1. The parting line needs to be properly matched. OPEN -05 MM MATCH TO LEVAL
2. Ej. pin dep req. 0.5 mm max open
3. The mech. core finger cam guide problem was observed during the process. (Top core or side core check core stoke,
finger clmap lengt etc) ) OPEN (
4. The letters do not match according to the drawing requirements. (Like: ADC-12, 40A, 5K/10K etc..) metal stick up in rib in procces deeth
maintened as per drg
5. Core shifting issue (A thick flash obs. at the bottom side) CLOSE
6. Overflow volume needs to be increased according to the PPT. COLSE
7. The main branch needs to be properly matched to the Sub-branch. COLSE
8. Two-hole side cutter marks have been observed. COLSE
9. The core parting flash needs to be minimized. COLSE
10. There is a required an R10 radius at the spru area. OPEN
11. Letter-ADC-12,40A,5K/10K,I: Found Incorrect CLOSE
12. lettering wall thikness to be increase up to 0.5 mm OPEN -maintened as per drg
9. Thera is need to matching , flash observed during procces or core jaming issuse. OPEN
10.fix up moving up cooling hole shift from inseart to housing area ,thear is need to be incressed hole size OPEN
11. Thear is need to incressed spru bush is actual -dia 60 - requried - dia70 OPEN
12. loose piece found in spru bush area , allso step obsereved. So Thear is need to be rquried spru bush in a one piece OPEN
13. flash on core pin area, so thear is req. change the parting line as per ppt. (all body apply) OPEN
C. Part Name: Handle 5" & 6"(Part No: HDL-013013-001-K)
18. loose piece found in spru bush area , allso step obsereved. So Thear is need to be rquried spru bush in a one piece
OPEN
18. loose piece found in spru bush area , allso step obsereved. So Thear is need to be rquried spru bush in a one piece OPEN
VALIANT ALUCAST TECHNOLOGY PVT. LTD.
MPPL TOOL CORRECTION POINTS STATUS- 1.2.2020
1. The parting line needs to be properly matched. OPEN -05 MM MATCH TO LEVAL
2. Ej. pin dep req. 0.5 mm max open
3. The mech. core finger cam guide problem was observed during the process. (Top core or side core
check core stoke, finger clmap lengt etc) ) OPEN (
4. The letters do not match according to the drawing requirements. (Like: ADC-12, 40A, 5K/10K etc..) metal stick up in rib in procces deeth
maintened as per drg
5. Core shifting issue (A thick flash obs. at the bottom side) CLOSE
6. Overflow volume needs to be increased according to the PPT. COLSE
7. The main branch needs to be properly matched to the Sub-branch. COLSE
8. Two-hole side cutter marks have been observed. COLSE
9. The core parting flash needs to be minimized. COLSE
10. There is a required an R10 radius at the spru area. OPEN
11. Letter-ADC-12,40A,5K/10K,I: Found Incorrect CLOSE
12. lettering wall thikness to be increase up to 0.5 mm OPEN -maintened as per drg
9. Thera is need to matching , flash observed during procces or core jaming issuse. OPEN
10.fix up moving up cooling hole shift from inseart to housing area ,thear is need to be incressed hole OPEN
size
11. Thear is need to incressed spru bush is actual -dia 60 - requried - dia70 OPEN
12. loose piece found in spru bush area , allso step obsereved. So Thear is need to be rquried spru OPEN
bush in a one piece
13. flash on core pin area, so thear is req. change the parting line as per ppt. (all body apply) OPEN
11. inserat depth to be maintained as per the drg spec ( actual-19.0 , 19.20( req-18.5+/-0.1 mm
12. Drilling connection to be maintained as per the defined spec ( maintain +0.05 mm ) Trial pending
9. Dia 38.0+0.2: to be corrected (obs 1) 37.8 2) 37.84 3) 37.82 4) 37.84 5) 37.78- Both Sides OPEN
10. Dia 34.0+0.1: to be corrected( 1) 33.90 2) 33.8 3) 33.92 4) 33.90 5) 33.90)- Both Sides
11. apply the same to all the body
12. Runner direction requried as per match to 200k body .. OPEN
13. There is a need to minimize the gap between the slide and guide wage to avoid core jamming OPEN
issues. (Applicable the same for all the body’s tools.)
14. The necessary stopper plate at the back of the top core to avoid mismatch issues between the OPEN
finger cam and cam bore. Applicable for all side core (The same is applicable for all body tools)
15. (bottam side core stroke maintened , ( hydrolic cylinder shaft coupling follwing from cylinder OPEN
mounting plate, Thear is incredssed hole size from mounting plate.)
16.fix up moving up cooling hole shift from inseart to housing area ,thear is need to be incressed hole
size OPEN
17. flash on core pin area, so thear is req. change the parting line as per ppt. (all body apply)
OPEN
18. loose piece found in spru bush area , allso step obsereved. So Thear is need to be rquried spru
bush in a one piece OPEN
8. Dia 38.0+0.2: to be corrected (obs 1) 37.8 2) 37.84 3) 37.82 4) 37.84 5) 37.78- Both Sides
OPEN
9 . Dia 34.0+0.1: to be corrected( 1) 33.90 2) 33.8 3) 33.92 4) 33.90 5) 33.90)- Both Sides
10. Dia 47.7+0.2 mm to be maintained as per the defined spec. (actual obs-47.3,47.4,47.44)
11. apply the same to all the body OPEN
12. Thera is need to matching , flash observed during procces or core jaming issuse. OPEN
13. There is a need to minimize the gap between the slide and guide wage to avoid core jamming
issues. (Applicable the same for all the body’s tools.) OPEN
14. The necessary stopper plate at the back of the top core to avoid mismatch issues between the
finger cam and cam bore. Applicable for all side core (The same is applicable for all body tools)
OPEN
15. side core area finger clamp not loceted not crore proparly ,Noise during production , so Thera is
provied to chamfer to aviod noise issue.
