Republic of the Philippines

CAMARINES SUR POLYTECHNIC


COLLEGES
Nabua, Camarines Sur

PLATE SUPERELEVATION

4
DIAGRAM
SIMPLE CURVE

KIM SOLANO

BSCE 3B

ENGR. HENRY TURALDE

INSTRUCTOR
Republic of the Philippines
CAMARINES SUR POLYTECHNIC
COLLEGES
Nabua, Camarines Sur

SUPERELEVATION DIAGRAM: SIMPLE CURVE


I. OBJECTIVES

 To Illustrate the Superelevation Diagram based from the previous exercise


(Horizontal Alignment of Simple Curve).
 To determine setting-out details of the LHS and RHS of road surface starting
the earliest of stationing up to the latest end of station @ every full station.

II. PROCEDURE:

 Project the main points of the curve upward.


 Indicate the center line of the Superelevation Diagram.
 Draw the Superelevation Diagram revolved about the centerline.
 Determine the length of tangent runoff,
�� ��
=
�.�% � ���
, where TR is the length of tangent run out
�� is the length of spiral
 Find all stationing of the main points.
 By similar triangle, solved for the Superelevation at left/right hand
sight(LHS/RHS)
�.�% �
=
�� �
, where 2.5% is the normal Superelevation of the road
�� is the length of tangent run out
� is the value of Superelevation at the point
� is the distance between the stations from the main point.
�% �
=
�� �
, where 8% is my Superelevation design of the road
�� is the length of spiral
� is the value of Superelevation at the point
� is the distance between the stations from the main point.
Republic of the Philippines
CAMARINES SUR POLYTECHNIC
COLLEGES
Nabua, Camarines Sur

Another method: Interpolation Method

� − ���. �� � − ��
=
���. �� − ���. �� � ��� − ��
Where: (at LHS)
� is any station between the station of the main points( X1 & PC) .
NS = -2.5% is the normal Superelevation of the road
e is the value of the Superelevation at x
emax = +8% is my Superelevation design of the road
� − ���. �� � − � ���
=
���. ��− ���. �� �� − � ���
Where: (at LHS)
� is any station between the station of the main points( PT & Y2) .
NS = -2.5% is the normal Superelevation of the road
e is the value of the Superelevation at x
emax = +8% is my Superelevation design of the road

III. FIGURE/SKETCH:

SUPERELEVATION DIAGRAM
Republic of the Philippines
CAMARINES SUR POLYTECHNIC
COLLEGES
Nabua, Camarines Sur

IV. FIELD MEASUREMENT DATA

MAIN STATION STATION DISTANCE FROM X SE LHS (%) SE RHS (%)

X 0+000 0 -2.50 -2.50

0+020 20 -2.50 -2.50

0+040 40 -2.50 -2.50

0+060 60 -2.50 -2.50

0+080 80 -2.50 -2.50

0+100 100 -2.50 -2.50

0+120 120 -2.50 -2.50

0+140 140 -2.50 -2.50

0+160 160 -2.50 -2.50

0+180 180 -2.50 -2.50

0+200 200 -2.50 -2.50

0+220 220 -2.50 -2.50

0+240 240 -2.50 -2.50

0+260 260 -2.50 -2.50

0+280 280 -2.50 -2.50

0+300 300 -2.50 -2.50

0+320 320 -2.50 -2.50


Republic of the Philippines
CAMARINES SUR POLYTECHNIC
COLLEGES
Nabua, Camarines Sur

0+340 340 -2.50 -2.50

0+360 360 -2.50 -2.50

0+380 380 -2.50 -2.50

0+400 400 -2.50 -2.50

0+420 420 -2.50 -2.50

0+440 440 -2.50 -2.50

0+460 460 -2.50 -2.50

0+480 480 -2.50 -2.50

0+500 500 -2.50 -2.50

0+520 520 -2.50 -2.50

0+540 540 -2.50 -2.50

0+560 560 -2.50 -2.50

0+580 580 -2.50 -2.50

0+600 600 -2.50 -2.50

0+620 620 -2.50 -2.50

0+640 640 -2.50 -2.50

0+660 660 -2.50 -2.50

0+680 680 -2.50 -2.50

0+700 700 -2.50 -2.50

0+720 720 -2.50 -2.50

0+740 740 -2.50 -2.50

0+760 760 -2.50 -2.50

0+780 780 -2.50 -2.50

0+800 800 -2.50 -2.50

0+820 820 -2.50 -2.50

0+840 840 -2.50 -2.50

0+860 860 -2.50 -2.50

0+880 880 -2.50 -2.50

0+900 900 -2.50 -2.50

0+920 920 -2.50 -2.50

0+940 940 -2.50 -2.50

0+960 960 -2.50 -2.50

0+980 980 -2.50 -2.50


Republic of the Philippines
CAMARINES SUR POLYTECHNIC
COLLEGES
Nabua, Camarines Sur

