SERVICED SERVICED
No. Unit Date Last Date Next Date Last
HM HM
Serviced Serviced Serviced
1 MP - 01 14-Jul-21 28-Jul-21
2 MP - 02 14-Jul-21 28-Jul-21
SCHEDULE 3 AVD 3000 14-Jul-21 28-Jul-21 28-Jul-21
SERVICED RIG
4 MAXI 150
5 DE 740 8-Jul-21 22-Jul-21 29-Jul-21
6 DE 710 D 22-Jul-21 6-Aug-21 6-Aug-21
7 DE710 - A 19-Jul-21 3-Aug-21 3-Aug-21
8 MANCORE 600
SERVICED SERVICED
No. Unit Date Last Date Next Date Last
Serviced Serviced Serviced
1 SP DELTA 29-Jul-21 13-Jul-21 27-Jul-21
SCHEDULE SP ESTAFET
2 29-Jul-21 13-Jul-21 27-Jul-21
SERVICED LADAM
SUPPLY PUMP 3 SP HG 13
4 SP GERBANG
5 GENSET 24 29-Jul-21 13-Jul-21 27-Jul-21
6 SP SUPPLY MP 300
7 SP AIR PANAS 27-Jul-21
SERVICED SERVICED
No. Unit Date Last Date Next Date Last
SCHEDULE HM HM
Serviced Serviced Serviced
SERVICED 1 HANJIN 01 16-Jul-21 30-Jul-21
UNIT SUPORT
2 HANJIN 02
3 TELEHANDLER
QTY Remark
1EA PROBLEM CHUCK ROTARY HEAD LOOSE AND LEAKING IN CHUCK
1EA ROTARY HEAD
1EA
1EA
2EA
1EA
SERVICED SERVICED
Date Next Date Last Date Next
HM
Serviced Serviced Serviced
SERVICED SERVICED
Date Next Date Last Date Next
Serviced Serviced Serviced
11-Aug-21 11-Aug-21 25-Aug-21
SERVICED
Date Next
Serviced
Jun-21
SHCEDULE MONTHLY INSPECTION RIG AND SUPPLY PUMP
1 2 3 4 5 6 7
8 9 10 11 12 13 14
DE 740 - 01 AVD 3000
DONE DONE
15 16 17 18 19 20 21
HANJIN 01 OUTSTAND
DONE
22 23 24 25 26 27 28
MP 300 - 02
29 30 31 Color Remark :
SCHEDULE INSPEKSI
DILAKUKAN
PENUNDAAN INSPEKSI
TIDAK DILAKUKAN
Dilakukan
JULY
SHCEDULE MONTHLY INSPECTION RIG AND SUPPLY PUMP
1 2 3 4 5 6 7
DE 740 - 01
8 9 10 11 12 13 14
AVD 3000 DE 710 - A DE710 - D
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31 Color Remark :
SCHEDULE INSPEKSI
DILAKUKAN
PENUNDAAN INSPEKSI
TIDAK DILAKUKAN
Dilakukan
AUGUST
SHCEDULE MONTHLY INSPECTION RIG AND SUPPLY PUMP
1 2 3 4 5 6 7
DE 740 - 01
DONE
8 9 10 11 12 13 14
AVD 3000 DE 710 - A DE710 - D
DONE DONE DONE
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31 Color Remark :
SCHEDULE INSPEKSI
DILAKUKAN
PENUNDAAN INSPEKSI
TIDAK DILAKUKAN
Dilakukan
SUMMARY FAULT MECHANICAL PERI
15
13
11
9
9
7
6
5 5 5
5
4 4 4
33 3
3
2 2 22 2 2 2 2
11 1 1111 1 1 11 1
1
MP - 02 2 2 NaN 1 NaN 1
MP - 01 3 1 NaN 1 NaN 2
DE710 D 5 1 1 1 NaN 1
DE710 C 3 2 NaN 1 NaN NaN
AVD 9 NaN 2 6 NaN NaN
3000
MAN- 5 2 NaN 1 NaN 1
CORE MP - 02 MP - 01 DE710 D DE710 C AVD
600
HANJIN NaN NaN NaN 5 NaN NaN
01
HANJIN NaN NaN NaN 4 NaN NaN
04
DE 740 - 4 3 2 2 NaN NaN
01
TL- NaN NaN NaN NaN NaN NaN
XCMG-
01
SUPPLY NaN NaN NaN NaN NaN 3
PUMP
GENSET NaN NaN NaN NaN NaN NaN
W/SHOP
24
WORK- 4 NaN NaN NaN 1 6
SHOP
KM 24
MP - 01
4.5
4 3.5
4
3
3.5
3
3 2.5
2 2
2.5 2
2
0
1
2
3
4
5
6
7
8
9
10
0.5
1.5
2.5
3.5
4.5
0
1
2
3
4
0.5
1.5
2.5
3.5
0
1
2
3
9
3
3
ROTARY HEAD ROTARY HEAD ROTARY HEAD
2
ENGINE ENGINE ENGINE
2
MAIN PUMP MAIN PUMP MAIN PUMP
HYDRAULIC HYDRAULIC HYDRAULIC
6
1
1
HOSE HOSE HOSE
COOLER COOLER COOLER
2
5
1
CLAMP CLAMP CLAMP
1
FABRICATION FABRICATION 2 MP - 01 FABRICATION
4 DE710 C
MP - 01
DE710 C
MOTOR MOTOR MOTOR
1
AVD 3000
ROTARY ROTARY ROTARY
4
1
3
ELECTRICAL ELECTRICAL ELECTRICAL
2
ROD HANDLER ROD HANDLER ROD HANDLER
1
4
WIRELINE WIRELINE WIRELINE
1
WINCH WINCH WINCH
2
1
SANCHIN SANCHIN SANCHIN
1
1
FMC FMC FMC
0.5
1.5
2.5
3.5
4.5
0
1
2
3
4
0.5
1.5
2.5
3.5
0
1
2
3
ROTARY HEAD
1
ENGINE ENGINE
2
ENGINE
1
HYDRAULIC
4
HOSE HOSE HYDRAULIC
1
HOSE
COOLER COOLER
COOLER
0
2
4
6
8
10
12
14
16
0
1
2
3
0
2
4
6
8
10
12
ROTARY HEAD ROTARY HEAD ROTARY HEAD
13
10 TL-XCMG-01
ROTARY ROTARY ROTARY
13 WORKSHOP KM 24
TL-XCMG-01
1
0
1
ROTARY HEAD
ROTARY HEAD
ENGINE
ENGINE
MAIN PUMP
MAIN PUMP
HYDRAULIC
HOSE HYDRAULIC
HOSE
COOLER
COOLER
ROD
ROT
E
H
SOU
FA
SUMMARY FAULT PERIOD 2021
10 TL-XCMG-01
SUMMARY FAULT
No. UNIT
HYDRAULIC
ROTARY HEAD ENGINE MAIN PUMP
HOSE
1 MP - 02 2 2 1
2 MP - 01 3 1 1
3 DE710 D 5 1 1 1
4 DE710 C 3 2 1
5 AVD 3000 9 2 6
6 MANCORE 600 5 2 1
6 HANJIN 01 5
7 HANJIN 04 4
8 DE 740 - 01 4 3 2 2
10 TL-XCMG-01
11 SUPPLY PUMP
12 GENSET W/SHOP 24
13 WORKSHOP KM 24 4
ANICAL PERIOD 2021
15
4 4
3 3 33
2 2 2 2 2
1 11 1 1 1 11 1 11 11 1 1 1
NaN 1 1 1 2 1 3 NaN
P - 01 DE710 D DE710 C AVD 3000 MANCORE 600 HANJIN 01 HANJIN 04 DE 740 - 01 SUPPLY PUMP GENSET W/SHOP 24 WORKSHOP KM
1 6 1 1 15 NaN 1 NaN
MP - 02 MANCOR
3.5 6
3
3
5
2.5
2 2 2 2 4
2
0
1
2
3
4
5
6
0.5
1.5
2.5
3.5
4.5
0
1
2
3
4
0.5
1.5
2.5
3.5
0
1
2
3
5
ROTARY HEAD ROTARY HEAD
2
ROTARY HEAD
1
ENGINE ENGINE
2
ENGINE
1
MAIN PUMP MAIN PUMP
MAIN PUMP
HYDRAULIC
1
HYDRAULIC
4
HOSE HOSE HYDRAULIC
1
HOSE
COOLER COOLER
COOLER
1
YANMAR YANMAR 1
YANMAR
GENSET GENSET
3
GENSET
FOOT FOOT
CLAMP CLAMP FOOT
2
CLAMP
1
FABRICATION FABRICATION
DE710 D
FABRICATION
3 DE710 D
MOTOR MOTOR
1 MP - 02
MP - 02
ROTARY
HANJIN 02
ROTARY MOTOR
ROTARY
2
ELECTRICAL ELECTRICAL
ELECTRICAL
SUMMARY FAULT PERIOD 2021
WIRELINE
WINCH WINCH
WINCH
SANCHIN SANCHIN
2
SANCHIN
2
FMC FMC
FMC
SOUTRNCROSS SOUTRNCROSS
SOUTRNCROSS
0
1
2
3
4
5
6
0
1
2
3
4
5
6
0.5
1.5
2.5
3.5
4.5
0
1
2
3
4
ROTARY HEAD
ROTARY HEAD
ROTARY HEAD
ENGINE
ENGINE
ENGINE
MAIN PUMP
MAIN PUMP
MAIN PUMP
HYDRAULIC
5
HYDRAULIC
HOSE HYDRAULIC HOSE
HOSE
COOLER COOLER
COOLER
YANMAR YANMAR
YANMAR
GENSET GENSET
GENSET
6
FOOT
SUMMA
DE
SUMMAR
HA
SUMMARY
MANCOR
0
1
2
3
4
5
6
0.5
1.5
0
ROTARY HEAD 1
ROTARY HEAD
ENGINE
ENGINE
MAIN PUMP
MAIN PUMP
HYDRAULIC
HOSE HYDRAULIC
HOSE
COOLER
COOLER
3
YANMAR
YANMAR
GENSET GENSET
FOOT FOOT
CLAMP CLAMP
FABRICATION FABRICATION
7 HANJIN 04
MOTOR MOTOR
11 SUPPLY PUMP
ROTARY ROTARY
SUPPLY PUMP
ELECTRICAL ELECTRICAL
WIRELINE WIRELINE
WINCH WINCH
SANCHIN SANCHIN
FMC
5
FMC
SOUTRNCROSS
SOUTRNCROSS
0
1
2
0
2
4
6
8
10
12
ROTARY HEAD
ROTARY HEAD
ENGINE
ENGINE
MAIN PUMP
MAIN PUMP
HYDRAULIC
HYDRAULIC HOSE
HOSE
COOLER
COOLER
YANMAR
YANMAR
GENSET
GENSET
FOOT
12 GE
SUMMAR
GENSET
SUMMARY
6
SUMMARY FAULT PERIOD 2021
FOOT MOTOR ROD
COOLER YANMAR GENSET FABRICATION ELECTRICAL WIRELINE
CLAMP ROTARY HANDLER
1 3 2 1 1
2 4 1
1 1
1 3
5 1 1 1 2 4
1 1 1 2 1 3 1
2
4 2
1 6 1 1 15 1
8
5 5 5
4 4 4 4
33
2 2 2 2 2 2 2
1 1 1 11 1 1 1 1 1 1 1
3 NaN 1 NaN 5 5 1
GENSET W/SHOP 24 WORKSHOP KM 24
MANCORE 600
ROTARY HEAD
ENGINE
ENGINE
ENGINE
MAIN PUMP
MAIN PUMP
MAIN PUMP
HYDRAULIC
5
HYDRAULIC
HOSE HYDRAULIC HOSE
HOSE
COOLER COOLER
COOLER
YANMAR YANMAR
YANMAR
GENSET GENSET
GENSET
FOOT FOOT
CLAMP FOOT
CLAMP CLAMP
FABRICATION FABRICATION
FABRICATION
MOTOR MOTOR
8 DE 740 - 01
MOTOR
MANCORE 600
ROTARY
6 MANCORE 600
ROTARY
HANJIN 01
ROTARY
DE 740 - 01
ELECTRICAL ELECTRICAL
ELECTRICAL
FABRICATION FABRICATION
MOTOR
6 HANJIN 01
MOTOR
ROTARY ROTARY
12 GENSET W/SHOP 24
ELECTRICAL ELECTRICAL
SUMMARY FAULT PERIOD 2021
WIRELINE WIRELINE
WINCH WINCH
SANCHIN SANCHIN
FMC FMC
SOUTRNCROSS SOUTRNCROSS
SOUTRNCR
WINCH SANCHIN FMC
OSS
2
1
2
1 1
2 1
5 5 1
2 1
8 4
CONSUMABLE PART
NOV
No. Unit Date Part Nub
15.11.2020 5260221
1284740
09.11.2020 1" x 3M
1/2" x 3M
IT021-43561
1 MP -01 HH150-32094
14.11.2020
2 MP-02
10.11.2020 1284740
5260611
1267586
21.11.2020 5260611
22.11.2020 LF3970
FF5421
RF2020
FS19732
SAE 20-40W MEDITRAN
TELUS 68
A91672
1101419
1278104
1101419
1279674
1129675
5260221
3 DE740-01 8309
A91663
1283376
A5016
1247389
A80391
A80392
30.11.2020 M38
SAE 20W - 40 MEDITRAN
11.17.2020 SC-
P781039
MANCORE
4
600
01.11.2020 1247389
1285112
B93
1101419
02.11.2020 (…..)
105990-55730
HH150-32094
1T021-43560
03.11.2020 SC-120
SC-120
SC-120
SC-120
SC-120
19.11.2020 SC-120
SC-120
SC-120
SC-120
20.11.2020 105300-44502
21.11.2020
23.11.2020
60CM
6308NR
WORKSHOP
5
KM 24
WORKSHOP
5 6211NR
KM 24
6207NR
6011NR
TR-45
24.11.2020 PD27210BFK
28.11.2020
29.11.2020
30.11.2020
04.11.2020 1284740
1101419
06.11.2020 B557-546D
P551352
2020PM OR
105370-55711
IT021-43561
HH150-32094
11.11.2020 PD24433BA
21.11.2020 1284740
1101419
1279674
1129675
B557-546D
DE710 P551352
6
DELTA 2020PM OR
105370-55711
IT021-43561
HH150-32094
DE710
6
DELTA
29.11.2020
13.11.2020 PD22912Q
23.11.2020 IT021-43561
105990-55730
HH150-32094
P551352
2020
DE710
7 P181035
CHARLIE
25.11.2020 105990-55730
29.11.2020 1284740
1101419
30.11.2020 1284740
SUPPLY 1101419
8
PUMP
DEC
No. Unit Date Part Nub
1 MP -01
2 MP-02
06.12.2020 1T021-43560
HH150-32094
GL060-99410
3 DE740-01
FS19732
FS19732
LF3970
P182043
3 DE740-01
PM OR 2020
105370-55711
SC-120
SC-120
MANCORE
4
600
03.12.2020 1225327
1279674
1285112
DE710
6
DELTA
P551352
2020PM-OR
P551352
IT021-43561
HH150-32094
105370-55711
SAE 20W - 40MEDITRAN
DE710
7
CHARLIE
01.12.2020 1225327
1101419
02.12.2020 1225327
1101419
07.12.2020 105990-55730
SUPPLY
8
PUMP
SUPPLY
8
PUMP
CONSUMABLE PART
JA
No. Unit Date Part Nub
1 MP -01
2 MP-02
3 DE740-01
MANCORE
4
600
WORKSHOP
5
KM 24
DE710
6
DELTA
DE710
7
CHARLIE
SUPPLY
8
PUMP
9 MAXI 150
FE
No. Unit Date Part Nub
1 MP -01
2 MP-02
3 DE740-01
MANCORE
4
600
WORKSHOP
5
KM 24
DE710
6
DELTA
DE710
7
CHARLIE
SUPPLY
8
PUMP
SUPPLY
8
PUMP
9 MAXI 150
M
No. Unit Date Part Nub
1 MP -01
2 MP-02
3 DE740-01
MANCORE
4
600
WORKSHOP
5
KM 24
DE710
6
DELTA
DE710
7
CHARLIE
SUPPLY
8
PUMP
9 MAXI 150
A
No. Unit Date Part Nub
1 MP -01
2 MP-02
3 DE740-01
MANCORE
4
600
WORKSHOP
5
KM 24
DE710
6
DELTA
DE710
7
CHARLIE
SUPPLY
8
PUMP
9 MAXI 150
9 MAXI 150
M
No. Unit Date Part Nub
1 MP -01
2 MP-02
3 DE740-01
MANCORE
4
600
WORKSHOP
5
KM 24
DE710
6
DELTA
DE710
7
CHARLIE
SUPPLY
8
PUMP
9 MAXI 150
J
No. Unit Date Part Nub
1 MP -01
2 MP-02
3 DE740-01
MANCORE
4
600
WORKSHOP
5
KM 24
DE710
6
DELTA
DE710
7
CHARLIE
SUPPLY
8
PUMP
9 MAXI 150
J
No. Unit Date Part Nub
1-Jul-21 1T021-43560
HH150-32094
SAE 20 - 40W MEDITRAN
14-Jul-21 RIMULA
1 MP-02
HH150-32094
6C060-99410
1055990-55730
5-Jul-21
6-Jul-21 1101419
1284740
5260221
1279674
1285112
8-Jul-21 M38
M42
FF 5421
LF 3970
2020 PM - OR
105370-55711
300300
12660882
PD22981ER
REMULA
9-Jul-21
2 DE740-01
17-Jul-21 PD22870AA
20-Jul-21 HYDRAULINK
HYDRAULINK
21-Jul-21
29-Jul-21 FF 5421
LF 3970
2020 PM - OR
105370-55711
REMULA
IT150-43561
HH150-32094
6-Jul-21
9-Jul-21 1280910
1177473 / 39581 TIMKEN
1177474 / 39520 TIMKEN
1272558
10-Jul-21 1187039
A91676
1177489
1247389
5260221
11-Jul-21 B 93
12-Jul-21 NS 60
24-Jul-21
WORKSHOP
3
KM 24
28-Jul-21 RE522878
R2010
705990-51701
105990-53001
12-Jul-21 105991-55600
SUPPLY
4
PUMP
5-Jul-21 SC
9-Jul-21 15221-43170
HH 164-32430
105370-55711
5 MAXI 150 SAE 20 - 40 W MEDITRAN
1T021-43560
HH150-32094
3-Jul-21 BF7746D
RE2010
4-Jul-21 UM-063-156F
UM-065-116F
5-Jul-21
7-Jul-21 TELUS 68
9-Jul-21 TELUS 68
14-Jul-21 BF7746D
RF2010
FR1857
FR1856
6 AVD 3000 MF - 400 -3P25NBB
105370-559711
HH150-32094
IT021-43560
105990-55730
MF - 180 - 1IP25NBP01
6C060-99410
3271-58242
P320-1A10AN-P01
RIMULA
M10 x 50mm
15-Jul-21
16-Jul-21 18100452
16-Jul-21 31945-45001
26311-45010
5 HANJIN 01 P181052
SAE 20W - 40 MEDITRAN
25-Jul-21
31-Jul-21 WU14256
PD22928MB
6 DE 710 - D WU14259
PD22981GE
WU14254
PD22981GG
A
No. Unit Date Part Nub
1 MP-02
1-Aug-21
3-Aug-21 5260221
1279674
1285112
10-Aug-21 BI00006197
15-Aug-21
16-Aug-21 LF 3970
R4-40 SHELL
5260221
1279674
1285112
A91667
25-Aug-21 SC - 120 - 71
SC - 120 - 25
29-Aug-21 FF5421
LF3970
RF 2020 PM - OR
2 DE740-01 FS 19732
P182043
P124860
R4-40 SHELL
105370-55711
R4-40 SHELL
105370-55711
R4-40 SHELL
105990-55730
R4-40 SHELL
105370-55711
R4-40 SHELL
6C060-99410
2-Aug-21
RTE-47-G-10B51-B1-I-7
HF 7901
HF 6110
RTE-47-G-10B51-B1-I-7
3-Aug-21
8-Aug-21
10-Aug-21 IT021-43560
R4-40 SHELL
12-Aug-21 RE526965
M 46
B94
R4-40 SHELL
1/2 inch x 2.5 inch
13-Aug-21 RE123461
100536
100534
70584G-01750
105990-34850
14-Aug-21 RE535333
DEA-77
15-Aug-21 6308
6305
6206
127610-22500
105990-22050
105990-01100
70599623100
705990-21700
NF B12
6314/241010/63140
16-Aug-21 M 42
M46
NUT, HEX 5/8-11
NUT, HEX 1/2-13
705890-92605
18-Aug-21
M 46
WORKSHOP
3 B 64
KM 24
SC - 120
M42
NF308C3
6309C3
6005 CM
6008 CM
105406-28300
105406-28310
SC - 120 -25
SC - 120 -26
SC - 120 -35
20-Aug-21 NF308C3
6309
123325/02500
105300-01490
105300-11310
105300-01333
10540G-28310
10540G-28300
705300-23600
6005 CM
6008 CM
120150-22300
10540H -212200
105400-22500
105400-01100
105300-01300
21-Aug-21
23-Aug-21 1285094
1177474
5266814 & 1280910
1252939
9226
A91014
1272558
1177489
1266365
1266323
1278054
1101419
1247389
1279674
1129675
24-Aug-21
25-Aug-21 SC - 120 - 14
NF 308 C3
SC - 120 - 11
SC - 120 - 20
SC - 120 - 71
SC - 120 - 25
11-Aug-21 105990-55730
R4-40 SHELL
SUPPLY
4 29-Aug-21 105990-55730
PUMP
R4-40 SHELL
2-Aug-21 UM-063-300NN
9-Aug-21 P551352
BF7746D
RF2010
R4-40 SHELL
FR1857
FR1856
HH150-32094
IT021-43560
10-Aug-21 RPGC-LCN
23-Aug-21 P551352
B557-546D/RE522878
6 AVD 3000
R4-40 SHELL
RF 2010
HH150-32094
IT021-43560
105370-559711
105990-55730
29-Aug-21 TR
5 HANJIN 01
4-Aug-21 PD27210AE
PD27210I
WU29919
PD27210G
5-Aug-21 PD22873CA
61830MAC3
22252-000360
PM26162-155
WU14259
PD23776DB
PD22873CC
WU22919
PD2721OU
3543619
R4-40 SHELL
6-Aug-21 105370-55711
105370-55711
IT150-43561
R4 -40 SHELL
9-Aug-21
14-Aug-21
15-Aug-21 HF 6110
21-Aug-21 B557-546D/RE522878
R4-40 SHELL
P551352
105370-55711
IT150-43561
IT021-43560
105990-55730
23-Aug-21 2010 CM
24-Aug-21 SC - 120
2-Aug-21
4-Aug-21 8309
3-Aug-21 105370-55711
705600-51100
105370-55711
IT150-43561
R4 -40 SHELL
6-Aug-21 IT150-43561
9-Aug-21
16-Aug-21 5260221
1279674
6 DE 710 - A 1285112
21-Aug-21 B557-546D/RE522878
R4-40 SHELL
P551352
105370-55711
IT150-43561
IT021-43560
105990-55730
23-Aug-21 6C060-99410
3271-58242
26-Aug-21 5260221
1279674
1247389
CONSUMABLE PART FOR MAINTENANCE 2020
NOVEMBER
Name Sparepart QTY
RUBBER PISTON 3EA
SEATHING VALVE 2EA
VANBELT 1EA
OIL ENGINE 5L
GASKET CYLINDER 6 EA
GASKETCYLINDER HEAD 3 EA
V BELT 3 EA
BALL VALVE 1 EA
HOSE 1/2 x 5 M 1 EA
HOSE HYDROLIC 1x6 1 EA
WIDIA 2EA
JOINT SOUTRENCROSS 1EA
SEATHING VALVE 6 EA
STEEL BALL 6 EA
FUEL FILTER 1 EA
FUEL FILTER 1 EA
OIL FILTER 1 EA
OIL FILTER 1 EA
RACOR 1 EA
AIR FILTER 1EA
DECEMBER
Name Sparepart QTY
Jul-21
Name Sparepart QTY
ELEMENT FUEL FILTER GENSET KUBOTA GL 6000 1EA
OIL FILTER GENSET KUBOTA GL 6000 1EA
OIL ENGINE 3L
PETCOCK 1EA
GASKET, COVER 1EA
SEAL, OIL 1”x 1 ¾ x 5/16 9EA
GASKET CYLINDER GASKET CYLINDER 6EA
CYLINDER PACKING 3EA
V-PACKING 9EA
V-PACKING SEAT 3EA
V - PACKING 9EA
V-PACKING SEAT 3EA
AIR CHAMBER 1EA
VIDIA 36EA
CRANKSHAFT 1EA
CAPS BEARING 1EA
CONNECTING RODS AND BEARING INSERT 1EA
CROSSHEAD AND RODS ASSEMBLY WITH O - RING 1EA
BUSHING CONNECTING RODS 1EA
PIN CONNECTING RODS 1EA
BEARING PINION 2EA
SEAL, OIL 1”x 1 ¾ x 5/16 6EA
SEELVE PACKING NUT 3EA
NUT PLUNGER RODS 3EA
VALVE SEAT 6EA
BALL 6EA
GASKET CYLINDER 6EA
GASKET CYLINDER HEAD 3EA
GASKET VALVE COVER 3EA
VIDIA 30 EA
SANCHIN 1 UNIT
Remark
RECONDITION AT WORKSHOP KM 24
RECONDITION AT WORKSHOP KM 24
SERVICED 250H
PROBLEM BROKEN ON VANBELT SANCHIN
TO YANMAR
REPAIRED YANMAR
GENSET KUBOTA GL 6000
RECONDITION MP 01
RECONDITION YANMAR TF 85
FOR MP 01
PREPARED
PROBLEM FMC
SERVICRED REGULER
Remark
SCHEDULE SERVICED
AND REPAIRED LEAKING ON PLUNGER SANCIN
FOR REPAIRED FMC W420
RECONTIION SANCHIN
SERVICED 250 H
SCHEDULE SERVICED
RECONDITION / OVER HOUL FMC PUMP
PREPAPRED RIG LF 70 - 02
SERVICED GENSET KM 24
PREPARED RIG LF 70 - 02
SCHEDULE SERVICED
BROKEN OIL COOLER HYDRAULIC MAKE IT HYDRAULIC
OVERHEATING
SERVICED 250 H
SERVICED 250 H
RECONDTION SANCHIN
RECONDTION YANMAR TF 85
RECONDITION FMC PUMP 535 FOR SPARE DE 740 & AVD 3000
FOR RECONDITION JAW CHUCK AND JAW FOOT CLAMP FOR DE 710
PROBLEM SANCHIN
PROBLEM GENSET
NEED REPAIRED FITTING ELBOW 3/4 ON MOTOR ROTARY HEAD 25.03.2021 ODNE 28.03.2021 31.03.2021
NEED REPAIRED CONTROL BANG (HANDLE CONTROL) 25.03.2021 ODNE 28.03.2021 31.03.2021
NEED REPLACED RUBER PISTON FMC W 420 16.04.2021 ODNE 20.04.2021 27.04.2021
3 MP-01
D
RIG MODEL / RIG SERIAL#
RIG CARRIER
Date
№ Shift
Reported
1 14.07.2019 D/S
2 12.10.2019 D/S
3 29.10.2019 D/S
4 16.12.2019 D/S
6 29.12.2019 D/S
7 18.01.2020 D/S
8 30.01.2020 N/S
9 04.01.2020 N/S
10 07.01.2020 N/S
11 13.01.2020 N/S
12 19.20.2020
13 27.01.2020 N/S
14 28.01.2020 N/S
15 22.02.2020 D/S
16 24.02.2020 D/S
17 25.02.2020 D/S
18 24.20.2020 D/S
18 26.02.2020 D/S
19 05.08.2020 D/S
20 21.08.2020 N/S
21 22.08.2020 D/S
22 27.08.2020 N/S
23 28.08.2020 N/S
31 31.08.2020 D/S
32 02.09.2020 D/S
N/S
33 03.09.2020 N/S
34 04.09.2020 N/S
33 05.09.2020 N/S
34 06.09.2020 D/S
34 07.09.2020 N/S
35 08.09.2020 D/S
36 10.08.2020 D/S
37 11.08.2020 D/S
38 12.09.2020 D/S
39 14.09.2020 D/S
N/S
40 17.09.2020 N/S
41 23.09.2020 D/S
42 25.09.2020 D/S
43 29.09.2020 D/S
44 01.10.2020 D/S
N/S
45 03.10.2020 D/S
45 04.10.2020 N/S
46 08.10.2020 D/S
47 11.10.2020 N/S
48 12.10.2020 D/S
49 13.10.2020 N/S
50 17.10.2020 N/S
51 18.10.2020 D/S
52 18.10.2020 D/S
53 20.10.2020 D/S
N/S
54 22.10.2020 D/S
55 24.10.2020 N/S
57 25.10.2020 D/S
58 30.10.2020 N/S
59 01.11.2020 N/S
60 03.11.2020 D/S
61 04.11.2020 D/S
62 06.11.2020 D/S
63 11.11.2020 D/S
64 12.11.2020 N/S
65 13.11.2020 D/S
66 15.11.2020 D/S
67 17.11.2020 D/S
68 19.11.2020 D/S
69 21.11.2020 D/S
70 28.11.2020 D/S
71 29.11.2020 D/S
72 01.12.2020 D/S
73 08.12.2020 D/S
74 10.12.2020 N/S
75 12.12.2020 N/S
76 15.12.2020 N/S
77 16.12.2020 D/S
78 17.12.2020 N/S
79 18.12.2020 N/S
80 21.12.2020 N/S
81 22.12.2020 D/S
82 22.12.2020 N/S
83 28.12.2020 N/S
1 25-Jul-21 D/S
N/S
2 29-Jul-21 D/S
3 30-Jul-21 D/S
N/S
4 31-Jul-21 D/S
1 4-Aug-21 D/S
N/S
2 5-Aug-21 D/S
3 N/S
4 6-Aug-21 D/S
5 9-Aug-21 D/S
6 10-Aug-21 D/S
N/S
7 14-Aug-21 D/S
N/S
8 15-Aug-21 D/S
9 16-Aug-21 D/S
10 21-Aug-21 D/S
11 23-Aug-21 D/S
12 24-Aug-21 N/S
13 25-Aug-21 D/S
14 26-Aug-21 D/S
DE710-04 (D) P
RIG SERIAL#
EL / ENGINE SERIAL #
Problem
SCHEDULE SERVICE REGULAR 250 HR
INSTALL COMPONENT
MONITORING
SCHEDULE SERVICED
PROBLEM LEAKING ON CHUCK ROTARY HEAD
MONITORING
FABRICATION
MONITORING
MONITORING RIG
PROBLEM ROTARY
ELECTRICAL REPAIR
COMPONENT CHANGE
MONITORING RIG
MONITORING RIG
MONITORING RIG
MONITORING RIG
MONITORING RIG
MONITORING RIG
MONITORING RIG
MONITORING RIG
MONITORING RIG
MOITORING RIG
MONITORING RIIG
MONITORING RIG
MONITORING RIG
MONITORING RIG
MONITORING RIG
MONITORING RIG
Hours
Repair to be carried out
meter
COMPLETED SERVICE REGULAR 250 HR
WASHED AND CLEANED
TAKE OUT SHOE TO BE PREPARED FOR REPAIRING
COMMISIONING ELECTRICAL SYSTEM
ONLY CHANGE ENGINE OIL
TROUBLE SHOOTING HYDRAULIC PUMP NOISE
COMPLETED SERVICE REGULAR 250 HR
SERVICE YANMAN 155 + SACHIN CROSS
SERVICE YANMAN 125 + SACHIN CROSS
COMPLETED SERVICED
REPLACED OIL ENGINE
REPLACED FUEL FILTER ENGINE
REPLACED AIR CLEANER
REPLACED RACOR FILTER
REPLACED FUEL FILTER YANMAR TF 105
REPLACED FUEL FILTER KUBOTA GL 6000
REPLAED OIL FILTER KUBOTA GL 6000
REPAIRED SAUTHRENCROOS
CUTTING BOLT FOR SPIE
CHANGE BOLT
MONITORING
CHECKED CONDITION RIG
CHECKED CONDITION WATER PUMP
CHECKED CONDITION MIXER PUMP
CHECKED CONDITION LIGHTING ON RIG
JULY
REPAIRED AND RECONDITION SHAFT CROSSJOINT (PULL WITH HAMMER)
REPLACED BEARING SOUTHERN CROSS
REPLACED MECHANICAL SEAL
CHANGE CROSS JOINT SOUTHERN CROSS
AUGUST
REPAIR PROBLEM ROTATION HEAD
CHANGE PUMP LUBRICATION ROTATION HEAD
CHECK CONDTION LUBRICATION (OK)
CONTINUE REPAIR PROBLEM STUCK BEARING.
