© Det Norske Veritas. All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, including pho-
tocopying and recording, without the prior written consent of Det Norske Veritas.
If any person suffers loss or damage which is proved to have been caused by any negligent act or omission of Det Norske Veritas, then Det Norske Veritas shall pay compensation to such person
for his proved direct loss or damage. However, the compensation shall not exceed an amount equal to ten times the fee charged for the service in question, provided that the maximum compen-
sation shall never exceed USD 2 million.
In this provision "Det Norske Veritas" shall mean the Foundation Det Norske Veritas as well as all its subsidiaries, directors, officers, employees, agents and any other acting on behalf of Det
Norske Veritas.
DNV Offshore Codes, January 2003
Contents – Page 3
CONTENTS
Sec. 1 Current DNV Offshore Codes ............................. 5 DNV-OS-E101: Drilling Plant, October 2000................................. 11
DNV-OS-E201: Hydrocarbon Production Plant, October 2000...... 11
Sec. 2 Offshore Service Specifications ........................... 7
DNV-OS-E301: Position Mooring, June 2001................................ 11
DNV-OSS-101: Rules for Classification of Offshore Drilling and DNV-OS-E401: Helicopter Decks, March 2001 ............................. 12
Support Units, April 2002 ................................................................. 7
DNV-OS-F101: Submarine Pipeline Systems, 2000....................... 12
DNV-OSS-102: Rules for Classification of Floating Production and
Storage Units, April 2002 .................................................................. 7 DNV-OS-F201: Dynamic Risers, 2001........................................... 18
DNV-OSS-103: Rules for Classification of LNG/LPG Floating
Production and Storage Units or Installations, May 2001 ................. 7 Sec. 4 Recommended Practices .................................... 19
DNV-OSS-121: Classification based on Performance Criteria DNV-RP-A201: Standard Documentation Types, November 2000 19
Determined from Risk Assessment Methodology, May 2001........... 7 DNV-RP-A202: Documentation of Offshore Projects,
DNV-OSS-202: Verification for Compliance with UK Shelf January 2001 .................................................................................... 19
Regulations, March 2001................................................................... 7 DNV-RP-A203: Qualification Procedures for New Technology,
DNV-OSS-301: Certification and Verification of Pipelines, September 2001 ............................................................................... 19
October 2000...................................................................................... 7 DNV-RP-B401: Cathodic Protection Design, 1993 ........................ 19
DNV-OSS-303: Risk Based Verification, April 2001....................... 7 DNV-RP-C102: Structural Design of Offshore Ships,
February 2002.................................................................................. 19
Sec. 3 Offshore Standards............................................... 8
DNV-RP-C103: Column Stabilised Units, October 2001 ............... 19
DNV-OS-A101: Safety Principles and Arrangement, January 2001 8 DNV-RP-C201: Buckling Strength of Plated Structures,
DNV-OS-B101: Metallic Materials, January 2001 ........................... 8 October 2002 ................................................................................... 19
DNV-OS-C101: Design of Offshore Steel Structures, General (LRFD DNV-RP-C202: Buckling Strength of Shells, October 2002 .......... 19
method), October 2000 ...................................................................... 8
DNV-RP-C203: Fatigue Strength Analysis of Offshore Steel
DNV-OS-C102: Structural Design of Offshore Ships, Structures, October 2001 ................................................................. 19
October 2000...................................................................................... 8
DNV-RP-E301: Design and Installation of Fluke Anchors
DNV-OS-C103: Structural Design of Column Stabilised Units in Clay, 2000.................................................................................... 19
(LRFD method), October 2000.......................................................... 9
DNV-RP-E302: Design and Installation of Plate Anchors in Clay,
DNV-OS-C104: Structural Design of Self-elevating Units (LRFD December 2002 ................................................................................ 19
method), January 2001....................................................................... 9
DNV-RP-E305: Onbottom Stability Design of