15.fix up moving up cooling hole shift from inseart to housing area ,thear is need to be incressed hole
size OPEN
16. Thear is need to incressed spru bush is actual -dia 60 - Requried - dia70 OPEN
17. flash on core pin area, so thear is req. change the parting line as per ppt. (all body apply) OPEN
18. loose piece found in spru bush area , allso step obsereved. So Thear is need to be rquried spru OPEN
bush in a one piece
CORRECTION STAUS
VALIANT ALUCAST TECHNOLOGY PVT. LTD.
1. The parting line needs to be properly matched. OPEN -05 MM MATCH TO LEVAL
2. Ej. pin dep req. 0.5 mm max open
3. The mech. core finger cam guide problem was observed during the process. (Top core or side core
check core stoke, finger clmap lengt etc) ) OPEN (
4. The letters do not match according to the drawing requirements. (Like: ADC-12, 40A, 5K/10K etc..) metal stick up in rib in procces deeth
maintened as per drg
5. Core shifting issue (A thick flash obs. at the bottom side) CLOSE
6. Overflow volume needs to be increased according to the PPT. COLSE
7. The main branch needs to be properly matched to the Sub-branch. COLSE
8. Two-hole side cutter marks have been observed. COLSE
9. The core parting flash needs to be minimized. COLSE
10. There is a required an R10 radius at the spru area. OPEN
11. Letter-ADC-12,40A,5K/10K,I: Found Incorrect CLOSE
12. lettering wall thikness to be increase up to 0.5 mm OPEN -maintened as per drg
9. Thera is need to matching , flash observed during procces or core jaming issuse. OPEN
10.fix up moving up cooling hole shift from inseart to housing area ,thear is need to be incressed hole OPEN
size
11. Thear is need to incressed spru bush is actual -dia 60 - requried - dia70 OPEN
12. loose piece found in spru bush area , allso step obsereved. So Thear is need to be rquried spru OPEN
bush in a one piece
13. flash on core pin area, so thear is req. change the parting line as per ppt. (all body apply) OPEN
11. inserat depth to be maintained as per the drg spec ( actual-19.0 , 19.20( req-18.5+/-0.1 mm
12. Drilling connection to be maintained as per the defined spec ( maintain +0.05 mm ) Trial pending
9. Dia 38.0+0.2: to be corrected (obs 1) 37.8 2) 37.84 3) 37.82 4) 37.84 5) 37.78- Both Sides OPEN
10. Dia 34.0+0.1: to be corrected( 1) 33.90 2) 33.8 3) 33.92 4) 33.90 5) 33.90)- Both Sides
11. apply the same to all the body
12. Runner direction requried as per match to 200k body .. OPEN
13. There is a need to minimize the gap between the slide and guide wage to avoid core jamming OPEN
issues. (Applicable the same for all the body’s tools.)
14. The necessary stopper plate at the back of the top core to avoid mismatch issues between the OPEN
finger cam and cam bore. Applicable for all side core (The same is applicable for all body tools)
15. (bottam side core stroke maintened , ( hydrolic cylinder shaft coupling follwing from cylinder OPEN
mounting plate, Thear is incredssed hole size from mounting plate.)
16.fix up moving up cooling hole shift from inseart to housing area ,thear is need to be incressed hole
size OPEN
17. flash on core pin area, so thear is req. change the parting line as per ppt. (all body apply)
OPEN
18. loose piece found in spru bush area , allso step obsereved. So Thear is need to be rquried spru
bush in a one piece OPEN
8. Dia 38.0+0.2: to be corrected (obs 1) 37.8 2) 37.84 3) 37.82 4) 37.84 5) 37.78- Both Sides
OPEN
9 . Dia 34.0+0.1: to be corrected( 1) 33.90 2) 33.8 3) 33.92 4) 33.90 5) 33.90)- Both Sides
10. Dia 47.7+0.2 mm to be maintained as per the defined spec. (actual obs-47.3,47.4,47.44)
11. apply the same to all the body OPEN
12. Thera is need to matching , flash observed during procces or core jaming issuse. OPEN
13. There is a need to minimize the gap between the slide and guide wage to avoid core jamming
issues. (Applicable the same for all the body’s tools.) OPEN
14. The necessary stopper plate at the back of the top core to avoid mismatch issues between the
finger cam and cam bore. Applicable for all side core (The same is applicable for all body tools)
OPEN
15. side core area finger clamp not loceted not crore proparly ,Noise during production , so Thera is
provied to chamfer to aviod noise issue.
15.fix up moving up cooling hole shift from inseart to housing area ,thear is need to be incressed hole
size OPEN
16. Thear is need to incressed spru bush is actual -dia 60 - Requried - dia70 OPEN
17. flash on core pin area, so thear is req. change the parting line as per ppt. (all body apply) OPEN
18. loose piece found in spru bush area , allso step obsereved. So Thear is need to be rquried spru OPEN
bush in a one piece
OTHER POINT :-
DATE OF MEETING:
VENUE: VATPL
START TIME:
M)
CORRECTION STATUS