DISMANTLE UNIT MOTOR ROTATION HEAD
ENGINE
REPLACED FUEL FILTER ENGINE
CLEAN UP ELEMENT FUEL FILTER GENSET & AND CLEAN UP FILTER BASE, CHANGE FUEL
REPLACED OIL ENGINE (OIL RIMULA)
CHECKED CONDITION AIR FILTER (GOOD)
CHECKED CONDITION WATTER RADIATOR (GOOD)
MIXER PUMP :
REPLACED OIL ENGINE
REPLACED ELEMENT FUEL FILTER
CLEAN UP AIR FILTER AND CHANGE OIL IN COVER COVER AIR CLEANER
CLEAN UP COVER RADIATOR
TIGHTEN VAN BELT RADIATOR
CHECKED CONDITION SAFETY GUARD (GOOD)
SIRCULATION PUMP :
REPLACED ELEMENT FUEL FILTER
REPLACED OIL ENGINE
CHECKED CONDITION OIL SANCHIN PUMP (GOOD)
CLEAN UP AIR FILTER YANMAR TF 85 AND CHANGE OIL IN COVER AIR CLEANER
GENSET :
REPLACED ELEMENT FUEL FILTER GENSET
CHECKED CONDITION AIR FILTER (GOOD)
CHECKED CONDITION WATTER RADIATOR GENSEL GL 6000
REPLACED OIL ENGINE
SUPPLY PUMP :
REPLACED ELEMENT FUEL FILTER
REPLACED OIL ENGINE
CHECKED CONDITION OIL SANCHIN PUMP (GOOD)
CLEAN UP AIR FILTER YANMAR TF 85 AND CHANGE OIL IN COVER AIR CLEANER
ENGINE
REPLACED FUEL FILTER ENGINE
CLEAN UP ELEMENT FUEL FILTER GENSET & AND CLEAN UP FILTER BASE, CHANGE FUEL
REPLACED OIL ENGINE (OIL RIMULA)
CHECKED CONDITION AIR FILTER (GOOD)
CHECKED CONDITION WATTER RADIATOR (GOOD)
MIXER PUMP :
REPLACED OIL ENGINE
REPLACED ELEMENT FUEL FILTER
CLEAN UP AIR FILTER AND CHANGE OIL IN COVER COVER AIR CLEANER
CLEAN UP COVER RADIATOR
TIGHTEN VAN BELT RADIATOR
CHECKED CONDITION SAFETY GUARD (GOOD)
SIRCULATION PUMP :
REPLACED ELEMENT FUEL FILTER
REPLACED OIL ENGINE
CHECKED CONDITION OIL SANCHIN PUMP (GOOD)
CLEAN UP AIR FILTER YANMAR TF 85 AND CHANGE OIL IN COVER AIR CLEANER
GENSET :
REPLACED ELEMENT FUEL FILTER GENSET
CHECKED CONDITION AIR FILTER (GOOD)
CHECKED CONDITION WATTER RADIATOR GENSEL GL 6000
REPLACED OIL ENGINE
SUPPLY PUMP :
REPLACED ELEMENT FUEL FILTER
REPLACED OIL ENGINE
CHECKED CONDITION OIL SANCHIN PUMP (GOOD)
CLEAN UP AIR FILTER YANMAR TF 85 AND CHANGE OIL IN COVER AIR CLEANER
Hour
Part Desc Part No QTY
work
12
4
ENGINE OIL
OILFILTER
FUELFILTER
FUEL SEPARATOR
MAIN PUMP ASSY
OIL ENGINE
2
ENGINE JOHNDEREE JD4045ASSY
12
2
12
3
8 SERVICE KIT 250 HRS 1
BULL LAMP 400 W 2
OIL FILTER 1 EA
FUEL FILTER 1 EA
RACOR 1 EA
2 SETTING VALUE 6 EA
STEEL BALL 6 EA
2
2
6 V BELT M 42 1 EA
12 HEAD FMC 1 EA
RABER PISTON 1 EA
2
4
ENGINE :
FUEL FILTER ENGINE B557-546D/RE522878 1EA
OIL ENGINE R4-40 SHELL 20L
MIXER PUMP :
ELEMENT FUEL FILTER ENGINE 105370-55711 1EA
OIL ENGINE R4-40 SHELL 3L
SIRCULATION PUMP :
ELEMENT FUEL FILTER YANMAR 105370-55711 1EA
OIL ENGINE R4-40 SHELL 3L
GENSET :
ELEMENT FUEL FILTER GENSET GL 6000 IT150-43561 1EA
OIL ENGINE R4-40 SHELL 3L
SUPPLY PUMP :
ELEMENT FULE FILTER YANMAR TS 190/230 105990-55730 1EA
OIL RIMULA R4-40 SHELL
10
ENGINE :
FUEL FILTER ENGINE B557-546D/RE522878
OIL ENGINE R4-40 SHELL
OIL FILTER P551352
MIXER PUMP :
ELEMENT FUEL FILTER ENGINE 105370-55711 1EA
OIL ENGINE R4-40 SHELL 3L
SIRCULATION PUMP :
ELEMENT FUEL FILTER YANMAR 105370-55711 1EA
OIL ENGINE R4-40 SHELL 3L
GENSET :
ELEMENT FUEL FILTER GENSET GL 6000 IT150-43561 1EA
OIL ENGINE R4-40 SHELL 3L
OIL FILTER IT021-43560
SUPPLY PUMP :
ELEMENT FULE FILTER YANMAR TS 190/230 105991-55600 1EA
OIL RIMULA R4-40 SHELL
SURATMAN 29.12.2019
HERMANSYAH 18.01.2020
HERMANSYAH 30.01.2020
HERMANSYAH 04.01.2020
HERI 07.01.2020
HERI 13.01.2020
ISKANDAR 19.02.2020
SUPANJI 27.01.2020
SUPANJI 28.01.2020
ISKANDAR 24.02.2020
ISKANDAR 26.02.2020
YONI ALI
10.09.2020
YONI ALI
HERMAN 23.09.2020
TATANG 25.09.2020
AHMAD SUHAEFI
HILL 29.09.2020
TATANG 01.10.2020
HILL
HERMAN
SYAMSUL.H 03.10.2020
DIGDO
HILL 04.09.2020
HERMAN
ABDULRAHMAN 07.10.2020
AHMAD
HILL 11.10.2020
DIGDO 12.10.2020
HILL 13.10.2020
SUPRIATNA 17.10.2020
HILL M 18.10.2020
SUPRIATNA 20.10.2020
HILL M 22.10.2020
SUPRIATNA 24.10.2020
HILL M 25.10.2020
HILL M 30.10.2020
HILL M 01.11.2020
SUPRIATNA 03.11.2020
SUPRIATNA 04.11.2020
SUPRIATNA 06.11.2020
TATANG 11.11.2020
HADI W
ABDULRAHMAN 12.11.2020
13.11.2020
HADI. W 15.11.2020
SUPRIATNA 01.12.2020
S.KAMAL
HERMAN R 16.12.2020
HERMAN R 22.12.2020
TATANG S 25-Jul-21
YONI ALI
HERMAN R 29-Jul-21
TATANG S
BAMBANG H 30-Jul-21
REKYAN Y
HERMAN R
TATANG S 31-Jul-21
DEDEN
BAMBANG H
BAMBANG H 4-Aug-21
TATANG S
DEDEN
TATANG 5-Aug-21
DEDEN
BAMBANG H
HERMAN R
HERMAN 9-Aug-21
ARI WIBOWO
HERMAN 10-Aug-21
REKYAN
BAMBANG H
HERMAN R 14-Aug-21
BAMBANG H
DEDEN
HERMAN 15-Aug-21
SUPRIATNA
BAMBANG H
DEDEN
HERMAN R 16-Aug-21
BAMBANG 21-Aug-21
DEDEN ELON
ARI TRI 23-Aug-21
BAMBANG H
DIGDO S
SUPRIATNA
Ser# PE6068E003662
Saifudin/Ben Ul 02.11.2017
Purmihadi
Purmihadi 03.11.2017
Purmihadi/Ben Ul 04.11.2017
Purmihadi 06.11.2017
Thoyib
1
1
Purmihadi/Ben Ul 08.11.2017
Agung/Purmi/Ben Ul 09.11.2017
Agung/Purmi 11.11.2017
Agung/Purmi 13.11.2017
Agung/Purmi 14.11.2017
1
Agung/Purmi 15.11.2017
Solikhin
3L Agung P/Solikhin 16.11.2017
Solikhin/Agung P 12.11.2017
Solikhin/Agung P 18.11.2017
Solikhin 20.11.2017
Solikhin/Agung 21.11.2017
8 Agung P/Solikhin 22.11.2017
12 30-Jun-16 D/S MAKE EXTENSION FOR SKID BASE FOR STANDING ROD
13 22.08.2016 There is No Wire Line Wireline already at Ceger Warehouse
14 21.11.2016 D/S Moved drill rig from yard container to workshop 10
15 22.11.2016 D/S Prepared for fabricated lifting point at Engine John Deere 10
16 23.11.2016 D/S Rig Up Installed rotation carriage slides and adjusting tile carriage 10
ENANCE RECORD PERIOD JULY
Part Desc
Part No QTY Fitter REQ No PO# Date Repaired
4 HERYANTO 13.11.2018
PHUNGKY
12 HERYANTO 14.11.2018
YONI
YONI 15.11.2018
6 HERYANTO 16.11.2018
6 HERYANTO/YONI 18.11.2018
6 HOSE 1"X1 M 1 HERYANTO/PHUNGKY 19.11.2018
6 ISKANDAR/HERMANSYAH 22.11.2018
12 ISKANDAR 24.11.2018
HERMANSYAH
12 ISKANDAR 25.11.2018
12 HERMANSYAH 29.11.2018
8 HERYANTO 29.11.2018
6 ISKANDAR 01.12.2018
2 PHUNGKY/HERMANSYAH 05.12.2018
2 ISKANDAR 18.12.2018
5 PHUNGKY/SAZALI 27.12.2018
11 YONI ALI 02.01.2019
ALTERNATOR 1 DJUWANTO/TATANG 13.02.2019
BATTERY N150 2
DJUWANTO/KAMAL 23.02.2019
10 YONI 23.03.2019
OIL ENGINE
FUEL FILTER FF5421 1
OIL FILTER LF3970 1
FUEL SEPARATOR LF3970 1
RACOR FILTER LF3972 1
TEGUH/KAMAL 30.03.2019
YONI ALI 03.04.2019
TEGUH/KAMAL 05.04.2019
YONI/TATANG
10 MOTOR MIXER 26706 1 YONI ALI 09.05.2019
1 YONI ALI 10.05.2019
1 IMAM 01.06.2019
IMAM 20.07.2019
S. KAMAL 16.08.2019
4 HADI W 21.08.2019
1 DAYMOND/IMAM N 23.08.2019
DAYMOND/IMAM N 26.08.2019
SURATMAN 31.08.2019
SURATMAN 01.09.2019
IMAM 06.09.2019
ABDUL R/SURATMAN 07.09.2019
TATANG/HADI 16.09.2019
SURATMAN/HERMAN 21.09.2019
HILL 04.10.2019
12 ABD RAHMAN 19.10.2019
5 HADI 05.11.2019
12 HERMAN R 12.11.2019
12 ABD RAHMAN 03.12.2019
KAMAL 07.12.2019
3 HADI 19.12.2019
HILL/HADI 21.12.2019
SUPRIYATNA 01.02.2020
02.02.2020
3 18.08.2016
4 19.08.2016 D/S
5 20.08.2016 D/S
6 27.08.2016 D/S
7 28.08.2016 D/S
8 06.09.2016 D/S
9 07.09.2016 D/S
10 08.09.2016 D/S
11 09.09.2016 D/S
12 10.09.2016 D/S
13 13.09.2016 D/S
14 14.09.2016 D/S
14 14.09.2016 D/S
15 24.09.2016 D/S
16 26.09.2016 D/S
17 27.09.2016 D/S
18 28.09.2016 D/S
19 29.09.2016 D/S
29.09.2016 D/S
20 30.09.2016 D/S
30.09.2016 D/S
21 01.10.2016 D/S
22 03.10.2016 D/S
03.10.2016 D/S
23 04.10.2016 D/S
04.10.2016 D/S
24 07.10.2016 D/S
25 13.10.2016 D/S
26 14.10.2016 D/S
27 15.10.2016 D/S
28 17.10.2016 D/S
29 18.10.2016 D/S
30 19.10.2016 D/S
31 25.10.2016 D/S
32 25.10.2016 D/S
32 26.10.2016 D/S
33 27.10.2016 D/S
34 28.10.2016 D/S
28.10.2016 D/S
35 29.10.2016 D/S
29.10.2016 D/S
36 31.10.2016 D/S
31.10.2016 D/S
37 01.11.2016 D/S
01.11.2016 D/S
38 02.11.2016 D/S
02.11.2016 D/S
02.11.2016 D/S
39 03.11.2016 D/S
03.11.2016 D/S
40 04.11.2016 D/S
04.11.2016 D/S
41 05.11.2016 D/S
05.11.2016 D/S
05.11.2016 D/S
42 07.11.2016 D/S
43 08.11.2016 D/S
44 09.11.2016 D/S
45 10.11.2016 D/S
46 11.11.2016 D/S
47 15.11.2015 D/S
48 17.11.2016 D/S
49 18.11.2016 D/S
50 19.11.2016 D/S
51 21.11.2016 D/S
21.11.2016 D/S
52 22.11.2016 D/S
53 23.11.2016 D/S
54 26.11.2016 D/S
55 27.11.2016 D/S
56 28.11.2016 D/S
57 07.12.2016 D/S
58 08.12.2016 D/S
58 09.12.2016 D/S
59 14.12.2016 D/S
60 15.12.2016 D/S
61 16.12.2016 D/S
62 17.12.2016 D/S
63 19.12.2016 D/S
64 20.12.2016 D/S
65 21.12.2016 D/S
66 21.12.2016 D/S
66 22.12.2016 D/S
67 22.12.2016 D/S
67 23.12.2016 D/S
68 24.12.2016 D/S
69 27.12.2016 D/S
70 27.12.2016 D/S
71 28.12.2016 D/S
72 29.12.2016 D/S
73 30.12.2016 D/S
74 03.01.2017 D/S
75 16.01.2017 D/S
76 17.01.2017 D/S
77 18.01.2017 D/S
75 19.01.2017 D/S
76 25.01.2017 D/S
77 27.01.2017 D/S
78 30.01.2017 D/S
79 31.01.2017 D/S
31.01.2017 D/S
79 01.02.2017 D/S
80
81
82
83 01.02.2017 D/S
83 02.02.2017 D/S
02.02.2017
85
86 03.02.2017 D/S
03.02.2017 D/S
87 04.02.2017 D/S
88 06.02.2017 D/S
89 07.02.2017 D/S
07.02.2017 D/S
90 08.02.2017 D/S
08.02.2017 D/S
91 09.02.2017 D/S
92 10.02.2017 D/S
93 11.02.2017 D/S
11.02.2017 D/S
94 13.02.2017 D/S
95 23.05.2017 D/S
96 24.05.2017 D/S
97 25.05.2017 D/S
98 06.07.2017 D/S
99 10.07.2017 D/S
1 24.02.2020 D/S
2 25.02.2020 D/S
3 26.02.2020 D/S
4 27.02.2020 D/S
5 28.02.2020 D/S
6 29.02.2020 D/S
7 29.02.2020 D/S
8 01.03.2020 D/S
10 02.03.2020 D/S
11 03.03.2020 D/S
12 19.04.2020 D/S
13 19.04.2020 D/S
14 20.04.2020 D/S
15 20.04.2020 D/S
16 20.04.2002 D/S
17 20.04.2020 D/S
18 21.04.2020 D/S
19 21.04.2020 D/S
20 24.04.2020 D/S
D/S
D/S
D/S
21 25.04.2020 D/S
22 26.04.2020 D/S
24 27.04.2020 D/S
N/S
25 27.04.2020 D/S
26 28.04.2020 D/S
27 29.04.2020 D/S
28 30.04.2020 D/S
29 01.05.2020 D/S
30 03.05.2020 D/S
31 04.05.2020 D/S
32 05.05.2020 D/S
33 06.05.2020 D/S
D/S
34 07.05.2020 D/S
35 08.05.2020 D/S
36 09.05.2020 D/S
37 10.05.2020 D/S
38 11.05.2020 D/S
39 12.05.2020 D/S
40 13.05.2020 D/S
41 14.05.2020 D/S
42 15.05.2020 D/S
43 16.05.2020 D/S
44 17.05.2020 D/S
45 18.05.2020 D/S
46 19.05.2020 D/S
47 21.05.2020 D/S
48 21.05.2020 D/S
49 23.05.2020 D/S
49 25.05.2020 D/S
26 26.05.2020 D/S
27 27.05.2020 D/S
28 28.05.2020 D/S
29 29.05.2020 D/S
30 30.05.2020 D/S
31 31.05.2020 D/S
32 08.06.2020 D/S
33 09.06.2020 D/S
34 10.06.2020 D/S
10.06.2020 N/S
35 12.06.2020 D/S
36 13.06.2020 D/S
N/S
19 19.06.2020 D/S
N/S
37 20.06.2020 D/S
37 21.06.2020 D/S
N/S
37 22.06.2020 D/S
N/S
38 24.06.2020 D/S
39 25.06.2020 N/S
40 26.06.2020 N/S
41 27.06.2020 D/S
42 11.08.2020 D/S
43 17.08.2020 D/S
44 18.08.2020 N/S
45 19.08.2020 D/S
NS
46 20.08.2020 D/S
47 21.08.2020 D/S
48 22.08.2020
22.08.2020 N/S
49 23.08.2020 D/S
50 24.08.2020 D/S
51 25.08.2020 D/S
N/S
52 26.08.2020 D/S
53 27.08.2020 D/S
N/S
54 28.08.2020 D/S
54 29.08.2020 D/S
55 30.08.2020 D/S
56 31.02.2020 D/S
58 01.02.2020 D/S
59 02.09.2020 D/S
60 03.09.2020 D/S
61 04.09.2020 D/S
63 05.09.2020 D/S
64 06.09.2020 D/S
65 07.09.2020 D/S
66 08.09.2020 D/S
67 09.09.2020 D/S
68 10.09.2020 D/S
68 11.09.2020 D/S
69 12.09.2020 D/S
70 13.09.2020 D/S
71 14.09.2020 D/S
71 15.09.2020 D/S
###
73 17.09.2020 D/S
74 18.09.2020 D/S
###
N/S
75 19.09.2020 D/S
N/S
76 20.09.2020 D/S
77 21.09.2020 D/S
78 22.09.2020 D/S
23 23.09.2020 D/S
24 24.09.2020 D/S
25 25.09.2020 D/S
26 26.09.2020 D/S
27 27.09.2020 D/S
28 28.09.2020 D/S
29 29.09.2020 D/S
30 30.09.2020 D/S
31 01.10.2020 D/S
N/S
32 02.10.2020 D/S
N/S
33 03.10.2020 D/S
34 04.10.2020 D/S
N/S
35 05.10.2020 D/S
N/S
36 06.10.2020 D/S
N/S
37 07.10.2020 D/S
N/S
38 08.10.2020 D/S
N/S
39 09.10.2020 D/S
N/S
40 10.10.2020 D/S
N/S
41 11.10.2020 D/S
N/S
42 12.10.2020 D/S
42 13.10.2020 D/S
N/S
43 14.10.2020 D/S
44 14.10.2020 N/S
45 16.10.2020 N/S
46 16.10.2020 D/S
47 17.10.2020 D/S
48 18.10.2020 D/S
49 19.10.2020 D/S
50 20.10.2020 D/S
51 21.10.2020 D/S
52 22.10.2020 D/S
53 23.10.2020 D/S
54 24.10.2020 D/S
55 25.10.2020 D/S
56 26.10.2020 D/S
57 27.10.2020 D/S
58 27.10.2020 D/S
59 27.10.2020 D/S
60 28.10.2020 D/S
61 28.10.2020 D/S
62 28.10.2020 D/S
63 28.10.2020 D/S
64 28.10.2020 D/S
65 29.10.2020 N/S
66 30.10.2020 D/S
67 30.10.2020 D/S
68 30.10.2020 D/S
69 30.10.2020 N/S
70 31.10.2020 D/S
71 31.10.2020 N/S
72 31.10.2020 D/S
73 31.10.2020 D/S
74 01.11.2020 D/S
75 D/S
76 01.11.2020 N/S
77 02.11.2020 D/S
78 02.11.2020 N/S
79 02.11.2020 D/S
80 02.11.2020 D/S
81 02.11.2020 D/S
82 03.11.2020 D/S
83 03.11.2020 D/S
N/S
84 03.11.2020 D/S
85 04.11.2020 D/S
D/S
86 04.11.2020 D/S
86 04.11.2020 N/S
87 05.11.2020 D/S
88 05.11.2020 D/S
89 05.11.2020 N/S
90 06.11.200 D/S
91 07.11.2020 D/S
92 08.11.2020 D/S
93 08.11.2020 D/S
44 10.11.2020 D/S
N/S
45 11.11.2020 D/S
N/S
46 12.11.2020 D/S
N/S
47 13.11.2020 D/S
48 14.11.2020 D/S
49 15.11.2020 D/S
50 16.11.2020 D/S
51 17.11.2020 D/S
52 18.11.2020 D/S
53 19.11.2020 D/S
54 20.11.2020 D/S
55 21.11.2020 D/S
56 22.11.2020 D/S
57 23.11.2020 D/S
58 24.11.2020 D/S
59 25.11.2020 D/S
60 27.11.2020 D/S
61 28.11.2020 D/S
62 29.11.2020 D/S
63 30.11.2020 D/S
64 01.12.2020 D/S
N/S
65 02.12.2020 D/S
N/S
67 03.12.2020 D/S
N/S
68 04.12.2020 D/S
69 05.12.2020 D/S
70 06.12.2020 D/S
71 07.12.2020 D/S
73 08.12.2020 D/S
74 09.12.2020 D/S
75 10.12.2020 N/S
76 11.12.2020 D/S
N/S
77 12.12.2020 D/S
78 13.12.2020 D/S
79 14.12.2020 D/S
80 15.12.2020 D/S
81 15.12.2020 D/S
82 16.12.2020 D/S
83 16.12.2020 N/S
84 17.12.2020 D/S
85 17.12.2020 N/S
86 18.12.2020 D/S
D/S
87 18.12.2020 N/S
88 19.12.2020 D/S
89 19.12.2020 D/S
90 20.12.2020 D/S
D/S
91 21.12.2020 D/S
92 22.12.2020 D/S
93 23.12.2020 D/S
94 23.12.2020 N/S
95 24.12.2020 N/S
96 25.12.2020 D/S
97 26.12.2020 D/S
98 26.12.2020 N/S
99 27.12.2020 D/S
N/S
N/S
N/S
163 5-Apr-21 D/S
N/S
N/S
N/S
167 12-Apr-21 D/S
N/S
N/S
N/S
N/S
N/S
N/S
N/S
N/S
N/S
N/S
N/S
N/S
N/S
N/S
N/S
N/S
N/S
N/S
N/S
1 3-Jul-21 N/S
2 4-Jul-21 D/S
3 5-Jul-21 D/S
4 6-Jul-21 D/S
5 7-Jul-21 D/S
6 8-Jul-21 D/S
7 9-Jul-21 D/S
8 10-Jul-21 D/S
9 11-Jul-21 D/S
10 12-Jul-21 D/S
12 16-Jul-21 D/S
13 17-Jul-21 D/S
14 18-Jul-21 D/S
15 19-Jul-21 D/S
16 22-Jul-21 D/S
17 23-Jul-21 D/S
18 24-Jul-21 D/S
19 25-Jul-21 D/S
20 26-Jul-21 D/S
21 28-Jul-21 D/S
22 29-Jul-21 D/S
23 30-Jul-21 D/S
1 1-Aug-21 D/S
2 2-Aug-21 D/S
3 3-Aug-21 D/S
4 4-Aug-21 D/S
5 5-Aug-21 D/S
6 7-Aug-21 D/S
7 8-Aug-21 D/S
N/S
8 9-Aug-21 D/S
N/S
9 10-Aug-21 D/S
N/S
10 11-Aug-21 D/S
11 12-Aug-21 D/S
N/S
12 13-Aug-21 D/S
13 14-Aug-21 D/S
14 15-Aug-21 D/S
N/S
15 16-Aug-21 D/S
16 17-Aug-21 D/S
18 18-Aug-21 D/S
N/S
19 19-Aug-21 D/S
N/S
20 20-Aug-21 D/S
21 21-Aug-21 D/S
23-Aug-21 N/S
22
22 24-Aug-21 D/S
23 25-Aug-21 D/S
24 27-Aug-21 D/S
25 28-Aug-21 D/S
26 29-Aug-21 D/S
Problem
New scaffolding need guard rails at platform
-
-
-
-
Engine Deutz
Engine Deutz
JD6068TF150 Ex Duralite-02
REPAIRED YANMAR TF 85
YANMAR TF 85
BROKEN FOOTCLAMP
REBUILD YANMAR TF 85
REBUILD YANAMR TS - 85 - 02
REBUILD YANMAR TF 85
REPAIRED SKID SUPLLY PUMP
REBUILD YANMAR TF 85
REBUILD YANMAR TF 85
REBUILD YANMAR TF 85
PROBLEM AT FOOTCLAMP
REPAIRED AND REBUILD YANMAR TS 190
WORK SHOP KM 24
RECONDITION GEARBOX MP 01
CONTINUE ASSEMBLY GENSET
FABRICATION
RECONDITION SANCHIN
FABRICATION CONTAIMENT
FABRICATION
FABRICATION
FABRICATION
RECONDITION SANCHIN
FABRICATION MANUAL JACK FOR ROD
FABRICATION
STANDBY AT WORK SHOP KM24
FABRICATION
STANDBY AT WORKSHOP 24
RECONDTION WORKSHOP KM 24
PREPARE SKID MP 02
FABRICATION
FABRICATION
STANDBY
FABRICATION
STANDBY AT WORKSHOP KM 24
FABRICATION
RECONDTION SANCHIN
FABRICATION
FABRICATION
RECONDITION YANMAR
FABRICATION
RECONDITION YANMAR TS 190
RECONDITION YANMAR TS 190
RECONDITION FMC PUMP
FABRICATION
STANDBY AT WORKSHOP KM 24
STANDBY AT WORKSHOP KM 24
STANDBY
STANDBY
FABRICATION
PROBLEM AT GENSET KM 24
FABRICATION
FABRICATION
FABRICATION
RECONDITION YANMAR TF 85
STANDBY AT WORKSHOP KM 24
RECONDITION FMC PUMP
FABRICATION
RECONDITION GENSET DENYO
MONITORING
FABRICATION
FABRICATION
FABRICATION
FABRICATION
FABRICATION
FABRICATION
FABRICATION
FABRICATION
FABRICATION
RECONDITION SANCHIN 120
FABRICATION
ELECTRICAL REPAIRED
FABRICATION
FABRICATION
ELECTRICAL REPAIRED
PROBLEM YANMAR TF 85
FABRICATION
ELECTRICAL REPAIRED
PROBLEM WATER PUMP
ELECTRICAL REPAIRED
FABRICATION
FABRICATION
PROBLEM ELECTRICAL
MONITORING PUMP
BELT REPAIRED
PROBLEM ELECTRICAL
FABERICATION
PROBLEM PUMP
FABRICATION
RECONDITION MP 300.01
FABRICATION
RECONDITION MP 300.01
FABRICATION
ELECTRICAL REPAIR AND PUMP SUPLY
FABRICATION
ELECTRICAL REPAIRED
FABRICATION
STANDBY AT WORKSHOP KM 24
FABRICATION
STANDBY AT WORKSHOP KM 24
CHANGED CREW
FABRCATION FISHING TOOLS FOR RIG DE 740
PREPARED RIG MP 02
REPAIRED INNERTUBE
FABRICATION
STANDBY AT WORKSHOP KM 24
FABRICATION
FABRICATION
FABRICATION
FABRICATION
SET MP 02
FABRICATION
RECONDITION GENSET
RECONDITION SUPPLY PUMP
FABRICATION
REPAIRED PROBLEM YANMAR
FABRICATION
ELECTRICAL
FABRICATION
FABRICATION
RECONDIitoN FUNK TRANSMISI AVD 3000
FABRICATION
RECONDITION FUNK TRANSMISION
SET UP RIG MP01
FABRICATION
SET MP 01
FABRICATION
RECONDITION RIG MP 01 PREPARED FOR DRILLING
FABRICATION
FABRICATION
FABRICATION
STANDBY
STANDBY AT WORKSHOP KM 24
FABRICATION
STANDBY AND CLEAN UP WORKSHOP
FABRICATION
STANDBY AT WORKSHOP KM 24
STANDBY AT WORKSHOP KM 24
PREPARED RIG MP 02
REPAIRED YANMAR TF 230
STAND BY WORKSHOP
FABRICATION
FABRICATION
FABRICATION
FABRICATION
PUMP REPAIRED
FABRICATION
FABRICATION
MONITORING MP 300 02
FABRICATION
FABRICATION
CHECKED COMPONENT
FABRICATION
FABRICATION
FABRICATION
FABRICATION
FABRICATION
FABRICATION
SERVISE PUMP
FABRICATION
FABRICATION
FABRICATION
FABRICATION
RECONDITION PUMP
FABRICATION
RECONDITION WORKSHOP
FABRICATION
FABRICATION
FABRICATION
FABRICATION
RCONDITION SANCHIN
FABRICATION
FABRICATION
RECONDITION WATER PUMP
RECONDITION
FABRICATION
FABRICATION
FABRICATION
Fabrication
Fabrication
Fabrication
Fabrication
Fabrication
Fabrication
Fabrication
Fabrication
Fabrication
Fabrication
Fabrication
Fabrication
Fabrication
Rope Repair
Rope Repair
Fabrication
Fabrication
Fabrication
Fabrication
Rope Repair
Fabrication
CONTINUE
RECONDITION RIG DE 710 PREPARED DRILING
RECONDITION GENSET
FABRICATION
FABRICATION
FABRICATION
FABRICATION
STANDBY AT WORKSHOP KM 24
FABRICATION
STANBY AT WORKSHOP KM 24
STANBY AT WORKSHOP KM 24
STANDBY AT WORKSHOP KM 24
FABRICATION
STANDBY AT WORKSHOP KM 24
FABRICATION
STANBY AT WORKSHOP KM 24
RECONDIITION YANMAR TF 85
FABRICATION
RECONDIITON YANMAR TF 85
STANDBY AT WORKSHOP KM 24
STANDBY AT WORKSHOP KM 24
STANDBY AT WORKSHOP KM 24
FABRICATION
FABRICATION
STANDBY AT WORKSHOP KM 24
STANDBY AT WORKSHOP KM 24
STANDBY WORKSHOP KM 24
FABRICATION CHAMBER
STANDBY AT WORKSHOP KM 24
STAND BY AT WORKSHOP KM 24
STAND BY AT WORKSHOP KM 24
FABRICATION
STANDBY AT WORKSHOP KM 24
FABRICATION
STANDBY AT WORKSHOP KM 24
STANDBY AT WORKSHOP KM 24
FABRICATION
FABRICATION
FABRICATION
STANDBY AT WORKSHOP KM 24
FABRICATION
STANDBY WORKSHOP KM 24
STANDBY AT WORKSHOP KM 24
FABRICATION,
FABRICATION,
FABRICATION,
DESCRIPTION OF WORK
FABRICATION,
FABRICATION,
FABRICATION,
FABRICATION,
FABRICATION,
FABRICATION,
FABRICATION,
DESCRIPTION OF WORK
ENGINE/FUNK REPAIR
ENGINE/FUNK REPAIR
ENGINE/FUNK REPAIR
FABRICATION
BEAN PUMP
FABRICATION
FABRICATION
FABRICATION
FABRICATION
FABRICATION
FABRICATION
PREPARED RIG LF 70 - 02
PREPAPRED RIG LF 70 - 02
SCHEDULE SERVICED 250 H GENSET KM 24
FABRICATION
CONTINUE PREPARED LF 70 - 02
FABRICATION
CLEAN UP WORKSHOP KM 24
PREPARED RIG LF 70 - 02
PREPARED RIG LF 70 - 02
PREPARED RIG LF - 70 - 02
PRPEPARED RIG LF 70 - 02
FABRICATION
FABRICATION
CONTINUE PREPAPARED LF 70 - 02
FABRICATION
FABRICATION
FABRICATION
RECONDITION GENSET
RECONDITION SUPPLY PUMP
FABRICATION
ELECTRICAL
OVERHAUL YANMAR TF 85
FABRICATION
ELECTRICAL RECONDITION
FABRICATION
ELECTRICAL RECONDITION
FABRICATION
FABRICATION
STANDBY AT WORKHOP KM 24
ELECTRICAL RECODITION
10
Installed Engine 2
Fixed Stopper at the Skid
Fixed Safety Guard
Cut of Bracket replaced by TS230R new engine
Tested Running Engine
Fill up the Oil
Fill up the Fuel
Fabricate new skid for Engine Yanmar TS230 and Supply Pump
Repair sunchin 2 unit
Replaced valve assy & tap thread housing
Traning Crew
Dismantle LF70-02
Continued fabricate skid for new Yanmar Engine TS230R
Continue repaired sunchin
Continue repaired skid TS230 Yanmar
Fabricated Guard and Lifting Point for skid Yanmar TS230R
Make Skid PTL-SP-21
Installed Guard PTL-SP-20
Dismantle LF130
Continued Fixed safety guard for PTL-SP-20 new Pump
Fabricate engine skid for John Deere JD6068 ex Duralite -02
Continued fabricate engine skid for John Deere JD6068 ex Duralite -02
Finalized fabricate engine skid for John Deere JD6068 ex Duralite -02
Checked new brand engine John Deere
Replaced housing fly wheel john deere (bell housing)
Dismantle fly wheel
Take out old seal from crank shaft
Installed housing fly wheel engine john deere ex Duralite -02
Fabricated lifting point for rotation head
Continued fabricate NS50 skid
Continued fabricate NS50 skid
Continued fabricate NS50 skid
Continued fabricate NS50 skid
Continued skid FMC for duralite-01
Continued fabricate NS50 skid
Washed duralite-01 skid
Replaced container prop to H-Beam
RECONDITION SANCHIN :
REPLACED PLUNGER
REPLACED CONNECTING ROD
REPLACED PIN CONNECTING ROD
REPLACED PACKING BACK COVER
REPLACED BACK COVER
REPLACED CRANK SHAFT
REPLACED BEARING SHAFT
REPLACED OIL FILLER PLUG AND CAP
REPLACED BEARING OIL SEAL
REPLACED VALVE ASSY
REPLACED RING GREASE
REPLACED VPACKING RING GREASE
REPLACED V-PACKING ADAPTOR
REPLACED PACKING GRAND
REPLACED GUIDE OIL SEAL
RECONDITION YANMAR TS 190 :
CHANGED GEAR BALLANCER
REPLACED BEARING BALLANCER (LARGE)
REPLACED BEARING BALLANCER ( SMALL )
CLEAN ALL COMPONENT YANMAR
SETTING ALL COMPONENT YANMAR AND INSTALL
FABRICATION :
FABRICATION JAW CHUCK
FABRICATION FISHING TOOLS FOR DOWN HOLE TOOLS
FABRICATION RACK PIPE FOR BACK HAND DOWNHOLE TOOLS
FABRICATION :
CONTINUE FABRICATION / WELDING RACK BACK HAND FOR DOWNHOLE EQUIPMENT
INSTALL / WELDING ( SECOND )ROD NQ FOR RACK BACK HAND FOR DOWN HOLE EQUIPMENT
FABRICATION :
FABRICATION STABILLIZER ROTARY HEAD FOR RIG DE 710
FABRICATION :
MODIFICATION JAW CHUCK FOR RIG
FABRICATION JAW CHUCK
STANDBY AT WORKSHOP KM 24
FABRICATION :
FABRICATION JAW CHUCK
STANDBY AT WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
RECONDITION FOOTCLAMP MP 02
DISMANTLE ALL COMPONENT FOOT CLAMP MP
CLEANED ALL COMPONENT FOOT CLAMP FOR MP
RESEAL CYLINDER FOOT CLAMP
AND INSTALLED ALL COMPONENT FOOT CLAMP
FABRICATION :
FABRICATION FISHING TOLLS FOR DOWNHOLE EQUIPMENT
STANDBY AT WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
RECONDITION ROTARY HEAD MP :
REPLACED SPINDLE ROTARY HEAD MP
REPLACED BEARING ROTARY HEAD
REPLACED CON BEARING ROTARY HEAD
FABICATION :
FABRICATION FISHING TOOLS FOR DOWNHOLE EQUIPMENT
SPLITTING ROD PQ ( STUCK PIPE )
STANDBY AT WORKSHOP KM 24
STANDBY AT WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
STANDBY AT WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
STANDBY AT WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
LOADING RIG MP 02
LOADING COMPONENT ACCESSORIES RIG MP 02
STANDBY AT WORKSHOP KM 24
CLEAN UP WORK SHOP KM 24
STANDBY AT WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
INSTAL YANMAR TF 85
REPAIR SANCHIN 120
CLEAN UP AREA WORKSHOP
REPAIRED YANMAR TF 85
REPAIRED SANCHIN PUMP
CLEAN UP YANMAR SANCHIN PUMP
REPAIRED YANMAR TF 85
CHARGING BATTERY
CLEAN UP ENGINE YANMAR
MEMPERBAIKI SOCKET LISTRIK
REPAIRED YANMAR TF 85
REPAIRED CABLE ROLL
REPAIRED ENGINE HISG PRESSURE
REPAIRED ROTARY MOTOR CONNECTOR
REPOSISION MP 300.01
REPAIRED HARNES AND CONTROL PANEL MP 300.01
REPAIRED YANMAR TS 230
FABRICATION :
FABRICATION SKOR MAST FOR RIG MP -01
INSTALLATION CONTAIMENT FOR RIG MP-01
INSTALLATION WIDIA FOR JAW CHUCK
RECONDITION YANAMAR
CONTINUE RECONDITION YANMAR
STANDBY AT WORKSHOP KM 24
CLEANUP AT WORKSHOP KM 24
STANDBY AT WORKSHOP KM 24
CLEAN UP AT KM 24
FABRICATION
FABRICATION FISHING TOOLS PQ FOR RIG DE 740
FABRICATION FISHING TOOLS HQ FOR RIG DE 740
STANDBY AT WORKSHOP KM 24
CLEAN UP AT WORKSHOP KM 24
STANDBY AT WORKSHOP KM 24
CLEAN UP AT WORKSHOP KM 24
CHANGED CREW
INSTALL OR FABRICATION FISHING TOOLS ( HQ ) FOR RIG DE 740
MODIFICATION CUTTER FOR REPAIRED STUCK ROD DE740
STANDBY AT WORKSHOP KM 24
MONITORING ALL UNIT RIG
CLEAN UP WORKSHOP KM 24
PREPARE RIG MP 02
SET UP RIG MP 02
CHECKED CONDITION ENGINE RIG
CHECKED CONDIITON HOSE LEAKING
STANDBY AT WORKSHOP KM 24
CLEANUP WORKSHOP KM 24
FABRICATION
FABRICATION / INSTALLATION RACK ROD FOR JAKARTA SITE
RECONDITION SLIDE RIG DE 710 CHARLIE
FABRICATION / INSTALLATION FISHING TOOLS PWT
RECONDITION CYLINDER COVER FMC PUMP
STANDBY AT WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
FABRICATION
FABRICATION JAW CHUCK
REPLACED WIDIA JAW CHUCK
REPAIRED / RECONDITION CONTAIMENT RIG MP 02
CONTINUE INSTALLED RACK RODS FOR LOGISTIC JAKARTA
MP 02
CONTINUE RECONDITION RIG MP 02
REPLACED RADIATOR FOR RIG MP 02
SETTINGS BASE FOR RADIATOR RIG MP 02
STANDBY AT WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
FABRICATION
CONTINUE FABRICATION RACK RODS FOR JAKARTA
REPAIRED / MODIFICATION RACK BACK HAND FOR LOGISTIC
PAINTED RACK RODS
MP 02
CONTINUE RECONDITION MP 02 AT WORKSHOP KM 24
STANDBY AT WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
FABRICATION
CONTINUE FABRICATION RACK RODS FOR LOGISTIC JAKARTA
MP 02
CONTINUE RECONDITION MP 02 AT WORKSHOP KM 24
INSTALL BATTERY RIG
REPLACED SWITCH CONNECTION
PREPARED RIG LF 70
STANDBY AT WORKSHOP KM 24
CLEANING WORKSHOP
FABRICATION
FABRICATION RACK RODS FOR LOGISTIC JAKARTA
PAINTED RACK RODS
FABRICATION ANCHOR FOR BASE PADLOG MANCORE 600
MODIFICATION CONTAIMENT (ADDED BRACET)
SET UP RIG MP 02
CHANGED FITTING CHUCK ROTARY HEAD
CHECKED LEAKING RADIATOR ENGINE
DISMANTLE CHUCK ROTARY HEAD
REPAIRED CHUCK ROTARY HEAD
REPLACED BEARING SHAFT CHUCK ROTARY HEAD
REPLACED GEAR SHAFT ( NOT NEW )
ADD OIL GEARBOX FOR CHUCK ROTARY HEAD
PAINTED SAFETY GUARD ROTARY HEAD
FABRICATION
FABRICATION / REPAIRED SLIDE MENARA RIG DE 740
INSTALATION SAFETY ENGKOL YANMAR TF85
FABRIATION BASE YANMAR + DENYO
MODIFICATION BUSHING FOR RIG DE 710 D
STANDBY AT WORKSHOP KM 24
CLEANING AT WORKSHOP KM 24
STANDBY AT WORKSHOP KM 24
INSTALLATION WORKLAMP AT KM 24
REPAIRED BASE GENSET DENYO (CRACK ON WELD)
STANDBY AT WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
FABRICATION
FABRICATION JAW CHUCK.
FABRCATION / INSTALL EQUIPMENT FOR DEPT. SAFETY
STANDBY AT WORKSHOP KM 24
CLEANING WORKSHOP
FABRICATION
FABRICATION RACK FOR OXI ( WELDING EQUIPMENT )
STANDBY AT WORKSHOP KM 24
CLEANIG WORKSHOP KM 24
FABCICATION
CONTINUE FABRICATION RACK FOR OXI (WELDING EQUIPMENT)
PAINTED FRAME RACK FOR OXI ( WELDING EQUIPMENT)
MP 01
REPOTITION COMPONENT RIG MP 01
SET UP POSITION RIG MP 01
MP 300 - 01
FABRICATION BRACET FOR SKID MP 01
REPOTITION COMPONENT RIG MP 01
STANDBY AT WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
PREPARED RIG MP 01
CHECKED LEAKING ON HOSE RIG MP 01
INSTALL BRACET FOR CONTAIMENT RIG MP 01
STANDBY AT WORKSHOP KM 24
RECONDITION RIG MP 01
REPLACED ROTARY HEAD MP / MAXI
CHANGED ROTARY HEAD ( SPARE )
REPLACED HOSE 3/4" x 90CM
REPLACED SEATHING VALVE FMC
REPLACED BALL VALVE
REPLACED GASKET VALVE COVER
REPLACED GASKET CYLINDER COVER
INSTALL ALL COMPONENT
STANDBY AT WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
FABRICATION
REPAIRED WINCH X DE710D
MODIFICATION ROD CUTTER
INSTALL WIDIA AT ROD HOLDER
REPAIRED SOuTHERNCROSS
REPAIRED JOINT SOUTHERN CROSS X DE 710 D
INSTALL SOUTHERN CROSS AND YANMAR
STANDBY AT WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
FABRICATION
FABRICATION BASE MP 01
FABRICATION SKID SOUTHRENCROSS
FABRICATION
FABRICATION JAW CHUCK X DE 710 D
FABRICATION BASE FOR MP 01
STANDBY AT WORKSHOP KM 24
STANBY AT WORKSHOP KM 24
CLEAN UP WORK SHOP KM 24
ELECTRICAL
REPAIRED / RECONDITION LIGHTING TOWER
REPAIRED WEARING ELECTRICAL
STANDBY AT WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
STAND BY AT WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
FABRICATION
INSTALL SAFETY ENGKOL YANMAR TO FMC PUMP
RECONDITION DOWNHOLE EQUIPMENT
CLEAN UP WORSHOP KM 24
STANDBY AT WORKSHOP 24
STANDBY AT WORKSHOP KM 24
CLEANING WORKSHOP KM 24
ELECTRICAL
CHECKED UNIT GENSET KUBOTA GL 6000
FABRICATION:
FABRICATION QUIPMENT FOR DEPT SAFETY
FABRICATION TOOLS FOR CLEAN UP RIG
STANDBY AT WORKSHOP KM 24
CLEAN UP WORSHOP KM 24
FABRICATION
CONTINUE WELDING RACK FOR MOVING MP
STANDBY AT WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
FABRICATION
CONTINUE INSTALL RACK FOR MOVING RIG MP
FABRICATION SAFETY GUARD FOR UNIT SANCHIN PUMP
MODIFICATION RACK BAREL FOR DEPT LOGISTIC
STANDBY AT WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
FABRICATION
STANDBY AT WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
STANDBY AT WORKSHOP KM 24
FABRICATION
FABRICATION SPARE JAW CHUK
STANDBY AT WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
STANDBY AT WORKSHOP KM 24
CLEAN UP WORK SHOP KM 24
FABRICATION TUBE HQ
REPAIRED INJECTION TS 190
REPAIRED INJECTION TS 105
REPAIRED INJECTION TS 85
Service Sancin
Pemasangan Guard Sancin
Sancin DE 740
Pripare Area Workshop
RECONDITION SANCHIN
DISMANTLE / DISCONNECT COMPONENT SANCHIN PUMP
REPLACED STOP CRAN
REPLACED V PACKING
REPLACED PREASURE GAUGE
WINCH
DISMANTLE / DISCONECT BRACKET WINCH DRUM.
DISMANTLE / DISCONECT WINCH CABLE FROM WINCH DRUM
REPLACED WINCH CABLE (NEW)
INSTALL / ASSEMBLY WINCH CABLE
PULLEY
RECONDITION PULLEY AND CHECKED CONDITION PULLEY
DISMANTLE / DISCONECT PULLEY ON BRACKET
CHECK CONDITION BEARING PULLEY
REPLACED BEARING PULLEY
STANDBY AT WORKSHOP KM 24
CLEAN UP WORK SHOP KM 24
STANDBY AON CALL PROBLEM MECHANICAL
STANDBY AT WORKSHOP KM 24
CLEAN UP WORK SHOP KM 24
STANDBY AON CALL PROBLEM MECHANICAL
CONTINUE RECONDITION
PAINTED ALL COMPONENT ROD SPINNER
INSTALL ALL COMPINENT ROD SPINENER
CLEAN UP WORKSHOP KM 24
CLEAN UP YANMAR TF 85
REPLACED GASKET SET (BECAUSE UNIT YANMAR LEAK )
CHEKED CONDITION FUEL INJECTION PUMP
CHECKED LEAK ON RADIATOR
CLEAN UP AIR FILTER YANMAR
CHANGE EXHAUSE YANMAR TF 85
TEST ENGINE YANMAR TF 85
STANDBY AT WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
STANBY AT WORKSHOP KM 24
CLEAN UP ROTARY HEAD DE 710 D
AND CHECK CONDITION COMPONENT ROTARY HEAD
CLEAN UP WORKSHOP KM 24
STANBY AT WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
STANDBY AT WORKSHOP KM 24
STANDBY AT WORKSHOP KM 24
STANBY AT WORKSHOP KM 24
DISCONECTED ALL COMPONENT
REPLACED LINER
REPLACED CRANKSHAFT
REPLACED BEARING TB 309 / 6308
REPLACED CONROD
REPLACED GASKET
REPLACED GASKET KIT
REPAIRED YANMAR TF 85
REPAIRED FUEL INJECTION PUMP
STANDBY AT WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
STANDBY AT WORKSHOP KM 24
CLEAN UP WORK SHOP KM 24
STANDBY AON CALL PROBLEM MECHANICAL
STANDBY AT WORKSHOP KM 24
CLEAN UP WORK SHOP KM 24
STANDBY AON CALL PROBLEM MECHANICAL
FMC W 535
REPAIRED FMC PUMP W 535
REPLACED SEATHING VALVE
REPLACED BALL VALVE
REPLACED GASKET CYLINDER
CHANGE FITTING
REPLACED STOP KRAN 1"
REPLACED GASKET CYLINDER COVER
YANMAR TS 230
REPLACED HOSE TANK FUEL TO FILTER SOLAR
REPLACED HOSE FILTER FUEL TO FUEL INJECTION PUMP.