DNV-OS-C105: Structural Design of TLPs (LRFD method), Submarine Pipelines, 1988 .............................................................. 19
January 2001 ...................................................................................... 9
DNV-RP-F101: Corroded Pipelines, 1999 ...................................... 20
DNV-OS-C106: Structural Design of Deep Draught Floating Units
(LRFD method), January 2001 .......................................................... 9 DNV-RP-F104: Mechanical Pipeline Couplings, 1999................... 20
DNV-OS-C201: Structural Design of Offshore Units (WSD method), DNV-RP-F105: Free Spanning Pipelines, March 2002 .................. 20
April 2002 .......................................................................................... 9 DNV-RP-F106: Factory Applied External Pipeline Coatings for
DNV-OS-C301: Stability and Watertight Integrity, January 2001.... 9 Corrosion Control, 2000 .................................................................. 20
DNV-OS-C401: Fabrication and Testing of Offshore Structures, DNV-RP-F107: Risk Assessment of Pipeline Protection,
January 2001 ...................................................................................... 9 March 2001...................................................................................... 20
DNV-OS-D101: Marine and Machinery Systems and Equipment, DNV-RP-F201: Design of Titanium Risers, October 2002............. 20
January 2001 .................................................................................... 10 DNV-RP-G101: Risk Based Inspection of Offshore Topsides Static
DNV-OS-D201: Electrical Installations, March 2001..................... 10 Mechanical Equipment, January 2002............................................. 20
DNV-OS-D202: Instrumentation and Telecommunication Systems, DNV-RP-O401: Safety and Reliability of Subsea Systems,
October 2000.................................................................................... 10 April 1985........................................................................................ 20
DNV-OS-D301: Fire Protection, January 2001............................... 10 DNV-RP-O501: Erosive Wear in Piping Systems, 1999 ................ 20
SECTION 1
CURRENT DNV OFFSHORE CODES
SECTION 2
OFFSHORE SERVICE SPECIFICATIONS
DNV-OSS-101: Rules for Classification of Offshore Drill- DNV-OSS-121: Classification based on Performance Cri-
ing and Support Units, April 2002 teria Determined from Risk Assessment Methodology,
May 2001
Currently no Amendments and Corrections
Currently no Amendments and Corrections
DNV-OSS-103: Rules for Classification of LNG/LPG DNV-OSS-301: Certification and Verification of Pipelines,
Floating Production and Storage Units or Installations, October 2000
May 2001 Currently no Amendments and Corrections
Sec.2 Page 7
In item E201 2) the references F200, F300 and F400 should be
corrected to DNV-OS-D301 Sec.7 F200, DNV-OS-D301 Sec.7 DNV-OSS-303: Risk Based Verification, April 2001
F300 and DNV-OS-D301 Sec.7 F200, respectively. Currently no Amendments and Corrections
SECTION 3
OFFSHORE STANDARDS
DNV-OS-A101: Safety Principles and Arrangement, Janu- Table D3 Thickness limitations(mm) of structural steels for dif-
ferent structural categories and design temperatures (ºC)
ary 2001
Structural Grade ≥ 10 0 -10 -20
Sec.4 Page 14 Category
Item B302 is corrected to read: A 30 30 25 20
B/BW 60 60 50 40
302 The number and release rate of primary grade sources D/DW 150 150 100 80
shall be minimised as far as practicable. Location of a primary E/EW 150 150 150 150
grade source within an enclosed area shall as far as practicable AH/AHW 50 50 40 30
be avoided. DH/DHW 100 100 80 60
Secondary
Sec.4 Page 15 EH/EHW 150 150 150 150
FH 150 150 150 150
A new item C104 is introduced: AEH 60 60 50 40
DEH/DEHW 150 150 100 80
104 For definition of Grade of release, reference is made to EEH/EEHW 150 150 150 150
IP 15. FEH 150 150 150 150
Sec.4 Page 15 A 30 20 10 N.A.
In Table C1 zone references shall be deleted from ‘Grade of B/BW 40 30 25 20
D/DW 60 60 50 40
release’ column. E/EW 150 150 100 80
Sec.5 Page 18 AH/AHW 25 25 20 15
Primary DH/DHW 50 50 40 30
Item A405 is corrected to read: EH/EHW 100 100 80 60
405 The ESD central control unit shall be powered from a FH 150 150 150 150
monitored Uninterruptible Power Supply (UPS) capable of at AEH 30 30 25 20
least 30 minutes continuous operation on loss of its electrical DEH/DEHW 60 60 50 40
EEH/EEHW 150 150 100 80
power supply systems. The UPS shall be powered from both FEH 150 150 150 150
the main and the emergency power system.
D/DW 35 30 25 20
Sec.8 Page 28 and 29 E/EW 60 60 50 40
Item C501 is deleted. AH/AHW 10 10 N.A. N.A.
DH/DHW 25 25 20 15
Special EH/EHW 50 50 40 30
FH 100 100 80 60
DNV-OS-B101: Metallic Materials, January 2001 AEH 15 15 10 N.A.
