Report Gantry
Report Gantry
Owner Name:
Default NOC 43 43 43
NOC Without Conditions 2
NOC With Conditions 10
Conditions to Issue NOC
Objection
In Progress 12 12
12/18/23 8:44
AM
For Action
Abu Dhabi Airports ADAC ANS FP For Action
Company Supervisor
A) NOC with No
Conditions
12/11/23 1:16
PM
Abu Dhabi For Action
Distribution ADDC Assets FP For Action
Company B) NOC with
Conditions
12/12/23 8:48
AM
For Action
Municipality of Abu For Action
ADM Al Wathba FP
Dhabi City
B) NOC with
Conditions
11/30/23 9:12
AM
Abu Dhabi National For Action
Oil Company ADNOC HQ FP For Action
(ADNOC) A) NOC with No
Conditions
12/19/23 2:19
PM
Emirates Integrated For Action
Telecommunication Du Telecom FP For Action
Company - Du B) NOC with
Conditions
12/1/23 10:57
Emirates AM
For Action
Telecommunication Etisalat Telecom For Action
Corporation - FP - Abu Dhabi
Etisalat B) NOC with
Conditions
11/28/23 12:43
PM
UAE Armed Forces GHQ Military For Action
General Works and For Action
Headquarters Telecom FP B) NOC with
Conditions
11/30/23 10:46
AM
For Action
Integrated Transport ITC Right-of-Way For Action
Centre FP - AD
B) NOC with
Conditions
11/29/23 11:55
AM
For Action
Monitoring and MCC Monitor and For Action
Control Center Control FP
B) NOC with
Conditions
11/30/23 11:33
Abu Dhabi AM
For Action
Sustainable Water SWS Sewerage For Action
Solution Company AD FP
(SWS) B) NOC with
Conditions
12/5/23 11:51
AM
The Center of Waste For Action
Management - Abu Tadweer FP For Action
Dhabi B) NOC with
Conditions
12/2/23 6:49
PM
Abu Dhabi Transco For Action
Transmission and Infrastructure For Action
Despatch Company Services FP B) NOC with
Conditions
For
General Directorate AD Police Vehicle For Consideration Consideration
of Abu Dhabi Police Rental FP
Default NOC
Default NOC
Default NOC
Attachments
ADM Infrastructure
Review and authorize Requester Authorized By
Jaafar Habeeb Al Hashemi 21 - 11 - 2023 15:52:24 Projects
request Requesting Entity
Representative
ADM TP Infrastructure
Review request and
Lana Abdulla Ahmed Bin Kuwair Claim 28 - 11 - 2023 11:34:32 Permitting Eng -
perform further analysis
Utilities - Area2
Initiating NOC
ADM TP Infrastructure
Review request and Transaction by the
Lana Abdulla Ahmed Bin Kuwair 28 - 11 - 2023 11:34:42 Permitting Eng -
perform further analysis Permitting Body Project
Utilities - Area2
Representative
Organization Information
Department
Entity Name
Emirates National Oil Company ( Contact person
Organization Contact
Contact
Comments
Contractor Information
License Number /
AD-All osool.alroyah Initiate request and Administrative (1) - Emirates ID Copy 21 - 11 - 2023
define data General
AD-All osool.alroyah Initiate request and Administrative (1) - Power of Attorney 21 - 11 - 2023
define data General
AD-All osool.alroyah Initiate request and Administrative (1) - Letter of Award or 21 - 11 - 2023
define data General Appointment
AD-All osool.alroyah Initiate request and Spatial Inputs / Affection Plan 21 - 11 - 2023
define data Drawings
AD-All osool.alroyah Initiate request and Spatial Inputs / Location Plan or 21 - 11 - 2023
define data Drawings Map
AD-All osool.alroyah Initiate request and Spatial Inputs / Location Plan or 21 - 11 - 2023
define data Drawings Map
Transaction Nature
New Project
Construction Phase
Permit Sub type
Gantry for Support of Signs and Cameras Phase 1
Expedited
Muncipality Name District Name Community Name Road Name Plot Number
Project Information
Project Name
1706 PROPOSED ENOC FILLING STATION
Project Description
01 - 08 - 2023 31 - 05 - 2024
Transaction Data
SWS
SWS Sewerage AD FP
29-Nov-2023 Reviewed by: Eng. Faris Al Baloushi
"Incomplete Documents, Please Submit:
? Undertaking letter showing the date & exact location (Addressed to ?