INSTALL ELECTRICAL ENGINE STARTER
STANDBY AT WORKSHOP KM 24
CLEAN UP WORK SHOP KM 24
STANDBY AON CALL PROBLEM MECHANICAL
STANDBY AT WORKSHOP KM 24
CLEAN UP WORK SHOP KM 24
STANDBY AON CALL PROBLEM MECHANICAL
STANDBY AT WORKSHOP KM 24
CLEAN UP WORK SHOP KM 24
STANDBY AON CALL PROBLEM MECHANICAL
DENYO:
REPAIR ELECTRICAL GENSET DENYO
REPLACED DIODA GENSET DENYO
REPAIR DYNAMO GENSET
YANMAR
REPIAR UNIT YANMAR
REPLACED OIL ENGINE
CLEAN UP AIR CLEANER
CLEAN UP FUEL FILTER YANMAR
AAD WATER RADIATOR
STANDBY AT WORKSHOP KM 24
CLEAN UP WORK SHOP KM 24
STANDBY AON CALL PROBLEM MECHANICAL
STANDBY AT WORKSHOP KM 24
CLEAN UP WORK SHOP KM 24
STANDBY AON CALL PROBLEM MECHANICAL
CLEAN UP WORKSHOP KM 24
STANDBY ON CALL WORKSHOP KM 24
STANDBY AT WORKSHOP KM 24
STANDBY AT WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
CLEANING WORKSHOP KM 24
REPOSITION UNIT ENGINE AND UNIT SUPPLY, MIXER, CIRCULATION PUMP
STANDBY WORKSHOP KM 24
CLEANING WORKSHOP KM 24
REPOSITION UNIT ENGINE AND UNIT SUPPLY, MIXER, CIRCULATION PUMP
STANDBY WORKSHOP KM 24
WAITING ON CALL
CLEAN UP WORKSHOP KM24
CLEAN UP WORKSHOP KM 24
REPOSITION UNIT PUMP
STANBY ON CALL
CLEAN UP WORKSHOP KM 24
STANBY ON CALL
CLEAN UP WORKSHOP KM 24
STANBY ON CALL
CLEAN UP WORKSHOP KM 24
JULY
DISMANTLE UNIT SPOOLING WIRELINE X MANCORE 600 IN WIRELINE DRUM
CLEAN UP UNIT SPOOLING WIRELINE
PREPARE RIG LF 70 - 02
CHANGE COPLER 1/2" FOR FAST FEED
CHECKED CONDITION WIRELINE AND WINCH
GREASE IN PULLEY
FABRICATION MODIFICATION DOUBLE NAPLE 1" MALE NPT TO 1" JIC FEMALE
CHECKED CONDTION SOLAR (BECAUSE ENGINE HAS BEEN TURN ON FOR A LONG TIME)
REPLACED HOSE 1/4" x 50 cm
REPLACED HOSE 1/4" x 1,5 mtr
CHANGED HOSE 3/4" x 1 mtr FOR ROTARY HEAD
CHANGED HOSE 3/4" x 1,5 mtr FOR ROTARY HEAD
CHANGED QUICK COPPLER 3/4" (2EA) FOR ROTARY HEAD
CHANGED DOUBLE NAPLE 3/4"(-12) NPT MALE TO 3/4 (-12) JIC MALE
CHANGED DOUBLE NAPLE 3/4" (-12) NPT MALE TO 3/4" (-12) JIC FEMALE
CHANGED DOUBLE NAPLE 3/4 (-12) NPT MALE TO 3/4" (-12) NPT MALE
CHANGED ELBOW 1/4" (-4) JIC MALE TO 1/4" (-4) JIC FEMALE
FABRICATION BUILD TOOLS FOR DOWN HOLE EQUIPMENT (RECOVER STUCK RODS)
CLEAN UP WORKSHOP KM 24
Aug-21
PREPARED RIG LF 70 -02
FABRICATION MODIFICATION DOUBLE NAPPLE
CHECKED FEED CYLINDER RIG LF 70 - 02 (NEED REPLACED SEAL FEED CYLINDER)
STARTED RUNNING ENGINE AND CHECKED LEAKING IN HOSE CONTROL PANNEL AND ALL EQUIPMENT
REPLACED QUICK COPPLER FOR LINE WINCH
REPLACED QUICK COPPLER FOR RETURN TO HYDRAULIC TANK
NEED REPLACED CARBIDGE STUNGSTREN IN JAW FOOT CLAM RIG MP 300 - 01
DISMANTLE UNIT FOOT CLAM MP 300 - 01
CONTINUE RECONDITION LF 70 - 02
CHECKED CONDITION ENGINE
FABRICATION RECONDTION JAW FOOT CLAMP FOR AVD 3000. (NEED REPLACED CADBRIDGE STUNGTREN)
FABRICATION CYLINDER SLIDE AND RODS CPOVER (CRACK WELD)
RECONDITION FMC :
CHECKED CONDITION FMC 435
CHANGED SEATING VALVE FMC 435
CHANGED BALL FMC 435
REPLACED HEX BOLT FOR CYLINDER VALVE
REPLACED HEX BOLT FOR FMC VALVE COVER
CLEAN UP ALL COMPONENT AND COMPONENT CONTAIMENT SUPPLY PUMP AND SIRCULATION PUMP
CHECKED PROBLEM SUPPLY PUMP AND SIRCULATION PUMP
REPLACED VANBELT RADIATOR FOR TS 230 (SUPPLY PUMP)
REPLACED VANBELT CONNECTOR FOR CIRCULATION PUMP
CHANGE UNIT YANMAR TF 85 FOR CIRCULATION PUMP
CHANGE BOLT MOUNTING FOR YANMAR TF 85 (CIRCULATION PUMP)
CLEAN UP AIR FILTER YANMAR TS 230 & TF 85
RECONDITION SKID FOR CIRCULATION PUMP (WELDING)
REPAIRED PROBLEM FUEL MIX WITH WATTER (CLEAN UP ELEMENT FUEL FILTER AND DRAIN OUT FUEL)
CHECKED CONDITION VIDIA AND REPLACED VIDIA FOR JAW FOOT CLAMP CHUCK
CLEAN UP BODDY FMC PUMP
CLEAN UP WORKSHOP KM 24
CLEAN UP WORKSHOP KM 24
REPOSITION YANMAR IN WORKSHOP KM 24
10
5
10
5
10
10
10
10 Plate 2,5mm x 5cm x 153cm
Plate strip 2,5mm x 5cm x 35cm
angle plate 2,5mmx5cmx37cm
10
10 Plate strip 2,5mmx5cmx38cm
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
3
10
10
10
10
10 Plat strip 250x300mm
Angel Steel 500mm
10
10
10
10
10
6 - -
10 - -
STEEL CHANNEL 2 X 233 X 6MM
STEEL PLATE 233 X 43 X 2MM
10
STEEL SQUARE TUBE 30 X 30 X 4MM
ANGLE STEEL 3 X 3 X 2MM
10 - -
10 - -
10
10 - -
10
10
5
10
5
10
10
4
2
10
Alternator (rebuild)
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10 Panel Meter AC300V Model SF-96
Terminal Box 4 Hole
10
10
12
12
12
12
12
12
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
Rubber Support Engine Swap Old Engine
10
10
10
10
10
10
10
10
10
5
5
12
12
8
3 Oil Cooler 04158584
6 Bearing 6205
Bearing 6305
8
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
12
12
12 PIPA NQ 36 BATANG 36
PIPA HRQ 1
12 HOLLOW 40 x 60
NQ ROD
HQ ROD
HOLLOW 40 x 60
12 HOLLOW 40 x 60
BQ ROD
5
5.5
4 LINER 105400-01350
BEARING BALANCER BEA-6008
BEARING CAM SHAFT 6314/NF312
8
1.5
2
8
8 SEAL KIT
FUEL TANK
10
10
10
10
10 EXAUST 105300-1111
ROD ASSY 70130G-23100
VALVE ASSY 705300-53100
BOLT 105300-07940
GASKET REAR 105300-01490
PULLEY ASSY 105300-44810
LINER CYLINDER 105400-01100
PISTON ASSY 105400-22191
PUMP ASSY INJECTION 705400-81102
2 V-BELT YANMAR M 38
10 EXAUST 105300-11111
ROD CONECTION 70130G-23100
VALVE ASSY 705300-53100
BOLT 105300-07940
GASKET REAR COVER 105300-44810
LINER CYLINDER 100900-07940
PULLEY TENSION ASSY 105300-07940
INJEECTION PUMP ASSY 705400-81102
5
8
8
8
8
8 V BELT
8
4 BOLT
SEAL CYLINDER FOOTCLAMP
8 BEARING 104705-02820
BEARING 105990-02300
10
5 SPRING SC69
V PACKING SC25
AIR CHAMBER SC35
10
10
10
10
10
4 BEARING 6914ZZ
BEARING 6209CM
BEARING 33116
2 SEAL CRANKSHAFT SC 11
SEAL PLUNGGER
10
10
3 CRANKSHAFT SC 14
BEARING SHAFT
SEAL CRANK SHAFT SC11
CONROD SC13
PLUGER SC16
PREASURE GAUGE
OIL SEAL PLUGER SC20
10
10
10
10
10
10
10
10
BEARING 6914
BEARING NTT 61211
BEARING 6029
10
10
10
10
12
4 ROD HQ
4 ROD NQ
10
12
12
10
12
12 WIDIA
12
12 WIDIA
12 NRQ ROD
12 NRQ ROD
12 NRQ ROD
12 CONROD SC13
PIN CONROD SC15
CRANKSHAFT SC14
OIL SEAL
GASKET COVER
VALVE ASSY
12
12
12
12
12
12
12 WIDIA
12
12 RADIATOR ENGINE
12
12 HOUSHING SANCHIN
CONECTING ROD
PLUNGER
PIN CON ROD
BEARING OIL SEAL
BEARING SHAFT 6308Z2
GASKET PACKING BACK COVER
BACK COVER PLATE
SEAL PLUNGER
GUIDE OIL SEAL
BOLT UNC 1/2" x 70mm
SHAFT
BEARING COVER
12
12
12 LINER 705890-01900
PISTON 105940-76500
BEARING CONROD 127610-23910
12 VALVE CHAMBER 1284777
CYLINDER CERAMIC 1267586
CYLINDER PACKING 52620221
CLAMP CYLINDER HEAD A80391
CYLINDER COVER 1285112
GASKET CYLINDER HEAD 1279674
VALVE COVER 1285113
GASKET VALVE COVER 1129675
VALVE SEAT BALL 1284740
GASKET CYLINDER 1247389
BALL VALVE 1101419
12 PART SANHIN :
PLUNGER
CONNECTING ROD
PI N CONNECTING ROD
PACKING BACK COVER
BACK COVER
CRANKSHAFT
BEARING SHAFT
OIL FILLER PLUG AND CAP
BEARING OIL SEAL
VALVE ASSY
RING GREASE
VPACKING ADAPTOR
PACKING GRAND
GUIDE OIL SEAL
VPACKING RING GREASE
PART YANMAR TS 190 :
BEARING BALLANCER ( SMALL ) 6305
BEARING BALLANCER ( LARGE ) 6307
12 LINNER YANMAR
PISTON YANMAR
GASKET KIT
12
12 PIN PLUNGER
PLUNGER
V-PACKING
V-PACKING ADAPTOR
GREASE PACKING
PACKING GRAND
CYLINDER
VALVE ASSY
12 VALVE ASSY
STOP KRAN / BALL VALVE
FITTING 1" NPT TO 1/2" JIC
FUEL FILTER YANMAR 105370-55711
OIL ENGINE SAE 20W-40MEDITRAN
12
12
12
12
12
12
12
12
12
12
12
12 CYLINDER PISTON
PIN PISTON
GASKET SET
12 GASKET VALVE COVER
GASKET CYLINDER HEAD
12
PRESSURE GUAGE SANCHIN 120
12
12 PIPE HQ
LANDING SOLDER
12
12 PIPE NQ
12 PIPE HRQ
12 EA WIDIYAH 44
IRON PLATE 4x4 50 cm
IRON PLATE 2x2 33 cm
12 EA WIDIYAH 24
IRON 50 cm
PIPE GALUARS 30 cm
12 EA WIDIYAH 28
COPLER
12 PLAT ESER 2 mm
PLAT STRIP 50 cm
10
12 PIPE NQ 4
12 WIDIYAH 36
12 CYLINDER
VALUE SPRING
SEAL
OVER FLOW
12
12
10
10
12
12
12
10
10 INJECTOR
FUEL FILTER
10
12 PIPE NQ
10 INJECTOR
GASKET BONET
10 GASKET CYLINDER
GASKETCYLINDER HEAD
V BELT B 93
BALL VALUE
12 PIPE NQ
10
4
10
8 V-BELT B 93
10
12
10
10
12
10
2 HOSE 1/2 x 5 M
HOSE HYDROLIC 1x6
12 PIPE NQ
12
10 PANEL BOX
CABLE AND SKUN
10
12
12 PIPA PQ
PIPA HRQ
BESI BETON
12
12
12 RODS NQ ( SECOND HAND )
RODS PQ ( SECOND HAND )
12 WIDIA
12
12 PIPA HQ (SECOND)
PROFIL U 10x10x50mm
PLAT STRIP 5mmx5mmx1.5cm
PLAT STRIP 10x10x50cm
BEARING SHAFT
OIL GEARBOX
12 SEAL CRANKSHAFT SC-120
O-RING PLUNGER SC-120
SPRING VALVE SC-120
V-PACKING SC-120
OIL ENGINE SANCHIN SAE 20W -40MEDITRAN
SAFETY ENGKOL
PLAT ESER 70x10x4mm
ROD PQ 40cm
12 RADIATOR YANMAR TF 85
12 DOUBLE EXTENSION
12 OIL SEAL PLUNGER
SEAL CRANK SHAFT
CONNECTING ROD
12 HOLLOW 50x50mm
HOLLOW 30x30mm
PLAT ESER 50x60mm
PLAT 3x3 60CM
BEARING 6308NR
BEARING 6211NR
BEARING 6207NR
BEARING 6011NR
FORK ASSY TR-45
12
D/S MOTOR ROTARY HEAD
HOSE 3/4" x 90m
SEATHING VALVE
BALL VALVE
VALVE CYLINDER
GASKET VALVE COVER
GASKET CULINDER COVER
12 WIDIA
JOINT SOUTRENCROSS
12
12
12
12 CHAMBER SANCHIN
12
12
12 WIDIA
12 INJECTION TS 190
INJECTION TS 105
INJECTION TS 85
12 INJECTION TS 190
INJECTION TS 155
12 LINER
HANDLE PISTON
RING PISTON
INJEKSI AND NUKSEL
PUCKING COMPLETE
KRANSAP BERING
12 BERING TEMENG
CRANSAP
PISTON COMPLETE
LINER
CLEP
12 WIDIA
12
12 PIPE HOLLOW 40 x 40
12 KREN SHAP
BERING KREN SHAP
CONROD
12
12 BOX HQ
BOLT 19 mm PJE 15 cm
12
12 WIDIA
DOBLE NEVEL 8 3/4
8 BALL VALVE
STUD CILINDER COVER 1279602
COVER CILINDER 63684
CILINDER COVER 79882
44526
12
12
6 V BELT RADIATOR TS 230 M 42
V BELT B 93
12
12
12
8 VALVE 1/2
12
12
12
12
6
12 CAT EMCO
6 PLUNGER SC -16
BEARING 6308/12
PLUNGER PIN 15141
CRANK SHAFT 14
SEAL CRANK SHAFT 11
SEAL PLUNGER 20
CONROD 13
12 PLAT 180X120 cm
ANGLE 40X40X600
PLAT ESER 2.5 20X30 cm
12 PIPE NQ 150 cm
PIPE HQ 40 cm
4
6 RELIEF VALVE
12 GER BLLANCER
PISTON
CRANG SHAPT
BEARING CRANG SHAPT
GASKET SET
BLESH
TAMMING BELT
12 PLAT 120X240 cm
ENGLE 40X40X600 cm
12 Pipa 1" 4 m x 30 cm
Pipa 1" 4,8 m x 3 cm
Pipa 1" 5 m x 30 cm
Pipa 1" 4 m x 60 cm
12 Pipe Hollow 45 x 75
12 Drum
12 NQ 1800 x 1800 mm
NQ 1000 x 1000 mm
NQ 750 x 750 mm
NQ 800 x 800 mm
12
12 Pipa PQ 50 cm
12 Gasket Head
Ring Fiston
Crasshap 230
Poly FMC
12 Pipa Hollow 50 x 50
Siku 50 x 50
12
12 Pipa HQ 50 Cm
Pipa PQ 100 Cm
Pipa Hollow 40 x 40 x 200 cm
Pipa Hollow 50 x 50 x 200 cm
Plat Strip 20 x 1,5 x 200 cm
12
12
12 Piston, Ring Piston
Conrod
Cramshap
Main Bearing
Gounroad Bearing
Easket 1 Set TD 230
Oil Boor bearing
12 Kunci Cube
12
12
12 Noksel
Koper Gas
12 Carbon Bras
12 HOLLOW 50 x 50 x 600 mm
12
12
2 STOP CRAN 1/2"
V-PACKING SC
WATER PREASURE GAUGE SC
12
12
12 OIL FILTER
FUEL FILTER
OIL ENGINE
12 RACOR FILTER 2020 PM 0R
TURBO ENGINE
12 GASKET
WIDIA
12
12 WIDYA
12
12
12
12
12
12
12 LINER
CRANKSHAFT
BEARING TB 309
BEARING 6308
CONECTING ROD
GASKET SET
FUEL FILTER
12 SEATHING VALVE
VIDYA
12 LINER
CRANKSHAFT
BEARING TB 309
BEARING 6308
CONECTING ROD
GASKET SET
12 BEARING 6914ZZ
BEARING 6209CM
BEARING 33116
OIL SEAL
GEAR INPUT SHAFT
INIDCATOR GAUGE
12 VIDIA
12
FUEL FILTER
OIL FILTER
OIL ENGINE
12 BALL VALVE 1101419
SEATHING VALVE 1284740
GASKET CYLINDER 1285112
GASKET CYLINDER HEAT 1279674
12 WINCH ROPE
12
12
12
6 DIODA
10
2
12
12 SHAFT SPPINDLE
BEARING SHAFT SPINDLE 33116JR
ROTARY HEAD SEAL 415279
SEAL KIT 2129-6013BKT
BEARING INPUT SHAFT 6209CM
BEARING MIDLE 6211ZZ
BEARING 6914ZZ
GEAR INPUT ROTARY
12
12
10
12
12
12
12
12
12
12
12
12 FUEL FILTER YANMAR TS 190 / 230 105990-55730
OIL ENGINE SAE 20 - 40 W MEDITRAN
12 CARBIDGE STUNGSTREN
12
12
CARBIDGE STUNGSTERN
12 CARBIDGE STUNGSTERN
12
DIGDO. S
TATANG S
ARI TRI
HERMAN R
TATANG S
12
12
12 BESI RONBAR 20MM X 120 CM
12 PIPA NQ 4 BATANG
PIPA HOLLOW 40X40 4 BATANG
PIPA HOLLOW 50X50X100 CM
12 RONBAR 20 MM
12 WIDYA 47 EA
12 WIDYA
PIPA BEKAS HRQ
12 FAN BELT 38
FMC EKS DE 740
GASKET REAR COVER
GASKET BEARING COVER
GASKET CYUNER LINER
GEAR COUPLING SET MTC-38
12 PIPA PQ 150 CM
PIPA STIM 1 1/2"
PLAT ESER 10 MM 10X20 CM
12 TS 230
12 TS 230
LINNER TS 230
12 CRAN SHAF TS 230
FISTON TS 23
MOTOR WIRE LINE
GASKET KIT/SET
12 INSERT 12 EA 12 EA
VALVE IN
VALVE EX
12
12 STUNG INSERT/WIDYA
12 PIPA NRQ 50 CM
PIPA PQ 150 CM
PIPA HQ 350 CM
PIPA HOLLOW 40X40X1800 CM
PIPA PQ 300 M
12 NRQ PIPE 50 CM
OVER SHOT NRQ
OIL FILTER
FUEL FILTER OIL
12
6 VAN BELT YANMAR TF 155 M42
BOLT 3/4" FOR MOUNTING SOUTHREN CROSS
BOLT 1/2" FOR SAFETY GUARD MIXER PUMP
7 PETCOCK 1187039
GASKET, COVER A91676
SEAL, OIL 1”x 1 ¾ x 5/16 1177489
GASKET CYLINDER GASKET CYLINDER 1247389
CYLINDER PACKING 5260221
8 VANBELT B 93
3 BATTERY GS ASTRA NS 60
10
10
10
10
12
12
10
12
12
10
10
12
10
10
10
3 BEARING CRANKSHAFT
CRANK SHAFT
PLUNGER
GASKET BACK COVER
OIL SEAL PLUNGER
OIL SEAL CRANK SHAFT
O-RING PLUNGER
3
3 SEAL KIT
BARBIDGE STUNGTREN
10
10
D/S VIDIA
10 PLUNGER SANCHIN
OIL SEAL
GASKET BACK COVER
OIL ENGINE SAE 20W - 40 MEDITRAN
BULP ZETALUX
NF308C3
BEARING CRANKSHAFT
10
BEARING CRANKSHAFT 6309C3
BEARING BALANCER 6005 CM
BEARING BALANCER 6008 CM
GEAR BALLANCER (UPPER) 105406-28300
GEAR BALLANCER (LOWER) 105406-28310
10
10
10
VIDIA
CRANKSHAFT
1285094
CAPS BEARING 1177474
CONNECTING RODS AND BEARING INSERT 5266814 & 1280910
CROSSHEAD AND RODS ASSEMBLY WITH O - RING 1252939
BUSHING CONNECTING RODS 9226
PIN CONNECTING RODS A91014
BEARING PINION 1272558
SEAL, OIL 1”x 1 ¾ x 5/16 1177489
SEELVE PACKING NUT 1266365
NUT PLUNGER RODS 1266323
VALVE SEAT 1278054
BALL 1101419
GASKET CYLINDER 1247389
GASKET CYLINDER HEAD 1279674
GASKET VALVE COVER 1129675
10
VIDIA
10
VIDIA
10
VIDIA
10 VIDIA
QTY Fitter
Agus.N
Heryanto
2 Heryanto
2
Heryanto
Heryanto
Heryanto
Iskandar/Heryanto
15.m Heryanto
1 Heryanto
2
2 Heryanto
2 Heryanto
1
2 Heryanto
2
2
2 Heryanto
1
4
2 Heryanto
2
2
1
1 Agus N
Heryanto
Heryanto
Heryanto
2 Heryanto
1
2
2
Agus N
Heryanto
2 Heryanto
2
1
Agus N
12 Heryanto
12 Heryanto
Agus N
12 Heryanto
Agus N
Agus N
Heryanto
4 Heryanto
2
Heryanto
2 Heryanto
1 Heryanto
1 Heryanto
Iskandar
Heryanto/Agus
Iskandar
Heryanto/Agus N
Heryanto/Agus N
Iskandar
Heryanto/Agus N
Iskandar
Heryanto/Agus N
2 Iskandar
1
2
Heryanto/Agus N
2 Iskandar
Heryanto
Agus N
Iskandar
Iskandar
Agus N
Heryanto
Heryanto
Agus N
Iskandar
Heryanto
Agus N
Agus N/Heryanto
Heryanto/Agus N
Heryanto
Heryanto
Iskandar
Heryanto
Agus N
Agus N
Heryanto
Agus N
Heryanto
Agus N
Agus N
1 Agus N
1
Agus N
Agus N
Heryanto
Heryanto
Heryanto
- ISKANDAR
- ISKANDAR
2
2
HERYANTO
1
1
- ISKANDAR
2
ISKANDAR
1
- ISKANDAR
HERYANTO
- ISKANDAR
HERYANTO
ISKANDAR
HERYANTO
ISKANDAR
HERYANTO
ISKANDAR
ISKANDAR
ISKANDAR
HERYANTO
ISKANDAR
HERYANTO
HERYANTO
HERYANTO
HERYANTO
HERYANTO
HERYANTO
Heryanto
Iskandar
Heryanto
Heryanto
1 Iskandar
1
Heryanto
Iskandar
Heryanto
Heryanto
Iskandar
Iskandar
Heryanto
Heryanto
Heryanto
Iskandar
Heryanto
Iskandar
Heryanto
Heryanto
Heryanto
2 Iskandar
3
Heryanto
Iskandar
Purmihadi
Purmihadi
Purmihadi
Purmihadi/Yoni
Purmihadi/Yoni
Purmi/Yoni
Purmihadi
Purmi/Yoni
Purmi/Yoni
Purmi/Yoni
Purmi/Yoni
Purmi/Yoni
Purmi/Yoni
Purmi/Yoni
Yoni
Yoni
Yoni
Yoni
Yoni
Yoni
Yoni
Yoni
Agung
Agung
Yoni
Yoni
Yoni
Yoni
Yoni
Yoni
Yoni
Yoni
Yoni
Yoni/Agung
Yoni/Agung
Agung
4
Agung
Agung
Agung
Agung
Agung
Agung
Agung
Agung
Agung
Agung/Solikhin
Solikhin
Solikhin
Solikhin/Agung
Solikhin
Agung
1 Agung/Solikhin
1 Agung/Solikhin
1
Agung/Solikhin
Agung
1 Agung
Agung
Solikhin
Solikhin
Solikhin
Solikhin
Solikhin
Solikhin
Solikhin
Solikhin
Solikhin
Solikhin
Solikhin
Solikhin
Solikhin
Solikhin
Solikhin
Solikhin
Solikhin
Solikhin
Solikhin
Solikhin
Solikhin
Solikhin
YONI ALI
YONI ALI
SYAMSUL
HADI W
6 SYAMSUL
4 EA SYAMSUL
S. KAMAL
SYAMSUL
1 S KAMAL
1 SYAMSYUL
HADI W
1 SYAMSYUL
1
HADI 2
HILL
ARY TRY
1 TATANG
1
1
TATANG
HILL
SHOLIKHIN
YONI ALI
SOLIKHIN
1 TATANG
1
TATANG
SOLIKHIN
HILL
SOLIKHIN
HILL
ARI TRI
TATANG
1 TATANG
1 YONI ALI
1 HILL
1 SOLIKHIN
1
1
1
1
1
1 SUPRIATNA
SOLIKHIN
HILL
YONI ALI
TATANG
1 SET HILL
TATANG
SOLIKHIN
ARI TRI
HILL
1 TATANG
1 ARI TRI
1 YONI ALI
1
1
2
2
1
1SET
YONI ALI
TATANG
SOLIKHIN
1 TATANG
1
1
2
2
1
1
1
1EA TATANG
1EA HILL
1EA
1EA
1EA
1EA
SOLIKHIN
SOLIKHIN
TATANG
2 ARI TRI
1 YONI ALI
2 ARI TRI
1
1 TATANG
1
TATANG
HILL
SOLIKHIN
4EA SUPRIATNA
ABDULRAHMAN
1EA TATANG
1EA SOLIKHIN
HILL
1EA ARI TRI
1EA SUPRIATNA
HILL
SOLIKHIN
6 ARI TRI
6 SUPRIATNA
2
ABDULRAHMAN
TATANG
TATANG
ARI TRI
ARI TRI
HILL
1 TATANG
2
TATANG
TATANG
TATANG
HILL
SOLIKHIN
TATANG
HILL
SOLIKHIN
6 SUPRIATNA
6
1
1 TATANG
3
2
TATANG
SOLIKHIN
TATANG
SOLIKHIN
TATANG
SOLIKHIN
SOLIKHIN
TATANG
TATANG
SAMSUL. H
ARI TRI
2 ARI TRI
1 SUPRIATNA
2 ABDULRAHMAN
YONI ALI
ABDULRAHMAN
1EA HILL
2EA SUPRIATNA
2EA TATANG
3EA
3EA
3EA
3EA
3EA SUPRIATNA
3EA HILL
3EA TATANG
4EA
1EA TATANG
1EA HILL
SUPRIATNA
ABDULRAHMAN
TATANG
HILL
SUPRIATNA
HILL
ABDULRAHMAN
TATANG
HILL
SUPRAITANA
ABDULRAHMAN
HILL
TATANG
SUPRIATNA
2EA ABDULRAHMAN
2EA HILL
1EA
1EA
2EA
SUPRIATNA
1 ABDULRAHMAN
2 TATANG
1
SUPRIATNA
SYAMSUL H
ANDREASKY
SUPRIATNA
SUPRIATNA
TATANG
ABDULRAHMAN
ARI TRI
DIGDO
ARI TRI
DIGDO
1EA YONI ALI
1EA
5EA SYAMSUL H
YONI ALI
4EA SYAMSUL H
1 SYAMSUL H
1
1
2EA SYAMSUL H
1EA
2EA
1EA YONI ALI
1EA
ARI TRI
SYAMSUL. H
SYAMSUL H
SYAMSUL. H
ARI TRI
YONI ALI
10EA SYAMSUL. H
6EA ARI TRI
SYAMSUL H
YONI ALI
100EA SYAMSUL H
ARI TRI
100 SYAMSUL H
ARI TRI
2EA SYAMMSUL H
ARI TRI
1EA SYAMSUL H
ARI TRI
1EA SYAMSUL H
ARI TRI
1EA SYAMSUL H
ARI TRI
SYAMSUL H
ARI TRI
2EA SYAMSUL H
SYAMSUL H
ARI TRI
ARI TRI
SYAMSUL H
ARI Tri
SYAMSUL H
ARI TRI
SYAMSUL H
SYAMSUL H
ARI TRI
1EA SYAMSUL H
2EA ARI TRI
2EA SYAMSUL H
2EA ARI TRI
SYAMSUL H
ARI TRI
20EA SYAMSUL H
ARI TRI
ARI TRI
SYAMSUL H
1EA SYAMSUL
TATANG
DIGDO
ABDULRAHMAN
TATANG
DIGDO
SYAMSUL H
ABDULRAHMAN
1EA TATANG
3EA HERMAN
3EA SYAMSUL
3EA DIGDO
2EA
2EA
1EA
1EA
3EA
3EA
3EA
1EA
2EA
SYAMSUL
TATANG
DIGDO
HERMAN
SYAMSUL
DIGDO
TATANG
AHMAD. S
HILL
HERMAN
1EA SYAMSUL
1EA DIGDO
1EA TATANG
AHMAD. S
HILL
HERMAN
1EA TATANG
1EA SYAMSUL
3EA DIGDO
3EA HERMAN
3EA HILL
3EA AHMAD
3EA
3EA
6EA
3EA
6EA
3EA HILL
3EA TATANG
3EA SYAMSUL
1EA DIGDO
1EA HERMAN
1EA AHMAD
2EA
1EA
2EA
6EA
3EA
3EA
3EA
3EA
9EA
1EA
1EA
1EA HILL
1EA HERMAN
1SET TATANG
SYAMSUL
DIGDO
HILL
HERMAN
TATANG
DIGDO
SYAMSUL
3EA HILL
3EA TATANG
9EA DIGDO
3EA SYAMSUL H
3EA HERMAN R
1EA
3EA
HILL
TATANG
SYAMSUL
DIGDO
SYAMSUL H
HERMAN
6EA HILL
1EA TATANG
1EA SYAMSUL H
1EA DIGDO
15L HERMAN
TATANG
ABDULRAHMAN
AHMAD
DIGDO
SYAMSUL H
HILL
HERMAN
1EA ABDULRAHMAN
2 ABDULRAHMAN
1 AHMAD
2 TATANG
DIGDO
HILL
HERMAN
6EA
4EA
HERMAN
HILL
2EA ABDULRAHMAN
2EA AHMAD.S
2EA TATANG
8EA DIGDO
HERMAN
HILL
1EA DIGDO
1EA TATANG
1EA AHMAD
ABDULRAHMAN
6EA HILL
6EA HERMAN
3EA
3EA
10L
3EA
1EA
TATANG
DIGDO
ABDULRAHMAN
AHMAD
HILL
HERMAN
TATANG
AHMAD
DIGDO
ABDULRAHMAN
3EA HILL
3EA
TATANG
DIGDO
AHMAD
ABDULRAHMAN
HILL
4EA TATANG
DIGDO
AHMAD
ABDULRAHMAN
HILL
DIGDO
TATANG
AHMAD
ABDULRAHMAN
DIGDO
1EA HILL
1EA
1SET
3EA TATANG
3EA DIGDO
AHAMAD
ABDULRAHMAN
HILL M
1 HILL M
DIGDO
ANDRESKI
8 DIGDO
2 ANDRESKI
DIGDO
ANDRESKI
4 DIGDO
ANDRESKI
1 DIGDO
ANDRESKI
11 DIGDO
ANDRESKI
2 DIGDO
2 ANDRESKI
1
3 DIGDO
2 ANDRESKI
1 DIGDO
1 ANDRESKI
HILL M
1 DIGDO
ANDRESKI
HADI W
4 DIGDO
ANDRESKI
1 EA HILL M
6 EA
12 EA
1 EA
1 DIGDO
ANDRESKI
TATANG
HILL M
HADI W
TATANG
HILL M
DIGDO
ANDRESKI
1 EA TATANG
HADI W
9 EA SUPRIATNA
6 EA
HILL M
SUPRIATNA
HILL M
TATANG
HADI W
1 DIGDO S
ANDRESKY
TATANG
HADI W
6 EA HILL M
3 EA
3 EA
1 EA
2 EA DIGDO
ANDRESKY
HILL M
SUPRIATNA
1 EA HADI W
1 EA
TATANG
3 EA SUPRIATNA
HADI W
3 EA HILL M
3 EA
9 EA
3 EA
3 EA
DIGDO S
ANDRESKY
TATANG
HADI W
DIGDO S
ANDRESKY
HILL M
1 EA SUPRIATNA
1 EA
1 EA DIGDO S
ANDRESKY
HILL M
DIGDO
ANDRESKY
1 EA TATANG
25 EA HADI W
2 EA ANDRESKY
TATANG
HADI W
2EA ANDRESKY
5EA TATANG
32EA ARI TRI
SUPRIATNA
HADI W
HILL
1EA ANDREASKY
1EA ARI TRI
150CM SUPRIATNA
TATANG
HADI W
HILL
YONI ALI
AHMAD SUHAEFI
SYAMSUL H
ANDRESKY
ARI TRI
SUPRIATNA
18EA SYAMSUL H
1EA ANDRESKY
ARI TRI
SUPRIATNA
HADI W
YONI ALI
AHMAD. S
39 SYAMSUL. H
ANDRESKY
YONI ALI
AHMAD. S
ARI TRI
SYAMSUL H
ANDRESKY
ARI TRI
SUPRIATNA
YONI ALI
AHMAD. S
ARI TRI
SUPRIATNA
YONI ALI
HADI W
SYAMSUL.H
ANDRESKY
AHMAD. S
1SET
S. KAMAL
SUPRIATNA
YONI ALI
HADI W
ARI TRI
SYAMSUL H
ANDRESKY
1EA S. KAMAL
3EA SUPRIATNA
6EA YONI ALI
6EA HADI W
3EA ARI TRI
3EA SYAMSUL H
3EA ANDRESKY
S. KAMAL
ARI TRI
SUPRIATNA
YONI ALI
HADI W
SYAMSUL H
ANDRESKY
AHMAD
ABDULRAHMAN
ARI TRI
SUPRIATNA
YONI ALI
HADI W
S. KAMAL
SYAMSUL H
ANDRESKY
AHMAD
ABDULRAHMAN
ARI TRI
SUPRIATNA
HADI W
S. KAMAL
YONI ALI
SYAMSUL H
ANDRESKY
1EA
1EA
ARI TRI
SUPRIATNA
HADI W
S KAMAL
YONI ALI
SYAMSUL
ANDRESKY
ARI TRI
YONI ALI
HADI W
S, KAMAL
SYAMSUL. H
ANDRESKY
ARI TRI
YONI ALI
SUPRIATNA
HADI W
S,. KAMAL
SYAMSUL H
ANDRESKY
YONI ALI
TATANG
HERMAN
AHMAD
SYAMSUL H
YONI ALI
15 EA SYAMSUL H
4 EA SYAMSUL H
3 EA
5 EA
5 EA SYAMSUL H
6 EA
1 EA SYAMSUL H
1 EA
1 EA
1 EA
1 EA
6 EA
1 EA HERMAN R
6 EA SYAMUL H
1 EA
1 EA
1 EA
1 EA
YONI ALI
40 EA SYAMSUL H
HERMAN R
YONI ALI
3 BTG SYAMSUL H
1 EA HERMAN R
2 EA
1 EA
YONI ALI
SYAMSUL H
HERMAN R
1 EA SYAMSUL H
4 EA
HERMAN R
SYAMSUL H
6 EA SYAMSUL H
2 EA DIGDO S
1 EA
1 EA
1 EA
60 EA SYAMSUL H
1 EA DIGDO S
3 EA YONI ALI
3 EA
1 EA
6 EA
6 EA
6 EA
1 EA YONI ALI
1 EA
3 EA
3 EA
6 EA
SYAMSUL H
DIGDO S
SYAMSUL H
DIGDO S
1 EA YONI ALI
3 EA
SYAMSUL H
DIGDO S
YONI ALI
SYAMSUL H
DIGDO S
YONI ALI
SYAMSUL H
DIGDO S
YONI ALI
SYAMSUL H
DIGDO S
YONI ALI
SYAMSUL H
DIGDO S
YONI ALI
HERMAN R
YONI ALI
SYAMSUL H
DIGDO S
YONI ALI
SYAMSUL H
DIGDO S
SYAMSUL H
DIGDO S
3 EA YONI ALI
2 EA
3 EA
1 EA
2 EA
3 EA
3 EA
SYAMSUL H
DIGDO S
YONI ALI
SYAMSUL H
DIGDO S
40 EA
7L YONI ALI
SYAMSUL H
DIGDO S
YONI ALI
2 EA YONI ALI
1 EA SYAMSUL H
1 EA
1 EA
1 EA
1 EA
1 EA
1 EA
SYAMSUL H
DIGDO S
3 EA YONI ALI
3 EA
3 EA
3 EA
1 EA
SYAMSUL H
DIGDO S
3 EA YONI ALI
3 EA TATANG
3 EA
9 EA
1 EA
8 EA YONI ALI
5 EA
3 EA
1 SYAMSUL H
ARI TRI
1 SYAMSUL H
ARI TRI
BAMBANG
6EA SUPRIATNA
6EA TATANG. S
2EA
3EA
TATANG
SYAMSUL H
2EA SYAMSUL H
1ROLL TATANG
DIGDO
HERMAN RANAN
TATANG
SUPRIATNA
DIGDO
SYAMSUL H
TATANG
SUPRIATNA
DIGDO
SYAMSUL H
1EA TATANG
1EA SYAMSUL
15L SUPRIATNA
HERMAN RANAN
1EA TATANG S
1EA SYAMSUL H
DIGDO
HERMAN RANAN
1EA TATANG
1EA
2EA
3EA
3EA
SYAMSUL
1EA TATANG
50 DIGDO
HERMAN RANAN
SYAMSUL H
TATANG
DIGDO
HERMAN RANAN
6EA SYAMSUL H
TATANG
DIGDO
HERMAN RANAN
SYAMSUL H
TATANG
HERMAN
SYAMSUL H
TATANG S
HERMAN R
DIGDO
TATANG
DIGDO
HERMAN
SYAMSUL H
TATANG
HERMAN
DIGDO
1EA SYAMSUL
1EA
1EA
2EA
1EA
1SET
1EA
2SET
3EA TATANG
58EA DIGDO
HERMAN
1EA SYAMSUL H
1EA
1EA
2EA
1EA
1SET
1 HERMAN R
2 TATANG
2 DIGDO S
1
1
60EA
SYAMSUL H
1EA HERMAN
1EA TATANG
DIGDO
SYAMSUL H
HERA|MAN R
DIGDO
REKYAN. Y
SYAMSUL H
65 TATANG
DIGDO
HERMAN
REKYAN
SYAMSUL H
1EA TATANG
1EA REKYAN
1EA DIGDO
3EA TATANG
3EA DIGDO
3EA REKYAN
3EA
20MTR BAMBANG. H
TATANG
DIGDO
REKYAN
BAMBANG H
2EA TATANG
DIGDO
REKYAN
TATANG
DIGDO
REKYAN
BAMBANG H
2ea TATANG
2ea REKYAN
3ea
3ea
1ea
1ea
BAMBANG H
1EA TATANG
1EA REKYAN
DIGDO
3EA BAMBANG H
3EA
3EA
12EA
3EA
2EA
1EA BAMBANG H
2EA
1EA
1EA
2EA
1EA
1EA
1EA
2EA TATANG
REKYAN
3EA
3EA
3EA
2EA
2EA
1EA
3EA
TATANG
REKYAN
DIGDO
ARI TRI
REKYAN
DIGDO
ARI
DIGDO
REKYAN
ARI TRII
REKYAN
BAMABANG H
DIGDO S
DIGDO S
ARI TRI
BAMBANG
REKYAN Y
BAMBANG H
ARI TRI
BAMBANG H
ARI TRI
ARI TRI
BAMBANG H
ARI TRI
DIGDO
ARI TRI
DIGDO
ARI TRI
DIGDO
BaMBANG
ARI TRI
DIGDO
BAMBANG
30EA BAMBANG H
ARI TRI
TATANG S
ARI TRI
BAMBANG H
3EA DIGDO H
6EA DIGDO. H
DIGDO S
ARI TRI
BAMANG H
HERMAN
SYAMSUL IDAYAT
SYAMSUL HIDAYAT
AHMAD SUAHAIFI
1 SYAMSUL HIDAYAT
1
1 SYAMSUL HIDAYAT
1
1 SYAMSUL HIDAYAT
1 SYAMSUL HIDAYAT
47 SYAMSUL HIDAYAT
20 EA SYAMSUL HIDAYAT
1
1 EA
1 UNIT
1 EA SYAMSUL HIDAYAT
10 EA
3 EA
1 EA
12 EA SYAMSUL HIDAYAT
SYAMSUL HIDAYAT
SYAMSUL HIDAYAT
1EA
1EA SYAMSUL HIDAYAT
1EA
1EA
1EA
1 UNIT
1EA SYAMSUL HIDAYAT
1EA
2 EA
6 EA SYAMSUL HIDAYAT
3 EA
3 EA
3 EA
SYAMSUL IDAYAT
12 EA SYAMSUL HIDAYAT
1 SYAMSUL HIDAYAT
1
1
1 EA SYAMSUL HIDAYAT
1 EA
10 L
HERMAN RANAN
1EA TATANG
1EA SYAMSUL H
DIGDO.S
4EA TATANG
2EA REKYAN
2EA
4EA
DIGDO
TATANG
SYAMSUL
REKYAN
1EA TATANG
2EA REKYAN
2EA
DIGDO
SYAMSUL H
DIGDO S
3EA TATANG
2EA REKYAN
2EA
2EA
75EA
120EA
1EA TATANG
1EA REKYAN
9EA
6EA
3EA
DIGDO
3EA SYAMSUL H
DIGDO S
1EA TATANG S
SYAMSUL
DIGDO. S
SYAMSUL H
HERMAN
TATANG S
DIGDO
SYAMSUL H
YONI ALI
TATANG S
HERMAN R
DIGDO S
TATANG S
YONI ALI
TATANG S
DIGDO S
HERMAN R
SYAMSUL H
SYAMSUL H
2EA HERMAN
2EA AHMAD SUHAEFI
DIGDO S
2EA TATANG S
2EA REKYAN Y
DIGDO S
HERMAN R
1EA HERMAN R
1EA
1EA TATANG
1EA REKYAN
1EA
1EA
1EA
1EA
1EA
DIGDO. S
AHMAD SUHAEFI
TATANG S
DEDEN
DIGDO S
BAMBANG S
BAMBANG H
2EA BAMABNG H
2EA REKYAN Y
1EA TATANG S
1EA DEDEN
1EA ARI WIBOWO
1EA
1EA
DIGDO.
