During August and September 2022, samples were taken from Pit 1 to analyze nickel and iron content and estimate production volumes. A total of 105 metric tons of ore was extracted from Pit 1 over this period, containing 1.84% nickel on average and 24.31% iron on average based on analysis of the samples.
During August and September 2022, samples were taken from Pit 1 to analyze nickel and iron content and estimate production volumes. A total of 105 metric tons of ore was extracted from Pit 1 over this period, containing 1.84% nickel on average and 24.31% iron on average based on analysis of the samples.
During August and September 2022, samples were taken from Pit 1 to analyze nickel and iron content and estimate production volumes. A total of 105 metric tons of ore was extracted from Pit 1 over this period, containing 1.84% nickel on average and 24.31% iron on average based on analysis of the samples.
During August and September 2022, samples were taken from Pit 1 to analyze nickel and iron content and estimate production volumes. A total of 105 metric tons of ore was extracted from Pit 1 over this period, containing 1.84% nickel on average and 24.31% iron on average based on analysis of the samples.
NO TANGGAL JUMLAH NITON KODE SAMPEL SOURCE VOLUME (MT) INCRAMEN Ni % Fe % 1 30 August 2022 SM 01 PIT 1 18 302,4 1,92 18,25 SM 02 PIT 1 10 168 1,84 19,57 2 31 August 2022 SM 03 PIT 1 20 336 1,88 20,14 3 04 September 2022 SM 04 PIT 1 6 100,8 1,57 29,64 4 05 September 2022 SM 05 PIT 1 17 285,6 1,79 27,34 5 06 September 2022 SM 06 PIT 1 15 252 1,96 25,31 6 07 September 2022 SM 07 PIT 1 19 319,2 1,73 31,73 105 1764 1,84 24,31 REMARKS