1+000 1000 -2.50 -2.50

1+020 1020 -2.50 -2.50

1+040 1040 -2.50 -2.50

1+060 1060 -2.50 -2.50

1+080 1080 -2.50 -2.50

1+100 1100 -2.50 -2.50

1+120 1120 -2.50 -2.50

1+140 1140 -2.50 -2.50

1+160 1160 -2.50 -2.50

1+180 1180 -2.50 -2.50

1+200 1200 -2.50 -2.50

1+220 1220 -2.50 -2.50

X1 1+226.9597 1226.9597 -2.50 -2.50

1+240 1240 -0.79 -2.50

X2 1+251.9597 1251.9597 0.78 -2.50

1+260 1260 1.84 -1.84

1+280 1280 4.46 -4.46

1+300 1300 7.09 -7.09

PC 1+306.9597 1306.9597 8 -8

1+320 1320 8 -8

1+340 1340 8 -8

1+360 1360 8 -8

1+380 1380 8 -8

1+400 1400 8 -8

1+420 1420 8 -8

1+440 1440 8 -8

1+460 1460 8 -8

1+480 1480 8 -8

1+500 1500 8 -8

1+520 1520 8 -8

1+540 1540 8 -8

1+560 1560 8 -8

1+580 1580 8 -8
Republic of the Philippines
CAMARINES SUR POLYTECHNIC
COLLEGES
Nabua, Camarines Sur

1+600 1600 8 -8

1+620 1620 8 -8

1+640 1640 8 -8

1+660 1660 8 -8

1+680 1680 8 -8

1+700 1700 8 -8

1+720 1720 8 -8

1+740 1740 8 -8

1+760 1760 8 -8

1+780 1780 8 -8

1+800 1800 8 -8

PT 1+802.0747 1802.0747 7.73 -7.73

1+820 1820 5.65 -5.65

1+840 1840 3.02 -3.02

Y1 1+857.0747 1857.0747 0.78 -0.78

1+860 1860 0.40 -2.50

1+880 1880 -2.23 -2.50

Y2 1+882.0747 1882.0747 -2.50 -2.50

2+000 2000 -2.50 -2.50

2+020 2020 -2.50 -2.50

2+040 2040 -2.50 -2.50

2+060 2060 -2.50 -2.50

2+080 2080 -2.50 -2.50

2+100 2100 -2.50 -2.50

2+120 2120 -2.50 -2.50

2+140 2140 -2.50 -2.50

2+160 2160 -2.50 -2.50

2+180 2180 -2.50 -2.50

2+200 2200 -2.50 -2.50

2+220 2220 -2.50 -2.50

2+240 2240 -2.50 -2.50

2+260 2260 -2.50 -2.50

2+280 2280 -2.50 -2.50


Republic of the Philippines
CAMARINES SUR POLYTECHNIC
COLLEGES
Nabua, Camarines Sur

2+300 2300 -2.50 -2.50

2+320 2320 -2.50 -2.50

2+340 2340 -2.50 -2.50

2+360 2360 -2.50 -2.50

2+380 2380 -2.50 -2.50

2+400 2400 -2.50 -2.50

2+420 2420 -2.50 -2.50

2+440 2440 -2.50 -2.50

2+460 2460 -2.50 -2.50

2+480 2480 -2.50 -2.50

2+500 2500 -2.50 -2.50

2+520 2520 -2.50 -2.50

2+540 2540 -2.50 -2.50

2+560 2560 -2.50 -2.50

2+580 2580 -2.50 -2.50

2+600 2600 -2.50 -2.50

2+620 2620 -2.50 -2.50

2+640 2640 -2.50 -2.50

2+660 2660 -2.50 -2.50

2+680 2680 -2.50 -2.50

2+700 2700 -2.50 -2.50

2+720 2720 -2.50 -2.50

2+740 2740 -2.50 -2.50

2+760 2760 -2.50 -2.50

2+780 2780 -2.50 -2.50

2+800 2800 -2.50 -2.50

2+820 2820 -2.50 -2.50

2+840 2840 -2.50 -2.50

2+860 2860 -2.50 -2.50

2+880 2880 -2.50 -2.50

2+900 2900 -2.50 -2.50

Z 2+902.0344 2902.0344 -2.50 -2.50


Republic of the Philippines
CAMARINES SUR POLYTECHNIC
COLLEGES
Nabua, Camarines Sur