TATANG S
1EA DEDEN
ARI WIBOWO
ARI WIBOWO
ARI WIBOWO
DEDEN
BABANG
DIGDO. S
TATANG
ARI WIBOWO
DIGDO
REKYAN
2EA BAMBANG
1EA DEDEN
3EA
1EA
3EA
2EA
3EA
ARI WIBOWO
HERMAN R
1SET DEDEN
BAMBANG H
DIGDO.S
DEDEN
ARI WIBOWO
1SET TATANG.S
SUPRIATNA
12EA DIGDO. S
DEDEN
BAMBANG
1EA HERMAN R
TATANG S
1EA
1EA
1EA
1EA
1EA
DIGDO
ARI WIBOWO
ARI WIBOWO
DIGDO
REKYAN
2EA BAMBANG H
2EA DEDEN
1EA
1EA
1EA
1EA
1EA
1EA
1EA
1EA
12 EA ARI TRI
HERMAN R
DIGDO
TATANG S
SUPRIATNA
3EA SUPRIATNA
3EA REKYAN
1EA
4L
TATANG S
1EA BAMBANG. H
1EA DEDEN
2EA
2EA
1EA
1EA
9EA
3EA
1EA
DIGDO S
ARI TRI
ARI WIBOWO
BAMBANG H
ARI TRI
BAMBANG H
SUPRIATNA
DEDEN ELON
ARI WIBOWO
36 DIGDO S
1EA ARI TRI
1EA BAMBANG H
1EA SUPRIATNA
1EA DEDEN ELON
1EA ARI WIBOWO
1EA
2EA
6EA
3EA
3EA
6EA
6EA
6EA
3EA
3EA
ARI TRI
BAMBANG H
SUPRIATNA
DEDEN
ARI WIBOWO
DIGDO S
30
ARI WIBOWO
30EA DIGDO H
AIR WIBOWO
20 DIGDO S
BAMBANG H
ARI TRI
SUPRIATNA
32 DIGDO
ARI TRI
DEDEN
SUPRIATNA
ARI WIBOWO
SKID NO PTL-SP-01, PTL-SP-61
PTL-SP-01, PTL-SP-61
PUMP
TL -TS230-12, PTL-TS230-12
Hour Hour
Repair to be carried out
meter work
ADDED OIL 1
ADDED FUEL
CLEANED ALL UNIUT
CHECKED ALL PUMP 2
ADDED FUEL
ADDED RADIATOR WATTER
ADDED OIL ENGINE
CHECKED ALL PUMP 2
ADDED FUEL PUMP NO. 4
ADDED OIL ENGINE
CHECKED RADIATOR WATTER
CHECKED ALL CONDITION PUMP N0. 4 2
ADDED FUELYANMAR 230
ADDED AIR RADIATOR
CHECKED ALL UNIT BRAFO PUMP
ADDED FUEL ENGINE YANMAR 230
ADDED RADIATOR WATTER
CHECKED ALL CONDITION PUMP N0. 4 2
ADDED FUEL ENGINE YANMAR 230
ADDED RADIATOR WATTER
CLEANED ALL UNIT PUMP AND GENERATOR
COMPLETED SCHEDULE SERVICED 1.5
REPLACED FUEL FILTER YANMAR TS 230 & TS 190
REPLACED OIL ENGINE YANMAR TS 230 & TS 190
REPLACED OIL FMC PUMP
CHECKED ALL UNIT PUMP No. 4 2
AADED FUEL ON YANMAR TS 230
ADDED WATTER ON RADIATOR YANMAR TS 230
CHECKED ALL CONDITION OIL ON SUPLY PUMP
CHECKED ALL UNIT PUMP No. 4 2
AADED FUEL ON YANMAR TS 230
ADDED WATTER ON RADIATOR YANMAR TS 230
CHECKED ALL CONDITION OIL ON SUPLY PUMP
CHECKED ALL UNIT PUMP No. 4 2
CHECKED WATTER RADIATOR
ADD FUEL ON YANMAR TF 230
CHECKED ALL UNIT PUMP No. 4 2
CHECKED WATTER RADIATOR
ADD FUEL ON YANMAR TF 230
CHECKED ALL UNIT PUMP No. 4 2
CHECKED WATTER RADIATOR
ADD FUEL ON YANMAR TF 230
CHECKED ALL UNIT PUMP No. 4 2
CHECKED WATTER RADIATOR
ADD FUEL ON YANMAR TF 230
CHECKED ALL UNIT PUMP No. 4 2
CHECKED WATTER RADIATOR
ADD FUEL ON YANMAR TF 230
COMPLETED SCHEDULE SERVICED 2
REPLACED OIL ENGINE YANMAR TS 230 & TS 190
REPLACED FUEL FILTER YANMAR TS 230 & TS 190
CHECKED OIL LEVEL AT FMC PUMP
CLEANING ALL UNIT FMC PUMP
CHECKED ALL UNIT PUMP No. 4 2
CHECKED WATTER RADIATOR
ADD FUEL ON YANMAR TF 230
CHECKED OIL LEVEL AT FMC PUMP
CHECKED OIL LEVEL AT YANMAR 230
CHECKED ALL UNIT PUMP No. 4 2
CHECKED WATTER RADIATOR
ADD FUEL ON YANMAR TF 230
CHECKED OIL LEVEL AT FMC PUMP
CHECKED OIL LEVEL AT YANMAR 230
CHECKED ALL UNIT PUMP No. 4 2
CHECKED WATTER RADIATOR
ADD FUEL ON YANMAR TF 230
CHECKED OIL LEVEL AT FMC PUMP
CHECKED OIL LEVEL AT YANMAR 230
CHECKED ALL UNIT PUMP No. 4 2
CHECKED WATTER RADIATOR
ADD FUEL ON YANMAR TF 230
CHECKED OIL LEVEL AT FMC PUMP
CHECKED OIL LEVEL AT YANMAR 230
CHECKED ALL UNIT PUMP No. 4 2
CHECKED WATTER RADIATOR
ADD FUEL ON YANMAR TF 230
CHECKED OIL LEVEL AT FMC PUMP
CHECKED OIL LEVEL AT YANMAR 230
CHECKED ALL UNIT PUMP No. 4 2
CHECKED WATTER RADIATOR
ADD FUEL ON YANMAR TF 230
CHECKED OIL LEVEL AT FMC PUMP
CHECKED OIL LEVEL AT YANMAR 230
CHECKED ALL UNIT PUMP No. 4 2
CHECKED WATTER RADIATOR
ADD FUEL ON YANMAR TF 230
CHECKED OIL LEVEL AT FMC PUMP
CHECKED OIL LEVEL AT YANMAR 230
CHECKED ALL UNIT PUMP No. 4 2
CHECKED WATTER RADIATOR
ADD FUEL ON YANMAR TF 230
CHECKED OIL LEVEL AT FMC PUMP
CHECKED OIL LEVEL AT YANMAR 230
CHECKED ALL UNIT PUMP No. 4 2
CHECKED WATTER RADIATOR
ADD FUEL ON YANMAR TF 230
CHECKED OIL LEVEL AT FMC PUMP
CHECKED OIL LEVEL AT YANMAR 230
COMPLETED SCHEDULE SERVICED 7
REPLACED FUEL FILTER YANMAR TS 190 / 230
REPLACED OIL ENGINE
REPLACED SEATING VALVE
REPLACED NUT
REPLACED VALVE CHAMBER
REPLACED GASKET CYLINDER HEAD
REPLACED CLAMP VALVE COVER
REPLACED BALL
REPLACED CYLINDER PACKING
REPLACED BEARING SHAFT
REPLACED GASKET CYLINDER HEAD (SMALL )
ASSEMBLY ALL COMPONENT 2
CLEANING ALL UNIT FMC PUMP
CLEANING CONTAIMENT
PTL-SP-15, PTL-TS230-13,
PUMP
TL-TS190-09, PTL-TS230-13
Hour Hour
Repair to be carried out
meter work
ADDED OIL AND FUEL PUMP ESTAFET 2
ACHECKED ALL UNIT PUMP ESTAFET
ADDED FUEL PUMP ESTAFET 2
CLEANED CONTIAIMENT
CHECKED ALL ESTAFET PUMP 2
ADDED FUEL PUMP ESTAFET
ADDED AIR RADIATOR
CHECKED ALL ESTAFET PUMP 2
ADDED FUEL PUMP ESTAFET
CHECKED AIR RADIATOR
CHECKED ALL ESTAFET PUMP
ADDED FUEL ON ESTAFET PUMP
CHECKED CONDITION PUMP AND YANMAR 2
ADDED FUEL YANMAR
ADDED WATTER ON RADIATOR
CHECKED ALL UNIT ESTAFET PUMP 2
ADDED FUEL ON YANMAR 190 & 230
CLEANED ALL UNIT PUMP SUPLY
CHECKED ALL ESTAFET PUMP 2
AADED FUEL ENGINE YANMAR 190 AND 230
ADJUST VBELT RADIATOR
CHECKED ALL UNIT ESTAFET PUMP 2
ADDED FUEL ON ENGINE YANMAR TS 190 & TS 230
ADDED WATTER RADIATOR
CHECKED CONDITION OIL LEVEL
COMPLETED SHEDULE SUPLY PUMP 1.5
REPLACED FUEL FILTER YANMAR TS 230 & TS 190
REPLACED OIL ENGINE YANMAR TS 230 DAN TS 190
REPLACED OIL FMC
CHECKED ALL CONDITION PUMP ESTAFET 2
ADDED FUEL YANMAR TS 190 & 230
ADDED WATTER ON RADIATOR YANMAR TS 190 & 230
CHECKED ALL CONDITION PUMP ESTAFET 2
ADDED FUEL YANMAR TS 190 & 230
ADDED WATTER ON RADIATOR YANMAR TS 190 & 230
CHECKED ALL CONDITION PUMP ESTAFET 2
ADDED FUEL YANMAR TS 190 & 230
ADDED WATTER ON RADIATOR YANMAR TS 190 & 230
CHECKED ALL CONDITION PUMP ESTAFET 2
ADDED FUEL YANMAR TS 190 & 230
ADDED WATTER ON RADIATOR YANMAR TS 190 & 230
CHECKED ALL CONDITION PUMP ESTAFET 2
ADDED FUEL YANMAR TS 190 & 230
ADDED WATTER ON RADIATOR YANMAR TS 190 & 230
CHECKED ALL CONDITION PUMP ESTAFET 2
ADDED FUEL YANMAR TS 190 & 230
ADDED WATTER ON RADIATOR YANMAR TS 190 & 230
CHECKED ALL CONDITION PUMP ESTAFET 2
ADDED FUEL YANMAR TS 190 & 230
ADDED WATTER ON RADIATOR YANMAR TS 190 & 230
CHECKED ALL CONDITION PUMP ESTAFET 2
ADDED FUEL YANMAR TS 190 & 230
ADDED WATTER ON RADIATOR YANMAR TS 190 & 230
CHECKED ALL CONDITION PUMP ESTAFET 2
ADDED FUEL YANMAR TS 190 & 230
ADDED WATTER ON RADIATOR YANMAR TS 190 & 230
COMPLETED SHEDULE SUPLY PUMP 2
REPLACED OIL ENGINE YANMAR TS 230 DAN TS 190
REPLACED FUEL FILTER YANMAR TS 230 & TS 190
CHECKED OIL FMC PUMP
CLEANING ALL UNIT SUPPLY PUMP
CHECKED ALL CONDITION PUMP ESTAFET 2
ADDED FUEL YANMAR TS 190 & 230
ADDED WATTER ON RADIATOR YANMAR TS 190 & 230
CHECKED ALL CONDITION PUMP ESTAFET 2
ADDED FUEL YANMAR TS 190 & 230
ADDED WATTER ON RADIATOR YANMAR TS 190 & 230
CHECKED ALL CONDITION PUMP ESTAFET 2
ADDED FUEL YANMAR TS 190 & 230
ADDED WATTER ON RADIATOR YANMAR TS 190 & 230
CHECKED ALL CONDITION PUMP ESTAFET 2
ADDED FUEL YANMAR TS 190 & 230
ADDED WATTER ON RADIATOR YANMAR TS 190 & 230
CHECKED ALL CONDITION PUMP ESTAFET 2
ADDED FUEL YANMAR TS 190 & 230
ADDED WATTER ON RADIATOR YANMAR TS 190 & 230
CHECKED ALL CONDITION PUMP ESTAFET 2
ADDED FUEL YANMAR TS 190 & 230
ADDED WATTER ON RADIATOR YANMAR TS 190 & 230
CHECKED ALL CONDITION PUMP ESTAFET 2
ADDED FUEL YANMAR TS 190 & 230
ADDED WATTER ON RADIATOR YANMAR TS 190 & 230
CHECKED ALL CONDITION PUMP ESTAFET 2
ADDED FUEL YANMAR TS 190 & 230
ADDED WATTER ON RADIATOR YANMAR TS 190 & 230
CHECKED ALL CONDITION PUMP ESTAFET 2
ADDED FUEL YANMAR TS 190 & 230
ADDED WATTER ON RADIATOR YANMAR TS 190 & 230
CHECKED ALL CONDITION PUMP ESTAFET 2
ADDED FUEL YANMAR TS 190 & 230
ADDED WATTER ON RADIATOR YANMAR TS 190 & 230
COMPLETED SHEDULE SUPLY PUMP 2
REPLACED OIL ENGINE YANMAR TS 230 DAN TS 190
REPLACED FUEL FILTER YANMAR TS 230 & TS 190
CHECKED OIL FMC PUMP
CLEANING ALL UNIT SUPPLY PUMP
COMPLETED SHEDULE SUPLY PUMP 2
REPLACED OIL ENGINE YANMAR TS 230 DAN TS 190
REPLACED FUEL FILTER YANMAR TS 230 & TS 190
CHECKED OIL FMC PUMP
CLEANING ALL UNIT SUPPLY PUMP
REPAIRED SOLVE PROBLEM YANMAR TS 190 2
REPLACED FUEL FILTER YANMAR TS 190
REPLACED FUEL INJECTION PUMP
REPLACED INJECTOR / NOZLE
POMPA BRAVO
SCHEDULE SERVICE 2
REPLACED FUEL FILTER YANMAR TS 190
REPLACED FUEL FILTER YANMAR TS 230
REPLACED 'RUBBER PISTON FMC 535
REPLACED 'OIL ENGINE YANMAR TS 230 & TS 190
REPLACED OIL FMC PUMP
REPAIRED PROBLEM BROKEN SEATHING VALVE 12
REPLACED SEATHING VALVE
REPLACED BALL VALVE
ASSEMBLY ALL COMPONENT
HG-05
PTL-SP-25, PTL-SP-04
PUMP
PTL-TS230-02, PTL-SP-04
Hour Hour
Repair to be carried out
meter work
COMPLETED SCHEDULE SERVICED 2
CHECKED ALL UNIT DELTA PUMP
REPLACED OIL ENGINE YANMAR TS 190
REPLACED FUEL FILTER YANMAR TS 190
CHECKED OIL LEVEL YANMAR AND FMC PUMP
COMPLETED SCHEDULE SERVICED 2
REPLACED OIL ENGINE YANMAR TS 230 & TS 190
REPLACED FUEL FILTER YANMAR TS 230 & TS 190
CHECKED OIL LEVEL AT FMC PUMP
CHECKED SEATHING VALVE AND BALLVALVE
CLEANED AIR CLEANER
REPLACED OIL FOR AIR CLEANER
REPLACED OIL FMC
GREASING LINER FMC PUMP
CLEANED RADIATOR AND ADD WATTER RADIATOR
Jul-21
REPLACED FUEL STRAINER YANMAR TS 190 1
INSTALL FUEL STAINNER YANMAR TS 190
AUGUST
COMPLETED SCHEDULE SERVICED SUPPLY PUMP 12
DRAIN OUT OIL ENGINE YANMAR TS 230 / 190 AND FMC
REPLACED OIL ENGINE YANMAR AND FMC
REPLACED ELEMENT FUEL FILTER YANMAR
CHECKED CONDITION VAN BELT
ADDED GREASE FMC PUMP
CLEAN UP AIR CLEANER YANMAR TS 190/230 AND CHANGE OIL
PTL-FMC-21
PUMP
PTLAME/FMC-17
Part Desc Part No QTY Fitter
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
ARI TRI
FUEL FILTER YANMAR TS 190 / 230 105990-55730 1EA
OIL ENGINE SAE 20 W - 40 MEDITRAN 25L
SEATING VALVE 1284740 3EA
NUT NUT HEX 5/8 x 11 6EA
VALVE CHAMBER 1284777 1EA
GASKET CYLINDER HEAD 1279674 3EA
CLAMP VALVE COVER A-5076 6EA
BALL 1101419 6EA
CYLINDER PACKING 5260221 3EA
BEARING SHAFT 6208 ZZ 2EA
GASKET CYLINDER HEAD (SMALL ) 1279676 3EA
ARI TRI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
LADAM
PTL- FMC-22
PUMP
PTL-FMC-05
Part Desc Part No QTY Fitter
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
VO
PTL-AME-04
PUMP
PTL-FMC535-07, PTL-FMC-10
Part Desc Part No QTY Fitter
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
SEATING VALVE 1284740 YONI ALI
STEEL BALL FMC 26157/1101419
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
ARI TRI
YONI ALI
PTL-FMC-03
PUMP
PTL-FMC-04
Part Desc Part No QTY Fitter
OIL ENGINE 20W - 40 MEDITRAN 10L HILL
FUEL FILTER YANMAR 190/230 105995-55730 1
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
YONI ALI
HERMAN
HERMAN
HERMAN
HERMAN
SYAMSUL H
HERMAN R
SYAMSUL H
MC-17
REQ No Date Repaired
12.04.2020
14.04.2020
15.04.2020
18.04.2020
20.04.2020
23.04.2020
24.04.2020
25.04.2020
30.04.2020
30.04.2020
02.05.2020
06.05.2020
07.05.2020
10.05.2020
13.05.2020
14.05.2020
15.05.2020
16.05.2020
17.05.2020
21.05.2020
22.05.2020
23.05.2020
20.08.2020
21.08.2020
22.08.2020
26.08.2020
27.08.2020
29.08.2020
10.09.2020
24.09.2020
29.09.2020
10.10.2020
25.11.2020
C-22
C-05
REQ No Date Repaired
12.04.2020
13.04.2020
14.04.2020
15.04.2020
17.04.2020
18.04.2020
19.04.2020
20.04.2020
23.04.2020
23.04.2020
24.04.2020
25.04.2020
28.04.2020
30.04.2020
01.05.2020
02.05.2020
03.05.2020
06.05.2020
07.05.2020
10.05.2020
13.05.2020
14.05.2020
15.05.2020
15.05.2020
16.05.2020
17.05.2020
21.05.2020
22.05.2020
23.05.2020
25.05.2020
10.08.2020
21.09.2020
24.08.2020
26.09.2020
10.10.2020
25.11.2020
07.12.2020
E-04
PTL-FMC-10
REQ No Date Repaired
12.04.2020
13.04.2020
14.04.2020
15.04.2020
16.04.2020
17.04.2020
18.04.2020
19.04.2020
22.04..2020
23.04.2020
24.04.2020
28.04.2020
30.04.2020
01.05.2020
02.05.2020
03.05.2020
06.05.2020
07.05.2020
10.05.2020
13.05.2020
14.05.2020
15.05.2020
16.05.2020
17.05.2020
21.05.2020
22.05.2020
23.05.2020
25.05..2020
07.12.2020
C-03
C-04
REQ No Date Repaired
16.04.2020
19.04.2020
20.04.2020
23.04.2020
24.04.2020
25.04.2020
28.04.2020
30.04.2020
01.05.2020
02.05.2020
03.05.2020
06.05.2020
08.05.2020
10.05.2020
13.05.2020
14.05.2020
15.05.2020
16.05.2020
21.05.2020
22.05.2020
23.05.2020
21.08.2020
22.08.2020
24.08.2020
27.08.2020
10.09.2020
24.09.2020
08.10.2020
10.10.2020
25.05..2020
01.12.2020
02.12.2020
07.12.2020
C-03
C-04
REQ No Date Repaired
24.09.2020
10.10.2020
25.11.2020
29.11.2020
07.12.2020
12.12.2020
13.12.2020
14.12.2020
15.12.2020
16.12.2020
17.12.2020
18.12.2020
19.12.2020
20.12.2020
21.12.2020
22.12.2020
23.12.2020
24.12.2020
25.12.2020
26.12.2020
27.12.2020
28.12.2020
29.12.2020
30.12.2020
31.12.2020
01.12.2020
02.12.2020
03.01.2021
05.01.2021
06.01.2021
07.01.2021
09.01.2021
10.01.2021
12.01.2021
13.01.2021
16.01.2021
26.01.2021
27.01.2021
29.01.2021
02.02.2021
11.02.2021
12.02.2021
15.02.2021
16.02.2021
25.02.2021
26.02.2021
27.02.2021
02.03.2021
09.03.2021
11.03.2021
16.03.2021
26-Mar-21
27-Mar-21
28-Mar-21
30-Mar-21
6-Apr-21
6-Apr-21
14-Apr-21
15-Apr-21
21-Apr-21
24-Apr-21
30-Apr-21
3-May-21
15-May-21
16-May-21
23-May-21
12-Jul-21
11-Aug-21
29-Aug-21
HANJIN CRANE-04 PROBLEM REPORT & MAINTENANCE RECORD (EX. AFRICA)
MODEL CONSTRUCTION HANJIN CRANE-03 (7125) D&B -25CR
CHASSISS D&B-25CRCAN12091047
CRANE MODEL
: DH SUPER 3000 by DONGHAE MACHINERY
5 13.03.2020 D/S SCHEDULE SERVICED 250 H REPLACED OIL FILTER 2 OIL FILTER 2631145010 1EA ARI TRI
REPLACED FUEL FILTER FUEL FILTER 31945-4501 1EA TATANG
REPLACED RACOR FILTER RACOR FILTER RF2020 1EA SOLIKHIN
REPLACED AIR FILTER AIR FILTER 31945-4501 1EA
SAE 20W-40
OIL ENGINE 20 L
MEDITRAN
10.05.2020 D/S SCHEDULE SERVICED 250 H REPLACED OIL FILTER 2 OIL FILTER 2631145010 1EA ARI TRI
REPLACED FUEL FILTER FUEL FILTER 31945-4501 1EA TATANG
REPLACED RACOR FILTER RACOR FILTER RF2020 1EA SOLIKHIN
REPLACED AIR FILTER AIR FILTER 31945-4501 1EA
SAE 20W-40
OIL ENGINE 20 L
MEDITRAN
4 19.05.2020 D/S PROBLEM LEAKING HOSE HANJIN REPIARED HOSE HANJIN 2 SOLIKHIN
5 20.06.2020 D/S PROBLEM LEAKING HOSE HANJIN REPAIRED HOSE AT BOOM HANJIN 2 ARI TRI
CLEANING HANJIN AND CHECKED HANJIN 04
SAE 20-40W
6 21.06.2020 D/S SCHEDULE SERICED HANJIN 04 COMPLETED SERVICED HANJIN 04 2 OIL ENGINE 15L ARI TRI
MEDITRAN
REPLACED OIL FILTER FUEL FILTER 1EA
REPLACED FUEL FILTER OILFILTER 1EA
REPLACED RACOR FILTER RACOR FILTER 1EA
REPLACED OIL ENGINE
CLEANING HANJIN 01
SAE 20-40W
7 22.07.2020 D/S SCHEDULE SERICED HANJIN 04 COMPLETED SERVICED HANJIN 04 2 OIL ENGINE 15L ARI TRI
MEDITRAN
REPLACED OIL FILTER FUEL FILTER 1EA
REPLACED FUEL FILTER OILFILTER 1EA
REPLACED RACOR FILTER RACOR FILTER 1EA
REPLACED OIL ENGINE
SAE 20-40W
9 27.08.2020 D/S SCHEDULE SERICED HANJIN 04 COMPLETED SERVICED HANJIN 04 2 OIL ENGINE 15L ARI TRI
MEDITRAN
REPLACED OIL FILTER FUEL FILTER 1EA
REPLACED FUEL FILTER OILFILTER 1EA
REPLACED RACOR FILTER RACOR FILTER 1EA
REPLACED OIL ENGINE
AUGUST
1 26-Aug-21 D/S RECODITION HANJIN LEAKING CYLINDER RECONDITION CYLINDER PISTON BOOM EXTENSION 2 ARI TRI
PISTON BOOM EXTENSION
RESEAL CYL PISTON AND RECONDTION SLING BOOM DEDEN
INSTALL CYLINDER PISTON HANJIN SUPRIATNA
INSTALL EXTENSION HANJIN BAMBANG H
2 27-Aug-21 N/S CHANGE UNIT EXTENSION ASSY HANJIN 01 DISCONECT BOOM EXTENSION HANJIN O1 8 BAMBANG
TO HANJIN 02 1. RECKON IN EXTENSION BOOM WITH TELEHANDLER ARI TRI
ICA)
Date
REQ No PO#
Repaired
04.12.2019
05.12.2019
15.01.2020
20.01.2020
13.03.2020
13.02.2020
19.05.2020
20.06.2020
21.06.2020
22.07.2020
27.08.2020
25.08.2020
26-Aug-21
27-Aug-21
HANJIN CRANE-01 (7124) PROBLEM REPORT & MAINTENANCE RECORD
MODEL CONSTRUCTION D&B-25CR
CHASSISS D&B-25CRCAN12091046
4 07.02.2020 D/S SCHEDULE SERVICED 250 REPLACED OIL ENGINE] 2 OIL ENGINE HANJIN
REPLACED FUEL FILTER HANJIN OIL FILTER HANJIN
REPLACED OIL FILTER HANJIN FUEL FILTER HANJIN
REPLACED RACOR FILTER HANJIN RACOR FILTER HANJIN
5 03.03.2020 D/S PROBLEM LEAKING ON BOOM HANJIN 01 REPLCED HOSE HANJIN 2 HOSE 3/4"
INSTALL HOSE 3/4 HANJIN
6 05.04.2020 D/S SCHEDULE SERVICED 250 REPLACED OIL ENGINE 2 OIL ENGINE HANJIN
REPLACED FUEL FILTER HANJIN OIL FILTER HANJIN
REPLACED OIL FILTER HANJIN FUEL FILTER HANJIN
REPLACED RACOR FILTER HANJIN RACOR FILTER HANJIN
9 11.07.2020 D/S SCHEDULE SERVICED 250 REPLACED OIL ENGINE 2 OIL ENGINE HANJIN
REPLACED FUEL FILTER HANJIN OIL FILTER HANJIN
REPLACED OIL FILTER HANJIN FUEL FILTER HANJIN
REPLACED RACOR FILTER HANJIN RACOR FILTER HANJIN
REPLACED AIR FILTER HANJIN AIR FILTER HANJIN
ARI TRI
TATANG
SOLIKHIN
HILL
SUPRIATNA 18.05.2020
TATANG
CHASSISS D&B-25CRCAN12091046
Date
Fitter REQ No PO#
Repaired
LF70-02 PROBLEM REPORT & MAINTENANCE RECORD
RIG SERIAL NUMBER : IN -DRD - LF702
ENGINE SERIAL NUMBER : 6068TF250
ENGINE TYPE :PE6068T448349
Date Hour Hour
№ Shift Problem Repair to be carried out
Reported meter work
1 01.07.2016 D/S Mud Mixer Hose Damage Instaled Hose Mud Mixer 12
D/S FMC Pump Hose Damage Replaced Doblle Niple 12
Replaced Hydraulic Hose 2''
Replaced Hydraulic Hose 1''
Replaced Filter Hydraulic
2 Rod Holder Hose Damage (Foot Clamp to be installed) Set all hydraulic hoses and fittings 12
3 D/S Rod Head Lubrication Line need to be modificated Modificated Rod Head 12
Intaled Lubrication Line
Instaled niple
Intaled Hose Lubrication Line
4 Hour Meter Damage Repared Cable Hour Meter
5 Spin Guard need to be modificated Fabricated
6 Need to get Mud Tank
45 14.09.2016 D/S Foot Clamp seating to be fabricated Make a holes for Foot Clamp seating ( installed to bottom mast) 12
Leaks on O ring seal Chuck Valve & Mixer Fixed
46 15.09.2016 D/S Continued fabricated foot clamp seating to bottom mast 12
47 16.09.2016 D/S Fabricated plate for foot clamp seating 12
48 17.09.2016 D/S Fabricated holes for bolts for foot clamp adjuster 12
Installed seating plate into bottom mast
49 19.09.2016 D/S Installed all hoses and fittings to breakout 12
Installed nipples to hydraulic cylinder breakout
Tested breakout cylinder
Installed Safety guard for rotary and installed all bushing
50 20.09.2016 D/S Repaired hydraulic system at jaws foot clamp 12
Checked control valve & hydraulic hoses line control bank to jaws
Rig Down
Installed stand rotary head
Installed quick coupler 1/2''
51 21.09.2016 D/S Installed Winch Cable to Drum 12
Installed hose 1/4'' x 9m crown block grease
Installed quick coupler and nipple NPT to JIC 1/2'' for crown block grease
12
52 23.09.2016 D/S Welded breakout stand 12
Installed lock lever
Dismantle safety guard engine for painting preparation
Dismantle air cleaner for painting
Mast raise for preparation weld break out
53 24.09.2016 D/S Installed Clevis Rod and steel position to rod drill 12
Installed safety guard for engine
Installed Air Cleaner Housing
Installed safety guard exhaust manifold engine
54 27.09.2016 D/S Repaired mud mixer motor 12
Repaired hydraulic hose and installed motor to bracket support
Fitted hydraulic hoses motor mud mixer
Installed couplers half female 1/2'' NPT
Installed couplers half male 1/2'' NPT
55 28.09.2016 D/S Take out insert from jaws rod holder 12
Made holesat rack drill for installed lifting point
56 06.10.2016 D/S Adjusted pressure secondary pump 12
Replaced squence valve for mud mixer
Adjusted pressure stand by main pump
57 07.10.2016 D/S Replaced hose 1/4'' for high low speed motor water pump FMC 12
Reposition hoses water pump
Replaced hose 3/4'' for motor water pump fmc
Replaced hose 3/4'' for winch drum motor
58 08.10.2016 D/S Leaks on control valve feed cylinder Repaired control valve feed cylinder 1
59 10.10.2016 Need ladder at mast to doing working at height job (crown, wireline sheave) Finished fabricated ladder 5
60 13.10.2016 D/S Fabricate clamp for additional ladder at mast 3
61 18.10.2016 D/S Fabricated bracket for ladder
62 20.10.2016 D/S Fabricated clamp for ladder 12
63 21.10.2016 N/S Continued fabricated ladder 7
64 22.10.2016 D/S Continued fabricated ladder 10
65 24.10.2016 D/S Continued fabricated ladder 10
D/S BROKEN FOOT CLAMP REMOVED CYLINDER HOSE FOOT CLAMP
INSTALL CYLINDER HYDRAULIC AND FOOT CLAMP
66 25.10.2016 D/S Continued fabricated ladder 10
67 26.10.2016 D/S Continued fabricated ladder 10
68 27.10.2016 D/S Finished fabricated ladder 5
69 28.10.2016 D/S Tested loading chamber with pressure water pump 10
70 05.11.2016 D/S Installed wireline and winch guard 10
Made stand drill rod
71 18.11.2016 D/S Chekced starting for rig down 10
Set tacho meter up engine RPM
Replaced seal kit motor for FMC pump
72 19.11.2016 D/S Replaced hydraulic motor pump FMC and tested pressure 10
73 29.06.2017 D/S Prepare Drill Rig for Elang Project (Plan) Fixed wiring for E-Stop
Fixed wiring for turn off solenoid
Installed relay 5 point
74 25.05.2017 D/S Prepared Elang Project (plan) Fitted engine to rig LF70-02
Tested Engine running and tested hydraulic system
75 26.05.2017 D/S Installed new wireline cable
76 27.05.2017 D/S Prepared Elang Project (plan) Continued installed new wireline cable
73 30.05.2017 D/S Prepare Drill Rig for Elang Project (Plan) Prepared foot clamp
Installed hose #8 x 60 cm
Fixed valve control foot clamp
Tested Foot clamp
73 31.05.2017 D/S Prepare Drill Rig for Elang Project (Plan) Prepared skid base from container
74 01.06.2017 D/S Prepare Drill Rig for Elang Project (Plan) Prepared all jaws for rotary chuck
Prepared all jaws for foot clamp
Assembled Top Mast
75 02.06.2017 D/S Prepare Drill Rig for Elang Project (Plan) Fitted mast leg
Installed ladder at mast
Installed exhausted manifold
76 06.06.2017 D/S Prepare Drill Rig for Elang Project (Plan) Disconnected old battery
Installed battery 12V 120Ah
Tested pump pressure
Setting pressure relief valve water pump
Replaced seating valve & ball
77 19.06.2017 D/S Prepare Kelly Hose 3/4 X 10 m 12
Prepare Kelly Hose 1'' X 4 m
Maked Kelly Hose 1'' X 8 m
78 12.07.2017 D/S Installed Hose Drained Engine 12
Changed out engine oil
Dismantle Unit
79 13.07.2017 D/S Changed & Installed Hose Engine Oil Drained 12
80 27.08.2017 D/S Replaced motor wireline 12
Installed bearing mixer F205
81 29.08.2017 D/S Replaced motor FMC bean pump 12
Cleaned up fuel filter because water contaminant
82 30.08.2017 D/S Service Genset 12
Repaired leaking from engine Rig
80 24.09.2017 D/S Serviced Hose FMC 12
Replaced Coupling FMC
Fixed Alternator Problem
81 02.09.2017 D/S Serviced Yanmar Engine TS190 12
Replaced seat ball valve
82 14.09.2017 D/S Fixed Problem engine shut down suddenly 12
83 17.09.2017 D/S Installed pulley for NS50 Pump and Mud Tank 12
84 23.10.2017 D/S Replaced Oil seal crank shaft 12
Replaced pulley crank shaft
Replaced Nut crank shaft
85 24.10.2017 D/S Replaced Alternator 12
Replaced Stater Motor
86 26.10.2017 D/S Replaced Nut Cover Rotation head 12
Pull out broken nut
87 30.10.2017 D/S Replaced Shaft Wireline motor, because broken 12
88 04.11.2017 D/S Replaced Bearing Shaft for Pump at Mud Tank 12
89 05.11.2017 D/S Schedule Service 250 Hrs Completed Schedule Service 250 Hrs 12
Replaced All Filters
Repaired oil seal chuck because leaks
90 07.11.2017 D/S Re tighten foot clamp hose 12
91 11.11.2017 D/S Replaced hose 1/2'' for Foot Clamp 2
92 16.11.2017 D/S Replaced Top cover FMC & bottom cover 12
Replaced packing cover
Installed polypipe
93 17.11.2017 D/S Repaired carbon brush genset at rig 12
94 19.11.2017 D/S Foot Clamp hose leaking Replaced hose foot clamp 12
95 20.11.2017 D/S Rubber coupling broken Removed mixer from tank and repaired 12
96 26.11.2017 D/S Check over the rig Checked V belt and tension 12
Cleaned oil cooler engine
Re tighten bolt for wireline motor
Checked bolt foot clamp
Continued repaire emergency stop
97 28.11.2017 D/S Moving Rig Prepared moving rig 12
98 29.11.2017 D/S Prepared set rig up 12
171 16.09.2018 N/S Low Pressure hydraulic Dismantle main pump and clean up hydraulic tank 81090 5
172 17.09.2018 D/S SCHEDULE SERVICE 250 HRS PERFORMEND SERVICE 250 HRS 81124
CHANGED OUT ENGINE OIL
REPLACED MAIN PUMP
REPLACED FUEL FILTER
REPLACED FUEL FILTER
REPLACED CHUCK FILTER
REPLACED HYDRAULIC FILTER AT HYDRAULIC TANK
173 18.09.2018 D/S ADJUSTED PRESSURE MAIN PUMP
CHECKED ROTATION TORQUE
CHECKED WINCH CABLE & FEED CYLINDER
CHECKED VALVE MIXER
18.09.2018 N/S GEAR BOX OIL TRANSMISSIONS LEAKING CHECKED LEAKING, CONTINUED D/S 12
172 19.09.2018 D/S CONTINUED SERVICE 250 HRS 81124
REPLACED AIR CLEANER
REPLACED RUBBER MIXER MUD
REPLACED WINCH CABLE
GEAR BOX OIL TRANSMISSIONS LEAKING CHECKED CIRCULATION OIL PUMP
172 21.09.2018 N/S ENGINE OVER HEATING CLEANED COOLER ENGINE 6
GEAR BOX TRANSMISSIONS SOUND UN NORMAL CHECKED AND GREASED
173 23.09.2018 D/S REPLACED WINCH CABLE 81202 4
172 24.09.2018 D/S REPLACED GEAR BOX TRANSMISSIONS ROTARY HEAD
REPAIRED ELECTRIC SOLENOID & E- STOP
172 25.09.2018 D/S INSTALLED SQUENCE VALVE FOR ROTATION SPEED
INSTALLED CIRCULATION HOSE FOR TRANSMISSIONS GEAR
CHECKED LEAKS AT OIL SPINDLE
ADJUSTED HYDRAULIC PRESSURE AT FOOT CLAMP
25.09.2018 N/S ENGINE SUDDENLY SHUT OFF REPAIRED CABLE SOLENOID, NOT CONNECTED 81248 12
FIXED LEAKING SEAL ROTARY HEAD
172 27.09.2018 D/S RE TIGHTEN BOLT FOR HOUSING WINCH DRUM 8
REPAIRED ROLLER BEARING AT MAST
REPLACED BATTERY
REPAIRED - STOP BRACKET
172 29.09.2018 D/S REPAIRED E-STOP 7
REPLACED HYDRAULIC FILTER
29.09.2018 N/S REPLACED KELLY HOSE 1
173 02.10.2018 D/S REPAIRED ROTARY HEAD
REPLACED SPEEDI SLEEVE
173 03.10.2018 D/S SCHEDULE SERVICE 250HRS PERFORMEND SERVICE 250 HRS
CHANGED OUT ENGINE OIL
REPLACED FUEL FILTER
REPLACED OIL FILTER
REPAIRED HOSE FOR MOTOR ROTARY
174 10.10.2018 D/S LEAKING AT ROTATION HEAD REPAIRED ROTATION HEAD 2696
REPAIRED SUPPLY PUMP
175 14.10.2018 D/S REPLACED SHEAVE ROLLER CROWN BLOCK 2976.2 9
GREASED CROWN BLOCK
174 15.10.2018 N/S SET RIG UP 4
INSTALLED DRILL SHELTER
OIL SEAL CHUCK LEAKING
175 16.10.2018 D/S REPLACED ROTATION HEAD ASSY 3020 12
176 20.10.2018 N/S REPAIRED FITTING COUPLER HYDRAULIC 12
176 23.10.2018 D/S CHECKED TRANSMISSIONS GEAR BOX 3726 2
CHECKED FOOT CLAMP & CHUCK JAWS
23.10.2018 N/S REPLACED HYDRAULIC COOLER (SWAP FROM KM 24) 3763 4
177 30.20.2018 D/S REPAIRED ELECTRIC E-STOP 4560 8
CHECKED ROTATION HEAD & MOTOR HEAD
177 31.10.2018 D/S REPLACED OIL SEAL FEED CYLINDER 4584 6
FIXED QUICK COUPLER OIL COOLER
178 02.11.2018 D/S REPAIRED E-STOP 4620 2
REPAIRED MAIN PUMPF FITTING HYDRAULIC
178 09.11.2018 D/S MODIFICATED FITTING FOR BREAK OUT 3
REPAIRED GEAR BOX TRANSMISSIONS ROTARY
178 15.11.2018 D/S PREPARED MOTOR SECONDARY PUMP TO BE DELIVERED TO DRILL SITE 3
179 16.11.2018 D/S ASSEMBLING MAIN PUMP & 2ND PUMP TO BE DELIVERED TO DRILL SITE (FROM KM 24)
12
180 29.11.2018 D/S INSTALLED SPIN GUARD 12
181 02.12.2018 N/S REPLACED NUT FOR PISTON FOOT CLAMP 8
182 06.12.2018 N/S FOOT CLAMP CYLINDER LEAKING REPAIRED HOUSING 8270 6
183 18.12.2018 N/S BROKEN SHAFT MOTOR WIRELINE FIXED PROBLEM SHAFT MOTOR WIRELINE 9914 12
184 19.12.2018 D/S BROKEN SHAFT MOTOR WIRELINE REPLACED SHAFT MOTOR WIRELINE 9925 12
185 22.12.2018 D/S SCHEDULE SERVICE REGULAR 250 HRS COMPLETED SERVICE 250 HRS 1050 12
CHANGED OUT ENGINE OIL
REPLACED FUEL FILTER
CLEANED AIR FILTER
186 06.01.2019 D/S TRIAL OIL ENGINE MEDITRAN REPLACED O RING SECONDARY PUMP
REPAIRED MIXER
214 24.10.2019 D/S SCHEDULE SERVICE REGULAR 250 HRS COMPLETED SERVICE REGULAR 250 HRS 12
CHANGED OUT ENGINE OIL
REPLACED FUEL FILTER
215 25.10.2019 D/S CLEANED UP AIR CLEANER FOR GENSET GL6000 12
CHECKED OVER THE RIG
216 26.10.2019 D/S CHECKED RIG 8492 12
REPLACED AIR CLEANER GENSET GL6000
217 27.10.2019 D/S REPAIRED FITTING HOSE WINCH 12
JULY
1 23-Jul-21 D/S PREPARED RIG LF 70 - 02 INSTALL COMPONENT RIG LF 70 12
INSTALL ENGINE JHON DEERE 6068 IN SKID
INSTALL CONTROL PANNEL IN SKID
INSTALL MAST, WIRELINE, IN SKID
4 26-Jul-21 D/S CONTINUE PREPARED RIG LF 70 - 02 CHECKED HOSE HYDRAULIC NEED REPLACED. (BROKEN)
REPLACED HOSE HYDRAULIC FAST FEED 2 mtr AND 50 cm
CHECKED CONDTION SOLAR (BECAUSE ENGINE HAS BEEN TURN ON FOR A LONG TIME)
REPLACED HOSE 1/4" x 50 cm
REPLACED HOSE 1/4" x 1,5 mtr
CHANGED HOSE 3/4" x 1 mtr FOR ROTARY HEAD
CHANGED HOSE 3/4" x 1,5 mtr FOR ROTARY HEAD
CHANGED QUICK COPPLER 3/4" (2EA) FOR ROTARY HEAD
CHANGED DOUBLE NAPLE 3/4"(-12) NPT MALE TO 3/4 (-12) JIC MALE
CHANGED DOUBLE NAPLE 3/4" (-12) NPT MALE TO 3/4" (-12) JIC FEMALE
CHANGED DOUBLE NAPLE 3/4 (-12) NPT MALE TO 3/4" (-12) NPT MALE
CHANGED ELBOW 1/4" (-4) JIC MALE TO 1/4" (-4) JIC FEMALE
6 28-Jul-21 D/S PREPARED RIG LF 70 - 02 MODIFICATION DOUBLE NAPLE 1 " FOR LINE WIRELINE 10
REPLACED DOUBLE NAPPLE
REPLACED HOSE HYDRAULIC
AUGUST
1 1-Aug-21 D/S PREPARED RIG LF - 70 - 02 PREPARED RIG LF 70 -02 10
FABRICATION MODIFICATION DOUBLE NAPPLE
CHECKED FEED CYLINDER RIG LF 70 - 02 (NEED REPLACED SEAL FEED CYLINDER)
2 2-Aug-21 D/S PRPEPARED RIG LF 70 - 02 REPLACED FEED CYLINDER ASSY ( FEED CYLINDER LOOSE)
REPLACED PREAUSURE GAUGE 3500 psi
REPLACED FILTER HYDRAULIC FOR LF 70
INSTALL BREATHER ROTARY HEAD
3 3-Aug-21 D/S CONTINUE PREPARED RIG LF 70 - 02 PREPAPRED COOLER AND RECONDIITION COOLER HYDRAULIC X AVD 3000 10
REPAINT COOLER HYDRAULIC
BUILD SPIRAL HOSE (WITH POLYPIPE)
7 8-Aug-21 D/S CONTINUE PREPARED RIG LF 70 - 02 REPAINT SKID SPARE FOR RIG LF 70 - 02 10
REPAINT COOLER HYDRAULIC
INSTALL DOUBLE NAPPLE REDUCER 1 1/4" MALE NPT TO 1" FEMALE
INSTALL DOUBLE NAPPLE REDUCER 1 " MALE NPT TO 1" NPT MALE
INTALL QUICK COULPER 1"
INSTALL DOUBLE NAPLE (REDUCER) FOR LINE WATTER 1" MALE NPT TO 3/4" MALE NPT
11 12-Aug-21 D/S CONTINUE PREPAPARED LF 70 - 02 (RECONDITION ENGINE) CONTINUE REPAIRED ENGINE COMBUSTION PROBLEM 10
DISMANTLE ALL COMPONENT CYLINDER HEAD ENGINE JHON DEERE 6068
SKIR KLEP ENGINE JHON DHEERE 6068
N/S CONTINUE PREPAPARED LF 70 - 02 (RECONDITION ENGINE) CONTINUE SKIR KLEP ENGINE JHON DHEERE 10
12 13-Aug-21 D/S CONTINUE PREPAPARED LF 70 - 02 (RECONDITION ENGINE) CONTINUE INSTALLED CYLINDER HEAD FOR RIG LF 70 - 02 10
CONTINUE INSTALLED ALL COMPONRNT CYLINDER HEAD
CONTINUE BLEDING ENGINE JOHN DEERE 6068
STARTED UNIT ENGINE JOHN DEERE AND CHECKED ALTERATION UNIT ENGINE
REPLACED VAN BELT RADIATOR ENGINE JOHN DEERE 6068
LEAKING IN ROTATION HEAD
CHECKED PROBLEM LEAKING RORY HEAD
REPLACED OIL SEAL ROTARY HEAD
REPLACED SPEEDY SELVE ROTARY HEAD
13 14-Aug-21 D/S CONTINUE PREPARED LF 70 -02 (RECONDIITON ENGINE) REPLACED TURBO ENGINE FOR JHON DEERE 6068 2
Date
Part Description Part No Qty Mechanic REQ No PO#
Repaired
HERYANTO 15.08.2016
Doblle Niple 2 HERYANTO 14.08.2016
Hydraulic Hose 1''X150Cm 2
Hydraulic Hose 1''X50Cm 1
Hydraulic Filter 035E05B/4 1
ISKANDAR 13.09.2016
ISKANDAR 13.08.2016
ISKANDAR 15.08.2016
HERIYANTO 13.08.2016
HERIYANTO 27.07.2016
HYDRAULIC MOTOR 100689 1 29.07.2016
COUPLING HUB 100625 1
FUEL FILTER P550440 1
FUEL FILTER 5034 1
ISKANDAR 30.07.2016
24401-01 1 HERYANTO
ISKANDAR 01.08.2016
HERYANTO 01.08.2016
HERYANTO 02.07.2016
HERYANTO 03.08.2016
HERYANTO 04.08.2016
Selenoid Injection From LF70-05 1
13.08.2016
HERYANTO 05.08.2016
08.08.2016
Oil Sae 90 2.L
Oil Sae 40 3,5L
HERYANTO
Quick Coupler 1/4 1 09.08.2016
Hyd hose 3/8x65cm 1
Hyd hose 3/8x70cm 1
Quick Coupler 3/4 1
Quick Coupler 3/8 1
Cable Graun 3mm 2m
HERYANTO 10.08.2016
Seat Valve 28740 6
Packing Rubber 5260021 3
HERYANTO 25.08.2016
ISKANDAR/BUDHIYANTO 06.09.2016
HERYANTO 23.09.2016
ISKANDAR 19.09.2016
HERYANTO 14.08.2016
ISKANDAR 15.08.2016
ISKANDAR 31.08.2016
HERYANTO 13.08.2016
ISKANDAR On going
ISKANDAR
HERYANTO/ISKANDAR
HERYANTO/ISKANDAR 22.08.2016
HERYANTO/ISKANDAR
HERYANTO 24.08.2016
HERYANTO On Going
27.08.2016
ISKANDAR On Going
ISKANDAR On Going
ISKANDAR 06.09.2016
ISKANDAR On Going
ISKANDAR On Going
06.09.2016
ISKANDAR 08.09.2016
ISKANDAR 10.09.2016
Hydraulic Hose 3/8'' x 170cm 2 ISKANDAR 13.09.2016
Fitting 3/8'' 4
Fitting 3/8'' 90 Deg 2
Fitting 3/8'' 45 Deg 1
Hose end male JIC 3/8'' 6040609 3
Hose End Female 3/8'' 6040609 3
Ferrule 3/8'' L00-06 2
ISKANDAR 17.09.2016
ISKANDAR On Going
Plate 40 x 50cm x 12mm 1 ISKANDAR On Going
ISKANDAR 17.09.2016
ISKANDAR 20.09.2016
ISKANDAR 24.09.2016
ISKANDAR 27.09.2016
ISKANDAR 28.09.2016
ISKANDAR 06.10.2016
1 HERYANTO On going
1 HERYANTO On going
HERYANTO 27.10.2016
ISKANDAR 28.10.2016
ISKANDAR 05.11.2016
ISKANDAR 18.11.2016
Purmihadi on going
Purmihadi 27.05.2017
Purmihadi
Hose#8 x60cm 2
31.05.2017
Purmihadi
01.06.2017
Purmihadi
02.06.2017
Purmihadi
06.06.2017
Purmihadi
Purmihadi/Yoni 19.06.2017
Purmihadi/Yoni 12.07.2017
Purmihadi/Yoni 13.07.2017
Hidayat 27.08.2017
Hidayat 29.08.2017
Hidayat 30.08.2017
Hidayat 24.09.2017
Hidayat 02.09.2017
Hidayat 14.09.2017
Hidayat 17.09.2017
Oil Seal Crank Shaft 658513 Heryanto 23.10.2017
Alternator Deutz 1
Starter Motor 1
Heryanto 26.10.2017
Heryanto 30.10.2017
Heryanto 04.11.2017
Heryanto 05.11.2017
Heryanto 07.11.2017
Hose 1/2'' Foot Clamp 1 Yoni 11.11.2017
Heryanto 16.11.2017
Heryanto 17.11.2017
Hose foot clamp 1 Heryanto 18.11.2017
Saifudin 20.11.2017
Iskandar/Hidayat 26.11.2017
Saifudin 28.11.2017
Iskandar 29.11.2017
Iskandar 30.11.2017
Iskandar 01.12.2017
Heryanto 08.12.2017
Heryanto 09.12.2017
Heryanto 12.12.2017
Yoni/Heryanto 13.12.2017
Heryanto 14.12.2017
Heryanto 20.12.2017
Heryanto 21.12.2017
Yoni Ali 22.12.2017
Heryanto 25.12.2017
Iskandar/Akbar 05.01.2018
Oil Engine SAE 40 15L
Fuel Filter J8620940 2
Oil Filter P553771 1
Heryanto
Iskandar 08.02.2018
Heryanto
Iskandar/Sazali 09.02.2018
Iskandar 15.02.2018
Iskandar 17.02.2018
Hidayat 18.02.2018
Hermansyah 23.02.2018
Hermansyah 25.02.2018
Hermansyah 27.02.2018
Heryanto 28.02.2018
Yoni 11.03.2018
Heryanto/Hidayat 12.03.2018
Heryanto 13.03.2018
Yoni 13.03.2018
Yoni 14.03.2018
Yoni 15.03.2018
Iskandar/Heryanto/
Gear Box Transmissions 1 16.03.2018
Hermansyah
Heryanto 17.03.2018
Heryanto 20.03.2018
Iskandar 27.03.2018
Iskandar 31.03.2018
Heryanto 28.04.2018
Iskandar 29.04.2018
Hermansyah
Hydraulic Filter (at Tank) 1020013945 1
Yoni Ali 02.05.2018
Hermansyah 04.05.2018
Iskandar 05.05.2018
Iskandar 07.05.2018
Sazali 27.05.2018
Sazali 28.05.2018
Sazali/Hidayat 02.06.2018
Iskandar/Hermansyah 09.06.2018
Motor Hydraulic
Heryanto/Yoni Ali 09.06.2018
Sazali 04.07.2018
Yoni Ali/Heryanto
Heryanto 06.07.2018
Heryanto 08.07.2018
Heryanto 10.07.2018
Heryanto 12.07.2018
Heryanto 13.07.2018
Heryanto 14.07.2018
Heryanto 15.07.2018
Yoni Ali 17.07.2018
Heryanto
Hermansyah 24.07.2018
Engine Oil SAE 15-40 27 Yoni Ali 25.07.2018
Fuel Filter J86-20940 1 Iskandar
Oil Filter P553771 1
Air cleaner P181052 1
Hydraulic Filter BF366-10 1
Heryanto/Tatang 26.07.2018
Hermansyah/Sazali 04.08.2018
Phungky 05.08.2018
Quick Coupler 2 Ari Tri/Iskandar 07.08.2018
Seal Spindle 100536 1
Phungky 09.08.2018
Ari Tri/Iskandar 10.08.2018
Sazali/Hermansyah 11.08.2018
Heryanto 03.09.2018
Heryanto 04.09.2018
Hermansyah 06.09.2018
Yoni Ali
Heryanto 07.09.2018
Heryanto 09.09.2018
ARI 13.09.2018
BEARING SHAFT FMC 2
ARI 14.09.2018
Hermansyah/Phungky 14.09.2018
Disconnect Switch 1
CRANK SHAFT 1285094 1 ARI 15.09.2018
BEARING CONE 1177473 2
BEARING CUP 1177474 2
BEARING CON ROD P514965 3
SEAL PACKING 5260221 3
Hermansyah/Phungky Continue
S. KAMAL 17.09.2018
MAIN PUMP
S. KAMAL/ISKANDAR 18.09.2018
HERMANSYAH 18.09.2018
S. KAMAL/ISKANDAR 19.09.2018
AIR CLEANER 1
RUBBER MUD MIXER 1
WINCH CABLE 1
PHUNGKY 21.09.2018
SOLIKHIN
PHUNGKY/HERMANSYAH 25.09.2018
PHUNGKY/ARI/HERYANTO 27.09.2018
HERYANTO 29.09.2018
S. KAMAL/HERMANSYAH 10.10.2018
HERYANTO
ROTATION HEAD 1 S.KAMAL/ISKANDAR/HERMANSYAH 16.10.2018
HERYANTO 20.10.2018
ISKANDAR 23.10.2018
ISKANDAR 02.11.2018
HERYANTO 09.11.2018
TATANG/JUWANTO 06.01.2019
TATANG/JUWANTO 12.01.2019
DJUWANTO 15.02.2019
DJUWANTO/TATANG/KAMAL 20.02.2019
DJUWANTO/KAMAL 22.02.2019
ROTATION MOTOR 1 DJUWANTO/TATANG 25.02.2019
SPINDLE OIL SEAL 1
BALL THRUST BEARING 1
FURQON 10.03.2019
KAMAL 30.03.2019
OIL TEMPERATURE GAUGE 1 TEGUH Y/KAMAL 01.04.2019
02.04.2019
KAMAL 08.05.2019
KAMAL 13.05.2019
YONI/TATANG 17.05.2019
YONI/TATANG 18.05.2019
IMAM 28.05.2019
IMAM 29.05.2019
IMAM 30.05.2019
YONI 10.06.2019
OIL ENGINE SAE20-40W YONI 11.06.2019
FUEL FILTER J86-20940 1
FUEL FILTER 105370-55711 1
YONI 17.06.2019
YONI 24.06.2019
YONI 18.07.2019
TATANG 19.07.2019
YONI 20.07.2019
TATANG 21.07.2019
YONI 22.07.2019
YONI 29.07.2019
YONI/HADI W 11.08.2019
YONI 13.08.2019
HADI W 13.08.2019
HERMAN 14.08.2019
HADI W 15.08.2019
YONI 30.08.2019
YONI 01.09.2019
YONI 07.09.2019
TATANG
YONI 08.09.2019
FUEL FILTER J86-20940 1
OIL FILTER P553771 1
YONI 09.09.2019
DAYMOND 09.09.2019
HYDRAULIC FILTER 169452 1 YONI 10.09.2019
HYDRAULIC FILTER 7901 1
YONI 11.09.2019
YONI 12.09.2019
YONI 13.09.2019
YONI 14.09.2019
YONI 15.09.2019
TATANG
LH SLIDE TOP 100175 1
RH SLIDE TOP 3540814 1
SLIDE 100173 8
SHIMS 104732 10
PIN PIVOT 100171 1
KAMAL 27.09.2019
KAMAL 28.09.2019
FUEL FILTER 5034 1
KAMAL 29.09.2019
KAMAL 30.09.2019
KAMAL 01.10.2019
KAMAL 03.10.2019
KAMAL 04.10.2019
MOTOR STARTER 12V 1 HADI W/SURATMAN 05.10.2019
KAMAL
ALTERNATOR 1
KAMAL 06.10.2019
KAMAL 07.10.2019
FUEL FILTER J86-20940 1 YONI 12.10.2019
YONI 13.10.2019
YONI 15.10.2019
YONI 17.10.2019
YONI 19.10.2019
YONI 24.10.2019
YONI 25.10.2019
YONI 26.10.2019
YONI 27.10.2019
YONI 28.10.2019
YONI 31.10.2019
SUPRIATNA 07.11.2019
SUPRIATNA 10.11.2019
SUPRIATNA 12.11.2019
SUPRIATNA 17.11.2019
HOSE 1/4''X1,5M
HADI 18.11.2019
YONI 03.12.2019
YONI 10.12.2019
YONI 11.12.2019
YONI 12.12.2019
YONI 14.12.2019
YONI 16.12.2019
SUPRIATNA 18.12.2019
SUPRIATNA 22.12.2019
SUPRIATNA 26.12.2019
SUPRIATNA 28.12.2019
SUPRIATNA 29.12.2019
SUPRIATNA 31.12.2019
SUPRIATNA 01.01.2020
SUPRIATNA 03.01.2020
SUPRIATNA 04.01.2020
SUPRIATNA 05.01.2020
SUPRIATNA 12.01.2020
SUPRIATNA
HERMAN 21.01.2020
HERMAN 22.01.2020
AHMAD 13.02.2020
OIL ENGINE SAE 20 W - 40 MEDITRAN 15 L ISKANDAR 15.02.2020
HYDRULIC HOSE 1/2 X 7MM 1
AHMAD 16.02.2020
AHMAD 17.02.2020
ROHMAD TAUFIK
TATANG S 25-Jul-21
DIGDO S
HERMAN R
SYAMSUL H
FUEL FILTER FOR ENGINE JHON DEERE 606RE522878 1EA TATANG 27-Jul-21
ELEMENT FUEL FILTER R2010 1EA REKYAN
HOSE HYDRAULIC 1/4" x 50 cm 1EA
HOSE HYDRAULIC 1/4" x 1 mtr 1EA
HOSE HYDRAULIC 3/4" x 1 mtr 1EA
HOSE HYDRAULIC 3/4" x 1 .5 mtr 1EA
DOUBLE NAPLE 3/4" (-12) NPT MALE TO
3/4" (-12) NPT MALE 1EA
TATANG 28-Jul-21
DIGDO
TATANG S 30-Jul-21
TATANG S 1-Aug-21
DEDEN
DIGDO S
TATANG S 3-Aug-21
REKYAN Y
TATANG. S 4-Aug-21
REKYAN
ARI WIBOWO
BABANG
DIGDO. S
TATANG 8-Aug-21
ARI WIBOWO
DIGDO
REKYAN
TATANG 9-Aug-21
HERMAN
DEDEN
BAMBANG
TURBO ENGINE FOR JOHN DEERE 6068 RE535333 1EA TATANG 14-Aug-21
THROTTLE CABLE ASEMBLY 25FT DEA-77
C/W T HANDLE LF70-02 1EA SUPRIATNA
LF 70 - 06 PROBLEM REPORT & MAINTENANCE RECORD
RIG MODEL : LF 70 - 06 RIG SERIAL NUMBER : IN-DRD-LF706
Date
Part Desc Part No QTY Fitter REQ No PO#
Repaired
ISKANDAR 12.02.2020
ISKANDAR 14.02.2020
ISKANDAR 16.02.2020
ISKANDAR 17.02.2020
ISKANDAR 20.02.2020
TOMMY W
SUPANJI 22.02.2020
Date
Fitter REQ No PO#
Repaired
Agung 05.09.2017
Agung 06.09.2017
Agung 02.10.2017
Agung 07.10.2017
Agung 09.10.2017
Agung 10.10.2017
Yoni/Agung 11.10.2017
Yoni/Agung 12.10.2017
Yoni 13.10.2017
Yoni/Indra S 14.10.2017
Yoni/Indra S 14.10.2017
Yoni 16.10.2017
Yoni 17.10.2017
Yoni 18.10.2017
Yoni 19.10.2017
Yoni 20.10.2017
Yoni 21.10.2017
Agung 23.10.2017
Iskandar 25.11.2017
Hidayat 06.12.2017
Yoni/Heryanto 07.12.2017
Heryanto/Hidayat 11.12.2017
Yoni 12.12.2017
MP-02 PROBLEM REPORT & MAINTENA
RIG MODEL : MP-02
33 07.06.2020 D/S PREPARED RIG MOVE TO SEBU CHECKED ALL CONDITION HOSE
DISMANTLE ALL COMPONENT RIG CHECKED CONDITION FOOT CLAMP
CHECKED CONDITION WIRE LINE
CLEANED ALL COMPONENT RIG
40 10.08.2020 D/S SCHEDULE SERVICE REGULER 250 H COMPLETED SCHEDULE SERVICE 250 H
REPLACED FUEL FILTER
REPLACED FUEL FILTER YANMAR TF 230
REPLACED FUEL FILTER YANMAR TF 85 & 155
REPLACED OIL FILTER
OIL ENGINE
STAND BY AT CAME SEBU
CHECKED ALL CONDITON RIG
CHECKED ALL CONDITION SUPPLY PUMP
41 12.08.2020 D/S PROBLEM LEAKING HYDRAULIC SYSTEM REPAIRED PROBLEM HYDRAULIC SYSTEM
CHECKED ALL UNIT ENGINE
CHANGE V SANCHIN TO YANMAR
STANDBY AT CAME SEBU
42 13.08.2020 D/S PROBLEM AT RADIATOR ENGINE KUBOTA V2203 REPLACED RADIATOR ENGINE KUBOTA
REPLACED QUICK COPPLER
CHECKED ALL UNIT ENGINE
CHECKED ALL UNIT SUPPLY PUMP
60 20.09.2020 D/S CONTINUE PREPARED MOVING TO NEW HOLLE SITE CONTINUE CHECKED FOR MOVING RIG MP 02
SCHEDULE SERVICED RIG MP 02 COMPLETED SCHEDULE SERVICED
SCHEDULE INSPECTION RIG 02 REPLACED OIL FILTER
REPLACED FUEL FILTER
REPLACED AIR CLEANER
REPLACED OIL ENGINE
REPLACED PIN SLIDE MP 02
MODIFICATION PIN SLIDE MP 02
REPLACED EXHAUSE ENGINE KUBOTA V 2203
61 24.09.2020 D/S PROBLEM YANMAR TS 230 REPAIRED YANMAR TS 230 NOT START
MOVING RIG MP-02 REPLACED FUEL INJECTION PUMP
PREPARE RIG MOVING MP 02
DISMANTLE ALL COMPONENT RIG
MOVING SUPPLY PUMP AND GENSET
62 27.09.2020 D/S PROBLEM CRACK WELD SLIDE ROTARY HEAD FABRICATION SLIDE ROTARY HEAD
62 28.09.2020 D/S PROBLEM YANMAR TS 230 REPAIRED SOLVE PROBLEM YANMAR TS 230
REPLACED INJECTOR YANMAR TS 230
FABRICATION SKOR MAST REPAIRED /FABRICATION SKOR MAST MP 02
MODIFICATION SKOR MAST MP 02
63 29.09.2020 D/S PROBLEM LEAKING ON HOSE ROTARY HEAD REPAIRED HOSE LEAKING
64 02.10.2020 D/S PROBLEM ON SLIDE ROTARY HEAD ( BROKEN ON WELD ) FABRICATION ON SLIDE ROTARY HEAD
FABRICATION MAKE BASE SAFETY ENGKOL YANMAR TF105
65 05.10.2020 D/S SCHEDULE SERVICED 250H COMPLETED SERVICED 250H
SCHEDULE MONTHLY INSPECTION REPLACED OIL FILTER KUBOTA V2203
REPLACED FUEL FILTER KUBOTA V2203
REPLACED FUEL FILTER YANMAR TS 230
REPLACED FUEL FILTER YANMAR TF 105
REPLACED OIL ENGINE SUPPLY PUMP ( FMC )
REPLACED OIL ENGINE GENSET
REPLACED OIL ENGINE SUPPLY PUMP ( SANCHIN )
REPLACED OIL ENGINE KUBOTA V 2203
66 06.10.2020 D/S PROBLEM ENGINE LOW POWER REPAIRED ENGINE LOW POWER
REPLACED INJECTOR ENGINE KUBOTA V2203
N/S CONTINUE REPAIRED ENGINE LOW POWER CONTINUE REPAIRED ENGINE LOW POWER
REPLACED FUEL INJECTION PUMP ENGINE KUBOTA V2203
76 08.10.2020 D/S PREPARED RIG MOVE TO LAMPUI PREPARED RIG MOVE TO LAMPUI
CHECKED LEAKING AT HOSE HYDRAULIC
TEST CONDITION ENGINE KUBOTA V2203
PREPARED ACCESSORIES FOR RIG MP 02
CHECKED CONDITION ROTARY HEAD MP 02
PROBLEM VANBELT RADIATOR (BROKEN) DISMANTLE VAN BELT ON UNIT YANMAR TF 105
INSTALL UNIT VAN BELT YANMAR TF 105
PROBLEM COPLER HANDLE CONTROL TO MOTOR ROTARY CHANGE O RING COPPLER 3/8 FOR RETURN MOTOR ROTARY HEAD
89 15-Mar-21 D/S SET UP RIG MP 300 -02 SET UP RIG MP 300 -02
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
91 17-Mar-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
92 18-Mar-21 D/S PROBLEM RADIATOR YANMAR TF 105 REPAIRED PROBLEM YANMAR TF 105
DISMANTLE RAIDATOR YANMAR
CHANGE UNIT RADIATOR
ADD WATTER COLLENT YANMAR TF 105
93 19-Mar-21 D/S SET UP RIG MP 300 -02 SET UP RIG MP 300 -02
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
94 20-Mar-21 D/S PROBLEM DYNAMO / MOTOR STARTER YANMAR TF 105 REPAIRED DYNAMO STARTER YANMAR TF 105
DISMANTLE / OPEN DYNAMO STARTER YANMAR 105
REPAIRED UNIT DYNAMO
INSTALL ALL UNIT COMPONENT DYNAMO
I95 21-Mar-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
196 22-Mar-21 D/S SET UP RIG MP 300 -02 SET UP RIG MP 300 -02
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
I95 23-Mar-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
I95 24-Mar-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
196 25-Mar-21 D/S SCHEDULE SERVICED 250 H COMPLETED SHCEDULE SERVICED 250 H
REPLACED OIL FILTER KUBOTA V2203
REPLACED FUEL FILTER KUBOTA V2203
REPLACED FUEL FILTER YANMAR TF 85 / 105
CLEAN UP AIR FILTER YANMAR TF 85 / 105
ADD GREASE ON GREASE CUP SANCHIN (SC 120)
REPLACED OIL ENGINE MEDITRAN 40W
ADD GREASE ON ROTARY HEAD
CHECKED OIL FMC PUMP
CHECKED WATER RADIATOR
CHEKED CONDITION AIR CLEANER
197 26-Mar-21 D/S SET UP RIG MP 300 -02 SET UP RIG MP 300 -02
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
198 27-Mar-21 D/S SERVICED SUPPLY PUMP SEBU CAMP COMPLETED SERVICED SUPPLY PUMP AT SEBU
REPLACED FUEL FILTER YANMAR TS 230
REPLACED OIL ENGINE YANMAR TS 230
CHECKED WATER RADIATOR ENGINE
CHCEKED OIL ENGINE FMC PUMP
199 29-Mar-21 D/S SET UP RIG MP 300 -02 SET UP RIG MP 300 -02
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
PROBLEM BROKEN VAN BELT REPLACED VAN BELT YANMAR 190/230 CONECT FMC
200 30-Mar-21 D/S PROBLEM FMC 42O CRACK ON BODY ENGINE CHANGE UNIT FMC 420 SPARE AT KM 24
CONTINUE PREPARE
STAND BY AT SEBU CAMP AND MONITORING
I95 31-Mar-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
197 3-Apr-21 D/S SET UP RIG MP 300 -02 SET UP RIG MP 300 -02
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
198 4-Apr-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
199 5-Apr-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
199 6-Apr-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
200 7-Apr-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
201 8-Apr-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
202 9-Apr-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
203 10-Apr-21 D/S SET UP RIG MP 300 - 02 SET UP RIG MP 300 -02
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
INSTALL GENSET SILENT GL 6000 X WORKSHOP KM 24
204 11-Apr-21 D/S SERVICE SUPPLY PUMP AT SEBU CAMP SERVICED UNIT YANMAR TS - 230
SERVICED UNIT FMC W 535
REPLACED FUEL FILTER YANMAR
CLEAN UP AIR FILTER YANMAR TS 230
REPLACED OIL ENGINE YANMAR TS - 190
REPLACED OILFMC PUMP
200 13-Apr-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
203 14-Apr-21 D/S SET UP RIG MP 300 - 02 SET UP RIG MP 300 -02
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
INSTALL GENSET SILENT GL 6000 X WORKSHOP KM 24
204 15-Apr-21 D/S RECONDITION SAFETY GUARD FABRICATION FOR REPAIRED / RECONDITION SAFETY GUARD AND
RECONDITION / REAIRED BRACKET YANMAR TF 85 TO SKIT BROKEN BRACKET YANMAR TF 85 TO SKIT
205 16-Apr-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
206 17-Apr-21 D/S SET UP RIG MP 300 - 02 SET UP RIG MP 300 -02
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
INSTALL GENSET SILENT GL 6000 X WORKSHOP KM 24
207 18-Apr-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
208 24-Apr-21 D/S PROBLEM HANDLE CONTROL WIRELINE REPAIR PROBLEM HANDLE WIRELINE
209 25-Apr-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
210 26-Apr-21 D/S PROBLEM EMERGENCY STOP REPAIRED PROBLEM EMERGENCY STOP
211 28-Apr-21 D/S PROBLEM SANCHIN PUMP REPAIR PROBLEM SANCHIN PUMP
REPLACED SPRING VALVE
212 29-Apr-21 D/S PROBLEM LEAK AT MAIN BANG REPLACED HOSE HYDRAULIC (ROTARY HEAD)
REPLACED O- RING ROR THOROTLE ROTARY HEAD
REPAIR THOROTLE HANDLE WIRE LINE
ADJUST FOOT CLAMP SETTINGS.