DEH/DEHW 30 30 25 20
Currently no Amendments and Corrections EEH/EEHW 60 60 50 40
FEH 150 150 100 80
N.A. = no application
DNV-OS-C101: Design of Offshore Steel Structures, Gen-
eral (LRFD method), October 2000
Sec.4 Page 21 DNV-OS-C102: Structural Design of Offshore Ships,
Table D3 should be expanded with a column for temperatures October 2000
greater or equal to 10°C and A grade for primary structures as Ch.1 Sec.2 Page 9
follows:
The items in A200 should be replaced by the following:
201 According to DNV-OS-C101 material shall be catego-
rised into a special, primary or secondary category. With ref-
erence to the application of material classes as given in the
Rules for Classification of Ships Pt.3 Ch.1 or Pt.3 Ch.2 the re-
lationship between the material classes and structural catego-
ries is as given in Table A1.
L Load effect
DNV-OS-E401: Helicopter Decks, March 2001 PWHT Post weld heat treatment
Currently no Amendments and Corrections RT Radiographic testing
ST Surface testing
ToFD Time of flight detection
DNV-OS-F101: Submarine Pipeline Systems, 2000 UT Ultrasonic testing
Spine Sec.5 Page 33
Replace spine with: In item D102 under Accidental Limit State add:
DNV-OS-F101 Submarine Pipeline Systems, 2000 — ultimate limit state due to infrequent loading.
Page iv, Acknowledgement
Sec.5 Page 34
Add:
Add the following Guidance note to item D204:
British Steel
Niras Guidance note:
Røntgen Technische Dienst bv For the system pressure test condition, the local test pressure is
Seaflex considered as incidental pressure. In order to calculate the corre-
Shaw Pipeline Services Ltd. sponding pld, included in ∆pd above, the local test pressure shall
be calculated as:
Replace item D510 as follows: surface imperfections can be detected by visual inspection.
510 Propagation buckling cannot be initiated unless local Sec.6 Page 63
buckling has occurred. In case the external pressure exceeds Replace part of Table 6-11 as follows:
the criteria given below, buckle arrestors should be installed
and spacing determined based on consequences of failure. The
Metallographic Pipe body Q(&P9) Q&P Q&P
propagating buckle criterion reads: examination Weldment Q Q&P Q&P
Add footnote:
t 2 2.5
p pr = 35f y α fab § ----· HFW, EBW and LBW pipes, only.
© D¹
Sec.6 Page 64
In item E1003 replace the unit m with mm.
p pr Sec.6 Page 65
p e ≤ -------------
γ m γ sc Replace part of item E1011 as follows:
Sec.5 Page 41 1011 Repair welding of the weld seam is allowed for SAWL
and SAWH pipes only and shall be performed in accordance
Add the following to Table 5-10: with qualified welding repair procedures. Requirements for
welding repair procedures are given in Appendix C. Repair
10-2 - 10-3 To be evaluated on a case by case basis welding may only be performed subject to the following limi-
tations:
Sec.5 Page 41
Sec.6 Page 66
In item E302 correct the reference DNV Guideline No. 14 to
DNV-RP-F105. Replace part of item E1205 as follows:
Sec.5 Page 43 1205 The out-of-roundness for pipe ends shall be calculated
Replace item G101 as follows: by the following formula:
101 All supporting structures shall be designed according to Sec.6 Page 67
Offshore Standard DNV-OS-C101, "Design of Steel Struc- Replace part of Table 6-14 as follows:
tures".
Sec.6 Page 47 Greatest difference in pipe diameter
between pipe ends (each pipe meas- R 2) 12.5% t
Replace item A404 as follows: ured)
404 Linepipe formed from strip (skelp) and welded with one Sec.6 Page 68
longitudinal seam, without the use of filler metal. The longitu-
dinal seam is generated by high frequency current (minimum Replace parts of Table 6-15 as follows:
100 kHz) applied by induction or conduction. The weld area
(heat affected area) or the entire pipe shall be heat treated. The Greatest difference in pipe 10% 10% t, but maximum 3 mm
forming may be followed by cold expansion to obtain the re- diameter between pipe ends
quired dimensions. (each pipe measured)
Sec.6 Page 48 Diameter pipe body 10% ± 0.75% D 1), but maximum
Replace item C104 as follows: 310 < D 1) < 610 mm ± 3.0 mm
104 If materials shall be used at a design temperature above Sec.7 Page 71
50°C, the yield strength at the Tmax may be determined during
the qualification of the manufacturing procedure specification. Replace Table 7-2 as follows:
This information shall be obtained either by use of the curves
in Sec.5 B600 or by testing. Table 7-2 Bolts and nuts for subsea use
Bolt Nut Size range
Sec.6 Page 51
ASTM A320, ASTM A194, Grade 4/S3 (Low- < 50 mm
Replace (footnote reference) in Table 6-3 as follows: Grade L7 temperature requirement for
Grade 4 and Grade 7 nuts)
Charpy V-notch ASTM A320, ASTM A194, Grade 7 < 100 mm
energy (KVT) Grade L43
minimum J 6)
Sec.7 Page 74
Sec.6 Page 53
Replace item D203 as follows:
Replace item C515 as follows:
203 The chemical composition, taken from the product anal-
515 The hardness of base material, cladding material, HAZ, ysis, of material for hot-formed components, castings and
weld metal and the metallurgical bonding area shall meet the forgings, shall not exceed the values given in Table 7-4. The
relevant requirements of this standard (see Table 6-3 and 6-6). notes given in Table 7-5 shall apply, except Note 9 and Note
Sec.6 Page 59 10.