V. COMPUTATION:

A. LENGTH OF TRANSITION RUN OFF

NOTE: From Plate 1 (HORIZONTAL ALIGNMENT FOR SIMPLE CURVE)


COMPUTED VALUE FOR RADIUS = 394 m

THUS, Length of Spiral Curve ar based from the following:


1. Criterion of rate of increase of lateral acceleration
Ls = 0.0214v³ /RC
Ls = 0.0214(100³)/394(0.675) = 80.466 m say 80m
2. Criterion of minimum Ls
Ls min = 24PminR
Ls min = 24(0.2)(394) = 43.488 m
3. Criterion of maximum Ls
Ls max = 24PmaxR
Ls max = 24(1)(394) = 97.241 m
Therefore, use Ls = 80m
TO COMPUTE FOR THE TRANSITION RUNOFF (TR)
TR/2.5% = Ls/e max; where e max= 8%
TR/2.5%=80/8%
TR = 25 m
B. LENGTH OF a
a = D1-T-Ls
NOTE: FROM PLATE 1 (HORIZONTAL ALIGNMENT FOR SIMPLE CURVE)
D1=1593m AND T=286.0403m
THEREFORE;
a = 1593-286.0403-80
a = 1226.9597m
C. LENGTH OF b
b = D2-T-Ls
NOTE: FROM PLATE 1 (HORIZONTAL ALIGNMENT FOR SIMPLE CURVE)
D2=1386m AND T=286.0403m
THEREFORE;
b = 1386-286.0403-80
b = 1019.9597m
D. STATIONING OF MAIN POINTS
* STATIONING AT POINT X
= 0+000
* STATIONING AT X1
= STA. X + a
Republic of the Philippines
CAMARINES SUR POLYTECHNIC
COLLEGES
Nabua, Camarines Sur

= [0+000] + 1226.9597
= 1+ 226.9597
* STATIONING AT X2
= STA. X1 + TR
= [1+226.9597] + 25
= 1+251.9597
* STATIONING AT PC
= STA. X1 + Ls
= [1+226.9597] + 80
= 1+306.9597
* STATIONING AT Y OR PI
= STA. PC + T
= [1+306.9597] + 286.0403
= 1+593
* STATIONING AT PT
= STA. PC + Lc
NOTE: FROM PLATE 1 (Lc = 495.115m)
=[1+306.9597] + 495.115
= 1+802.0747
* STATIONING AT Y1
= STA. PT + (Ls - TR)
= [1+802.0747] + (80-25)
=1+857.0747
* STATIONING AT Y2
= STA. PT + Ls
= [1+802.0747] +80
= 1+882.0747
* STATIONING AT POINT Z
= STA. Y2 + b
= [1+882.0747] + 1019.9597
= 2+902.0344

E. BY INTERPOLATION METHOD
� − ���. �� � − ��
=
���. �� − ���. �� � ��� − ��
Where: (at LHS)
is any station between the station of the main points( X1 & PC) .
NS = -2.5% is the normal Superelevation of the road
e is the value of the Superelevation at x
emax = +8% is my Superelevation design of the road

� − ���. �� � − � ���
=
���. ��− ���. �� �� − � ���
Republic of the Philippines
CAMARINES SUR POLYTECHNIC
COLLEGES
Nabua, Camarines Sur

Where: (at LHS)


is any station between the station of the main points( PT & Y2) .
NS = -2.5% is the normal Superelevation of the road
e is the value of the Superelevation at x
emax = +8% is my Superelevation design of the road

VI. DISCUSSION

Superelevation is the rotation of the pavement on the approach to and through a horizontal
curve. Superelevation is intended to assist the driver by counteracting the lateral acceleration
produced by tracking the curve. Superelevation is expressed as a decimal, representing the
ratio of the pavement slope to width, ranging from 0 to 0.12 foot/feet. The adopted criteria
allow for the use of maximum superelevation rates from 0.04 to 0.12. Maximum
superelevation rates for design are established by policy by each State. Selection of a maximum
superelevation rate is based on several variables, such as climate, terrain, highway location
(urban vs. rural), and frequency of very slowmoving vehicles. For example, northern States that
experience ice and snow conditions may establish lower maximums for superelevation than
States that do not experience these conditions. Use of lower maximum superelevation rates by
policy is intended to address the perceived problem created by vehicles sliding transversely
when traveling at very low speeds when weather conditions are poor.

The adopted criteria provide complete tables expressing the appropriate superelevation rate
consistent with the established policy for all curves and all design speeds.