213 1-May-21 D/S SCHEDULE SERVICED 250 H COMPLETED SHCEDULE SERVICED 250 H
REPLACED OIL FILTER KUBOTA V2203
REPLACED FUEL FILTER KUBOTA V2203
REPLACED FUEL FILTER YANMAR TF 85 / 105
CLEAN UP AIR FILTER YANMAR TF 85 / 105
ADD GREASE ON GREASE CUP SANCHIN (SC 120)
REPLACED OIL ENGINE MEDITRAN 40W
ADD GREASE ON ROTARY HEAD
CHECKED OIL FMC PUMP
CHECKED WATER RADIATOR
CHEKED CONDITION AIR CLEANER
214 2-May-05 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
214 3-May-05 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
215 4-May-21 D/S SET UP RIG MP 300 - 02 SET UP RIG MP 300 -02
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
216 5-May-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
217 6-May-21 D/S RECONDIITON MIXER FOR MUD TANK CHANGE NIXER FOR MUD TANK X KM 24
DRILL BRACKET FOR MIXER PUMP (LARGE HOLE BRACKET)
218 7-May-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
218 8-May-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
219 9-May-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
220 10-May-21 D/S SET UP RIG MP 300 - 02 SET UP RIG MP 300 -02
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
221 11-May-21 D/S PROBLEM BROKEN VAN BELT RADIATOR ENGINE REPLACED VANBELT RADIATOR ENGINE TF 85
YANMAR TF 85 INSTALL UNIT YANMAR TF 85
222 12-May-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
222 13-May-21 D/S SET UP RIG MAXI 150 SET UP RIG MAXI 150
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
223 13-May-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
224 14-May-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
225 15-May-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
226 16-May-21 D/S PROBLEM CYLINDER FOOT CLAMP REPAIRED PROBLEM LAKING IN CYLINDER FOOT CLAMP
CHANGE CYLINDER FOOT CLAMP
227 17-May-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
228 18-May-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
229 19-May-21 D/S SET UP RIG MP 300 - 02 SET UP RIG MP 300 -02
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
230 20-May-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
231 21-May-21 D/S SET UP RIG MP 300 - 02 SET UP RIG MP 300 -02
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
232 22-May-21 D/S SET UP RIG MP 300 - 02 SET UP RIG MP 300 -02
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
233 23-May-21 D/S SET UP RIG MP 300 - 02 SET UP RIG MP 300 -02
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
234 24-May-21 D/S SET UP RIG MP 300 - 02 SET UP RIG MP 300 -02
INSTALL COMPONENT MAST AND FEED CYLINDER
PROBLEM MUFLER ENGINE V 2203 INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
WELDING MUFLER ENGINE KUBOTA V 2203
RE?PLACED QUICK COPLER 3/8"
234 25-May-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
235 26-May-21 D/S SET UP RIG MP 300 - 02 SET UP RIG MP 300 -02
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
236 27-May-21 D/S MONITORING UNIT RIG MP 300 - 02 MONITORING RIG MP 300 -02
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
237 28-May-21 D/S PROBLEM CRACK WELD IN SUPORT MAST MP 300 -02 FABRICATION SUPORT MAST RIG MP 300 -02 ( WELDING)
238 29-May-21 D/S SET UP RIG MP 300 - 02 SET UP RIG MP 300 -02
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
238 1-Jun-21 D/S SET UP RIG MP 300 - 02 SET UP RIG MP 300 -02
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
239 2-Jun-21 D/S SET UP RIG MP 300 02 SET UP RIG MP 300 02
CHECK ALL UNIT ENGINE KUBOTA AND PUMP SUPLY
241 4-Jun-21 D/S SCHEDULE SERVICED 250 H COMPLETED SHCEDULE SERVICED 250 H
CHANGE PRESURE WATER
CHANGE ALL UNIT ENGINE
SET UP RIGG
243 6-Jun-21 D/S MONITORING RIG MP 300 02 CHECK RIG MP02 AND ALL UNIT
WELDING BOX SPARPART / TOOL BOX
246 9-Jun-21 D/S MONITORING RIG MP 02 CHECK RIG MP-O2 AND ALL UNIT
PASANG BOLT SHET POMP SANCHIN
TAMBAH GRACE POMPA SANCIN
PASANG HOSE RETURN FUEL POMPA SANCHIN
248 12-Jun-21 D/S MONITORIG RIG MP 02 MOVING RIG, PRPAIRING AND DRILL
PUMP SUPPLY ESTAPET CLEAN UNIT, RADIATOR AND VANBELT
249 13-Jun-21 D/S MONITORIG RIG MP 02 CECK UP AIR CLEANIR OPEN AND CLEAN FUEL FILTER
CHECK FUEL TANK, BLEADING FUEL PIPE
COR ENGINE BLOCK
251 16-Jun-21 D/S MONITORIG RIG MP 02 DRAIN FUEL TANK, CLEAN TANK, AND WELDING OF
FITTING RETURN FUEL CREK, CHANGE SUPORT MUST
CHANGE OF FUEL SELENOID
253 18-Jun-21 D/S MONITORIG RIG MP 02 DISCONNECTION OF HYD HOSE FROM PANNEL CONTROL
SERVICE PUMP WATTER SUPPLY YANMAR TS 230 AND FMC 535
PREPAIRING OF RIG MP FOR DRILL NEW SITE
254 19-Jun-21 D/S MONITORIG RIG MP 02 DISCOVER ALL HYD HOSE AND ALL COMPONENT HYT TANK
PRIPAIRING FOR DRILL
TEST GENSET AND LAMPU
255 20-Jun-21 D/S MONITORIG RIG MP 02 FILL OIL GANSET GL 6000 TEST RUN
CEK ALL UNIT AT RIG SITE
256 21-Jun-21 D/S MONITORIG RIG MP 02 RIG MOVE, INSTALL HOSE FOR RIG
TEST UNIT RIG RUN
CEK PUMP SUNCHIN SUM SUPPLY
CEK PUMP PRESS DRILL, TEST GENSET
257 22-Jun-21 D/S MONITORIG RIG MP 02 REPAIR OF WINCH ANGLE LOSES FROM LOCK BOLT NOT
258 23-Jun-21 D/S MONITORIG RIG MP 02 DISCONNECT ALL HYD HOSE AND ALL COMPONENT RIG FOR MOVE
MOVING RIG, PREPAIRING INSTALL ALL HYD HOSE
259 24-Jun-21 D/S MONITORIG RIG MP 02 MOVING RIG AND PRPAIRING RIG FOR DRILL
260 25-Jun-21 D/S MONITORING RIG MP 02 CEK ALL UNIT RIG SITE
REPAIR OF EXHAUST MAINPRO HOSE
261 26-Jun-21 D/S MONITORING RIG MP 02 MOVING RIG, PREPAIR OF RIG FOR DRILL
CHANGE OF SEATING VALVE SHANCIN SE 120 FOR SAM MP 02
262 27-Jun-21 D/S MONITORING RIG MP 02 REPAIR / CHANGE JAW SHOT CREAK
263 28-Jun-21 D/S MONITORING RIG MP 02 GO TO BATU HIJAU FOR VAKSIN COVID 19
264 29-Jun-21 D/S MONITORING RIG MP 02 DISCONNECTION OF HYD HOSE AND COMPONENT FOR MOVE HELY
CONNECTION OF HYD HOSE AND COMPONENT FOR PREPARE
263 30-Jun-21 D/S PROBLEM MECHANICAL YANMAR DOESN’T STARTED REPAIRED PROBLEM YANMAR DOESN’T STARTED
(SIRCULATION PUMP)
JULY
264 1-Jul-21 D/S SERVICED GENSET KUBOTA GL 6000 SERVICED GENSET KUBOTA GL 6000
REPLACED ELEMENT FUEL FILTER GENSET KUBOTA GL 6000
REPLACED FILTER OIL GENSET GL 6000
265 2-Jul-21 D/S SET UP RIG MP 300 - 02 SET UP RIG MP 300 -02
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
266 3-Jul-21 D/S MONITORING RIG MP 02 CHECK RIG MP-O2 AND ALL UNIT
PASANG BOLT SHET POMP SANCHIN
TAMBAH GRACE POMPA SANCIN
PASANG HOSE RETURN FUEL POMPA SANCHIN
267 4-Jul-21 D/S SET UP RIG MP 300 - 02 SET UP RIG MP 300 -02
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
PROBLEM FMC 535 BROKEN CAP AND CONE BEARING CHANGE UNIT ASSY FMC 535.
268 5-Jul-21 D/S SET UP RIG MP 300 - 02 SET UP RIG MP 300 -02
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
266 6-Jul-21 D/S MONITORING RIG MP 02 CHECK RIG MP-O2 AND ALL UNIT
PASANG BOLT SHET POMP SANCHIN
TAMBAH GRACE POMPA SANCIN
PASANG HOSE RETURN FUEL POMPA SANCHIN
267 7-Jul-21 D/S MONITORING RIG MP 02 CHECK RIG MP-O2 AND ALL UNIT
PASANG BOLT SHET POMP SANCHIN
TAMBAH GRACE POMPA SANCIN
PASANG HOSE RETURN FUEL POMPA SANCHIN
268 8-Jul-21 D/S MONITORING RIG MP 02 CHECK RIG MP-O2 AND ALL UNIT
PASANG BOLT SHET POMP SANCHIN
TAMBAH GRACE POMPA SANCIN
PASANG HOSE RETURN FUEL POMPA SANCHIN
269 9-Jul-21 D/S MONITORING RIG MP 02 CHECK RIG MP-O2 AND ALL UNIT
PASANG BOLT SHET POMP SANCHIN
TAMBAH GRACE POMPA SANCIN
PASANG HOSE RETURN FUEL POMPA SANCHIN
270 10-Jul-21 D/S SET UP RIG MP 300 - 02 SET UP RIG MP 300 -02
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
271 11-Jul-21 D/S MONITORING RIG MP 02 CHECK RIG MP-O2 AND ALL UNIT
PASANG BOLT SHET POMP SANCHIN
TAMBAH GRACE POMPA SANCIN
PASANG HOSE RETURN FUEL POMPA SANCHIN
272 12-Jul-21 D/S MONITORING RIG MP 02 CHECK RIG MP-O2 AND ALL UNIT
PASANG BOLT SHET POMP SANCHIN
TAMBAH GRACE POMPA SANCIN
PASANG HOSE RETURN FUEL POMPA SANCHIN
273 13-Jul-21 D/S MONITORING RIG MP 02 CHECK RIG MP-O2 AND ALL UNIT
PASANG BOLT SHET POMP SANCHIN
TAMBAH GRACE POMPA SANCIN
PASANG HOSE RETURN FUEL POMPA SANCHIN
274 14-Jul-21 D/S SCHEDULE SERVICED 250 H COMPLETED SCHEDULE SERVICED 250 H
REPLACED OIL ENGINE
REPLACED OIL FMC
REPLACED FUEL FILTER ELEMENT YANMAR TS 230
GENSET GL 6000
REPLACED AIR CLEANER GENSET KUBOTA GL 6000
REPLACED AIR CLEANER GENSET GL 6000
REPLACED OIL ENGIINE GENSET GL 6000
REPLACED OIL FILTER GENSET GL 6000
SIRCULATION PUMP
REPLACED OIL SANCHIN PUMP
276 16-Jul-21 D/S MONITORING RIG MP 02 CHECK RIG MP-O2 AND ALL UNIT
PASANG BOLT SHET POMP SANCHIN
TAMBAH GRACE POMPA SANCIN
PASANG HOSE RETURN FUEL POMPA SANCHIN
ABDUL R 02.09.2019
8 HADI 27.01.2020
S.KAMAL 01.02.2020
S.KAMAL 03.02.2020
2 HADI W 08.02.2020
BALL SEATING VALVE S. KAMAL 09.02.2020
5 HILL 11.05.2020
ABDULRAHMAN
SUPRIATNA
2 LAMP 1EA YONI ALI 16.05.2020
07.06.2020
12 HERMAN 03.08.2020
12 HERMAN 06.08.2020
12 HERMAN 08.08.2020
12 SUPRIATNA 14.08.2020
12 SUPRIATNA 17.08.2020
12 SUPRIATNA 18.08.2020
12 SUPRIATNA 21.08.2020
12 SUPRIATNA 22.08.2020
12 SUPRIATNA 23.08.2020
12 SUPRIATNA 24.08.2020
12 SUPRIATNA 31.08.2020
12 SUPRIATNA 02.09.2020
12 SUPRIATNA 04.09.2020
12 SYAMSUL H 27.09.2020
DIGDO
1 HILL 29.09.2020
3 SYAMSUL 02.10.2020
DIGDO
3 FUEL FILTER KUBOTA V2203 IT021-43561 1EA ABDULRAHMAN 05.10.2020
OIL FILTER KUBOTA V2203 HH150-32094 1EA AHMAD. S
OIL ENGINE SAE 20W - 40 MEDITRAN 2GEN
FUEL FILTER YANMAR TF 105 105370-55711 2EA
FUEL FILTER YANMAR TS 230 105990-55730 1EA
4 HILL
HERMAN
12 ABDULRAHMAN 08.10.2020
AHMAD. S
12 AHMAD 13.11.2020
YONI ALI
12 HERMAN R 28.12.2020
12 ELEMENT FUEL FILTER YANMAR TS 230 105990-55730 2EA AHMAD SUHAEFI 27-Mar-21
OIL ENGINE SAE 20 - 40 W MEDITRAN 30L YONI ALI
12 HERMAN R
18-Apr-21
12 HERMAN R 25-Apr-21
12 HERMAN. R 26-Apr-21
12 HERMAN R 2-May-05
12 HERMAN R 3-May-05
12 HERMAN R 4-May-21
12 HERMAN R 5-May-05
12 HERMAN R 6-May-21
12 HERMAN R 7-May-21
12 HERMAN R 8-May-21
12 HERMAN R 9-May-21
12 HERMAN R 10-May-21
12
12 HERMAN R 12-May-21
12 HERMAN R 13-May-21
SUPRIATNA
12 HERMAN R 14-May-21
SUPRIATNA
12 HERMAN R 15-May-21
SUPRIATNA
12 HERMAN R 16-May-21
SUPRIATNA
12
12 HERMAN R 17-May-21
SUPRIATNA
12 HERMAN R 18-May-21
SUPRIATNA
12 HERMAN R 19-May-21
SUPRIATNA
12 HERMAN R 20-May-21
SUPRIATNA
12 HERMAN R 21-May-21
SUPRIATNA
12 HERMAN R 23-May-21
SUPRIATNA
12 HERMAN R 25-May-21
SUPRIATNA
12 HERMAN R 26-May-21
SUPRIATNA
12 HERMAN R 27-May-21
SUPRIATNA
SUPRIATNA 28-May-21
HERMAN R
DIGDO. S
12 HERMAN R 29-May-21
SUPRIATNA
12 SUPRIATNA 1-Jun-21
12 SUPRIATNA 2-Jun-21
12 Yoni Ali
6-Jun-21
AHMAD SUHAEFI
YONI ALI 12-Jun-21
JULY
12 ELEMENT FUEL FILTER GENSET KUBOTA GL 6000 1T021-43560 1EA AHMAD SUHAEFI 1-Jul-21
OIL FILTER GENSET KUBOTA GL 6000 HH150-32094 1EA YONI ALI
OIL ENGINE SAE 20 -40 W MEDITRAN 3L
12 HERMAN R 5-Jul-21
SUPRIATNA
1279674 3EA
GASKSET CYLINDER COVER YONI ALI 15-Jul-21
17-Jul-21
MAXI 150 PROBLEM REPORT & MAINTENANCE RE
RIG MODEL : MAXI 150
46 24.09.2018 D/S SCHEDULE SERVICE REGULAR 250 HRS COMPLETED SERVICE 250 HRS 20110
CHANGED OUT OIL FILTER
REPLACED FUEL FILTER
REPLACED OIL ENGINE
46 25.09.2018 D/S SCHEDULE SERVICE REGULAR 250 HRS COMPLETED SERVICE 250 HRS
CHANGED OUT ENGINE OIL
46 26.09.2018 D/S REPLACED BOLT 7/16'' TO BOLT 1/2'' SLIDING FEED
46 27.09.2018 D/S CHECKED EMERGENCY STOP ENGINE FOR DRILL PUMP 2035.2
PROBLEM E-STOP REPAIRED & CONNECTED CABLE EMERGENCY STOP
46 28.09.2018 D/S RE TIGHTEN BOLT 1/2'' FOR WINCH DRUM 20532
47 30.09.2018 D/S REPAIRED LEAKING AT FEED PRESSURE 2084
NEW HOLE SET RIG UP
48 05.10.2018 D/S ADDED SHIM FRAME HYDRAULIC MODULE 21763
91 21.09.2019 D/S PROBLEM PANEL CONTROL STUCK (HYDRAULIC) REPAIRED HYDRAULIC VALVE
SUDDENLY SWITCH OFF REPAIRED GENSET
21.09.2019 N/S REPLACED CONTROL VALVE 6642
REPLACED MOTOR ROTARY
92 22.09.2019 D/S REPLACED MAIN PUMP
REPLACED HYDRAULIC HOSE 1 1/4'' FOR SUCTION
REPLACED HOSE 1'' FOR RETURN
ADJUSTED PRESSURE
22.09.2019 N/S ROTATION HEAD GEAR BOX STUCK REPAIRED GEAR BOX 6651
93 23.09.2019 D/S PROBLEM ROTATION HEAD BEARING
94 26.09.2019 D/S REPAIRED GEAR BOX 1
REPLACED SEAL BOTTOM GEAR BOX
94 05.10.2019 D/S SCHEDULE SERVICE 250 HRS COMPLETED SCHEDULE SERVICE 250 HRS
REPLACED OIL FILTER
REPLACED FUEL FILTER
CHANGED OUT ENGINE OIL
95 14.10.2019 N/S REPAIRED ENGINE KUBOTA (SOLENOID ENGINE) 1
96 20.10.2019 D/S SCHEDULE SERVICE 250 HRS COMPLETED SCHEDULE SERVICE 250 HRS 12
REPAIRED SOUTHERN CROSS PUMP
97 06.11.2019 D/S SCHEDULE SERVICE 250 HRS COMPLETED SCHEDULE SERVICE 250 HRS
98 09.11.2019 D/S E-STOP CAN'T BE FUNCTIONED REPAIRED E-STOP 6
99 16.11.2019 D/S REPLACED E-STOP SWITCH FOR MAIN ENGINE 3
99 23.11.2019 D/S SCHEDULE SERVICE 250 HRS COMPLETED SCHEDULE SERVICE 250 HRS 12
100 04.12.2019 D/S REPAIRED PULLEY WIRELINE
REPAIRED WATER PUMP
101 11.12.2019 D/S REPAIRED E-STOP 6
SCHEDULE SERVICE 250 HRS COMPLETED SCHEDULE SERVICE 250 HRS
102 22.12.2019 D/S REPAIRE EMERGENCY STOP
REPLACED GENSET GL6000
103 28.12.2019 D/S SCHEDULE REGULER SERVICE 250 HRS COMPLETED SCHEDULE SERVICE 250 HRS 2
104 31.01.2020 REPLACED STEEL BALLL FMC
REPLACED SEATING VALVE
REPLACED RUBBER FMC
REPLACED LINER FMC
105 01.02.2020 N/S SCHEDULE REGULER SERVICE 250 HRS COMPLETED SCHEDULE SERVICE 250 HRS
REPLACED OIL FILTER
REPLACED FILTER OIL
D/S REPLACED MOTOR STARTER 5
CHECKED ELECTRICAL SYSTEM
ADDED CABLLE STARTER ( - ) TO DISCONNECT SWITCH
106 07.02.2020 D/S REPAIRED MACHINE NOT START 3
REPAIRED ALTERNATOR NOT CHARGING
107 09.02.2020 N/S REPAIRED RADIATOR
CLEANED RADIATOR
108 10.02.2020 N/S MAKE CLAMPS TO PULL OUT THE PIPE
109 18.20.2020 N/S CHECKED ALL UNIT ENGINE AND PUMP
REPLACED V BELT RADIATOR YANMAR
110 20.02.2020 N/S SERVICE ENGINE MAXI 150 82884 12
REPLACED OIL FILTER
REPLACED FUEL FILTER
ADDED OIL ENGINE
111 28.02.2020 D/S CHANGE GOVERNOR INJECTION PUMP
REPAIRED ENGINE NOT RUNNING
112 02.02.2020 D/S SCHEDULE REGULER SERVICE 250 HRS COMPLETED SCHEDULE REGULER SERVICE 250 HRS 8403 6
REPLACED OIL ENGINE
REPLACED FUEL FILTER
REPLACED OIL FILTER
REPLACED MOTOR STARTER
REPLACED OIL ENGINE SUPLY PUMP
REPLACED PULLEY AND BELT
REPLACED OIL ENGINE GENSET KUBOTA
REPLACED FUEL FILTER GENSET KUBOTA
113 04.03.2020 N/S SHEDULE SERVICE REGULER 250 HOURS COMPLETED SCHEDULE SERVICE 250 HRS 1212 5
REPLACED OIL ENGINE
REPLACED FUEL FILTER
REPLACED FILTER OIL
REPLACED AIR FILTER
CHANGE VALVE HEAD ASSY SANCHN
TAKE OUT THERMOSTAT ENGINE AT MAXI
REPLACED CYLINDER HEAD BLOCK
REPALCED HOLDER NOZZLE INJECTOR
114 12.04.2020 N/S REPAIRED ENGINE BROKEN REPAIRED FUEL PUMP 12
REPAIRED ENGINE NOT START
115 13.04,2020 N/S MONITORING RIG MAXI 150 CHECKED ALL UNIT RIG MAXI - 01 12
BLENDING ENGINE RIG MAXI
116 14.04.2020 N/S PROBLEM ENGINE RIG NOT START REPAIRED ENGINE NOT START 4
REPLACED BATTERY RIG
117 17.05.2020 N/S MONITORING CONDITION RIG MAXI 150 CHECKED ALL CONDITION RIG MAXI 150 2
ADDED GREASE ON SANCHIN PUMP MAXI 150
CHECKED CONDITION SUPPLY PUMP
CHECKED ALL CONDITION GENERATOR
118 18.05.2020 N/S MONITORING AND CHECKED RIG MAXI 150 CHECKED ALL CONDITION RIG MAXI 150 2
REPLACED HOSE HYD SLIDE
119 21.05.2020 D/S SHEDULE SERVICE 250 HOURS COMPLETED SHEDULE SERVICE 250 HOURS 8989 1
REPLACED FUEL FILTER
REPLACED OIL FILTER
REPLACED FUEL FILTER TF-85
REPLACED FUEL FILTER TF-155
REPLACED FUEL FILTER GENSET KUBOTA
120 23.04.2020 D/S BROKEN FOOT CLAMP AT MAXI 150 REPAIRED FOOT CLAMP AT MAXI 150 3
121 24.04.2020 D/S MONITORING AND CHECKED RIG MAXI 150 CHECKED ALL CONDITION RIG MAXI AND ALL UNIT 3
REPAIRED FITING HYDRAULIC
CHECKED BELT SUPPORT ENGINE
CHANGED FITING HYDRAULIC
122 26.04.2020 D/S MOVING RIG MAXI 150 SET UP RIG MAXI 150 4
123 29.04.2002 D/S MONITORING AND CHECKED RIG MAXI 150 CHECKED ALL CONDITION RIG MAXI AND ALL UNIT 2
REPLACED HOSE FUEL GENSET
REPAIRED TANGKI SOLAR
124 04.05.2020 D/S SCHEDULE SERVICED REGULER 250 HOURS COMPLETED SERVICED REGULER 250 HOURS 8
REPALED FUEL FILTER YANNAR TF 155
REPLACED OIL FILTER KUBOTA
REPLACED FUEL FILTER KUBOTA
STANBY AT KM 24 STANBY AT KM 24
127 24.12.2020 D/S MONITORING RIG REPAIRED PIT SILINDER MAXI 150 12
REPAIRED SANCHIN
REPLACED HOSE FUEL
129 01.01.2021 N/S MONITRING RIG CHECKED ALL UNIT AND COMPONENT RIG 4
REPAIRED LAMP RIG
130 03.01.2021 D/S MONITORING RIG REPLACED CONTROL PANEL MAXI 150 12
REPLACED RABER FMC
131 07.01.2021 N/S MONITORING RIG CHECKED ALL UNIT RIG MAXI 150 2
REPAIRED BOLT SLIDE
135 8/2/2021 D/S Monitoring Rig Repaired Engine Water Pump Sonoid 12
Check Cabel Electric Solonoid
137 8-Mar-21 D/S Cek all Unit and Rig and Pump Supply 12
138 9-Mar-21 D/S Servise 250 HR Servise genset Yanmar and Pump Sanci dan Engine Pump Drill 12
139 14-Mar-21 D/S SET UP RIG MAXI 150 INSTALL ALL COMPONENT RIG 12
INSTALL MAST
INSTALL ALL HOSE HYDRAULIC
INSTALL FUEL TANK
RECONDISITION BRACKET ALTENATOR ENGINE KUBOTA
REPAIR FEED CYLINDER LEAKING
140 15-Mar-21 D/S SET UP RIG MAXI 150 SET UP RIG MAXI 150 12
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
141 16-Mar-21 D/S MONITORING UNIT RIG MAXI 150 MONITORING RIG MAXI 150 12
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
142 17-Mar-21 D/S SET UP RIG MAXI 150 SET UP RIG MAXI 150 12
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
143 18-Mar-21 D/S PROBLEM YANMAR TF 105 CHECKED CONDITION PISTON YANMAR TF 105 12
CLEAN PISTON AND CHECKED CONDITION (OK)
INSTALL UNIT PISTON
REPLACED BOLT SKID BASE YANMAR TF 85 (1/2 inch X 2Omm)
141 19-Mar-21 D/S MONITORING UNIT RIG MAXI 150 MONITORING RIG MAXI 150 12
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
142 20-Mar-21 D/S PROBLEM ROTARY HEAD LEAKING REPAIRED UNIT ROTARY HEAD LEAKING 12
CLEAN UP ROTATY HEAD LEAKING
LUBRICATION ROTARY HEAD
CHANGE HOSE WIRE LINE TO CONTROL PANNEL
REPLACED AIR CLEANER ENGINE KUBOTA V2203
143 21-Mar-21 D/S SET UP RIG MAXI 150 SET UP RIG MAXI 150 12
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
144 22-Mar-21 D/S SET UP RIG MAXI 150 SET UP RIG MAXI 150 12
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
145 23-Mar-21 D/S MONITORING UNIT RIG MAXI 150 MONITORING RIG MAXI 150 12
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
146 24-Mar-21 D/S MONITORING UNIT RIG MAXI 150 MONITORING RIG MAXI 150 12
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
147 25-Mar-21 D/S MONITORING UNIT RIG MAXI 150 MONITORING RIG MAXI 150 12
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
146 26-Mar-21 D/S MONITORING UNIT RIG MAXI 150 MONITORING RIG MAXI 150 12
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
147 31-Mar-21 D/S MONITORING UNIT RIG MAXI 150 MONITORING RIG MAXI 150 12
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
CHECKED LEAKING ON RADIATOR
RADIATOR NEED REPLACED
STANDBY AT SEBU CAMP
148 1-Apr-21 D/S MONITORING UNIT RIG MAXI 150 MONITORING RIG MAXI 150 12
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
CHECKED LEAKING ON RADIATOR
RADIATOR NEED REPLACED
STANDBY AT SEBU CAMP
149 2-Apr-21 D/S SET UP RIG MAXI 150 SET UP RIG MAXI 150 12
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
150 3-Apr-21 D/S MONITORING UNIT RIG MAXI 150 MONITORING RIG MAXI 150 12
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
150 4-Apr-21 D/S MONITORING UNIT RIG MAXI 150 MONITORING RIG MAXI 150 12
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
151 5-Apr-21 D/S PRONBLEM HYDRAULIC HOSE CHECK AND ANALYSIS PROBLEM. 12
REPAIRED PROBLEM LEAKING HOSE ON FEED REGULATOR
REPLACED HOSE 3/8' X 1 M
REPLACED HOSE 1/4' X 40 CM
152 6-Apr-21 D/S PROBLEM LEAKING ON FEED GAUGE REPAIRED PROBLEM LEAKING FEED GAUGE 12
CHANGED O RING FITTING OIL HYDRAULIC FOR RETURN
153 7-Apr-21 D/S PROBLEM VAN BELT GENSET CONNECT TO YANMAR REPLACED VAN BELT GENSET CONNECTED TO YANMAR 12
150 8-Apr-21 D/S MONITORING UNIT RIG MAXI 150 MONITORING RIG MAXI 150 12
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
151 9-Apr-21 D/S MONITORING UNIT RIG MAXI 150 MONITORING RIG MAXI 150 12
CHECKED ALL UNIT COMPONENT RIG
REPLACED HOSE 3/8" x 1 M (JIC x JIC) FOR PRESS FEED
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
152 10-Apr-21 D/S MONITORING UNIT RIG MAXI 150 MONITORING RIG MAXI 150 12
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
153 11-Apr-21 D/S SERVICE SUPPLY PUMP AT SEBU CAMP SERVICED UNIT YANMAR TS - 230 12
SERVICED UNIT FMC W 535
REPLACED FUEL FILTER YANMAR
CLEAN UP AIR FILTER YANMAR TS 230
REPLACED OIL ENGINE YANMAR TS - 190
REPLACED OILFMC PUMP
153 12-Apr-21 D/S SET UP RIG MAXI 150 SET UP RIG MAXI 150 12
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
154 13-Apr-21 D/S MONITORING UNIT RIG MAXI 150 MONITORING RIG MAXI 150 12
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
155 14-Apr-21 D/S SET UP RIG MAXI 150 SET UP RIG MAXI 150 12
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
166 16-Apr-21 D/S MONITORING UNIT RIG MAXI 150 MONITORING RIG MAXI 150 12
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
167 17-Apr-21 D/S SCHEDULE SERVICED 250 H COMPLETED SHCEDULE SERVICED 250 H 12
REPLACED OIL FILTER KUBOTA V2203
REPLACED FUEL FILTER KUBOTA V2203
REPLACED FUEL FILTER YANMAR TF 85 / 105
CLEAN UP AIR FILTER YANMAR TF 85 / 105
ADD GREASE ON GREASE CUP SANCHIN (SC 120)
REPLACED OIL ENGINE MEDITRAN 40W
ADD GREASE ON ROTARY HEAD
CHECKED OIL FMC PUMP
CHECKED WATER RADIATOR
CHEKED CONDITION AIR CLEANER
168 18-Apr-21 D/S MONITORING UNIT RIG MAXI 150 MONITORING RIG MAXI 150 12
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
206 24-Apr-21 D/S PROBLEM HYDRAULIC WIRE LINE REPAIR PROBLEM HYDRAULIC WIRELINE (LOW POWER)
207 25-Apr-21 D/S PROBLEM LAEKS ON RADITOR ENGINE KUBOTA V 2203 REPAIR PROBLEM LEAKS ON ENGINE KUBOTA V2203 12
INJECT RADIATOR ENGINE
208 26-Apr-21 D/S PROBLEM ELECTRICAL REPAIRED PROBLEM ELECTRICAL (EMERGENCY STOP,ENGINE START, 12
ISOLATOR)
REPLACED SELENOID ENGINE
209 28-Apr-21 D/S PROBLEM ELECTRICAL REPAIR PROBLEM ELECTRILCAL MOTOR STARTER 12
REPLACED BALM WORK LAMP
CHANGE MOTOR STARTER
210 29-Apr-21 D/S PROBLEM UNIT ROTATION HEAD CHANGE UNIT ROTARY HEAD X REPAIR KM 24
REPLACED BOLT FOR HOLDER ROTARY HEAD
N/S PROBLEM UNIT VAN BELT ENGINE REPLACED VANBELT ENGINE KUBOTA
INSTALL UNIT VAN BELT ENGINE KUBOTA
213 3-May-21 D/S MONITORING UNIT RIG MAXI 150 REPOSITION FOOT CLAMP 12
REPAIR SKOR / BRACKET FOR ROTARY HEAD
TIGHTEN BOLT BRACKET SKID
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
214 4-May-21 D/S SET UP RIG MAXI 150 SET UP RIG MAXI 150 12
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
MONITORING UNIT RIG MAXI 150 TIGHTEN BOLT MOUNTING YANMAR TF 85 ( LOOSE)
TIGHTEN VAN BELT RADIATOR ENGINE TF 85
REPAIR ELECTRICAL ENGINE RIG
215 5-May-21 D/S MONITORING UNIT RIG MAXI 150 REPOSITION FOOT CLAMP 12
REPAIR SKOR / BRACKET FOR ROTARY HEAD
TIGHTEN BOLT BRACKET SKID
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
216 6-May-21 D/S SET UP RIG MAXI 150 SET UP RIG MAXI 150 12
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
217 7-May-21 D/S PROBLEM LEAK IN ENGINE KUBOTA V2203 REPLACED RADIATOR ENGINE KUBOTA V 2203 12
REPLACED GASKET HEAD ENGINE KUBOTA V 2203
REPLACED OIL ENGINE RIG MAXI 150
218 8-May-21 D/S MONITORING UNIT RIG MAXI 150 REPOSITION FOOT CLAMP 12
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
218 9-May-21 D/S MONITORING UNIT RIG MAXI 150 REPOSITION FOOT CLAMP 12
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
219 10-May-21 D/S SET UP RIG MAXI 150 SET UP RIG MAXI 150 12
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
220 11-May-21 D/S PROBLEM UNIT CIRCULATION PUMP (YANMAR TF 85) CHANGE RADIATOR YANMAR TF 85
FABRICATION SAFEY GUARD YANMAR (WELDING)
MONITORING UNIT RIG MAXI 150 CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
221 12-May-21 D/S SET UP RIG MAXI 150 SET UP RIG MAXI 150 12
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
222 13-May-21 D/S MONITORING UNIT RIG MAXI 150 REPOSITION FOOT CLAMP 12
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
223 14-May-21 D/S SCHEDULE SERVICED 250 H COMPLETED SCHEDULE SERVICED 250 H 12
REPLACED OIL ENGINE FOR RIG AND UNIT PUMP SEBU CAMP
REPLACED OIL FILTER ENGINE
REPLACED FUEL FILTER ENGINE
FABRICATION MUFLER
222 15-May-21 D/S MONITORING UNIT RIG MAXI 150 REPOSITION FOOT CLAMP 12
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
223 16-May-21 D/S MONITORING UNIT RIG MAXI 150 REPOSITION FOOT CLAMP 12
CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
224 17-May-21 D/S MONITORING UNIT RIG MAXI 150 CHECKED ALL UNIT COMPONENT RIG 12
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
225 18-May-21 D/S MONITORING UNIT RIG MAXI 150 CHECKED ALL UNIT COMPONENT RIG 12
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
226 19-May-21 D/S PROBLEM MECHANICAL MUFLER REPLACED MUFLER ENGINE KUBOTA V 2203 12
INSTALL MUFLER ENGINE KUBOTA V 2203
MONITORING UNIT RIG MAXI 150 CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
227 20-May-21 D/S PROBLEM UNIT BROKEN HOSE FUEL ENGINE REPLACED HOSE FUEL ENGINE KUBOTA V 2203 12
DRAIN FUEL ENGINE CLOGGED
MONITORING UNIT RIG MAXI 150 CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
228 21-May-21 D/S MONITORING UNIT RIG MAXI 150 CHECKED ALL UNIT COMPONENT RIG 12
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
229 22-May-21 D/S MONITORING UNIT RIG MAXI 150 CHECKED ALL UNIT COMPONENT RIG 12
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
230 23-May-21 D/S SET UP RIG MAXI 150 SET UP RIG MAXI 150 12
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
231 24-May-21 D/S MONITORING UNIT RIG MAXI 150 CHECKED ALL UNIT COMPONENT RIG 12
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
231 25-May-21 D/S MONITORING UNIT RIG MAXI 150 CHECKED ALL UNIT COMPONENT RIG 12
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
231 26-May-21 D/S MONITORING UNIT RIG MAXI 150 CHECKED ALL UNIT COMPONENT RIG 12
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
232 27-May-21 D/S PROBLEM FMC 435 CHANGE UNIT FMC 435 x REPAIRRED W/S KM 24 12
MONITORING UNIT RIG MAXI 150 CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
233 28-May-21 D/S MONITORING UNIT RIG MAXI 150 CHECKED ALL UNIT COMPONENT RIG 12
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
234 29-May-21 D/S MONITORING RIG MAXI-150 CHANGE FUEL TANK AND TEST RUN
WELDING BROKET ENGINE COL BREAK FOR PUMP SUMP SUPPLY 12
CHANGE ASSY SUNCHIN SC 120 FOR SUMP
235 13-Jun-21 D/S MONITORING RIG MAXI-150 CEK ALL UNIT RIG AND WAITING FOR MOVING 12
236 15-Jun-21 D/S MONITORING RIG MAXI-150 REPAIR OF LAMPU MOT PLAS
REPAIR OF FUEL SYSTEM ENGINE AIR STARTING 12
REPAIR OF FEED CONTROL VALVE SPOOL LITLE HARD
237 16-Jun-21 D/S MONITORING RIG MAXI-150 PREPARE FOR RIG MOVE
MOVING RIG WELDING OF DEEP TRY OIL LOSES 12
WELDING SKIT BOSE FOR PUMP SUPPLY SUMP
238 17-Jun-21 D/S MONITORING RIG MAXI-150 CECK ALL COMPONENT RIG 12
239 18-Jun-21 D/S MONITORING RIG MAXI-150 DIS DISEMBLY AND PREPAREING FOR MOVING 12
241 20-Jun-21 D/S MONITORING RIG MAXI-150 CHANGE OF SEATING VALVE FMC 420
CHANGE COVER TOP AND FROAT 12
CLEAN SECTION INPUT HOSE
243 22-Jun-21 D/S MONITORING RIG MAXI-150 REPAIR OF EXHOSE MANIPOLT CREAK BOLT
INSTALL AND CHANGE BOLT 3 EA V-2203 V-2203 ENGINE 12
CEK ELECTRIC, ENGINE CANT STARTING FOR ENGINE KUBOTA
244 23-Jun-21 D/S MONITORING RIG MAXI-150 MOVING RIG, PREPAIRING OF UNIT FOR DRILLING 12
CEK ALL UNIT, TEST GENSET AND LAMPU
245 24-Jun-21 D/S MONITORING RIG MAXI-150 SERVICE SCEDHULE 250 HRS RIG
SERVICE YANMAR SANCHIN SC 120 FOR WATER SUMP SUPPLY 12
SERVICE 2 UNIT GENSET GL 6000
246 25-Jun-21 D/S MONITORING RIG MAXI-150 CHANGE OF BELT M-38 FOR YANMAR TF 85 FOR SUPPLY SUMP 12
CHANGE OF ELEMENT FILTER FUEL GL 6000
247 26-Jun-21 D/S MONITORING RIG MAXI-150 CLEAN SISTEM FMC 525 FOR MAXI AND MP
CEK AND CLEAN CHAMBER HEAD FMC 12
248 27-Jun-21 D/S MONITORING RIG MAXI-150 PRPEARE RIG FOR MOVING
SET FOR DRILL NEW LOCATION 12
TEST GENSET GL 6000
249 28-Jun-21 D/S MONITORING RIG MAXI-150 GO TO BATU HIJAU FOR VAKSIN COVID 19 12
350 29-Jun-21 D/S MONITORING RIG MAXI-150 SERVICE PUMP SUPPLY ESTAPET YANMAR TS230 AND FMC 535 12
251 30-Jun-21 D/S PROBLEM MECHANICAL FMC 420 REPAIRED FMC FOR DRILL PUMP RIG MAXI 150 12
JULY
252 1-Jul-21 D/S SET UP RIG MAXI 150 SET UP RIG MAXI 150 12
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
253 2-Jul-21 D/S MONITORING UNIT RIG MAXI 150 CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
ENGINE PROBLEM FUEL SYSTEM REPAIRED PROBLEM FUEL SYSTEM ENGINE KUBOTA V2203
254 3-Jul-21 D/S PROBLEM MECHANICAL DOESN’T STARTED REPAIRED PROBLEM MECHANICAL ENGINE DOESN’T STARTED
MONITORING UNIT RIG MAXI 150 CHECKED ALL UNIT COMPONENT RIG
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
255 4-Jul-21 D/S SET UP RIG MAXI 150 SET UP RIG MAXI 150 12
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
256 5-Jul-21 D/S PROBLEM SIRCULATION PUMP, BROKEN SPRING VALVE REPAIRED SIRCULATION PUMP, BROKEN SPRING VALVE 12
REPLACED SPRING SANCHIN SC 120
257 6-Jul-21 D/S SET UP RIG MAXI 150 SET UP RIG MAXI 150 12
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
268 7-Jul-21 D/S MONITORING UNIT RIG MAXI 150 CHECKED ALL UNIT COMPONENT RIG 12
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
269 8-Jul-21 D/S MONITORING UNIT RIG MAXI 150 CHECKED ALL UNIT COMPONENT RIG 12
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
269 9-Jul-21 D/S SCHEDULE SERVICED 250 H COMPLETED SHCEDULE SERVICED 250 H 12
REPLACED OIL FILTER KUBOTA V2203
REPLACED FUEL FILTER KUBOTA V2203
REPLACED FUEL FILTER YANMAR TF 85 / 105
CLEAN UP AIR FILTER YANMAR TF 85 / 105
ADD GREASE ON GREASE CUP SANCHIN (SC 120)
REPLACED OIL ENGINE MEDITRAN 40W
ADD GREASE ON ROTARY HEAD
CHECKED OIL FMC PUMP
CHECKED WATER RADIATOR
CHEKED CONDITION AIR CLEANER
REPLACED FUEL FILTER GENSET GL 6000
REPLACED OIL FILTER GENSET GL 6000
269 10-Jul-21 D/S MONITORING UNIT RIG MAXI 150 CHECKED ALL UNIT COMPONENT RIG 12
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
270 11-Jul-21 D/S SET UP RIG MAXI 150 SET UP RIG MAXI 150 12
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
271 12-Jul-21 D/S MONITORING UNIT RIG MAXI 150 CHECKED ALL UNIT COMPONENT RIG 12