Abu Dhabi Sustainable Water Solution Company?, Correct transaction
number, 6 months valid)
? Clear and colored proposed drawing (land base, show your proposed
work, road crossing (NDRC/open cut) legends, coordinates ?in zone 40?
and contractor information as PDF)
? CAD WGS84 2013 (the CAD should be single lines for the proposed
work only) *coordinates in zone 40 *
- Submit all SWS requirements (undertaking letter + proposed drawings
CAD & PDF) in compressed file name it SWS."
"If you have any inquiries, please contact us via
? Care email: Care@sws.ae
? WhatsApp: 028180000
? Chatbot: 028180000
? Website: sws.se
? Call: 028180000 or 800555
? Virtual Meeting through TAMM
From Monday to Friday 7:00 am to 3:00 pm "
ITC
ITC Right-of-Way FP - AD
No objection is subject to obtain permits for Parking-spaces reservations
or Cancelation from MAWAQIF before establishing the work.
This approval issued as Renewal previous conditions are applicable.
ADDC
ADDC Assets FP
Kindly be inform that you have 2 times to upload main ADDC
requirements correctly. This is 1 out of 2 chance to upload it again.
Otherwise, it will be block and we will not open it again which lead you to
open new transaction. Upload main ADDC requirements as (copy
attached) as THREE ZIP Folders using WinZip, three separate folders
for Water, Recycled Water and Electricity and Please clarify the
documents by naming each with its relevant description within folder and
choose REISSUE for ADDC in the system. in case any of ADDC main
requirements are not clear for you, please call for a meeting before
reissue Alhusain.alhashmi@addc.ae and we will guide you.
ADM
ADM Al Wathba FP
1- This approval is valid for 6 months only.
2- Any minor or major changes during the construction will cancel
this NOC and you should obtain new NOC request.
3- This NOC issued depending on GIS layers and ADM Makani
program and any observed line or conflict with ADM Assets on the field
you should inform ADM and the owner should take the responsibility to
Relocate or protect the lines/Assets under his cost.
4- Submit a permits in the IPS System for the Following (Asphalt
cutting, Tile Lifting, NDRC, Soft/ Hard Landscape, Storm Water,
Installing Temporary Container, Temporary Sign Board, Temporary
Hump, SCADA integration, Loading And Offloading of Excavation
Material, Loading And Offloading of Quaries Material, street Light, Mobile
Crane, General Bank Guarantee Release, Earthwork Clearance
Certificate) throw this link: https://ips.adm.gov.ae/.
5- Approve any required relocation/protection/Connection for
storm water/street light or lines VIA IDAS SYSTEM.(forgit VIA External
Centers)
6- Coordinating with ADM Consultant if there any conflicts with
ADM Musanada projects.
7- Any required detours/ramps should be approved online by
DOT.
8- All ADM Specifications and Quality directory should applied.
9- Safety assurance should applied during the work.
10- GET A FINAL APPROVAL FROM THE DEVELOPER IT THE
AREA STILL UNDER HIS CUSTODY.
11- The Consultant should fill UP the attached form and upload it in
the system.
ADNOC
ADNOC HQ FP
Please be informed that we have reviewed your request together with
submitted enclosures and have No Objection for the proposed works.
This NOC is for ADNOC assets protection only and you are requested to
approach other government sectors and utilities providers for their NOCs
and Permits. Any change to the proposed work needs to be referred
back to us for our review.
Du
Du Telecom FP
1. The TPD approval doesn?t match the submitted pdf drawing
2. Please provide us Shp or Detail CAD file (2010) of PROPOSED
WORK ONLY (without existing work or base map) following projection
UTM WGS84 ZONE 40.
