Mr. Kuldeep available for
plan and inspection that height
operation standard to be
updated.

Plating thickness will be


checked at n=3 points and
35 recording will be done.RM Mr. Kuldeep done
inspection standard and
control plan to be updated.

Tool and Die to be verified


and specific location
36 Mr. Kuldeep done
allocate to indicate during
preventive maintenance.

Tool and punch life to be


added in control plan and tool & Punch
37 will make matrix sheet for Mr. Ashok life added in
monitoring tool & die cp
history card.

All RM grade in incoming


38 inspection standard will be Mr. Javed done
verified and corrected.

Setup approval and scrap


records of part to be
39 Mr. Javed will shared
shared once in a week to
customer.

Mr.
Improvement plan will
40 Anil/Javed/Kuld
made and to be shared.
eep
At visual inspection stage
41 lux level to be verified and Mr. Kuldeep light found ok
lighting increased.

Bin cleaning plan to be


42 made and will follow as per ……
plan.