Replace item E504 as follows: Replace item D205 as follows:
504 Plates and strip shall be subject to 100% visual examina- 205 For material to be quenched and tempered, the content
tion on both sides. The inspection shall be performed in a suf- of hardening elements Cr, Mo, Cu and Ni shall be sufficient to
ficiently illuminated area (approximately 500 lx) by trained obtain the desired microstructure in the centre of the compo-
personnel with sufficient visual acuity (e.g. Jaegar J-w eye- nent. The selected chemical composition shall have adequate
sight test at 300 mm within the last 12 months). The surface hardenability to ensure through thickness hardening of the re-
finish produced by the manufacturing process, shall ensure that spective component.
Sec.7 Page 79 — Base material in the start transition area outer radius lon-
gitudinal and transverse (total 2 sets) unless 903 is appli-
Replace item G107 as follows: cable.
107 Mother pipe in C-Mn steels shall be delivered in the nor-
malised, quenched and tempered or TMCP condition. Sec.7 Page 84
Sec.7 Page 80 Replace in item G906 as follows:
Replace item G301 as follows: Tensile testing:
301 In general all the requirements given in Sec.6 D100 shall — Cross weld tensile testing in the arc area (one specimen)
apply. The chemical composition of pipe for bends shall com- — Cross weld tensile testing in the start transition area (one
ply with Table 6-7 and Table 6-8 as relevant. specimen) unless 903 is applicable
Sec.7 Page 81 Charpy V-notch impact testing:
Replace item G401 as follows: — Weld metal, FL, FL + 2 mm and FL + 5 mm in the arc (4
401 In situations where dedicated mother pipes are not avail- sets)
able for manufacturing of bends, the factors given in G100 and — Weld metal in the start transition area (1 set) unless 903 is
G200, especially G108, should be considered in order to select applicable.
the most appropriate pipe for bend manufacturing.
Sec.8 Page 92
Sec.7 Page 83
Replace existing F204 with the following:
Replace in item G905 as follows:
204 The concrete coating shall be reinforced by steel bars
Tensile testing: welded to cages or by wire mesh steel. The following recom-
mendations apply: For welded cages, the spacing between cir-
— Base material in the arc outer radius longitudinal and cumferential bars should be maximum 120 mm. Steel bars
transverse (total 2 specimens) should have a diameter of 6 mm minimum. The average cross
— Base material in the start transition area outer radius lon- sectional area of steel reinforcement in the circumferential di-
gitudinal and transverse (total 2 specimens) unless 903 is rection should be minimum 0.5% of the longitudinal concrete
applicable. cross section. The corresponding cross sectional area of steel
reinforcement in the longitudinal direction should be minimum
Charpy V-notch impact testing: 0.08% of the transverse concrete cross section.
— Base material in the arc outer radius longitudinal and Sec.12 Page 127
transverse (total 2 sets) Replace Table 12-1 as follows:
Appendix D Page 193 inspection channel does not represent more than 2 mm of cir-
In item I301 replace N5 notches with N3 (3% of thickness) cumferential weld distance.
notches
Appendix E Page 196
DNV-OS-F201: Dynamic Risers, 2001
Replace item B408 as follows:
Sec.5 Page 33
408 The recording or marking system shall clearly indicate
the location of imperfections relative to the 12 o'clock position In item D604 an absolute value operator is missing for the mo-
of the weld, with a ± 1% accuracy. The system resolution shall ment value, M in the formula (5.29).
be such that each segment of recorded data from an individual
SECTION 4
RECOMMENDED PRACTICES
Sec.3 Page 56
DNV-RP-A201: Standard Documentation Types, Novem-
ber 2000 Under Code 371.1, change all entries in columns: 'Ship', 'Col-
umn-stab.' and 'Self-elevating' from: 1A1 (NSP) to: MODU.