MCC
MCC Monitor and Control FP
1.Kindly brief on your scope.
2.Kindly provide AutoCAD file with XREF file
3.Highlight only the required scope of the project area
4.Legend to be provided. Kindly make sure to upload all your documents
and reissue to us for our review as ?MCC_DDMMMYYYY.zip?, where
DD is current date, MMM is Month and YYYY is the year. If in case any
assistance required to Phone No.024058976 or Email ID:
rizwan.ali@admcc.ae
Tadweer
Tadweer FP
Please follow the comments in the attachment
TRANSCO
Transco Infrastructure Services FP
Dear Applicant
Please be informed that according to your marked location on the
ENOC, we have No Objection on your work as we have no existing
water or power transmission lines within your project area.
ADM
ADM Al Wathba FP
Your enclosed drawings have being reviewed and we regret to issue
objection against your transaction. The applicant kindly requested to
provide Undertaking letter submitted by the contractor pledge to
preserve the integrity of ADM assets and to compensate unconditionally
in case of any damaging occur to ADM asset (Storm Water & irrigation
lines) at the proposed project / services route. (attached example)
Send a confirmation E-mail to a.almarzuqi@adm.gov.ae when
MCC
MCC Monitor and Control FP
ﻳﺮﺟﻰ ﺍﻟﺘﻔﻀﻞ ﺑﺎﻟﻌﻠﻢ ﺑﺄﻧﻪ ﻻﻣﺎﻧﻊ ﻟﺪﻳﻨﺎ ﻣﻦ ﺍﻟﺒﺪﺀ ﻓﻲ ﺍﻟﻤﻮﻗﻊ ﺍﻟﻤﺸﺎﺭ ﺇﻟﻴﻬﺎ ﻓﻲ ﺍﻟﻜﺘﺎﺏ ﺃﻋﻼﻩ ﺇﻻ ﺇﻧﻨﺎ ﻧﻮﺩ
ﺍﻟﺘﻨﻮﻳﻪ ﻋﻠﻰ ﺿﺮﻭﺭﺓ ﺇﺗﺒﺎﻉ ﺍﻟﺸﺮﻭﻁ ﻭﺍﻟﺘﻌﻠﻴﻤﺎﺕ ﻭﺗﻮﻓﻴﺮ ﺍﻟﻤﺘﻄﻠﺒﺎﺕ ﺍﻟﺘﺎﻟﻴﺔ:
1. ﺍﻻﺑﺘﻌﺎﺩ ﻋﻦ ﺃﺻﻮﻝ ﻭﺧﺪﻣﺎﺕ ﻣﺸﺮﻭﻉ ﻋﻴﻦ ﺍﻟﺼﻘﺮ ﺩﻭﻥ ﺍﺧﺬ ﻣﻮﺍﻓﻘﺔ ﻣﺮﻛﺰ ﺍﻟﻤﺘﺎﺑﻌﺔ ﻭﺍﻟﺘﺤﻜﻢ.
2. ﺗﻮﻓﻴﺮ ﺍﻟﺤﻤﺎﻳﺔ ﺍﻟﻤﻨﺎﺳﺒﺔ ﻋﻨﺪ ﺍﻟﻄﻠﺐ ﻟﺠﻤﻴﻊ ﺃﺻﻮﻝ ﻭﺧﺪﻣﺎﺕ ﻣﺸﺮﻭﻉ ﻋﻴﻦ ﺍﻟﺼﻘﺮ ﺧﻼﻝ ﻣﺮﺍﺣﻞ
ﺍﻟﻤﺸﺮﻭﻉ ﺍﻹﻧﺸﺎﺋﻴﺔ ﻭﺗﺤﻤﻞ ﺍﻟﻤﺴﺆﻭﻟﻴﺔ ﺍﻟﻜﺎﻣﻠﺔ ﻋﻦ ﺃﻱ ﺃﺿﺮﺍﺭ ﻧﺎﺟﻤﺔ ﻭ ﺗﺼﺤﻴﺤﻬﺎ ﻓﻮﺭﺍً ﻭﺩﻓﻊ ﺍﻟﺘﻜﺎﻟﻴﻒ.