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
272 13-Jul-21 D/S MONITORING UNIT RIG MAXI 150 CHECKED ALL UNIT COMPONENT RIG 12
CHECKED ALL UNIT ACESORIES RIG
STANDBY AT SEBU CAMP
273 14-Jul-21 D/S SCHEDULE SERVICED 250 H COMPLETED SCHEDULE SERVICED 250 H 12
REPLACED OIL ENGINE
REPLACED OIL FMC
REPLACED FUEL FILTER ELEMENT YANMAR TS 230
GENSET GL 6000
REPLACED AIR CLEANER GENSET KUBOTA GL 6000
REPLACED AIR CLEANER GENSET GL 6000
REPLACED OIL ENGIINE GENSET GL 6000
REPLACED OIL FILTER GENSET GL 6000
SIRCULATION PUMP
REPLACED OIL SANCHIN PUMP
274 16-Jul-21 D/S PROBLEM FOOT CLAMP LOOSE CHANGE UNIT FOOT CLAMP (SPARE RECONDTION) 2
INSTALL UNIT FOOTCLAMP
N/S PROBLEM FOOT CLAMP LOOSE ADD SHIM IN BETWEEN HOUSING TO FOOT CLAMP 2
275 17-Jul-21 D/S PROBLEM FOOT CLAMP LOOSE (PROBLEM CYLINDER CHECKED UNIT BREAK VALVE FOOT CLAMP 2
PISTON) CHECKED CYLINDER FOOT CLAMP
CHANGE CYLINDER FOOT CLAMP (SECOND RECONDITION)
GRINDING CYLINDER FOOT CLAMP
ORT & MAINTENANCE RECORD
Date
Part Desc Part No QTY Fitter REQ No PO#
Repaired
Agung/Solikhin 13.08.2018
Agung/Solikhin 18.08.2018
Agung 23.01.2018
Solikhin 29.01.2018
Agung P 30.01.2018
Solikhin
Solikhin 31.01.2018
Solikhin 01.02.2018
Agung/Solikhin 05.02.2018
Agung/Solikhin 08.02.2018
Agung/Solokhin 10.02.2018
Agung/Solikhin 28.02.2018
Agung/Solikhin 12.03.2018
Agung/Solikhin 13.03.2018
Agung/Solikhin 03.04.2018
Agung/Solikhin 12.04.2018
Solikhin 13.04.2018
Solikhin 16.04.2018
Solikhin 17.04.2018
Solikhin 19.04.2018
Solikhin 20.04.2018
Solikhin 21.04.2018
Solikhin 23.04.2018
Solikhin 24.04.2018
Solikhin 25.04.2018
Solikhin 26.04.2018
Solikhin 27.04.2018
Phungky 31.05.2018
Sazali 01.06.2018
Heryanto/Phungky 04.06.2018
Syamsul H 13.06.2018
Iskandar 17.06.2018
Yoni 17.06.2018
Iskandar 21.06.2018
Mancore 600 Feed Cylinder 1 Iskandar/Syamsul 22.06.2018
Yoni Ali/Heryanto 04.07.2018
Yoni
Phungky 08.07.2018
Yoni Ali/Hermansyah 12.07.2018
Fuel Filter 15221-43170 2
Oil Filter LF3313 2
Air Filter PA1708TA 2
Phungky/Sazali 12.07.2018
Phungky/Sazali 14.07.2018
Yoni Ali 18.07.2018
Hermansyah 19.07.2018
Ari Tri 24.07.2018
Sazali 25.08.2018
Hermansyah 28.08.2018
Iskandar 31.08.2018
Hermansyah 01.09.2018
SAZALI 24.09.2018
SAZALI 25.09.2018
SAZALI 26.09.2018
SAZALI 27.09.2018
SAZALI 28.09.2018
SAZALI 30.09.2018
SAZALI 05.10.2018
SAZALI 06.10.2018
ISKANDAR 17.10.2018
HERMANSYAH
ISKANDAR 19.10.2018
PHUNGKY/HERMANSYAH 27.10.2018
ENGINE KUBOTA V2203 EX.CGR 1 ISKANDAR 28.10.2018
HERMANSYAH 17.11.2018
BOLT M 19 x 25 mm
RAHMAD 19.11.2018
HERYANTO/HERMANSYAH 23.11.2018
HERMANSYAH/PHUNGKY 10.12.2018
HERMAN R 20.12.2018
YONI ALI 21.12.2018
HERMAN R 21.12.2018
PHUNGKY/SAZALI 22.12.2018
HERYANTO 24.12.2018
HERMAN R 27.12.2018
DJUWANTO/TATANG 24.02.2019
HERMAN R 28.03.2019
HERMAN 29.03.2019
HERMAN R 12.04.2019
HERMAN R 17.05.2019
HERMAN R 20.05.2019
HERMAN R 23.05.2019
IMAM 02.06.2019
HADI W 22.08.2019
HADI W 23.08.2019
HADI W 25.08.2019
DAYMOND 28.08.2019
SURATMAN 01.09.2019
IMAM 03.09.2019
TATANG 16.09.2019
SURATMAN/HERMAN
OIL COOLER 1 HADI W/KAMAL 19.09.2019
HERMAN/SURATMAN 19.09.2019
HERMAN/SURATMAN 20.09.2019
KAMAL 21.09.2019
HADI W
MOTOR ROTATION HEAD 1 SURATMAN/HERMAN 21.09.2019
SURATMAN/HERMAN 22.09.2019
KAMAL/HERMAN R 23.09.2019
SUPRIATNA 26.09.2019
SUPRIATNA 05.10.2019
SUPRIATNA/HILL 14.10.2019
ABD RAHMAN 20.10.2019
HILL 06.11.2019
HADI 09.11.2019
HADI 16.11.2019
HADI 11.12.2019
S. KAMAL 09.02.2020
S. KAMAL 10.02.2020
V BELT M40 1 SUPRIYATNA 18.20.2020
S.KAMAL 28.02.2020
HADI W
OIL ENGINE SAE 20 W - 40 MEDITRAN 10L TATANG 02.03.2020
FUEL FILTER 15221 - 43170 1 HADI. W
OIL FILTER HH 164-32430 1
MOTOR STARTER 228000-102 1
OIL ENGINE SUPLY PUMP SAE 20 W - 40 MEDITRAN 10L
PULLEY AND BELT SUPLY PUMP PULLEY 46CM 1
OIL ENGINE GENSET KUBOTA SAE 20 W - 40 MEDITRAN 10L
FUEL FILTER GENSET KUBOTA 1T021-43561 1
STANBY AT
STANBY AT KM 24 STANBY AT KM 24 STANBY AT KM 24
KM 24
HERMAN R 30.12.2020
HERMAN R 03.01.2021
DIGDO S 15.01.2021
. HERMAN R 25-Apr-21
HERMAN R 1-May-21
OIL FILTER KUBOTA V 2203 HH 164-32430 2 EA HERMAN R 2-May-21
HERMAN R 3-May-21
HERMAN R 5-May-21
HERMAN R 8-May-21
HERMAN R 9-May-21
HERMAN R 11-May-21
SUPRIATNA
HERMAN R 13-May-21
SUPRIATNA
OIL ENGINE SAE 20 - 40 W MEDITRAN 25L HERMAN RANAN 14-May-21
OIL FILTER HH 164 - 32430 1EA SUPRIATNA
OIL FILTER ENGINE YANMAR 85/105 1053470 - 55711 1EA
HERMAN R 15-May-21
SUPRIATNA
HERMAN R 16-May-21
SUPRIATNA
HERMAN R 17-May-21
SUPRIATNA
HERMAN R 18-May-21
SUPRIATNA
HERMAN R 21-May-21
SUPRIATNA
HERMAN R 22-May-21
SUPRIATNA
HERMAN R 24-May-21
SUPRIATNA
HERMAN R 25-May-21
SUPRIATNA
HERMAN R 26-May-21
SUPRIATNA
HERMAN R 27-May-21
SUPRIATNA
HERMAN R 28-May-21
SUPRIATNA
FUEL TANK YANMAR TF 155 TF 155 1 EA
SUNCHIN SC 120 PREPAIR 1 UNIT AHMAD SUHAEFI 12-Jun-21
YONI ALI
JULY
AHMAD SUHAEFI 1-Jul-21
YONI ALI
AHMAD SUHAEFI 2-Jul-21
YONI ALI
HERMAN R 7-Jul-21
SUPRIATNA
HERMAN R 8-Jul-21
SUPRIATNA
HERMAN R 10-Jul-21
SUPRIATNA
HERMAN R 12-Jul-21
SUPRIATNA
HERMAN R 13-Jul-21
SUPRIATNA
HERMAN 16-Jul-21
REKYAN Y
AHMAD SUHAEFI
HERMAN 17-Jul-21
REKYAN Y
MP-01 PROBLEM REPORT & MAINTENANCE RECORD
RIG MODEL : MP-01
ENGINE SERIAL #
Hours Hour
№ Date Shift Problem Repair to be carried out
meter work
Reported
1 15.07.2019 D/S ENGINE SUDDENLY SHUT DOWN CHECKED FUEL SYSTEM
DRAINED FUEL CONTAMINATED WITH WATER
REPLACED FUEL FILTER
2 07.08.2019 D/S WIRED BROKEN CABLE
3 12.08.2019 D/S REPAIRED PULLEY BEAN PUMP
REPAIRED HYDRAULIC HOSE
5 20.08.2019 D/S SCHEDULE SERVICE 250 HOURS COMPLETED SERVICE 250 HOURS 3
REPLACED OIL FILTER
REPLACED FUEL FILTER
REPLACED OIL FILTER
REPLACED OIL FILTER
REPLACED AIR FILTER
REPLACED FUEL FILTER
INSTALLED E-STOP
47 24.06.2020 D/S NONITORING ALL COMPONENT RIG MP 01 CHEKED ALL COMPONENT RIG MP 01 12
FABRICATION RACK FOR MP 01
CHECKED ALL UNIT SUPLLY PUMP
50 15.11.2020 D/S PROBLEM FMC PUMP AT RIG MP 01 ( LEAKING ) REPAIRED PROBLEM LEAKING ON CYLINDER / PISTON 5
BROKEN SEATHING VALVE DISMANTLE CHAMBER FMC
REPLACED RUBBER PISTON FMC
REPLACED SEATHING VALVE FMC
55 03.01.2021 N/S MONITORING RIG CHECKED ALL UNIT AND COPONENT RIG 2
57 10.01.2021 D/S SHCEDULE SERVICED REGULER 250 HOURS COMPLETED SERVICE LEGULER 250 HOURS 5
REPLACED FUEL FILTER YANMAR TF 155
REPLACED FUEL FILTER YANMAR TF 230
REPLACED FUEL FILTER
REPLACED OIL FILTER
OIL ENGINE
REPLACED AIR CLEANER
62 20-Mar-21 D/S SET UP RIG MP 300 -01 SET UP RIG MP 300 -01 12
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
63 24-Mar-21 D/S SET UP RIG MP 300 -01 SET UP RIG MP 300 -01 12
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
69 1-Apr-21 D/S PROBLEM HYDRAULIC LOW POWER REPAIRED SOLVE PROBLEM HYDRAULIC LOW POWER 1
PROBLEM CATRIDGE CLOGGED REPLACED CATRIDGE AT CONTROL BANG / CONTROL VALVE
ADJUST CATRIDGE AND CONTINUE DRILLING
70 3-Apr-21 D/S SET UP RIG MP 300 -01 SET UP RIG MP 300 -01 12
PROBLEM LEAKING CONTROL BANK INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
75 5-Apr-21 D/S PROBLEM ROTATION AT ROTARY HEAD DELAYED CHECK AND ANALYSIS PROBLEM ROTATION DELAYED 5.45
REPAIRED ON MAIN BANK / CONTROL VALVE.
REPLACED CONTROL VALVE X KM 24
64 7-Apr-21 D/S SET UP RIG MP 300 -01 SET UP RIG MP 300 -01 12
PROBLEM LEAKING CONTROL BANK INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
65 9-Apr-21 D/S SET UP RIG MP 300 -01 SET UP RIG MP 300 -01 8
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
N/S PROBLEM ENGINE NOT STARTED AFTER MOVING JUMPER BATERAI AND TEST STARTED THIS ENGINE. 2
66 10-Apr-21 D/S PROBLEM DELAYED ROTARY HEAD REPAIRED AND ADJUST CADTRIDGE CONTROL VALVE 2
TEST ROTATION AND CONTINUE DRILING
67 13-Apr-21 D/S SET UP RIG MP 300 -01 SET UP RIG MP 300 -01 8
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
68 14-Apr-21 D/S PROBLEM ROTARY HEAD MP 300 -01 LOW ROTATION CHANGE ROTARY HEAD x REPAIRED WORKSHOP KM 24 2
INSTALL ROTARY HEAD FOR MP / MAXI
69 16-Apr-21 D/S SET UP RIG MP 300 -01 SET UP RIG MP 300 -01 8
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
CONNECTED HOSE HYDRAULIC
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
SCHEDULE INSPECTION RIG CHECKED UNIT COMPONENT RIG AND UNIT ACCRSORIES RIG
67 19-Apr-21 D/S SET UP RIG MP 300 -01 SET UP RIG MP 300 -01 8
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
67 23-Apr-21 D/S SET UP RIG MP 300 -01 SET UP RIG MP 300 -01 2
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
68 26-Apr-21 D/S SET UP RIG MP 300 -01 SET UP RIG MP 300 -01 2
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
68 28-Apr-21 D/S SET UP RIG MP 300 -01 SET UP RIG MP 300 -01 2
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
N/S CONTINUE SET UP RIG MP 300 -01 INSTALL UNIT ROTARY HEAD 1
CONTINUE INSTALL HOSE HYDRAULIC
CHECK ELECTRICAL (WORK LAMP)
69 16-May-21 D/S PREPARED SKIT FOR NEXT PROJECT SPT PREPARE SKID RIG MP 300 2
CLEAN UP UNIT SKID.
70 17-May-21 D/S PREPARE RIG MP 300 PREPARE FOR DRILLING SPT CLEAN UP ALL COMPONENT RIG MP 300 12
REPOSITION MAST PIVOT BASE
REPOSITION WIRELINE
REPOSITION WINCH
REPOSITION COTROL PANNEL
REPOSTION ENGINE
REPOSTION HYDRAULIC TANK
REPOSITION FUEL TANK
REPOSITION WATER PUMP
REPOSITION MAST AND CONNECTED PIN MAST
INSTALL BRACKET CONNECT SKID BASE (WELDING)
INSTALL HOSE HYDRAULIC (CONNECTED)
REPLACED QUICK COPLER 3/8"
N/S CONTINUE RIG MP 300 PREPARE FOR DRILLING SPT RECONDITION THREAT IN BRACKET ROTARY HEAD 4
INSTAL ROTARY IN BRACKER ROTARY HEAD
71 18-May-21 D/S CONTINUE RIG MP 300 PREPARE FOR DRILLING SPT CONTINUE WELDING BRACKET FOR EQUIPMENT RIG 12
CONTINUE INSTALL ROTARY HEAD
CONTINUE INSTALL / CONNECTED ALL HOSE ROTARY HEAD
CONTINUE FABRICATION BRACKET FOR PANNEL CONTROL
CONTINUE RECONDITION FOOT CLAMP
FABRICATION SAFETY GUARD FOR WIRE LINE MP 300 - 01
FABRIACTION / WELDING SAFETY GUARD FOR CIRCULATION PUMP
REPLACED FUEL FILTER ENGINE KUBOTA V2203
REPLACED HYDRAULIC FILTER KUBOTA V2203
REPLACED OIL FILTER ENGINE KUBOTA V2203
REPLACED FUEL FILTER YANMAR TF 105 (FOR FMC 420)
REPLACED OIL ENGINE
REPLACED FITTING ELBOW 1" JIC MALE TO JIC FEMALE
68 28-May-21 D/S SET UP RIG MP 300 -01 SET UP RIG MP 300 -01 2
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
68 31-May-21 D/S SET UP RIG MP 300 -01 SET UP RIG MP 300 -01 2
INSTALL COMPONENT MAST AND FEED CYLINDER
INSTALL SUPPLY PUMP
ISTALL AND REPOSITION MUD TANK
INSTALL / CONNECTED ALL HOSE HYDRAULIC
REPOSISI FUEL TANK
CHECKED ALL UNIT PUMP AND COMPONENT RIG
MECHANICAL PROBLEM CAN'T TURN LEFT ROTATION CHANGE BALL ROTATION HANDLE IN MAIN BANG
INSTALL COPONENT (DONE)
EPORT & MAINTENANCE RECORD
Date
Part Desc Part No QTY Fitter REQ No PO#
Repaired
HADI W 07.08.2019
S. KAMAL 12.08.2019
HILL 15.02.2020
HILL 16.02.2020
HILL 17.02.2020
HILL 18.02.2020
HILL 19.02.2020
HILL 23.02.2020
SUPRIATNA
HILL 01.04.2020
ARI TRI
FUEL FILTER YANMAR TF 155 105370-32094 1 HILL 05.04.2020
FUEL FILTER YANMAR TF 230 105370-32094 1
FUEL FILTER P554408 1
OIL FILTER 2654408 1
OIL ENGINE SAE 20 - 40 W 35L
HERMAN 24.06.2020
SUPRIATNA 14.11.2020
ARI TRI
HERMAN R 31.12.2020
HERMAN R 02.01.2021
SYAMSUL H 20-Mar-21
ARI TRI
BAMBANG
SYAMSUL H 24-Mar-21
ARI TRI
BAMBANG
HERMAN 26-Mar-21
HERMAN 27-Mar-21
HERMAN 28-Mar-21
SYAMSUL H 3-Apr-21
ARI TRI
BAMBANG
5-Apr-21
SYAMSUL H 7-Apr-21
SYAMSUL H
SYAMSUL H
SYAMSUL H 20-Apr-21
SYAMSUL H 21-Apr-21
TATANG 26-Apr-21
REKYAN Y
DIGDO
BAMBANG H
TATANG
FUEL FILTER ENGINE KUBOTA V2203 BF7746D 1EA ARI TRI 18-May-21
OIL FILTER KUBOTA V2203 HH 164-32430 1EA BAMBANG
FUEL FILTER YANMAR TF 105 105370-55711 1EA DIGDO
FITTING ELBOW 1" JIC MALE TO 1" JIC FEMALE 1EA
FILTER HYDRAULIC FOR MP / MAXI 1260881 1EA
BAMBANG 31-May-21
HERMAN
`
DE710-03 (C) PROBLE
RIG MODEL / RIG SERIAL#
RIG CARRIER
Date
№ Shift Problem
Reported
1 23.05.2019 D/S PROBLEM CHUCK
2 21.06.2019 N/S
4 21.06.2019 N/S
3 01.07.2019 N/S
4 16.07.2019 D/S CHUCK PROBLEM
5 21.07.2019 N/S
6 13.08.2019 D/S SCHEDULE REGULAR SERVICE 250 HOURS
7 26.08.2019 N/S
8 02.09.2019 D/S SCHEDULE REGULAR SERVICE 250 HOURS
8 03.09.2019 N/S
9 11.10.2019 D/S BROKEN ENGINE
10 12.10.2019 D/S BROKEN ENGINE
11 13.09.2019 D/S SCHEDULE MONTHLY INSPECTION
12 15.10.2019 D/S
14 29.10.2019 D/S
15 06.01.2020 N/S
16 19.01.2020 D/S SCHEDULE SERVICE 250 HOURS
17 12.02.2020 N/S
18 20.02.2020 D/S SCHEDULE SERVICE 250 HOURS
19 23.02.2020 D/S
N/S
20 24.02.2020 N/S
21 28.02.2020 D/S
N/S MONITORING
Hours Hour
Repair to be carried out
meter work
REPAIRED CHUCK
RE WIRED WORK LAMP
REPLACED FAN BELT ENGINE
REPOSITION SHROUD RADIATOR
REPLACED FAN BELT ENGINE
REPOSITION SHROUD RADIATOR
INSTALLED WORKING LAMP FOR MUD TANK 70 12
CHECKED CHUCK OIL LEAKS --- CHUCK PRESSURE TOO
HIGH
ADJUSTED CHUCK PRESSURE
REPLACED HYDRAULIC HOSE FROM ROTATION HEAD
COMPLETED REGULAR SERVICE 250 HOURS 8270
REPLACED OIL FILTER
REPLACED FUEL FILTER
REPLACED FUEL FILTER
COMPLETED SERVICED 3
REPLACED OIL ENGINE
REPLACED FUEL FILTER ENGINE
REPLACED AIR CLEANER
REPLACED RACOR FILTER
REPLACED FUEL FILTER YANMAR TF 105
REPLACED FUEL FILTER KUBOTA GL 6000
REPLAED OIL FILTER KUBOTA GL 6000
COMPLETED SERVICED 3
REPLACED OIL ENGINE
REPLACED FUEL FILTER ENGINE
REPLACED RACOR FILTER
REPLACED FUEL FILTER YANMAR TF 105
REPLACED FUEL FILTER KUBOTA GL 6000
REPLAED OIL FILTER KUBOTA GL 6000
INSPECTION UNIT RIG DE 710 C
SERVICE 250 HR 6
REPAIRED TACHOMETER
MONITORING : 1
CHECKED ALL COMPONENT RIG
CHECKED CONDITION MIXER PUMP
CHECKED CONDITION WATER PUMP
CHEKED CONDITION LIGHTING FOR RIG
MONITORING : 1
CHECKED ALL COMPONENT RIG
CHECKED CONDITION MIXER PUMP
CHECKED CONDITION WATER PUMP
CHEKED CONDITION LIGHTING FOR RIG
ABDUL RAHMAN
YONI
ARI T/SOLIHIN
S. KAMAL
OIL FILTER 3703 1
FUEL FILTER 7746 1
SOLIKIN
S. KAMAL
SUPRIATNA/SURATMAN
IMAM
ENGINE JOHN DEERE 1 IMAM
1 IMAM
TATANG
IMAM
IMAM
HERMAN/SURATMAN
HADI
06.01.2020
OIL FILTER P 551352 HERMANSYAH
FUEL FLTER BF7746D
SPRING SANCHIN 30
RACOR PM 2020
HERI TRIMANTO
REPLACED OIL HYDRAULIC TELUSS 68 ROHMAD TAUFIK
REPLACED OIL ENGINE 20W - 40 MEDITRAN
REPLACED OIL FILTER P551352
REPLACED FUEL FILTER 2020 PM-OR
REPLACED AIR FILTER 6C060-99410
ISKANDAR
ARI TRI
ARI TRI
HILL
ABDULRAHMAN
AHMAD S
HILL
HERMAN
HILL
HERMAN
HILL
DIGDO
HILL
SUPRIATNA
SUPRIATNA
HILL M
PIPE NQ 1 EA ANDRESKY
PLAT 3x3 40 cm
PLAT 10x10 10 cm
ABDULRAHMAN
YONI ALI
YONI ALI
HERMAN R
HERMAN R
YONI ALI
Date
REQ No PO#
Repaired
23.05.2019
21.06.2019
21.06.2019
01.07.2019
16.07.2019
13.08.2019
30.08.2019
26.08.2019
02.09.2019
03.09.2019
11.10.2019
11.10.2019
13.09.2019
15.10.2019
23.09.2019
29.10.2019
29.01.2020
12.02.2020
20.02.2020
23.02.2020
24.01.2020
28.02.2020
07.08.2020
09.08.2020
23.09.2020
29.09.2020
01.10.2020
07.10.2020
09.10.2020
11.10.2020
11.10.2020
12.10.2020
13.10.2020
13.10.2020
19.10.2020
22.10.2020
23.10.2020
23.10.2020
26.10.2020
29.10.2020
06.11.2020
06.11.2020
07.11.2020
12.11.2020
13.11.2020
15.11.2020
23.11.2020
06.11.2020
10.12.2020
11.12.2020
14.12.2020
21.12.2020
21.12.2020
22.12.2020
22.12.2020
23.12.2020
29.12.2020
DE710-02 (B) PROBLEM REPORT & MAINTENANCE RECORD ( EX. MONGOLIA)
RIG MODEL / RIG SERIAL#
: SANDVIK DE710 / U200DLS-38-06 (02/2006)
ENGINE MODEL / ENGINE SERIAL #
: JOHN DEERE 6068TF250 / CD6068CO17615
RIG CARRIER
:
Date Hours Hour
№ Shift Problem Repair to be carried out Part Desc Part No QTY Fitter
Reported meter work
Injector Pump Needs To Governor Seal Installed Order New Governor Seal An Install Or Replace Injector
1 5-Apr-18 or Replaced Pump
2 5-Apr-18 Battery U/S Install New Battery
3 5-Apr-18 New Tempreature Gauge Install New Guage
4 5-Apr-18 New Oil Pressure Gauge Install New Guage
Inspect and Check what the Issue parts PD2375BA &
5 5-Apr-18 Rotation RPM Gauge Not working
PD23753DU Ordered
6 5-Apr-18 Engine Tacho Not Acurate Install New Tacho Gauge
Install New Hand Pump Assembly Hydraulic Tank
7 5-Apr-18 Filler
Install new Hand Pump Assembly PD24435EQ
8 5-Apr-18 Install New Winch Float Valve Missing Install New Winch Float Valve 3 Way 1/4Npt PD23778AA
9 5-Apr-18 Winch Rope Needs to Be Replaced Install New Winch Rope Replace Winch Rope
Inspect Clamps replace if required Install New Winch Rope
10 5-Apr-18 Winch Rope Retaing Bolts Replace
Retaining Bolts PM28615G51
Winch Rope Safety Clevis Pin needs replacing
11 5-Apr-18 with New Safety Lcoking Pin
Order New Pin and Retainer
12 5-Apr-18 Tramming Cab Throttle Cable Missing Install New Engine Throttle Cable in Cab
13 5-Apr-18 Chuck Seals Starting To Leak Remove and Inspect Install New Seals And Springs
14 5-Apr-18 Wire Line To Be replaced Remove and Install New Wire Line
Hydraulic Valve Bank Levers Missing and Locking
15 5-Apr-18 Device
Make Up New Levers or Order
16 5-Apr-18 Cameron Gauge Been Removed Need To Order New Gauge and Mounting Brackets
Need to Order New Taps and Fittings and Mounting
17 5-Apr-18 Drilling Bypass Taps
Brackets
18 5-Apr-18 Chuck Assembly Been Sitting for Years Remove and Reseal Chuck Assembly Before Drilling
Find Bean Pump and Motor and Reinstall Bean
19 5-Apr-18 Pump Needs Complete Overhaul
Strip And Rebuild Bean Pump Replace Most Components
Will Find Set Of Rod Clamp Jaw Holders Pins and Jaw
20 5-Apr-18 Missing Rod Clamp Jaw Holder and Jaw Inserts
Inserts NQ,HQ,PQ
Dump Mast Free Up Need Loosen Bolts off Get Loosen Dump Mast and Lubricate free up and may have to
21 5-Apr-18 Moving again And Free Up reshim
22 5-Apr-18 Fuel Tank Contaminated Drain And Clean Fuel Tank
Will Check Whats In Second Hand Conatiners And Confirm
23 5-Apr-18 Chuck Jaws Missing
Whats to Order
Will Check Whats In Second Hand Conatiners And Confirm
24 5-Apr-18 Guide Bushs Missings
Whats to Order
Will Check Whats In Second Hand Conatiners And Confirm
25 5-Apr-18 Jaw Reatining Clips Missing
Whats to Order
26 5-Apr-18 Upper Breaker Assemly Needs Rebuild Strip and Rebuild Upper Breaker Replace Parts Required
Replace Control Panel Pulldown, Holdback,
27 5-Apr-18 Rotation,
Will start to leak recommend Replacment before Drilling
Hydraulic Microfeed
Tank SightCartridges
Glass And Tempreture
28 5-Apr-18 Gauge U/S
Install New Sight Glass and Temp Gauge
29 5-Apr-18 Fuel Tank Contaminated Drain And Clean Fuel Tank
Wire Line Archmedies Safety Upgrade If Required Branch to decide if Required Old Quote Attached For Rough
30 5-Apr-18 By Client Or Major Pricing
Will Check Whats In Second Hand Conatiners And Confirm
31 5-Apr-18 Upper Breaker Assembly Jaws
Whats to Order
32 5-Apr-18 Winch Gaurding Missing Will Find Guarding Or Make New Guarding
33 5-Apr-18 Wire Line Wicnh Guarding Will Find Guarding Or Make New Guarding
Guard From Side Of Rig Near Wire Line Requires
34 5-Apr-18 New guard
Will Make and Install
35 5-Apr-18 Check All Mast Stays Are Still Here Will Check and Update you
36 5-Apr-18 Rotation Interlock Valve Seized Shaft Will Free up see If any Items Required
37 5-Apr-18 Head Slide Rack 4 Way Ball Valve Install New Head Slide Rack Valve Valve PD23778Y
38 5-Apr-18 Install Double Over Center Valve That’s Missing Install New Over Centre Valve PD2446$E
39 5-Apr-18 Install Pilot Open Check Valve Install New Pilot Open Check Valve PD2446D
40 5-Apr-18 Quick Couplings Missing Install New Quick Couplings For Mud Mixer Curcuit
41 5-Apr-18 Wire Line Billet Worn Install New Wire Line Billet
Rotation Head Had Noise at Start Up Small Play in Head Needs a Rebuild Can Run oUt until Required As New
42 5-Apr-18 Main Shaft and Gear On Key Shaft and Gears Will Be required
43 5-Apr-18
44 5-Apr-18
Rig Service To Be Carried Out Below Before
45
Commencment Of Drilling
46 Engine Service
47 5-Apr-18 Change oil Drain and Install New Engine Oil
Remove and Dispose Of Oil Filter Correctly Top Up New
48 5-Apr-18 Change oil filter
Filter with new oil reinstall
Remove and Dispose of Filters Correctly Install and Bleed
49 5-Apr-18 Change fuel filters
Fuel System
Remove and Dispose of Filters Correctly Install and Bleed
50 5-Apr-18 Replace racor filter, clean bowl & drain water
Fuel System
51 5-Apr-18 Check fuel system for leaks Check All Hoses and Pipes are secure and have no leaks
Remove Air Cleaners and Inspect If Ok Clean and Reinstall
52 5-Apr-18 Engine air filters inspect, clean or replace
if not replace
Inspect All Intake Pipes for wear or holes make sure all are
53 5-Apr-18 Check all intake piping for security
secure
Check radiator & oil coolers are clean & free of Inspect Raidator and Hydraulic Cooler for Any Leaks
54 5-Apr-18 leaks Pressure Test Raidator and Cap
Remove Guards and Clean out Raidator and Hydrualic
55 5-Apr-18 Wash out cooler pack
Cooler
Drain radiator, refill with recommended amount of
56 5-Apr-18 inhibitor
Drain and Replace Engine Coolant
57 5-Apr-18 Change water filter Install New Water Filter if Applicable
58 5-Apr-18 Check belt tensioner Remove Belt and Inspect Belt Tensioner replace if required
59 5-Apr-18 Check V-Belts Inspect Belt and Replace if required
60 5-Apr-18 Check fan hub rebuild if required
61 5-Apr-18 Change fan belt & check tensioner
62 5-Apr-18 Check condition of all hoses
63 5-Apr-18 Check all guards are fitted
64 5-Apr-18 Check engine for oil leaks
Check Operation on All Murphy Shutdowns as Well as
65 5-Apr-18 Check operation of shutdown system
Emergency Stops are functioning
Inspect For Exhaust Leaks Make Sure All Guards And
66 5-Apr-18 Inspect exhaust system (leaks & guarding)
Shielding or Lagging is installed
67 5-Apr-18 Adjust Valve Clearnace Adjust Valve Clearance As Per Manfcatures Specifcations
68 Hydraulics:
69 5-Apr-18 Replace any damaged hydraulic hoses Inspect All Hoses On Rig and Replace Damged Hoses
70 5-Apr-18 Clean Hydraulic tank Drain Remove Lid Clean Out Tank Reseal Lid
71 5-Apr-18 Replace hydraulic return filter Install New Filters and O'Rings
72 5-Apr-18 Replace hydraulic breather filters Install New Filter
73 5-Apr-18 Check oil level ( AWH68 ) Drain and Replace Top Up to Correct Level
74 5-Apr-18 Change Hydraulic oil Drain and Replace hyadraulic Oil
75 5-Apr-18 Check operation of all hydraulic gauges Inspect All Hydraulic Guages Replace if required
76 5-Apr-18 Check operation of all hydraulic valves on panel Inspect All Hydraulic Valve Repair Leaks or replace
A)
Date
REQ No PO#
Repaired
DURALITE-01 PROBLEM REPORT & MAINTENANCE RECORD
MODEL CONSTRUCTIO : DURALITE N-1000
43 15.11.2020 D/S PROBLEM LEAKING SEAL SPINDLE SHAFT REPAIRED LEAKING SPINDLE ROTARY HEAD 5
REPLACED SEAL SPINDLE ROTARY HEAD
44 16.11.2020 D/S PROBLEM BROKEN MOTOR WIRELINE DISMANTLE MOTOR WIRELINE (BROKEN) 281739 6
REPLACED MOTOR WIRELINE
45 17.11.2020 D/S PROBLEM HYDRAULIC PUMP LOW POWER REPAIRED HYDRAULIC PUMP LOW POWER 3
ADJUST HYDRAULIC PUMP
47 28.11.2020 D/S PREPARED RIG MOVING DISMALNTLE COMPONENT RIG HOSE, SKID, EXT 2
PREPARED ACCECORIES FOR PREPARED MOVING
48 29.11.2020 D/S CONTINUE SET UP RIG DURALITE 01 CONTINUE PREPARED RIG FOR MOVING TO NEW HOLE SITE 2
SET UP RIG AND PREPARED SKID
RT & MAINTENANCE RECORD
Date
Part Desc Part No QTY Fitter REQ No PO#
Repaired
Purmihadi/Yoni 19.06.2017
Fuel Filter Secondary R20P 1
Fuel Filter Primary RE19516 1
Purmihadi/Yoni 04.07.2017
Purmihadi/Yoni 05.07.2017
Yoni 04.08.2017
Yoni 05.08.2017
Yoni 07.08.2017
Yoni 08.08.2017
Yoni 09.08.2017
Yoni 10.08.2017
Yoni 15.08.2017
Yoni 24.08.2017
Yoni 25.08.2017
Yoni 26.08.2017
Yoni 28.08.2017
Pressure gauge 1
Hydraulic Filter P550388 1 Yoni 29.08.2017
Yoni 30.08.2017
Yoni 18.09.2017
Yoni 20.09.2017
Yoni 26.09.2017
Yoni 27.09.2017
Yoni 28.09.2017
Yoni 29.09.2017
Agung 04.10.2017
Yoni 11.10.2017
Agung/Solikhin 11.01.2018
Agung 12.01.2018
Agung/Solikhin 17.01.2018
Agung/Solikhin 18.01.2018
Agung/Solikhin/Sazali 20.01.2018
Agung/Sazali 22.01.2018
Quick Coupler
Purmihadi 24.01.2018
Agung 29.01.2018
Agung P 01.02.2018
Agung/Solikhin 02.02.2018
Agung/Solikhin 03.02.2018
Agung/Solikhin 15.02.2018
Bearing Housing 1 Solikhin/Agung 22.02.2018
Agung/Solikhin 23.02.2018
Agung/Solikhin 24.02.2018
Agung/Solikhin 26.02.2018
Solikhin/Agung 27.02.2018
Agung/Solikhin 05.03.2018
Agung/Solikhin 14.03.2018
Agung/Solikhin 22.03.2018
Solikhin 11.05.2018
Solikhin 12.05.2018
Solikhin 14.05.2018
Cylinder Foot Clamp 2 Solikhin 21.06.2018
HERI 20.12.2019
HERMANSYAH 26.01.2020
HERMANSYAH 27.01.2020
HERI 29.01.2020
ISKANDAR 17.02.2020
AHMAD 01.03.2020
ISKANDAR 06.03.2020
HERMANSYAH 17.11.2020
SUPANJI
HERMANSYAH 28.11.2020
HERMANSYAH 29.11.2020
DURALITE-02 PROBLEM REPORT & MAINTENANCE RE
MODEL CONSTRUCTIO : DURALITE N-1000
35 25.08.2016 D/S Modificated Position Linfting Poit Rod handler Complited Modificated Lifting Point Rod Handler
Replaced FMC Pump Changed Gasket
Installed quick couplers for mixer motor, pump, motor and power pressure
Fabricated bracket for control pump connected with control panel
77 16.11.2016 D/S Fabricated bracket pump water pressure
N/S Installed control pump to control panel bank
Dismantle rotation head unti for prepare modification
Dismantle gear box transmissions rotary head
D/S BROKEN FOOT CLAMP REMOVED CYLINDER HOSE FOOT CLAMP
INSTALL CYLINDER HYDRAULIC AND FOOT CLAMP
16.11.2016 D/S Fabricated lifting point and installed to the skid
78 17.11.2016 D/S Dismantle chain drill head
Drained rotation head oil
Fabricated tool for rotation head chain joinner
17.11.2016 D/S Finished lifting point fabrication
Fabricated safety guard for muffler & Alternator water pump (Aux)
79 18.11.2016 D/S Continued fabricate safety guard for muffler and alternator
80 19.11.2016 D/S Finished fabrication of safety guard alternator and pulley for water pump
81 02.12.2016 D/S Assembled transmissions gear box transmissions motor rotary
Welding stand engine john deer
Prepare pump for painting
82 03.12.2016 D/S Dismantled carriage slide from rotation unit
Repaired holes bolts for carriage slide
Installed carriage slide to feed frame
Installed rotation unit to carriage slide
Connected feed frame and tight bolt carriage slide and rotation unit
83 06.12.2016 D/S E-Stop Stand box to be installed Fabricated stand box for E - Stop water pump (auxilary pump)
84 26.12.2016 D/S Make a Cover Camp for Rig Duralite
Dismantle Hyd Hose and Quick Coupler 9 cs and install Back without Using
85 27.12.2016 D/S
Quick Coupler
86 24.01.2017 D/S Start up drill rig Connecting hydraulic hoses and install wrapper hydraulic
87 26.01.2017 D/S Repaired hydraulic mud mixer
Replaced valve control
Add hydraulic oil
88 09.02.2017 D/S Rig down and installed midle mast for preparation set rig up
Set rig up to 90 Degree position
Installed stop valve at Rod Handler
Set Mud Mixer up
89 10.02.2017 D/S Tested Rod Handler 13399
Tested Rotary Unit
Tested Water Pump Pressure (FMC)
90 22.02.2017 D/S Checked and inspected over the rig
91 09.03.2017 D/S Prepare moving rig
92 10.03.2017 D/S Continued moving rig
93 11.03.2017 D/S Continued moving rig
94 12.03.2017 D/S Set rig up
Tested running engine
Cleaned fuel filter racor
95 13.03.2017 D/S Installed electric lamp for lighting at drill rig
96 19.03.2017 D/S Checked over the rig 3507
97 23.03.2017 D/S Replaced V Belt radiator engine Kubota (aux Pump) 13598
Checked fuel filter and drained sight bowl of sediment and water
Grease feed frame slide
98 26.03.2017 D/S Fixed electric cable from genset to panel box 13658
99 01.04.2017 D/S Re tighten rotation head slide bolt 13775
Dismantle jaws HQ and add tungsten carbide
100 07.04.2017 D/S Welded bracket foot clamp
95 13.04.2017 D/S Schedule service 250 hours Completed service 250 hours 14018
Replaced fuel filter
Replaced oil filter
Replaced Filter Racor
Checked and cleaned jaws chuck and rod clamp and bolt bushing rotary
Tight bolt exhaust manifold engine and bolt cover valve
Checked alternator charger to battery
Changed engine oil kubota (Aux Pump)
Cleaned air cleaner
Checked alternator and V belt
105 29.05.2017 D/S Prepare for moving to new drill site
Fixed hydraulic nipple piston cylinder rod clamp
Fixed roller jaws for rod handler
Fixed safety guard blower fan
Cleaned control bank up
Cleaned water cooler
105 30.05.2017 D/S
Checked and inspect pump module, control module, radiator, foot clamp
Installed for lighting at drill rig
Checked connection relay and fuse and connecting cable to relay and fuse
Checked connection hose radiator and air cooler
96 16.06.2017 D/S Checked water temperatur and hydraulic temperatur 15193
Checked and clean air cleaner, checked V belt engine & fun radiator
Checked bolt mounting engine
Drainer water at fuel filter
Replaced and tight bolt wireline motor and winch motor
97 18.06.2017 D/S Prepared Rig Down
98 19.06.2017 D/S Prepared for moving to new drill site
99 20.06.2017 D/S EOH Prepared for moving to new drill site
100 21.06.2017 D/S Installed lighting at drill site area
101 22.06.2017 D/S Cleaned fuel filter separator
102 23.06.2017 D/S Add hydraulic oil
149 02.02.2018 D/S Schedule Service 250HRS Completed Service 250 HRS 17396
Changed out engine oil
Replaced oil filter
Replaced oil engine oil Kubota Power Pack Pump
Replaced filter racor Kubota Power Pack Pump
Cleaned up containtment
Wiring E-Stop
02.02.2018 N/S E-Stop not working Replaced E-Stop push botton
Wiring E-Stop
150 04.02.2018 D/S Replaced Fuel Filter 17427
Repaired wireline roller
Replaced air cleaner
Replaced bearing roller wireline
Replaced fuel filter Kubota Power Pack Pump
Replaced Oil filter Kubota Power Pack Pump
04.02.2018 N/S Repaired chuck piston
151 05.02.2018 D/S Fuel System Problem Repaired engine kubota power pack pump 17453
Checked fuel system
Drained fuel filter
Checked air cleaner
Checked hydraulic filter
Greased carriage and feed frame slide
Grease roller and sheave
Adjusted carriage wear slide
05.02.2018 N/S Fabricated rubber stopper for roller (sheave)
Replaced bearing roller
149 06.02.2018 D/S Fitted New Battery 17470
Fitted Battery Box
Checked electric relay motor
Problem E-Stop Wiring E-Stop
149 11.02.2018 D/S Replaced V Belt Alternator 17572
Adjusted V Belt
Foot Clamp leaking Fixed oil seal Foot Clamp
150 15.02.2018 D/S Replaced spring rotary head