Currently no Amendments and Corrections
Under Code 371.2, change all entries in columns: 'Ship', 'Col-
umn-stab.' and 'Self-elevating' from: 1A1, OI to: MODU.
DNV-RP-A202: Documentation of Offshore Projects, Jan- Under Code 371.2, change all entries in columns: 'Tension-
uary 2001 leg’ and 'Deep-draught' from: OI to: MODU.
Sec.1 Page 6 Sec.3 Page 57
Insert in Table 1-1, between LIFT and NSP: Under Code 372.5, change all entries in columns: 'Ship', 'Col-
umn-stab.' and 'Self-elevating' from: 1A1 (NSP) to: MODU.
MODU 1989 MODU Code as amended 1991
Sec.3 Page 69
Sec.2 Page 7 Under Code 388.1, change all entries in columns: 'Ship', 'Col-
In Table 2-1, item 26, change first word in text to: Openings umn-stab.' and 'Self-elevating' from: 1A1, OI to: MODU.
Sec.2 Page 10 Under Code 388.1, change all entries in columns: 'Tension-
leg’ and 'Deep-draught' from: OI to: MODU.
Insert new headline between headlines 70 and 701:
Under Code 388.2, change all entries in columns: 'Ship', 'Col-
700 Drilling general umn-stab.' and 'Self-elevating' from: 1A1, OI to: MODU.
Sec.3 Page 53 Under Code 388.2, change all entries in columns: 'Tension-
Under headline 362.0 Bilge general, item Z090: leg’ and 'Deep-draught' from: OI to: MODU.
Change contents of third column from: Y, FI to: Y, R, FI Sec.3 Page 75
Sec.3 Page 54 Insert new headline between headlines 70 and 701:
Under headline 363.0 Ballast general, item Z090: 700 Drilling general
Change contents of third column from: Y, FI to: Y, R, FI Insert under the headline 700 Drilling general:
Z030 Local arrangement plan - Drilling area Y DRU DRU DRU DRU DRU
Under Code 701, change all entries in columns: 'Ship', 'Col-
umn-stab.' and 'Self-elevating' from: 1A1, OI to: DRU. DNV-RP-C202: Buckling Strength of Shells, October 2002
Under Code 701, change all entries in columns: 'Tension-leg’ Currently no Amendments and Corrections
and 'Deep-draught' from: OI to: DRU.
Under Code 703, change all entries in columns: 'Ship', 'Col-
umn-stab.' and 'Self-elevating' from: 1A1, OI to: DRU. DNV-RP-C203: Fatigue Strength Analysis of Offshore
Steel Structures, October 2001
Under Code 703, change all entries in columns: 'Tension-leg’
and 'Deep-draught' from: OI to: DRU. Inside cover
Under the first item under CHANGES, add:
See Section 2.6, 2.8.7 and 2.12.
DNV-RP-A203: Qualification Procedures for New Tech-
nology, September 2001 Sec.2.2 Page 7
Currently no Amendments and Corrections In Fig 2.2-1, replace K with SCF.
Sec.2.6 Page 14
In Fig 2.6-2, replace K, the unit of the axis of ordinate, with
DNV-RP-B401: Cathodic Protection Design, 1993 SCF.
Currently no Amendments and Corrections
DNV-RP-C201: Buckling Strength of Plated Structures, DNV-RP-E305: Onbottom Stability Design of Submarine
October 2002 Pipelines, 1988
Currently no Amendments and Corrections Currently no Amendments and Corrections
DNV-RP-F101: Corroded Pipelines, 1999 DNV-RP-F201: Design of Titanium Risers, October 2002
Currently no Amendments and Corrections Sec.5 Page 12
The equations in D305 Guidance note should read:
DNV-RP-F104: Mechanical Pipeline Couplings, 1999 ∆f y, temp = 1.44 MPa/°C 20°C < T < 140°C
Currently no Amendments and Corrections ∆f y, temp = 0.97 MPa/°C 140°C < T < 200°C
∆f u, temp = 1.24 MPa/°C 20°C < T < 140°C
∆f u, temp = 0.83 MPa/°C 140°C < T < 200°C
DNV-RP-F105: Free Spanning Pipelines, March 2002 The definitions for β in D308 should read:
Currently no Amendments and Corrections
§1 ·
F Coll_Riser = F Hit_Platform x ¨ ---
©4
¦ P j¸
¹
DNV-RP-O401: Safety and Reliability of Subsea Systems,
j = Riser_i April 1985
(The righthand factors are to be multiplied rather than added.) Currently no Amendments and Corrections