3. ﺗﻮﻓﻴﺮ ﺣﻤﺎﻳﺔ ﺑﺎﻟﺨﺮﺳﺎﻧﺔ ﺍﻷﺳﻤﻨﺘﻴﺔ ﻟﻜﺎﺑﻼﺕ ﻋﻴﻦ ﺍﻟﺼﻘﺮ.
4. ﺗﻘﺪﻳﻢ ﺟﺪﻭﻝ ﺯﻣﻨﻲ ﻣﺤﺪﺙ ﻭﻣﻔﺼﻞ ﻟﻤﺸﺮﻭﻋﻜﻢ ﻓﻲ ﺃﻗﺮﺏ ﻭﻗﺖ ﻣﻤﻜﻦ.
5. ﺍﻟﺘﻌﻬﺪ ﺑﺎﻟﺴﻤﺎﺡ ﻟﻤﻬﻨﺪﺱ ﻣﺮﻛﺰ ﺍﻟﻤﺘﺎﺑﻌﺔ ﻭﺍﻟﺘﺤﻜﻢ ﺑﺎﻟﺪﺧﻮﻝ ﻟﻠﻤﻮﻗﻊ ﺧﻼﻝ ﺍﻻﻋﻤﺎﻝ.
6. ﻳﺤﻖ ﻟﻤﻬﻨﺪﺱ ﻣﺮﻛﺰ ﺍﻟﻤﺘﺎﺑﻌﺔ ﻭﺍﻟﺘﺤﻜﻢ ﺇﻳﻘﺎﻑ ﺃﻱ ﺃﻋﻤﺎﻝ ﻓﻲ ﻧﻄﺎﻕ ﺍﻟﻤﺸﺮﻭﻉ ﻗﺪ ﺗﻀﺮ ﺑﺄﺻﻮﻝ ﻭﺧﺪﻣﺎﺕ
ﺍﻟﻤﺮﻛﺰ.
7. ﻣﺮﺍﻋﺎﺓ ﺭﺑﻂ ﺟﻤﻴﻊ ﺍﻟﻤﻤﺮﺍﺕ ﻣﻊ ﻣﺸﺮﻭﻉ ﻋﻴﻦ ﺍﻟﺼﻘﺮ ﻓﻲ ﺣﺎﻝ ﻧﻘﻞ ﺍﻻﺻﻮﻝ.
8. ﺗﺸﺘﺮﻁ ﻫﺬﻩ ﺍﻟﻤﻮﺍﻓﻘﺔ ﻋﻠﻰ ﺗﻮﻓﻴﺮ ﺟﻤﻴﻊ ﻣﺘﻄﻠﺒﺎﺕ ﻣﺮﻛﺰ ﺍﻟﻤﺘﺎﺑﻌﺔ ﻭﺍﻟﺘﺤﻜﻢ
9. ﺷﻴﺪ ﻋﺰﻳﺰ ﻋﻠﻰ ﺍﻟﺒﺮﻳﺪ ﺍﻻﻟﻜﺘﺮﻭﻧﻲ/ ﺍﻟﺘﻮﺍﺻﻞ ﻭﺍﻟﺘﻨﺴﻴﻖ ﻣﻊ ﺍﻟﻤﻬﻨﺪﺱsheed@admcc.ae ﻗﺒﻞ
ﺑﺪﺀ ﺍﻟﻌﻤﻞ ﻓﻲ ﺍﻟﻤﻮﻗﻊ ﺑﻴﻮﻣﻴﻦ.
SWS
SWS Sewerage AD FP
30-Nov-2023 Reviewed by: Eng. Omar Radwan
"1. To send the proposal for review to ADSSC Operations and
Maintenance Division before the commencement of any work.
2. For issues related to Storm Water services, please contact ?PRFD ?
Abu Dhabi Municipality? as ADSSC is not be responsible of such issues.