150 17.02.2018 D/S Repaired Emergency Stop
150 19.02.2018 D/S Replaced spring jaws chuck 17728
Replaced insert jaws foot clamp
Fixed rod slide
151 28.02.2018 D/S Wiring E-Stop
152 08.03.2018 D/S Schedule Service 250HRS Completed Service 250 HRS 18006
Changed out engine oil
Replaced Fuel Filter
Replaced Oil Filter
Replaced Water Separator Filter
152 13.03.2018 D/S Cleaned oil line for chuck
Replaced packing transmissions gear box
Adjusted rotation head
13.03.2018 N/S Replaced hydraulic filter
Repaired feed rate
Installed silicon at gear box rotary
153 14.03.2018 D/S Replaced hose 1/4'' at transmission gear box
14.03.2018 N/S Greased wireline cables
152 17.03.2018 D/S Repaired pump FMC
Replaced rubber packing
Replaced hose hydraulic feed cylinder
Installed main pump for temporary
153 19.03.2018 D/S Cooler Blocked Dismantle Cooler
Cleaned oil cooler
154 20.03.2018 D/S Installed New Main Pump 18201
Replaced Cooler with S/H
Changed out hydraulic oil
153 25.03.2018 D/S Schedule Service 250HRS Completed Service 250 HRS 18307
Changed out engine oil
Replaced oil filter
Replaced fuel filter
25.03.2018 N/S Replaced oil seal foot clamp 18310
154 11.04.2018 D/S Cleaned valve for chuck & winch control
156 15.04.2018 D/S Re seal Piston Cylinder Head
157 25.04.2018 N/S Replaced Oil Seal Leak Piston Cylinder
158 26.04.2018 N/S Replaced Coupler Foot Clamp
159 27.04.2018 D/S Inspected Rig
159 29.04.2018 N/S Schedule Service 250HRS Completed Service 250 HRS 19000
Changed out engine oil
Replaced fuel filter
Replaced wireline motor
162 29.04.2018 N/S Schedule Service 250HRS Completed Service 250 HRS 19000
160 01.05.2018 N/S Replaced cable for motor starter kubota 19032
161 03.05.2018 D/S Schedule Service 250HRS Completed Service 250 HRS
03.05.2018 N/S Broken Packing Rubber Replaced Rubber FMC 19076
Replaced rubber drive coupling FMC
162 07.05.2018 N/S Schedule Service 250HRS Completed Service 250 HRS 19158
Changed out engine oil
Replaced fuel filter
Replaced valve assy
07.05.2018 D/S Replaced jaws chuck assembly
163 31.05.2018 N/S Continued remove seal chuck
163 02.06.2018 D/S Repaired oil seal spindle head
164 03.06.2018 D/S Schedule Service 250HRS Completed Service 250 HRS
Replaced hydraulic filter
Fitted seal pinion spindle
Installed piston cylinder chuck
Installed brake spring
Installed jaws
165 04.06.2018 N/S Inspected rig
166 06.06.2018 N/S Broken Bearing Piston Chuck Dismantle Rotation Head unit
167 07.06.2018 D/S Repaired rotary head
Changed out gear box oil
Replaced bearing assy piston Chuck
07.06.2018 N/S Checked rotation head
168 10.06.2018 D/S Leaked at Foot Clamp Fixed leaks issue at Foot Clamp
168 16.06.2018 D/S Repaired Hydraulic Mud Mixer
Repaired leaks at Panel Control
169 29.06.2018 N/S Loss pressure for chuck Cleaned valve hydraulic
169 30.06.2018 N/S Foot clamp problem Replaced seal cylinder
Repaired foot clamp cylinder
170 04.07.2018 D/S Cleaned up chuck & winch valve
Foot clamp leaking Distantle foot clamp
170 05.07.2018 D/S Modificated to avoid pipe slide out Repaired chuck
Replaced foot clamp
183 20.08.2018 D/S Broken pin Replaced pin for motor wireline 20976
184 25.08.2018 D/S Repaired FMC pump
185 28.08.2018 N/S Fuel line leaking Repaired hose fuel line for Kubota Pump
186 30.08.2018 D/S Fixed hydraulic hose 21180
Cleaned oil cooler
186 04.09.25018 D/S Broken Foot clamp bolt Replaced bolt foot clamp
Replacd tungsten insert foot clamp
Leaking hose Replaced hose for rod handler
Repaired pump FMC
04.09.2018 N/S Repaired foot clamp bolt
186 05.09.2018 D/S Replaced devider valve 21299
Cleaned up carbon brush
187 10.09.2018 D/S Auxiliary Pump Kubota Engine Broken fuel injection Replaced Engine Kubota
Installed solenoid to Engine
187 11.09.2018 D/S Broken Housing Repaired auxiliary pump for Kubota Pump
188 12.09.2018 D/S Low Hydraulic Pressure Replaced Main Pump Hydraulic 21435
Auxiliary Kubota Pump Continued replace engine Kubota
189 14.09.2018 D/S KUBOTA PUMP INSTALLED NEW ENGINE
189 15.09.2018 D/S HYDRAULIC FITTING BROKEN REPAIRE HYDRAULIC FITTING FOR CHUCK 21487.6
ADJUST BOLT SPRING CHUCK
REPOSITION FOOT CLAMP
ADJUST MAIN PUMP PRESSURE
190 16.09.2018 D/S REPLACE AUXILIARY PUMP 21509.2
191 22.09.2018 D/S CHECKED TEMPERATURE HYDRAULIC 21632
REPAIRED HYDRAULIC HOSE
REPLACED SWITCH OIL ENGINE
191 24.09.2018 D/S REPAIRED HYDRAULIC VALVE FEED CYLINDER 21678
24.09.2018 N/S CYLINDER FOOT CLAMP LEAKING REPAIRED FOOT CLAMP CYLINDER 216864
191 25.09.2018 D/S DISMANTLE SQUENCE VALVE FOR ROTATION HEAD 216937
REPAIRED FOOT CLAMP
INSTALLED ELECTRIC EMERGENCY STOP
192 26.09.2018 D/S REPLACED O RING FOOT CLAMP CYLINDER 21712
REPLACED ELBOW FOOT CLAMP
192 28.09.2018 D/S PULL OUT BROKEN NUT AT FOOT CLAMP PISTON 217493
REPAIRED FOOT CLAMP
191 29.09.2018 N/S Replaced seating valve FMC 21774
Replaced ball valve FMC
Replaced gasket cylinder
192 30.09.2018 D/S WORKING UN NORMAL CHECKED FMC BEAN PUMP
30.09.2018 N/S PREPARE FOR MOVING DISMANTLE RIG 21784
193 01.10.2018 D/S MOVED RIG
REPLACED OIL COOLER
REPLACED HYDRAULIC FILTER
REPLACED ROLLER BEARING
193 02.10.2018 D/S INSTALLED BEARING WINCH
INSTALLED WINCH MOTOR
INSTALLED SLIDE MAST
REPAIRED PULLEY WINCH
43 14.11.2020 D/S PROBLEM ROTARY HEAD REPAIRED BOLT HOSHING CHUCK LOOSE
PROBLEM TANKI ( GET IN THE WATTER) DRAIN FUEL AND CLEANED TANKI
REPLACED RACOR FILTER
REPLACED FUEL FILTER
GREASING UNIT PUMP
44 17.11.2020 D/S PROBLEM ON PRESURE PUMP ( BROKEN ON SPI ) REPAIRED PROBLEM AT PRESURE PUMP (BROKEN ON SPI)
PROBLEM SANCHIN PUMP
REPAIRED SANCHINPUMP ( SIRCULATION )
45 18.11.2020 D/S PROBLEM AT CONTROL PANNEL ( BREAK CONTROL) REPAIRED CONTROL PANNEL (PRESURE BREAK CONTROL)
PROBLEM PRESURE HYDRAULIC CHUCK ADJUST PRESURED HYDRAULIC CHUCK ROTARY HEAD
12
Hour Date
Part Desc Part No QTY Fitter REQ No PO#
work Repaired
ANDY 9/12/2014
FITTER This is old data from BIMO (there is no issue regarding this at n
FITTER
ANDY/RIANDI 9/23/2014
FITTER
FITTERS This is old data from BIMO (there is no issue regarding this at n
ANDY 9/23/2014
FITTER This is old data from BIMO (there is no issue regarding this at n
ANDY/RIANDI 9/23/2014
This is old data from BIMO (there is no issue regarding this at n
26.07.2016
26.07.2016
26.07.2016
26.07.2016
12 Agus.N 18.08.2016
26.07.2016
Agus N 19.09.2016
Agus.N/Iskandar 25.08.2016
Iskandar 29.09.2016
09.09.2016
12 Heryanto 26.07.2016
12 AGUS N 27.07.2016
12 Agus.N 01.08.2016
12 Agus.N
12 Agus.N On Goin
Quick Copler 1/2'' 1
Alluminium Plate 2
12 Agus.N 05.08.2016
Plate 4mmX120X100cm 1
Agus.N
Agus.N/Heryanto 23.08.2016
Iskandar
Agus.N
Andreas/Amandi 22.08.2016
Agus.N
Andreas/Amandi 22.08.2016
Andreas/Amandi 22.08.2016
12 ISKANDAR 29.08.2016
Agus/Purmihadi 15.10.2016
Iskandar 26.08.2016
Steel Plate 40mmx60mmx600mm 1 Agus N 19.09.2016
Agus.N 31.08.2016
2 Agus N 26.09.2016
12 Agus.N 12.08.2016
12 Agus.N
Plate 16X150X200mm 1
12 Agus.N
12 Heryanto 16.08.2016
03.09.2016
03.09.2016
12 Heryanto 22.09.2016
12 Steel UNP 10X100MM 2 Agus.N On Going
Steel UNP 6X100MM 2
12 Agus.N On Going
Agus.N
Agus.N/Heryanto 23.08.2016
12 Iskandar
Bolt Hex 1/2NC 13X2 1/2 Bolt Hex 1/2 Nc13x2 1/2 12
Nut Hex 1/2 Nc 13 Nut Hex 1/2 Nc 13 12
Plate Washer Hd 1/2 Plate Washer Hd 1/2 24
Lock Washer 1/2 Lock Washer 1/2 12
12 Amandi/Budhi 25.08.2016
12 Packing Gasket 12-79-676 6 Agus.N/Iskandar 25.08.2016
Packing Gasket 12-79-675 6
Rubber FMC Pump 3
Oil Sae-90 5.L
Inner Fmc Pump 3
12 Iskandar/Agus.N 29.08.2016
12 Heryanto On Going
12 Agus N 01.10.2016
Agus N/Purmihadi 13.10.2016
12 Agus N / Purmihadi 12.10.2016
12 Agus N 13.10.2016
Agus N 14.10.2016
12 Steel Plate 300x400x16mm 1 Agus N On Going
12 Agus N On Going
12 Agus N On Going
5 Heryanto 21.10.2016
12 Chain 3/8 x 80 cm 1 Iskandar 21.10.2016
10 Iskandar 25.10.2016
10 Heryanto On going
10 Heryanto On going
10 Iskandar 12.11.2016
10 Iskandar 14.11.2016
10 Heryanto On going
10 Quick coupler 1/4'' 2 Iskandar 15.11.2016
On going
10 16.11.2016
BOLT M 19 x 25 mm
RAHMAD
10 Heryanto On going
10 Iskandar 17.11.2016
10 Heryanto 17.11.2016
10 Heryanto On going
10 Heryanto 19.11.2016
10 Iskandar 02.12.2016
10 Iskandar 03.12.2016
10 Heryanto 06.12.2016
5 Terpal 8 x 10 meter Iskandar 27.12.2016
Culled BQ Drill pipe3meter x 1 ea
Culled BQ Drill pipe1.5meter x 1 ea
6 Iskandar 27.12.2016
10 Iskandar 24.01.2017
10 Iskandar 26.01.2017
Valve Control 100232 1
Hydraulic Oil 20
10 Iskandar 09.02.2017
5 Iskandar 10.02.2017
12 Iskandar 22.03.2017
12 Iskandar/heryanto 09.03.2017
12 Iskandar/heryanto 10.03.2017
12 Iskandar/heryanto 11.03.2017
12 Iskandar/Heryanto 12.03.2017
12 Iskandar/Heryanto 13.03.2017
12 Iskandar 19.03.2017
7 V belt 15196-97010 1 Iskandar 23.03.2017
2 Iskandar 26.03.2017
12 Heryanto 01.04.2017
6 Heryanto 07.04.2017
12 Heryanto 09.04.2017
12 Heryanto 10.04.2017
12 Heryanto 13.04.2017
Fuel filter PFC064 1
Oil filter 7243 1
Racor R20P 1
Oil seal 21375 1
12 Heryanto 15.04.2017
12 Heryanto 14.04.2017
12 Heryanto/Iskandar 17.04.2017
12 Heryanto/Iskandar 18.04.2017
12 Heryanto 24.04.2017
12 Iskandar 05.05.2017
7 Iskandar 08.05.2017
12 Heryanto 11.05.2017
12 Heryanto 13.05.2017
14.05.2017
12 Heryanto
12 Heryanto 15.05.2017
12 Heryanto 16.05.2017
12 Hidayat/Iskandar 24.05.2017
12 Iskandar 26.05.2017
Engine Oil SAE40 20l
12 Iskandar 27.05.2017
12 Iskandar 28.05.2017
12 Iskandar 29.05.2017
12 Iskandar 01.06.2017
Oil 3l
12 Iskandar 02.06.2017
12 Iskandar 03.06.2017
Iskandar 04.06.2017
12
Engine Oil 4l
12 Iskandar 05.06.2017
12 Iskandar 06.06.2017
12 Iskandar 07.06.2017
12 Iskandar 08.06.2017
12 Iskandar/Hidayat 09.06.2017
12 Iskandar 10.06.2017
12 Iskandar 11.06.2017
12 Iskandar 12.06.2017
12 Iskandar 13.06.2017
12 Iskandar 14.06.2017
12 Iskandar 16.06.2017
12 Hidayat 18.06.2017
12 Hidayat 19.06.2017
12 Hidayat 20.06.2017
12 Hidayat 21.06.2017
12 Hidayat 22.06.2017
12 Hidayat/Heryanto 23.06.2017
12 Hidayat 28.06.2017
12 Hidayat 29.06.2017
12 Hidayat 30.06.2017
12 Hidayat 01.07.2017
12 Hidayat 02.07.2017
12 Hidayat 20.09.2017
12 Hidayat 22.09.2017
12 Hidayat 23.09.2017
12 Hidayat 08.08.2017
12 Hidayat 24.08.2017
12 Hidayat 25.08.2017
12 Hidayat 31.08.2017
12 Hidayat 03.09.2017
12 Hidayat 06.09.2017
12 Heryanto 06.11.2017
12 Syamsul H 10.11.2017
6 Iskandar 11.11.2017
12 Iskandar 13.11.2017
12 Heryanto 17.11.2017
12 Iskandar 18.11.2017
12 Iskandar 23.11.2017
12 Hidayat 28.11.2017
12 Saifudin/Iskandar 29.11.2017
12 Alternator Kubota 1 Hidayat 30.11.2017
Alternator JD6068150 1
12 Yoni/Heryanto 06.12.2017
12 Yoni/Heryanto 08.12.2017
Engine oil 15W-40
Bearing 6209 1
Motor Wireline TF0195MS030AA 1
6 Heryanto 10.12.2017
Filter Racor R.20P 1
P.C 04 1
BF 7951D 1
3 Heryanto 11.12.2017
12 Hidayat 12.12.2017
12 Hidayat/Saifudin 16.12.2017
V Seal Sanchin 9
Oil SAE 40 5L
12 Syamsul H 18.12.2017
Heryanto
12 Iskandar 22.12.2017
12 Iskandar 24.12.2017
7 Heryanto
5 Iskandar 25.12.2017
E-Stop switch 1
3 Syamsul H 13.01.2018
4 Iskandar 15.01.2018
4 Heryanto 19.01.2018
5 Heryanto 02.02.2018
10 Heryanto 05.02.2018
Bearing Roller R16RS 2
12 Yoni Ali 06.02.2018
Iskandar
Heryanto
4 Heryanto 28.02.2018
12 Yoni 08.03.2018
Heryanto 14.03.2018
2 Yoni 14.03.2018
12 Iskandar/Hermansyah 17.03.2018
12 Hermasyah/Iskandar 19.03.2018
12 Yoni 25.03.2018
5 Heryanto 11.04.2018
12 Heryanto 15.04.2018
5 Heryanto 25.04.2018
8 Heryanto 26.04.2018
6 Iskandar 27.04.2018
12 Yoni 29.04.2018
Wireline Motor 1
12 Yoni 29.04.2018
12 Yoni Ali 01.05.2018
Hermansyah 03.05.2018
12 Yoni Ali 03.05.2018
Sazali 29.06.2018
Sazali 30.06.2018
4 Heryanto 04.07.2018
5 Heryanto 05.07.2018
8 Heryanto 06.07.2018
Chuck Spring 6
12 Yoni Ali 07.07.2018
2 Heryanto 10.07.2018
Yoni Ali 12.07.2018
Heryanto
12 Yoni Ali 13.07.2018
Hermansyah
Oil Filter LF3313 1
Air Filter Outer 1856 1
Air Filter Outer 1857 1
Fuel Filter 2654408 1
12 Heryanto/Tatang 26.07.2018
6 Heryanto/Tatang
12 Hermansyah/Sazali 01.08.2018
12 Yoni Ali 17.08.2018
12 20.08.2018
Solikhin 25.08.2018
12 Phungky 28.08.2018
4 Iskandar 30.08.2018
Iskandar
6 ISKANDAR 16.09.2018
6 ISKANDAR 22.09.2018
ISKANDAR 24.09.2018
12 PHUNGKY/HERANSYAH 24.09.2018
6 ISKANDAR 25.09.2018
12 HERYANTO/ARI 26.09.2018
4 HERYANTO 28.09.2018
5 06.10.2018
4 HERYANTO 07.10.2018
6 HERMANSYAH 11.10.2018
S. KAMAL 13.10.2018
ALTERNATOR 1 HERYANTO/YONI ALI
3 SPRING CHUCK 5 YONI ALI/HERYANTO 21.10.2018
3 ISKANDAR 02.11.2018
6 ISKANDAR 04.11.2018
6 OIL ENGINE 50 ISKANDAR 06.11.2018
OIL FILTER ENGINE P551352 1
OIL FILTER LF3313 1
FUEL FILTER 2654408 1
FUEL FILTER ROP 1
FUEL FILTER 2010 1
FUEL FILTER FF5320 1
12 HERMANSYAH/PHUNGKY 06.11.2018
PRESSURE GAUGE 3500 PSI HERYANTO/PHUNGKY 13.11.2018
8 OIL FILTER P551551 1
6 FUEL FILTER 2654408 1 HERYANTO/PHUNGKY 19.11.2018
OIL FILTER LF3313 1
OIL FILTER P551352 1
FUEL FILTER FF5320 1
RACOR FILTER R2010 1
12 SYAMSUL H 24.11.2018
6 ISKANDAR 01.12.2018
12 HERYANTO 04.12.2018
12 ISKANDAR 13.12.2018
12 ISKANDAR 14.12.2018
HOSE 1'' X 6 M 1
12 ISKANDAR 15.12.2018
12 ISKANDAR 16.12.2018
12 ISKANDAR 17.12.2018
12 HERYANTO 01.01.2019
12 HERMANSYAH 03.01.2019
12 HERMANSYAH 04.01.2019
12 HERMANSYAH 07.01.2019
12 HERMANSYAH 11.01.2019
ENGINE OIL 1LTR SURATMAN 17.12.2019
HYDROLIC OIL COOLER 1EA
HYDROLIC OIL COOLER 1 EA SURATMAN 18.12.2019
ENGINE OIL 20L SURATMAN 20.12.2019
ENGINE FILTER 1EA
FUEL FILTER 1EA
WATER SEPARATOR 1EA
RUBBER PISTON 3EA SURATMAN 23.12.2019
FEED CYLINDER 1 EA SURATMAN 24.12.2019
OIL LOW-40 20L SURATMAN 26.12.2019
ENGINE OIL 25L SURATMAN 28.12.2019
FUEL FILTER 2EA
SUPANJI 27.01.2020
11,4 ROHMAD 05.02.2020
TOMMY. W 06.02.2020
SUPANJI 18.02.2020
SEAT VELVE SUPANJI 19.02.2020
ISKANDAR 01.03.2020
ISOLATOR SWITCH BATTERY 1 ISKANDAR 05.03.2020
2
FITTING JIC AND NPT
12 HERMANSYAH 17.11.2020
12 HERMANSYAH 18.11.2020
IMO (there is no issue regarding this at now)
17 10/23/2014 CONTROL PANEL SCREEN READS FAULT SPN 000412 FMI 3(EXHAUST
RECIRCULATION) NEED TO CHECK ENGINE WITH DIAGNOSTIC MACHINE
18 10/23/2014 SCORE ON FEED CYLINDER ROD NOT LEAKING BUT WE NEED TO ORDER A SPARE ROD
19 10/23/2014 WIRE LINE TO BE REPLACED WITH A NEW ONE DOLY WORKING ON QUOTE
20 02.06.2016 D/S RE ASSEMBLY WINCH ROLLER LF 130
21 09.06.2016 D/S INSTALL GREASE NIPPLE AT ROD HANDLER
PREPARE VALVE BANK TO ROD HANDLER
TEST LF 130-01
22 13.06.2016 D/S REPAIR BEAN PUMP 535 RUBBER PACKING l A268N 3
VALVE SEAT 128470 6
BOLT VALVE 1101419 6
GASKET CYLINDER 1279675 6
GASKET COPPER 1279679 5
GASKET COVER 91676 1
23 15.06.2016 D/S DISMANTLE LF130-01 AND PAINTING
24 17.06.2016 D/S CONTINUE SCRUB AND PAINTING
25 23.06.2016 D/S BUILD UP BOLT ROD HANDLER
26 01.07.2016 Quick Coupler and All Adaptor need to be replaced Replaced the broken quick couplers with the new ones
Solenoid Cable Gripper Rod Handler Defective Fitted new cable gripper ON / OFF 12 Cable Gripper 5304191 2
Hydraulic Hose 3/4'' for Feed Cylinder Defective Replaced hose 3/4'' for feed cylinder Hose 3/4'' x 6m
Bushing Rod Holder Defective Bushing to be replaced
Seal Kit Rod Handler Ramp Installed seal kit ramp cylinder for Rod Handler 12 Seal Kit 3069176 1
LF130-01
54 20.03.2017 D/S LF130-01
Repaired Rod Handler 7233 12 Towe switch 1
Selector switch 2 position 3069202 1
Cable 3 wire 12m
54 21.03.2017 D/S Installed cable from panel battery to switch contact 7251 12
55 23.03.2017 D/S Checked temperature cooling system 7275 5
54 24.03.2017 D/S Checked over the rig 7308 12
Cleaned Radiator
Re tighten all bolt for feed frame slide
Adjusted carriage wear slide
Adjusted feed cylinder
54 25.03.2017 D/S Replaced bracket fan radiator 7336 12
54 26.03.2017 D/S Checked belt tensioner 7356 12
Checked bolt radiator and checked bolt bracket V belt
Inspected lubrication system
54 27.03.2017 D/S Checked water temperature 7358 12
Checked fuel filter
Checked oil level
Grease carriage
55 28.03.2017 D/S Checked and adjusted V belt bean pump 7367 12
Checked belt blower radiator
Replaced pan radiator engine and belt tension swap from LF130-02 Pan Blower Engine
Fixed flow suction pump NS50 for mud tank
55 29.03.2017 D/S Cleaned engine control 13713 12
Fixed emergency stop
54 30.03.2017 D/S Alternator not charge Replaced alternator 12 Alternator 1
Replaced inventer Inventer 1
Replaced battery 12 volt Battery 12 Volt 1
54 02.04.2017 D/S Schedule service reguler Completed service reguler 7454 12
LF130-01
LF130-01
Changed out engine oil Engine Oil SAE40 20l
Replaced fuel filter Fuel Filter 522886 2
Fixed water line for water cooler radiator Fuel Filter 2010 1
Checked electric system at fuel line
59 04.05.2017 D/S Checked over rig 8043 12
Fixed hydraulic hose for motor roller
Re tighten bolt for swing arm
Checked and re tighten carriage bolt
60 05.05.2017 D/S Checked engine temperature 8064 4
Checked and clean connecting cable electric at panel box
61 07.05.2017 D/S Checked water temperature & hydraulic 8111 7
Checked V belt blower engine
Checked alternator charger
Adjusted pressure motor fan blower hydraulic
62 08.05.2017 D/S Fixed terminal battery 8134 5
Replaced valve for drained water
Checked and clean positioner bolt
Checked hose management
63 11.05.2017 D/S Replaced V belt Engine 12 V Belt RE35680 1
Repaired water swivel hose
54 05.06.2017 D/S Rig Down Prepared for Rig Down moving location 12
Moving from BND 03 to BND 07
55 06.06.2017 D/S Prepared for moving Dismantle component for moving 12
56 07.06.2017 D/S Prepared new drill stations setting up all component from heli at new drill site 12
LF130-01
57 08.06.2017 D/S Prepared set rig up LF130-01
Fixed connection electric cables and socket 12
Fixed connection hydraulic hose connection quick coupler
Checked and completed all bolt
Checked and inspected pump module, control module,radiator, foot clamp
Installed cables and lamp and genset
58 10.06.2017 D/S Checked engine oil pressure water temperature and hydraulic temp 8649 12
Checked electric alternator
Cleaned and checked all solenoid and socket switch and fuse at panel
Checked V belt and tensioner engine and bracket fan
Re tighten bolt roller and motor at rod handler
Reposition hydraulic hose at hose management
Cleaned radiator, pump modules
59 14.06.2017 D/S Dismantle bracket fan because worn bearing
59 15.06.2017 D/S Replaced fun bracket and V belt blower engine john deere 8712 12 Support bracket RE503664 1
V Belt engine 5005177 1
60 28.07.2017 D/S Disconnected Rod Handler, module, FMC Pump, Cooler, Radiator Engine 12
61 29.07.2017 D/S Repaired cooler 12
Replaced fan oil cooler
Replaced air cooler rotation
Installed supply pump in the river
LF130-01
LF130-01fuel filter
Replaced Fuel Filter BF7677 2
78 24.11.2017 D/S Fuel priming pump leaking Replaced priming pump 12
Fixed ring retaining roller rod handler
Cleaned radiator & engine
Greased gripper
78 25.11.2017 D/S Schedule Service Reguler Completed schedule Service Reguler 12
Changed out engine oil
Replaced fuel filter
Continued replace rod handler
Repaired emergency stop
79 01.12.2017 D/S Problem electric system Switch oil level low, engine can't starting 12
Cleaned switch low oil level
Cleaned water & hydraulic temperature
80 11.12.2017 D/S Oil seal mud mixer leaking Replaced oil seal mud mixer 5
80 13.12.2017 D/S Radiator overheat Checked radiator 11218 12
Fill up radiator
81 14.12.2017 D/S Dirty condition Cleaned up radiator 11230 12
Installed relief valve main pump hydraulic
82 15.12.2017 D/S Replaced hydraulic filter 4 Hydraulic Filter 602518 1
83 16.12.2017 D/S Replaced bearing roller gripper rod handler 11278 Bearing 6206 1
Checked operation of rig Bearing 6306 1
83 17.12.2017 D/S Trouble shooting engine, engine suddenly shut down Re tighten cable connection 11296 12
Add Hydraulic oil Hydraulic Oil 30L
83 18.12.2017 D/S Checked oil leaking in hydraulic system 11300 12
Checked and repair Yanmar engine at Pump unit at Drill rig
84 20.12.2017 D/S Repaired chuck 11331 12
Cleaned up containment
84 21.12.2017 D/S Chuck leaking Replaced cup seal chuck 11374 12
Replaced oil seal chuck
85 22.12.2017 D/S Position hose reel rope rod handler 11372 6
Cleaned socket electric solenoid
Inspected valve assy
Checked hydraulic temperature & water temperature
Checked radiator
85 23.12.2017 D/S Checked bolt and cleaned rod holder jaws 11390 4
Inspection and grease
86 25.12.2017 D/S Schedule Service Reguler Completed Service Reguler 11441 7
Changed engine oil
Replaced oil filter engine Oil Filter RE504836 1
Replaced fuel filter Fuel Filter 529643 1
Cleaned air cleaner
Cleaned radiator & engine
Checked hydraulic filter indicator
Checked rod handler and all bolts
Adjusted carrier wear slide feed frame
86 26.12.2017 D/S Chuck leaking Dismantle rotation head to replace oil seal 11462 7
Replaced seal oil Seal Oil 568-276 1set
Replaced hose 3/8'' for Rod Handler Hose 3/8'' 1
87 29.12.2017 D/S Prepare rig move Set rig up 12
88 30.12.2017 D/S Inspected & cleaned jaws 7
Checked water temperature
Fixed vent gard & cable tension at feed frame
Fixed quick coupler
Cleaned up radiator
89 31.12.2017 D/S Cleaned engine & radiator 11515 12
Cleaned fuel filter
Fixed cable M12 Jumper Canbus
Checked inductive sensor & Indicator light
90 04.01.2018 D/S Schedule Service Reguler Completed Service Reguler 11595 12
Changed out gear box rotation head oil Oil SAE 40 20L
Replaced hydraulic filter Hydraulic Filter 1260882 1
Replaced battery connection Battery Cable 5003585 1
Checked fuel filter
Cleaned fuel pressure sensor
90 05.01.2018 D/S Checked harness & EOR Valve 11626 12
91 12.01.2018 D/S Engine Troubleshooting, Engine Can't start Repaired exhaust lines 11739 12
Checked fuel flow at fuel pump
Bleed fuel system
Checked water in fuel sensor conector
Replaced bearing fan radiator Bearing Fan Radiator R502014 1
92 13.01.2018 D/S Schedule service reguler Completed service 250 HRS 11763 8
LF130-01
LF130-01& grease
Inspected
Changed out engine oil Engine Oil SAE40
Replaced fuel filter Oil Filter RE504836 1
Replaced oil filter Fuel Filter 7951-D 1
Replaced air cleaner inner Fuel Filter RE529643 1
Replaced air cleaner outter Air Cleaner Inner 549139 1
Air Cleaner Outer 549138 1
93 21.01.2018 D/S Replaced Bearing Mixer Mud 12 Bearing F205 1
Service NS Pump at the Rig Bearing RRS 101493 1
Replaced V Belt Radiator Engine Yanmar at Rig V Belt M.38 1
94 22.01.2018 D/S Schedule service reguler Completed service 250 HRS 11972 12
Changed out engine oil Engine Oil 15W-40 20L
Replaced oil filter Oil Filter RE504836 1
Replaced fuel filter Fuel Filter RE522871 1
Cleaned up unit Fuel Filter RE529643 1
95 24.01.2018 D/S Repaired solenoid 12007 12
Cleaned up hose for return fuel Fuel Filter RE522871 1
Replaced fuel filter Fuel Filter RE529643 1
96 25.01.2018 D/S Repaired engine 10226 12
Cleaned up injection pump socket electrical
Cleaned up radiator
Replaced mud mixer bearing Bearing 205 2
Replaced coupler jaws Coupler Jaw (Rework) 101557 1
Spider rubber 101494 1
Coupler Jaw 101490 1
97 27.01.2018 D/S Replaced Rod Holder Bolt 12067 7
Cleaned up air cooler
96 28.01.2018 D/S Repaired starter motor 12
Cleaned up fuel hose
Cleaned fuel filter
Repaired solenoid
97 31.01.2018 D/S Replaced racor filter 12146 12 Racor Filter R20 1
Cleaned up fuel hose
98 01.02.2018 D/S Engine suddenly shut down Repaired engine 12
Cleaned fuel filter
99 04.02.2018 D/S Roller worn out Replaced roller spooling 4
100 08.02.2018 D/S Schedule service reguler Completed service 250 HRS 12314 12
Changed out engine oil Engine Oil SAE40 20L
Replaced fuel filter Fuel Filter BF7951 1
Replaced oil filter Fuel Filter BF7746 1
Cleaned up Oil Filter RE504836 1
101 09.02.2018 D/S Checked cooling system 3
Checked engine speed
Pressure test cooling system
Checked hydraulic and water temperature
Cleaned radiator
Fixed quick coupler wireline hoist
102 14.02.2018 D/S Inspected & greasing rod handler 12458 3
Inspected rod holder bolts & jaws
103 15.02.2018 D/S Replaced pressure fuel injection pump Pressure Fuel Injection Pump RE560091 1
104 16.02.2018 D/S Replaced main pump hydraulic
103 17.02.2018 D/S Replaced main pump hydraulic 12490 10 Main Pump 5001957 1
Engine can't start Checked solenoid fuel injection
104 18.02.2018 D/S Engine can't start Replaced solenoid pressure fuel 12498 9 Fuel Solenoid Engine JD RE560091 1
Fixed bracket adjuster main pump
105 19.02.2018 D/S Rig Down prepare for moving 4
Replaced seal oil feed cylinder
106 22.02.2018 D/S Schedule service reguler Completed service 250 HRS 12544 12
Changed out engine oil
Replaced Oil Filter
Replaced Fuel Filter
Checked Air filter
Checked engine bolts
106 25.02.2018 D/S Repaired hose for water swivel 12589 6
Repaired muffler
25.02.2018 N/S Schedule service reguler Completed service 250 HRS 13021 12
Changed out engine oil
106 28.02.2018 D/S Continued trouble engine (white smoke) 12
107 01.03.2018 D/S Broken Turbo Charger Replaced Turbo Charger 12 Turbo Charger D2 108164 1
108 02.03.2018 D/S Replaced Injector Nozzle engine 12 Injector Nozzle D2 100217 1
109 06.03.2018 D/S Broken Engine Replaced New Engine John Deere 12 JD4045HF485 SERIAL #PE4045L284585 1
LF130-01
110 07.03.2018 D/S Broken Engine LF130-01
Continued Installed New Engine 12
107 17.03.2018 D/S Broken rubber FMC Replaced rubber FMC 12869 6 Rubber FMC 790607 3
107 18.03.2018 N/S Broken bolts Dismantle rod holder 2
108 19.03.2018 D/S Rod Holder Broken Replaced Seal Oil 12 Seal Oil 88716 3
Seal Oil 57649 3
Seal Oil 94646 1
Replaced broken nut Allen Key Disc Spring 94617 30
19.03.2018 N/S Rod Holder Broken Repaired Rod Holder 12
109 20.03.2018 D/S Adjusted Valve for Chuck & Rod Holder 3
108 31.03.2018 D/S Replaced seal feed cylinder
109 02.04.2018 D/S Inspected Rig 6
110 04.04.2018 D/S Cleaned Radiator 13169 6
Checked Foot Clamp Assy
111 11.04.2018 D/S Adjusted Valve Rotation Head & Rod Holder
112 14.04.2018 D/S Cleaned up radiator core 13337 10
Cleaned up water cooler
Cleaned up hydraulic cooler
113 22.04.2018 D/S Schedule service reguler Completed service 250 HRS 13476 12
Changed out engine oil
Replaced fuel filter fuel filter BF7951 1
Replaced oil filter oil filter B7322 1
114 23.04.2018 D/S Feed Cylinder Leaking Replaced seal kit feed cylinder 12 Seal Kit Feed Cylinder 609147 1KT
23.04.2018 N/S Continued trouble Main pump shaft 12
114 24.04.2018 D/S Shaft Worn Out Replaced Main Pump Shaft 13479 8
24.04.2018 N/S Shaft Worn Out Replaced Main Pump Shaft 13479 8
Repaired Drive Coupling Main Pump
115 28.04.2018 D/S Cleaned up radiator 3
28.04.2018 N/S Repaired Roller 4
Replaced Snap Ring
Fabricated key motor roller
116 04.05.2018 D/S Schedule service reguler Completed service 250 HRS 20768 6
Changed out engine oil Fuel Filter 7746 2
Replaced fuel filter Racor Filter 2010 1
Replaced fuel water separator Oil Filter RE504836 1
Replaced oil filter
Cleaned radiator
Checked bean pump hydraulic
Cleaned air cleaner
Checked air system
Checked electric rod handler
117 06.05.2018 D/S Repaired radiator engine 13721 6
Replaced hose radiator
Added water coolant
Checked and clean rod holder &rod handler
118 07.05.2018 D/S Replaced radiator hose 1
Checked sunchin pump
119 10.05.2018 D/S Dismantle feed cylinder 1
120 11.05.2018 N/S Engine Problem Diagnostic engine problem 12
121 15.05.2018 D/S Fabricated towing skid 6
121 16.05.2018 D/S Continued fabricate connecting Towing Skid 6
122 30.05.2018 D/S Installed & repaired jaw chuck 4
Checked electrical system
122 05.06.2018 D/S Checked hydrauluic leaking 1
123 06.06.2018 N/S Broken Bolt Replaced bolt allen key 2 Rod Holder Bolt 1
124 09.06.2018 N/S Light not working Replaced neon light 6
Replaced FMC hose
Re tighten hoses for rotation head
124 12.06.2018 D/S Broken hose intake Repaired hoses intake manifold air cooler 14402 4
Replaced reusable fitting for water swivel
124 13.06.2018 D/S Schedule service reguler Completed Service Reguler 250 HRS 14414 5
Changed out engine oil
Cleaned up fuel filter
Cleaned up air cleaner
PTL SC 12 Service Regule Schedule Completed PTL SC 12 Service Regule Schedule
124 15.06.2018 D/S Replaced Feed Cylinder Rod & Oil Seals 9 Feed Cylinder Rod 1
Kit Seals 1
125 27.06.2018 N/S Replaced rubber piston FMC Pump
Replaced motor roller rod handler
125 03.07.2018 D/S Replaced V Belt Radiator Engine Yanmar at Rig
Checked Bearing generator set denyo
126 05.07.2018 D/S Re tighten nut at rotation head 5
LF130-01
LF130-01
Replaced key at roller motor
Replaced oil seal
126 07.07.2018 D/S Broken bolt rod holder Repaired rod holder bolt 12
Problem E-Stop Repaired E- Stop
127 10.07.2018 D/S Installed safety guard wireline 2
10.07.2018 N/S Installed Lamp at Drill rig 12
128 13.07.2018 D/S Schedule Service Regular 250 HRS Completed Service Regular 250 HRS 14942 12
Changed out engine oil
Replaced fuel filter Fuel Filter 105370-55711 1
Cleaned up air cleaner Seat Valve FMC 46 1
Replaced seat valve FMC pump Ball Valve FMC 47 3
Replaced ball valve FMC
129 22.07.2018 D/S Schedule Service Regular 250 HRS Completed Service Regular 250 HRS 12 Oil Filter B7322 1
Replaced oil filter Fuel Filter BF7746 2
Replaced fuel filter FMC Head (2nd Hand) 1
Set rig up Packing Cover 3
Replaced FMC pump head with second hand Packing Liner 3
Cleaned oil cooler radiator Ball Valve FMC 3
130 23.07.2018 D/S Replaced bearing shaft spooling wireline 4 Bearing Spooling 1
Replaced disconnected switch Disconect Switch 1
130 25.07.2018 D/S Modificated wireline guard 6 Seat Valve FMC 3
Replaced hose cooling system from resevoir to engine Hose 1'' x 90cm 1
130 28.07.2018 D/S Repaired FMC Pump 15212 5
Adjusted packing rubber
Replaced packing gasket pinion cover Gasket Pinion Cover 491574 4
Checked connection of radiator hose
Cleaned and check rod handler
28.07.2018 N/S Repaired FMC Pump
131 30.07.2018 D/S Broken pressure gauge feed pressure 4000 Psi Replaced pressure gauge 4000 psi 12 Pressure gauge 4000 psi 1