3. Enclosed herewith one set of detailed sewerage service?s As Built
drawings showing proximity locations, associated with a table that
indicates drawings numbers. However this does not relieve the applicant
(s) to confirm the same on actual ground before commencement of any
works.
4. No construction work is permitted within a limit of 10 Meters on either
side of our existing services which are highlighted on our attached As
Built drawings.
5.Following particular comments need to be adhered while performing
proposed works:-
-Excavation should be carried out by hand tools, within a distance of 3
meters on either side of the existing ADSSC services.
-We prohibit the movement of machinery and heavy equipment across
the lines or any other ADSSC assets, except where the safe passage is
designated.
-We prohibit dewatering within the limit of 50 meters on either side of our
pipeline or any other ADSSC assets.
-If the trench width exceeds 2.5 meters then it is a must to obtain
ADSSC?s approval for method deployed for protecting ADSSC
pipelines.
-To reinstate the site to its original form and shape at your own cost.
-Before you start the work, it is required to invite our site audit team of O
& M Division at the site for any intricacy, incase such a demand arises.
6. For all TSE line they have to take NOC and PTW from ADDC
Etisalat
Etisalat Telecom FP - Abu Dhabi
Subject NOC has been issued only for Relocation of the gantry sign
works purpose only.
Separate NOC request must be submitted to Etisalat prior to
commencement of any Road works / related utility works at site for
approval. Etisalat Telecom infrastructure provisioning in the area also to
be finalize in coordination with Etisalat.
Your proposed work should be carried out in compliance with the notes
given below and the attached Guidelines Annexure 1 & 2, stating safety
precautions, Contractors responsibilities to be followed from your side
prior to and during the proposed work at site.
During the construction period contractor need to submit all required
detailed drawing to Etisalat Plant Protection Office for site verification.
Moreover, your works program/schedule of proposed works should be
submitted to Etisalat Plant Protection office (Telephone 02 ?
6162728,0505794949) well in advance of commencement of any for
their information & co-ordination.
Locate the entire existing telecom network at site where your proposed
works crossing Etisalat telecom network or running parallel and provide
Marker post tied with Etisalat warning tape at the intervals of 100m to
indicate the presence of Etisalat network at the project area.
ADDC
ADDC Assets FP
Du
Du Telecom FP
Please be informed that this NOC has been given refer to the proposed
work showing in the attached drawing (PROPOSED GANTRY
LOCATION-UTM40) ONLY.
Submit authorized
Spatial Inputs / Drawings Electrical zip files mohmoud mohammed salman
transaction
Submit authorized
Spatial Inputs / Drawings Water zip files mohmoud mohammed salman
transaction
Submit authorized
Spatial Inputs / Drawings Detailed Layout Plans mohmoud mohammed salman
transaction
Submit authorized
Spatial Inputs / Drawings Cross Sections mohmoud mohammed salman
transaction
Submit authorized
Spatial Inputs / Drawings Cross Sections mohmoud mohammed salman
transaction
Location
Long, Lat DEM Elevation Sharing Duct
54.646634 , 24.352857 False
Region
Ground Level Length (Meter)
Buffer (Meters)
0 Width (Maximum)
Shape Area
3997.56
○
Changes in permitting requirements
NOC Reply
Conditions
Not Relevant Project
Other notes that may enhance the business
rules as specified in the comments /
attachments
Conditions
Implementation Conditions
Other Conditions
Conditions
Implementation Conditions
Other Conditions
Conditions
Not Relevant Project
Other notes that may enhance the business
rules as specified in the comments /
attachments
Entity Name Du
NOC Reply B) NOC with Conditions
Valid 6 Months Starting from:19 - 12 - 2023 02:19:40 till 18 - 06 - 2024 02:19:40
Conditions
Other Conditions
Conditions
Implementation Conditions
Other Conditions
Conditions
Other Conditions
Conditions
Other Conditions
Conditions
Other Conditions
Conditions
Other Conditions
Conditions
Implementation Conditions
Other Conditions
Conditions
Implementation Conditions
Other Conditions