131 31.07.2018 D/S Repaired electric cable rod handler 15248 6
Checked solenoid gripper
132 04.08.2018 D/S Replaced pressure gauge for bit pressure 15326 3 Pressure gauge 6000Psi 64000869 1
132 10.08.2018 N/S Replaced bearing shaft Bearing 6308 1
133 19.08.2018 D/S Replaced snap ring 6
134 24.08.2018 D/S Problem E-Stop Repaired E-Stop 15678 12
Tidy up hose at control module
134 25.08.2018 D/S Pull out broken nut for motor roller 6
135 28.08.2018 D/S Schedule Service Regular 250 HRS Completed Service Regular 250 HRS
Removed cooler will be used at LF130-02
136 29.08.2018 D/S Checked V belt blower engine 6
Cleaned exchanger
29.08.2018 N/S Hydraulic Cooler swap to LF130-02 Installed new hydraulic cooler 15725 8 Hydraulic Cooler 1
Repaired leaked hydraulic cooler
137 03.09.2018 D/S RIG MOVE Prepared load for moving 12
137 05.09.2018 D/S Checked engine Rig 15764 12
Repaired rod holder
Broken bolt Replaced bolt piston foot clamp
138 07.09.2018 D/S Repaired rod holder 15808 2
Fixed electric fuel system
138 09.09.2018 D/S Replaced roller wireline 12 Roller Wireline 1
139 12.09.2018 D/S Problem charging system Replaced Alternator JD 15888 6 Alternator RE533516 1
140 14.09.2018 D/S REPLACE SPY MOTOR ROD HOLDER
14.09.2018 N/S Broken bolt for piston rod holder Replaced bolt for piston rod holder 15914 6 Bolt Piston Rod Holder 1
141 15.09.2018 D/S REPAIRE WIRELINE SAFETY GUARD
141 16.09.2018 D/S SCHEDULE SERVICE 250HRS COMPLETE SERVICE 250HRS 3 OIL ENGINE 20L
CHANGE OUT ENGINE OIL FUEL FILTER BF7746-D- 2
GREASE ALL NIPPLE OIL FILTER P551352 1
REPLACE OIL FILTER ROTATION HEAD FILTER 5004896 1
REPLACE FUEL FILTER
CHANGE OUT GEAR BOX OIL ROTATION HEAD
CHANGE OUT GEAR BOX OIL FOR BEAN PUMP
CLEAN AIR CLEANER
16.09.2018 N/S SCHEDULE SERVICE 250HRS COMPLETE SERVICE 250HRS 3
CONTINUE SERVICE FROM DAY SHIFT
142 17.09.2018 N/S FUEL LINE PROBLEM REPLACED FUEL FILTER RACOR 16023 9
CHECKED HARNESS INJECTION PUMP
CHECKED FUEL LINE SYSTEM
142 18.09.2018 D/S ENGINE LOW POWER CHECKED FUEL SYSTEM 16010 10
CHECKED LINE INTAKE SYSTEM
CLEANED UP AFTER COOLER
ADJUSTED VALVE
LF130-01
143 19.09.2018 D/S LF130-01 & SHAFT GRIPPER
REPLACED BEARING 16029 5 SHAFT 3001347 2
REPLACED HOSE FOR CHUCK BEARING 6206 2
REPLACED AIR FILTER INNER & OUTTER BEARING 6306 2
INNER FILTER FR1857 1
OUTTER FILTER FR1856 1
144 21.09.2018 D/S FABRICATED FUNNEL MUD MIXER
144 25.09.2018 D/S REPLACED QUICK COUPLER RETURN ROTARY HEAD QUICK COUPLER 1
142 27.09.2018 N/S NOT FUNCTION (OPEN/CLOSE) REPAIRED ROD HANDLER 16222 12
REPLACED FITTING WATER SWIVEL
143 28.09.2018 D/S CHECKED LEAKING HOSE 16236 4
REPAIRED LEAKING HOSE
142 29.09.2018 D/S JAWS FOR ROD HOLDER SLIP CLEANED UP JAWS ROD HOLDER 16256 5
29.09.2018 N/S INSTALLED ROLLER GRIPPER ROD HANDLER 3
143 04.10.2018 D/S SCHEDULE SERVICE 250HRS PERFORMED SERVICE 250HRS 16354 8 FUEL FILTER RE529643 1
CHANGED OUT ENGINE OIL RACOR 2010 1
REPLACED OIL FILTER OIL FILTER RE504836 1
REPLACED FUEL FILTER
CLEANED UP RADIATOR
REPLACED MOTOR WIRELINE MOTOR WIRELINE 1
142 05.10.2018 D/S REPLACED JAWS FOR MUD MIXER 4
05.10.2018 N/S FABRICATED FISHING TOOL 16384 4
REPLACED SUB ROLLER ROD HANDLER SUB ROLLER ROD HANDLER 1
REPLACED BEARING ROD HANDLER BEARING 6203 1
BEARING 6306 1
143 14.10.2018 D/S CHECKED ELECTRIC SWITCH HIGH TEMPERATURE 16569 3
CHECKED ENGINE TEMPERATURE
144 17.10.2018 D/S SCHEDULE SERVICE 250HRS PERFORMED SERVICE 250HRS 16631 2
CHANGED OUT ENGINE OIL
REPLACED FUEL FILTER FUEL FILTER 529643 1
REPLACED RACOR FILTER RACOR FILTER 522878 1
REPLACED LUBE FILTER LUBE FILTER 504836 1
145 21.10.2018 D/S CHEKCED ROD HOLDER 16714 6
FIXED BRACKET HOSE MANAGEMENT
ADJUSTED CONTROL VALVE
CHEKCKED TENSION BELT
CHECKED ALL ROD HANDLER BOLT
21.10.2018 N/S ADJUSTED CARTRIDGE ROD HOLDER 3
LF130-01
LF130-01
CHECKED HYDRAULIC PRESSURE ROD HOLDER
22.11.2018 N/S REPAIRED ROLLER GRIPPER 3
154 23.11.2018 D/S REPAIRED & CLEANED WATER COOLANT & OIL COOLER 17330 2
RE TIGHTEN BOLT FOR MAIN PUMP
155 25.11.2018 N/S REPAIRED JAWS 7
156 28.11.2018 D/S BROKEN BOLT ROD HOLDER REPLACED ROD HOLDER BOLT 17420 2 ROD HOLDER BOLT 1
157 29.11.2018 N/S CHECKED ELECTRICAL 4
CLEANED ELECTRICAL SOCKET
156 30.11.2018 D/S ENGINE LOW POWER REPLACED FUEL FILTER 17454 12
REPLACED WATER SEPARATOR
CLEANED UP ELECTRICAL SENSOR
30.11.2018 N/S CLEANED UP ELECTRICAL SOCKET 12
REPAIRED MOTOR WIRELINE GRIPPER
157 06.12.2018 D/S REPAIRED ROD HOLDER 17585 5
158 11.12.2018 N/S CAN'T WORK PROPERLY REPAIRED ROD HOLDER 6
159 12.12.2018 D/S REPAIRED ROD HOLDER 17650 6
160 16.12.2018 N/S PREPARED RIG AFTER MOVED
161 19.12.2018 N/S PROBLEM ROD HANDLER TUBE REPAIRED ROD HANDLER 17768 10
162 21.12.2018 D/S CLEANED UP HOSE WATER PRESSURE GAUGE 4
CLEANED UP TUBING WATER PRESSURE
163 23.12.2018 D/S ADJUSTED SLIDE ROD 17883 2
164 24.12.2018 N/S REPAIRED CHUCK & ROD HANDLER 12
REMOVED TURBO LEAKING
165 27.12.2018 N/S MOTOR GRIPPER ROD HANDLER PROBLEM REPAIRED SPY GRIPPER ROD HANDLER 3
165 28.12.2018 D/S SCHEDULE SERVICE 250HRS COMPLETED SERVICE 250HRS 17923 6
CHANGED OUT ENGINE OIL ENGINE OIL
REPLACED AIR CLEANER AIR CLEANER 1856 / 1857 1SE
REPLACED FUEL SEPARATOR FUEL SEPARATOR R2010P 1
REPLACED FUEL FILTER FUEL FILTER RE522878 1
CLEANED RADIATOR
166 29.12.2018 D/S MAIN PUMP BROKEN REPLACED MAIN PUMP 17941 12 MAIN PUMP 1
167 31.12.2018 N/S MUFFLER EXHAUST BROKEN REPAIRED MUFFLER 6
168 09.01.2019 D/S REPLACED HYDRAULIC MOTOR MUD MIXER HYDRAULIC MOTOR MIXER 1
REPLACED HYDRAULIC HOSE PUMP TO CONTROL BANK HOSE 3/4'' X 6M 1
168 10.01.2019 N/S BROKEN BEARING REPLACED BEARING MOTOR ROD HANDLER 18199 3 BEARING 6306 1
BEARING 6206 1
169 12.01.2019 D/S REPLACED LEAF SEAL ACTUATOR ROTATION ROD HANDLER
170 13.04.2019 N/S CHUCK JAWS BROKEN CHECKED CHUCK JAW 3
171 14.07.2019 D/S WELDED AND CUT STUCK PIPE
172 15.07.2019 D/S REPAIRED LADDER
15.07.2019 D/S ENGINE LOW POWER CHECKED FUEL SYSTEM RACOR 1
REPLACED FUEL FILTER AND WATER SEPARATOR FUEL FILTER 1
WATER SEPARATOR 1
LF130-01
LF130-01
REPLACED ROD HOLDER BOLT
20.09.2019 N/S REPAIRED HANDLE / LEVER CONTROL
181 25.09.2019 N/S WIRELINE STUCK DISMANTLE WIRELINE UNIT 12
REPAIRED WIRELINE DRUM
182 26.09.2019 D/S REPAIRED RADIATOR ENGINE 1
CHECKED BEARING ROLLER
ADJUSTED DRUM WIRELINE
182 28.09.2019 D/S REPAIRED ROD HANDLER/ REPLACED BEARING BEARING 1
182 29.09.2019 N/S REPAIRED ROD HANDLER 2
182 06.10.2019 D/S REPAIRED ROD HANDLER ROD GRIPPER SOLENOID 3
REPLACED ROD GRIPPER SOLENOID ROD GRIPPER SOLENOID 1
183 09.10.2019 N/S REMOVED SOCKET CABLE CONTROL PANEL 2872 1
183 10.10.2019 N/S REPAIRED ROTATION HEAD
INSTALLED ROD HOLDER
TIGHTEN BOLT SLIDE ROTATION HEAD
184 16.10.2019 N/S CHECKED FUSE ROD HANDLER PANEL
184 18.10.2019 N/S REPLACED BOLT FOR ROD HANDLER MOTOR
185 21.10.2019 D/S SERVICE REGULAR 250 HRS COMPLETED SERVICE 250 HRS 12
REPLACED FILTER HYDRAULIC RETURN
RE-SEAL CYLINDER ROD HANDLER
REPLACED ROD HANDLER BEARING BEARING ROD HANDLER 1
21.10.2019 N/S REPAIRED SOCKET WORKING LAMP
186 25.10.2019 D/S REPAIRED SHORT CIRCUIT CABLE GRIPPER ROD HANDLER 3
187 06.11.2019 D/S SERVICE REGULAR 250 HRS COMPLETED SERVICE 250 HRS 12
188 10.11.2019 D/S REPLACED ROD HOLDER BOLT
REPLACED GRIPPER MOTOR ROD HANDLER
10.11.2019 N/S PROBLEM RADIATOR OVER HEATING
189 12.11.2019 D/S REPLACED HOSE RIGHT CONTROL VALVE ROD HANDLER
REPLACED FITTING HOSE WATER SWIVEL
190 14.11.2019 N/S REPAIRED WEAR SLIDE
REPAIRED ROD HOLDER BOLTS
CHECKED RADIATOR FAN
CHECKED JAW ROTATION & ROD HOLDER
191 16.11.2019 D/S REPLACED NITROGEN JAW CHUCK ROTATION HEAD
PULL OUT BROKEN BOLT AT ROTATION HEAD
16.11.2019 N/S CONTINUED FITT NITROGEN CHUCK
192 19.11.2019 D/S SERVICE REGULAR 250 HRS COMPLETED SERVICE 250 HRS 2957 12
CHANGED OUT ENGINE OIL
REPLACED FUEL FILTER
REPLACED OIL FILTER
LF130-01
206 06.01.2020 N/S LF130-01
REPLACED GAUGE MAIN PRESSURE PUMP 12 GAUGE MAIN PRESSURE PUMP 1
207 13.01.2020 N/S CHECKED ELECTRICAL PROBLEM ROD HANDLER 12
208 15.01.2020 N/S REPLACED JAW PQ ROD HOLDER JAW PQ ROD HOLDER
WELDING RODS PQ POSITION STUCK RODS
209 16.01.2020 N/S DISCONECTED HOSE FOR MOVING
OPEN TOP. MUSK & ROCK BOT
READY FOR MOVING TO NEW STATITION
D/S REPAIR ROD HANDLER CONTROLLER
210 17.01.2020 N/S CONNECTED HOSE FORM POWER BACK
CHECK BOLT BOTTOM MUSK
CHECK BOLT ROD HOLDER PLATE
CHECK POSITION GENSET LAMP
D/S INSTALLED ELECTRICAL SYSTEM
211 18.01.2020 N/S CHANGE RACOR FUEL FILTER TANK CABLE SENSOR BLY3003725
PROBLEM ROCK BOT ROD HANDLER SWITCH 800TC - XA
PROBLEM PUMP WATER FROM SUMP PELTA
D/S REPLACED CABLE SLEW SENSOR
REPOSITION CABLE SESOR
REPAIRED ROD HANDLER NOT CLAMP
212 20.01.2020 N/S REPLACED CULLER ENGINE CULLER ENGINE
213 21.01.2020 N/S CLEAN UP SOUTHON CROSS PULL PULL MUD FROM MIXER TANK COVER PLUG CHAMBER PMC
REPLACED COVER PLUG CHAMBER PMC GASKET COVER CHAMBER PMC
REPLACED GASKET COVER PLUG CHAMBER PMC
214 24.01.2020 N/S REPAIRED RIG HOSE (RIG DOWN)
REPAIRED ROCK BOOT (NOT SWING)
215 25.01.2020 D/S SCHEDULE SERVICE REGULER 250 HOURS COMPLETED SERVICE LEGULER 250 HOURS 3
REPLACED HYDRAULIC TEMPURATURE SENSOR
216 02.02.2020 D/S ASSEMBLY RIG LF 130-01 INSTALLED TOP MUST
INSTALLED HOSE HYDRAULIC
INSTALLED WATER SWIFLE
INSTALLED WIRE LINE
INSTALLED HOSE FUEL LINE
217 03.02.2020 D/S REPAIRED CHUCK ROTARY HEAD OPENED TOP ROTARY HEAD
CLEANED TOP ROTARY HEAD
DRAINED FUEL TANK
JUMPER BATTERY LOW
218 03.02.2020 D/S REPLACED SEAL CHUCK ROTARY HEAD SEAL CHUCK ROTARY HEAD
OPEN TOP ROTATY HEAD
DRAIN FULL TANK
219 04.02.2020 D/S CONTINUE REPAIRED SEAL CHUCK HEAD ROTARY
INSTALLED HOUSING ROTARY HEAD
INSTALLED HOSE LINE SOUTHEN CROSS
INSTALLED CUP ENGINE
220 05.02.2020 D/S REFUEL ALL SUPLY PUMP ( FMC AND SANCHIN ) 11,4
REPAIRED WIRE LINE
221 06.02.2020 D/S REPLACED COPULER FOOT CLAMP AND MOTOR ROTATION 12
INSTALL PULLY ENGINE SUPLLY PUMP (SANCHIN)
ADJUSTED CARRIAGE FOOT CLAMP VALVE
222 20.02.2020 D/S REPLACED PIN MOTOR GRIPER 12 PIN MOTOR GRIPER 1 EA
CLEAN UP MOTOR GRIPER
223 22.20.2020 N/S REPAIRED MOTOR STARTER TEST RUNNING
GENSET LIGHTING PLANT READY FOR TESTING
CHECKED MOTOR STARTER
CHECKED GENSET LIFTING PLANT
224 24.02.2020 N/S REPAIRED SUPPLY PUMP COMPLTED BELT SAFETY GUARD SPRING VALVE 1 EA
REPLACED SPRING VALVE SEAL VALVE 1 EA
REPAIRED PUMP SOUTHENCROSS
225 25.02.2020 N/S FIX RUBBER SHAFT ENGINE
226 29.03.2020 D/S GOING TO DODO FOR TAKE SPARE PART GEAR BOX TRANSMISION 12
227 01.03.2020 D/S INSTALLED GEER BOX TRANSMISION 6
CHANGED GEER BOX TRANMISIOON
N/S CHECKED OIL ROTARY HEAD
MONITORING LEAKING ON ROTARY HEAD
CHANGED GEARBOX TRANMISIOON ROTARY
229 04.03.2020 D/S CHANGE GENSET KUBOTA FOR LF 130 - 01 CHANGE GENSET KUBOTA BROKEN
MOVED GENSET KUBOTA WITH MANUAL HANDLING
INSTALLED ELECTRICAL SYSTEM FOR GENSET KUBOTA
229 06.03.2020 D/S TROUBBLE ROD HOLDER DOESN`T HOLD THE ROD ADJUSTED BOLT SPRING FOOT CLAMP
LF130-01
TO FIX VALVE LF130-01
HYD V35 SNAP RING BROKEN
230 07.03.2020 D/S REPAIRED TRANSMISION GEAR LEAKING ON GEAR BOX 44638
INSTALLED OIL SEAL AND GEAR OUT PUT
231 05.08.2020 D/S ENGINE NEED TO BE REPLACED
ROTARY HEAD NEED TO BE OVERHAUL
HYDRAULIC SYSTEM NEED TO BE RESETED
NEED TO BE CHANGED BRACKET FOR ROD HOLDER
ROD HOLDER NEED TO BE OVERHAUL
ROD HANDLER HYDRAULIC BANK NEED TO BE OVERHAUL AND RE SEAL
CONTROL PANEL NEED TO BE WIRED
SOME HYDRAULIC HOSES TO BE REPLACED
HOSE REEL MANAGEMENT TO BE REPLACED
SOME QUICK COUPLER AND FITTING NEED TO BE REPLACED
FEED CYLINDER NEED TO BE RESEALED
CYLINDER HYDRAULIC FOR FEED MUST BE RESETED
REPAIRED 4 EA MAIN PUMP
REPAIRED 2 UNIT BAREL AND PISTON
REPAIRED FLOW PRESSURE
REPLACED VALVE
REPLACED MAGNETIC VALVE
REPLACED MOTOR ROTARY
REPLACED BEAN PUMP MOTOR
REPLACED FAN FOR HYDRAULIC PUMP
REPLACED MAIN RELIEF VALVE
LF130-01
LF130-01
Date
Fitter REQ No PO#
Repaired
Fitter PO00923
ANDY 9/10/2014
ANDY/RIYANDI ON GOING This is old data from BIMO (there is no issue regarding this at now)
FITTER
RIYANDI 10/17/2014
ISKANDAR 10/22/2014
HERYANTO 10/14/2014
HERYANTO 10/14/2014
RIYANDI 10/14/2014
ANDY/RIYANDI 10/21/2014
10/18/2014
RIYANDI PO#00873 10/20/2014
ANDY/RIYANDI 11/7/2014
RIYANDI 10/15/2014
ANDY
BLY
This is old data from BIMO (there is no issue regarding this at now)
FITTER This is old data from BIMO (there is no issue regarding this at now)
This is old data from BIMO (there is no issue regarding this at now)
AMANDI TASNO / A PIRAL 2-Jun-16
ISKANDAR/AGUS.N 9-Jun-16
ISKANDAR/AGUS.N 9-Jun-16
ISKANDAR/AGUS.N 13-Jun-16
ISKANDAR/AGUS.N 15-Jun-16
ISKANDAR/AGUS.N 17-Jun-16
ISKANDAR/AGUS.N 23-Jun-16
ISKANDAR/AGUS N 05.10.2016
ISKANDAR/AGUS N 21.09.2016
ISKANDAR/AGUS N 21.09.2016
ISKANDAR 20-Jul-16
ISKANDAR/AGUS 22.09.2016
ISKANDAR 2-Jul-16
ISKANDAR 4-Jul-16
ISKANDAR
ISKANDAR 5-Jul-16
ISKANDAR 9-Jul-16
ISKANDAR 20.07.2016
LF130-01
LF130-01
ISKANDAR 25.07.2016
ISKANDAR 28.07.2016
ISKANDAR 29.07.2016
AGUS N 15.10.2016
HERYANTO 13.10.2016
ISKANDAR/AGUS 22.09.2016
ISKANDAR On Going
30.09.2016
ISKANDAR
ISKANDAR 01.10.2016
ISKANDAR 01.10.2016
HERYANTO 05.10.2016
ISKANDAR/AGUS N 05.10.2016
HERYANTO On going
HERYANTO On going
ISKANDAR 08.10.2016
HERYANTO On going
HERYANTO On going
HERYANTO On going
HERYANTO On going
HERYANTO 13.10.2016
AGUS N 15.10.2016
ISKANDAR 30.12.2016
Iskandar 04.02.2017
Iskandar 10.02.2017
Iskandar 13.03.2017
Iskandar 14.03.2017
Iskandar 15.03.2017
Iskandar 16.03.2017
Heryanto/Iskandar 17.03.2017
Iskandar 18.03.2017
Iskandar 19.03.2017
LF130-01
Iskandar 20.03.2017 LF130-01
Iskandar 21.03.2017
Iskandar 23.03.2017
Iskandar 24.03.2017
Iskandar 25.03.2017
Iskandar 26.03.2017
Iskandar 27.03.2017
Iskandar 28.03.2017
Iskandar 29.03.2017
Iskandar 30.03.2017
Heryanto 02.04.2017
Iskandar 14.04.2017
Iskandar 15.04.2017
Iskandar 16.04.2017
Heryanto 19.04.2017
Heryanto 20.04.2017
Iskandar/Heryanto 21.04.2017
Iskandar 22.04.2017
Iskandar/Heryanto 23.04.2017
Iskandar 24.04.2017
Iskandar 25.04.2017
Iskandar 26.04.2017
Iskandar 27.04.2017
Iskandar 29.04.2017
Iskandar 01.05.2017
LF130-01
LF130-01
Iskandar 04.05.2017
Iskandar 05.05.2017
Iskandar 07.05.2017
Iskandar 08.05.2017
Heryanto 11.05.2017
Hidayat/Heryanto 17.05.2017
Hidayat/Heryanto 18.05.2017
Heryanto 19.05.2017
Heryanto 20.05.2017
Hidayat/Heryanto 22.05.2017
Hidayat/Iskandar/Heryanto 23.05.2017
Heryanto 24.05.2017
Hidayat/Iskandar 25.05.2017
Hidayat/Heryanto 26.05.2017
Hidayat 27.05.2017
Heryanto 28.05.2017
Heryanto 30.05.2017
Heryanto 31.05.2017
Iskandar 31.05.2017
Heryanto 01.06.2017
Heryanto 02.06.2017
Heryanto 03.06.2017
Heryanto 04.06.2017
Iskandar 05.06.2017
Iskandar 06.06.2017
Iskandar 07.06.2017
LF130-01
Iskandar 08.06.2017 LF130-01
Iskandar 10.06.2017
Hidayat 14.06.2017
Iskandar 15.06.2017
Hidayat 28.07.2017
Hidayat 29.07.2017
Iskandar 31.07.2017
Hidayat 01.08.2017
Hidayat 03.08.2017
Hidayat 07.08.2017
Hidayat 26.08.2017
Hidayat 13.09.2017
Hidayat 15.09.2017
Hidayat 16.09.2017
Hidayat 17.09.2017
Heriyanto 22.10.2017
Heryanto 28.10.2017
Heryanto 02.11.2017
Heryanto 03.11.2017
Heryanto 04.11.2017
Iskandar 12.11.2017
Iskandar 17.11.2017
Heryanto 18.11.2017
Iskandar/Yoni 17.11.2017
LF130-01
LF130-01
Iskandar 24.11.2017
Hidayat 25.11.2017
Iskandar 01.12.2017
Heryanto 11.12.2017
Yoni Ali 13.12.2017
Heryanto 15.12.2017
Saifudin 16.12.2017
Hidayat/Saifudin 17.12.2017
Iskandar/Heryanto 21.12.2017
Iskandar 22.12.2017
Iskandar 23.12.2017
Iskandar 25.12.2017
Heryanto 26.12.2017
Yoni Ali
Iskandar/Yoni Ali 29.12.2017
Iskandar/Yoni 30.12.2017
Iskandar 31.12.2017
Iskandar/Akbar 04.01.2018
Saifudin 05.01.2018
Iskandar/Hidayat 12.01.2018
Iskandar 13.01.2018
LF130-01
LF130-01
Heryanto 27.01.2018
Heryanto 01.02.2018
Heryanto 04.02.2018
Yoni Ali 08.02.2018
Iskandar/Sazali 09.02.2018
Iskandar 14.02.2018
Hidayat 15.02.2018
Hidayat Continued
Iskandar 17.02.2018
Iskandar 18.02.2018
Iskandar 19.04.2018
Hermansyah 22.02.2018
Hermansyah 25.02.2018
Yoni 25.02.2018
Hidayat 28.02.2018
Heryanto/Sazali 01.03.2018
Heryanto 02.03.2018
PO04651 Continued
LF130-01
Yoni LF130-01
Heryanto 17.03.2018
Yoni 18.03.2018
Heryanto 19.03.2018
Yoni 19.03.2018
Heryanto 20.03.2018
Sazali 31.03.2018
Iskandar/Hermansyah 02.04.2018
Iskandar 04.04.2018
Heryanto 14.04.2018
Yoni 22.04.2018
Yoni 23.04.2018
Hidayat 23.04.2018
Yoni Continued
Heryanto 24.04.2018
Iskandar 28.04.2018
Heryanto 28.04.2018
Iskandar 04.05.2018
Iskandar 06.05.2018
Hermansyah 07.05.2018
Hidayat 10.05.2018
Hidayat 11.05.2018
Iskandar 15.05.2018
Iskandar 16.05.2018
Phungky 30.05.2018
Heryanto 05.06.2018
Heryanto/Yoni 06.06.2018
Heryanto 09.06.2018
Iskandar 12.06.2018
Hermansyah/Iskandar 13.06.2018
Iskandar 15.06.2018
Sazali 27.06.2018
Sazali 03.07.2018
Heryanto 05.07.2018
LF130-01
LF130-01
Phungky/Sazali 07.07.2018
Hermansyah 22.07.2018
Ari Tri
Iskandar 28.07.2018
Hermansyah 28.07.2018
Ari Tri 30.07.2018
Iskandar 31.07.2018
Iskandar 04.08.2018
Sazali 10.08.2018
Heryanto 19.08.2018
Heryanto 24.08.2018
Heryanto 25.08.2018
Sazali 28.08.2018
Iskandar/Hermansyah 29.08.2018
Heryanto 29.08.2018
Iskandar 07.09.2018
Hermansyah 09.09.2018
Hermansyah 12.09.2018
SOLIKHIN 14.09.2018
Hermansyah/Phungky 14.09.2018
SOLIKHIN 15.09.2018
ISKANDAR 16.09.2018
PHUNGKY 16.09.2018
PHUNGKY 17.09.2018
ARI/ISKANDAR 18.09.2018
LF130-01
ARI 19.09.2018 LF130-01
SOLIKHIN 21.09.2018
SOLIKHIN 25.09.2018
YONI ALI 27.09.2018
HERYANTO 28.09.2018
HERYANTO 29.09.2018
YONI ALI 29.09.2018
PHUNGKY/TATANG 04.10.2018
HERYANTO 05.10.2018
YONI ALI 05.10.2018
ISKANDAR 14.10.2018
S.KAMAL 17.10.2018
ISKANDAR 21.10.2018
HERYANTO 21.10.2018
25.10.2018
HERMANSYAH/PHUNGKY 25.10.2018
ISKANDAR 29.10.2018
KAMAL 01.11.2018
KAMAL 03.11.2018
ISKANDAR 05.11.2018
HERMANSYAH/PHUNGKY 05.11.2018
HERYANTO/PHUNGKY 12.11.2018
HERYANTO 15.11.2018
HERYANTO 17.11.2018
ISKANDAR 22.11.2018
LF130-01
LF130-01
HERYANTO 22.11.2018
ISKANDAR 23.11.2018
HERYANTO 25.11.2018
HERMANSYAH 28.11.2018
HERYANTO 29.11.2018
HERMANSYAH 30.11.2018
HERYANTO 30.11.2018
ISKANDAR 06.12.2018
HERMANSYAH/PHUNGKY 11.12.2018
ISKANDAR 12.12.2018
HERMANSYAH/PHUNGKY 16.12.2018
PHUNGKY/SAZALI 19.12.2018
YONI ALI 21.12.2018
PHUNGKY/SAZALI 27.12.2018
HERMAN R 29.12.2018
PHUNGKY/SAZALI 31.12.2018
TATANG/JUWANTO 09.01.2019
TATANG/JUWANTO 12.01.2019
KAMAL 13.04.2019
DODI K 14.07.2019
DODI K 15.07.2019
ARI T/SOLIHIN 15.07.2019
S. KAMAL 18.08.2019
HADI W 19.08.2019
HADI W / ARI TRI 21.08.2019
S. KAMAL 21.08.2019
S. KAMAL 27.08.2019
SUPRIATNA/SURATMAN 02.09.2019
IMAM 07.09.2019
DAYMOND/IMAM N 08.09.2019
IMAM 09.09.2019
HERMAN/SURATMAN 16.09.2019
TATANG 17.09.2019
HADI W
HERMAN/SURATMAN 19.09.2019
TATANG 20.09.2019
LF130-01
LF130-01
HERMAN/SURATMAN 20.09.2019
HERMAN R 25.09.2019
TATANG
SUPRIATNA/KAMAL 26.09.2019
HILL 28.09.2019
HERMAN R 29.09.2019
HADI W 06.10.2019
HILL 09.10.2019
SUPRIATNA/HILL 10.10.2019
HILL 16.10.2019
HILL 18.10.2019
ABD RAHMAN 21.10.2019
IMAM 21.10.2019
HADI 25.10.2019
HERMAN R 06.11.2019
HILL 10.11.2019
KAMAL 10.11.2019
HILL 12.11.2019
KAMAL 14.11.2019
HILL/HERMAN 16.11.2019
KAMAL
HERMAN R 19.11.2019
HILL 23.11.2019
ABD RAHMAN 11.12.2019
ABD RAHMAN 12.12.2019
KAMAL/TATANG 13.12.2019
HERMAN R
KAMAL/HERMAN 14.12.2019
HILL 18.12.2019
KAMAL 18.12.2019
LF130-01
ABDUL RAHMAN 06.01.2020 LF130-01
ABDUL RAHMAN 13.01.2020
JILL
ABDUL RAHMAN 04.01.2020
JILL
S. KAMAL 15.01.2020
S. KAMAL 16.01.2020
S. KAMAL 17.01.2020
HADI
S. KAMAL 18.01.2020
HADI
S. KAMAL 20.01.2020
S. KAMAL 24.01.2020
HERI. T 03.02.2020
HERI. T 03.02.2020
HERI. T 04.02.2020
HERI. T 05.02.2020
ROHMAD 06.02.2020
TOMMY W 24.02.2020
TOMMY W 25.02.2020
ISKANDAR 29.02.2020
ISKANDAR 01.03.2020
AHMAD
ISKANDAR 06.03.2020
LF130-01
LF130-01
ISKANDAR 07.03.2020
LF130-01
LF130-02
9/13/2014 ANDY
21 CRACKS IN SOME CROSS MEMBERS ON ENERGY CHAIN NEW ENERGY CHAIN ORDERED
22 10/14/2014 PRIMARY FUEL FILETR TO BE RELOCATED BRACKET FABRICATED AND FILTER RELOCATED ISKANDAR/ANDY
23 9/17/2014 NO DRAIN HOSE ON ENGINE SUMP DRAIN HOSE MADE ENGINE SUMP ISKANDAR
24 9/17/2014 BENT FEED CYLINDER VALVE GUARD REMOVED ,FIXED AND INSTALLED RIYANDI
25 9/17/2014 ROTATION HEAD BREATER SECURED WITH A ROPE BREATHER WELL LOCATED ISKANDAR
26 9/23/2014 NO BATTERY ISSOLATOR SIGNAGE SIGNAGE INSTALLED FITTER
27 10/23/2014 WIRE LINE TO BE CHANGED DOLY WORKING ON QUOTE
28 10/29/2014 GAUGE NOT STABLE WHEN USING FEED SYSTEM FIXED TH6 LEVER BY-PASS PROBLEM AND SHIMMED HEAD SLIDE ANDY
29 10/29/2014 LEAK ON FEED CYLINDR GLAND SEAL SEAL KIT ORDERED,TO BE RESEALED WHEN KIT ARRIVES FITTER
30 13.06.2016 D/S REPOSITION LF130-02 INSIDE WORKSHOP ISKANDAR/AGUS
USE ELECTRIC CABLE
15.06.2016 REPAIR ELECTRIC CABLE ROD HANDLER ISKANDAR/AGUS
31 D/S 3MM X 20 METER 1
LF13- RECHROME EX
15.06.2016 REPLACE ROD CYLINDER AND SEAL KIT ISKANDAR/AGUS
32 D/S SANDVIK ROD CYL 1
CYLINDER KIT 690147 1
33 17.06.2016 D/S DISMANTLE RIG LF130-02
REPAIR PLAT CARRIAGE LOWER , PAD WEAR SLIDE , PAD SLIDE AND BOLT
PLATE CARRIAGE LOWER ISKANDAR/AGUS
SS 1/4 X 4 5004178 2
LF130-02
LF130-02
35 22.06.2016 D/S REPLACE GUIDE REAR AND FRONT ROD HANDLER ISKANDAR/AGUS
INSTALL HOSE BOLT HEAT EXCHANGER RADIATOR
REPLACE BOLT ADJUSTING ROTARY
36 23.06.2016 D/S ADJUST VALVE CLEARANCE ENGINE JD ISKANDAR/AGUS
37 30.06.2016 D/S INSTALL COVER VALVE ENGINE ISKANDAR/AGUS
CHECK AND CLEAN TUBE COOLING SYSTEM
INSTALL VBELT BLOWER ENGINE RADIATOR
INSTALL SOLENOID INDICATOR FUEL
TEST RUNNING FOR CHECK CONDENTION HYD SYSTEM
38 01.07.2016 Quick Coupler and All Adaptor need to be replaced Replaced the broken quick couplers with the new ones ISKANDAR/AGUS N
39 Hose No 6 X 900 mm Roller Rod Handler Defective Replaced Hose -6 Hose -6 1 ISKANDAR
40 Cable On / Off Gripper defective Good condition
41 Cable 7 Pin for Rod Handler defective Replaced cable 7 pin rod handler Cable 7 Pin 5304195 1 ISKANDAR
42 Elbow 90 Degree - 6 JIC defective Replaced Elbow 90 Deg for Hose -6 Elbow 90 1 ISKANDAR
43 Seal Kit Ramp Rod Handler Defective Installed seal kit ramp cylinder for Rod Handler 12 Seal Kit 3069176 1 ISKANDAR/AGUS
44 Mud Mixer Motor defective Test Hydraulic motor for mud mixer and OK ISKANDAR
LF130-02
LF130-02
36 07.06.2017 D/S Prepare Drill Rig for Elang Project (Plan) Replaced Heat Exchanger Purmihadi
Replaced radiator hoses buttom
Swap bracket fan from Duralite-01
Fill up radiator coolant
36 08.06.2017 D/S Prepare Drill Rig for Elang Project (Plan) Fitted new battery N200 Battery N200 1 Purmi/Toyib
Make larger battery holes Rod Holder Bolt 10
Fixed cables connection box Adapter jaws 6
Checked all fuses
Prepare all jaws
37 09.06.2017 D/S Prepare Drill Rig for Elang Project (Plan) Prepared mud mixer Purmi/Yoni
Installed quick couplers 1/2'' Quick Coupler 1/2'' 2set
Repacked Bean Pump
Tested bean pump
Replaced seat ball valve Ball valve 2
Cleaned up fuel tank
Installed racor housing
38 10.06.02017 D/S Tested Water Pump 12 Purmi/Yoni
Tested Hydraulic Oil Cooler
Tested Pressure Fuel Cylinder
LF130-02
LF130-02
LF130-02
LF130-02
LF130-02
LF130-02
LF130-02
LF130-02
476 09.03.2018 D/S Schedule Service Reguler Completed service 250 HRS 11047 12 Yoni
Changed out engine oil
Replaced Air Filter Air Filter Outer 549138 1
Air Filter Inner 549139 1
Replaced Fuel Filter Fuel Filter BF7955 1
Fuel Filter BF7746 1
Replaced Oil Filter Oil Filter B7322 1
LF130-02
LF130-02
493 30.05.2018 N/S Replaced hose 3/4'' for feed cylinder 12 Hidayat
494 05.06.2018 N/S Checked wireline function OK 2 Sazali/Hidayat
495 07.06.2018 N/S Installed Lamp for lighting at Drill site 12668 12 Yoni Ali/Heryanto
Follower thread broken Replaced follower threads wireline Follower Thread 84736 1
Broken Roller wireline Replaced roller wireline Wireline Roller 305364 2
496 08.06.2018 N/S Installed roller wireline 12694 12 Wireline Roller 305565 1 Yoni Ali/Heryanto
496 14.06.2018 D/S Repaired Rod Handler Motor Swing 5 Iskandar
Checked engine & control panel
497 21.06.2018 D/S Schedule Service Reguler Completed service 250 HRS 12909 12 Hidayat Akbar
Changed out engine oil
Replaced Oil Filter Oil Filter B7322 1
498 22.06.2018 D/S Repaired lamp at drill site 12 Hidayat
499 08.07.2018 D/S Repaired safety guard 12 Yoni Ali
Replaced cylinder gasket FMC
499 09.07.2018 D/S Welded safety guard 5 Heryanto
Repaired genset at rig
09.07.2018 N/S Loose rod holder bolt Re tighten rod holder bolt 12 Phungky/Sazali
500 12.07.2018 N/S Roller Rod handler not function Re tighten bolt 12 Phungky
501 14.07.2018 N/S Re seal actuator & motor 12 Phungky/Sazali
509 04.09.2018 D/S Repaired motor roller rod handler 11567 12 Hermansyah/Iskandar
Checked electrical
Checked wireline drum
04.09.2018 N/S Broken Lamp Replaced bulb Zetalux Bulb Zetalux 1 Yoni Ali
LF130-02
LF130-02
515 05.10.2018 D/S ELECTRIC PROBLEM CONTINUED REPAIRE ELECTRIC PROBLEM 4 PHUNGLY/HERYANTO
518 17.10.2018 D/S SCHEDULE SERVICE 250HRS PERFORMED SERVICE 250HRS 20415 2 S.KAMAL
CHANGED OUT ENGINE OIL
REPLACED FUEL FILTER FUEL FILTER 529643 1
REPLACED RACOR FILTER RACOR FILTER 522878 1
REPLACED LUBE FILTER LUBE FILTER 504836 1
519 23.10.2018 D/S REPAIRED MUD MIXER MOTOR 2167 4 ISKANDAR
CLEANED RIG UP
520 27.10.2018 D/S PREPARED HOSE MANAGEMENT 2194 6 HOSE HYD 3/4'' X 480 1 ISKANDAR
REPLACED HYDRAULIC HOSE FOR MOTOR ROTARY
REPAIRED QUICK COUPLER
REPAIRED HOSE FOR WATER COOLER
REPAIRED CHUCK JAW
REPAIRED FUSE BOX FOR ENGINE
520 30.10.2018 D/S PROBLEM ALTERNATOR DIDN'T CHARGE REPAIRED CABLE CONNECTION BATTERY 2249 4 ISKANDAR
CHECKED BELT TENSION ENGINE
REPAIRED CABLE FOR SAFETY GUARD ROD
520 31.10.2018 D/S REPAIRED KEY SPY MOTOR 2276 2 ISKANDAR
521 01.11.2018 D/S REPLACED REWORK COUPLING MIXER KAMAL
CHECKED HOSE HYDRAULIC LEAKING
522 02.11.2018 N/S BROKEN HOSE WATER SWIVEL REPAIRED WATER SWIVEL HOSE 2326.2 2 HERMANSYAH/PHUNGKY
LF130-02
LF130-02
522 05.11.2018 D/S SCHEDULE SERVICE 250HRS PERFORMED SERVICE 250HRS 2376.9 6 OIL FILTER RE5046836 1 ISKANDAR
CHANGED OUT ENGINE OIL FUEL FILTER 7746D 2
CHANGED OUT GEAR BOX ROTARY OIL FILTER HEAD 500496 1
REPLACED OIL FILTER ENGINE RACOR FILTER 2010 1
REPLACED FILTER ROTARY HEAD
REPLACED FUEL FILTER
REPLACED FUEL FILTER ENGINE
INSPECTED & GREASE
CLEANED RADIATOR ENGINE
522 09.11.2018 D/S REPLACED BEARING ROLLER GRIPPER ROD HANDLER 6 BEARING 6306 1 HERYANTO
FABRICATED KEY FOR MOTOR ROLLER 6206 1
523 12.11.2018 D/S CHANGED OUT ENGINE OIL 2516 4 YONI
524 15.11.2018 D/S REPLACED CHUCK NITROGEN 6 NITRO COMPRESSED 5405230 6 HERYANTO
525 18.11.2018 D/S SCHEDULE SERVICE 250HRS PERFORMED SERVICE 250HRS 2650.5 6 OIL FILTER RE5046836 1 HERYANTO/YONI ALI
CHANGED OUT ENGINE OIL FUEL FILTER RE522878 1
REPLACED FUEL FILTER FUEL FILTER RE529643 1
REPLACED AIR CLEANER AIR CLEANER FR1856/1857 2
CHANGED OUT GEAR BOX ROTARY OIL
526 19.11.2018 D/S REPLACED V BELT ENGINE 2666 5 YONI ALI
REPLACED BELT SAFETY GUARD
527 25.11.2018 D/S CLEANED RADIATOR ENGINE 12 HERMANSYAH
CHECKED GENSET
528 28.11.2018 N/S REPAIRED MUD MIXER 12 HERYANTO
REPLACED SIPDER RUBBER SPIDER RUBBER 101494 1
REPLACED BLOCK BEARING BLOCK BEARING 101493 1
529 01.12.2018 N/S REPLACED FUSE AT ENGINE 4 HERYANTO
530 02.12.2018 D/S REPAIRED MOTOR MUD MIXER 6 ISKANDAR
CHECKED ELECTRICAL ROD HANDLER
531 11.12.2018 D/S REPAIRED MUD MIXER 3094 4 BEARING W0204 2 ISKANDAR
531 13.12.2018 N/S SCHEDULE SERVICE 250HRS COMPLETED SERVICE 250 HRS 3142 6 OIL FILTER 504836 1 HERMANSYAH/PHUNGKY
CHANGED OUT ENGINE OIL FUEL FILTER 529693 1
REPLACED OIL FILTER ENGINE RACOR FILTER 2010 1
REPLACED FUEL FILTER ENGINE OIL 15W-40 27L
CHANGED OUT GEAR BOX OIL FOR FMC PUMP
532 19.12.2018 N/S REPLACED RUBBER PUMP 2 PHUNGKY/SAZALI
533 25.12.2018 D/S DISMANTLE RIG PREPARE MOVING 12 HERMAN R/YONI ALI
25.12.2018 N/S RIG DOWN PREPARE TO BE MOVED 12 PHUNGKY/SAZALI
534 26.12.2018 N/S INSTALLED ALL LIGHT AFETER MOVING 12 PHUNGKY/SAZALI
535 27.12.2018 N/S REPAIRED ENGINE DIAGNOSTIC FLASH 7 PHUNGKY/SAZALI
534 11.01.2019 D/S SCHEDULE SERVICE 250HRS COMPLETED SERVICE 250 HRS TATANG/JUWANTO
CHANGED OUT ENGINE OIL
REPLACED OIL FILTER ENGINE OIL FILTER 1
REPLACED FUEL FILTER FUEL FILTER 1
REPLACED FUEL SEPARATOR FILTER SEPARATOR FILTER 1
535 12.01.2019 N/S ENGINE LOW POWER CHECKED ISSUES 3672 1 YONI ALI
536 14.01.2019 N/S REPAIRED ROD HANDLER 3715 1 YONI ALI
537 11.02.2019 D/S CAN'T BE MOVED REPAIRED ROD HANDLER 4236 4 YONI ALI
538 21.02.2019 D/S REPAIRED HEAD CARRIER (SLIDE PLATE) DJUWANTO/KAMAL
537 24.02.2019 N/S REPLACED GENETOR ACCANLES YONI ALI
538 25.02.2019 N/S BROKEN WIRELINE CHAIN REPLACED WIRELINE CHAIN 4523 3 YONI ALI
539 01.03.2019 D/S SCHEDULE SERVICE 250HRS COMPLETED SERVICE 250 HRS DJUWANTO
540 06.03.2019 D/S REPAIRED MOTOR SWING ROD HANLDER FURQON
REPAIRED CABLE ROD HANDLER
541 09.03.2019 D/S CHECKED INSULATOR BATTERY FURQON
CHECKED CABLE POWER
542 11.03.2019 D/S REPAIRED ROD HOLDER FURQON
REPLACED WIRELINE
543 12.03.2019 D/S REPAIRED BOLT ROLLER ROD HANDLER FURQON
REPAIRED COUPLING MIXING COUPLING
544 13.03.2019 N/S REPAIRED FMC BEAN PUMP FURQON
549 15.03.2019 D/S SCHEDULE SERVICE 250HRS COMPLETED SERVICE 250 HRS 4867 YONI ALI
REPLACED FUEL FILTER FUEL FILTER 529643/522878 1
LF130-02
LF130-02
552 20.07.2019 D/S ROD HOLDER BOLT BROKEN REPLACED ROD HOLDER BOLT BOLT M20 2 ARI T
551 21.07.2019 N/S INSTALLED HOSE FOR FOOTCLAMP IMAM
552 08.08.2019 D/S CHUCK PROBLEM REPAIRED CHUCK TATANG
08.08.2019 D/S ROD HANDLER CAN'T GRIPP REPAIRED ROD HANDLER PROBLEM HADI W
553 09.08.2019 D/S CHUCK PROBLEM REPLACED RELIEF VALVE CHUCK PRESSURE TATANG
PREPARE FOR MOVING RIG
554 10.08.2019 D/S RE - INSTALLED HOSE LINE HYDRAULIC TATANG
SETTING ROD HOLDER
REPLACED QUICK COUPLER QUICK COUPLER 3/4'' 2 HADI W
555 11.08.2019 N/S CHUCK PROBLEM RE-SEAL CHUCK ABDUL R
555 12.08.2019 D/S CHUCK PROBLEM REPLACED CYLINDER CHUCK CYLINDER CHUCK 1 TATANG/HERMAN R
REPLACED TRHUST BEARING CHUCK THRUST BEARING 1
SETTING CHUCK PRESSURE
556 13.08.2019 N/S CHUCK PROBLEM CHECKED PROBLEM CHUCK ABDUL R
557 15.08.2019 N/S REPLACED CARBON BRUSH S. KAMAL
REPLACED HOLDER BRACKET CARBON
558 22.08.2019 D/S SCHEDULE SERVICE REGULAR 250 HOURS COMPLETED SERVICE REGULAR 250 HOURS 345.6 4 IMAM N
COMPLETED SERVICE REGULAR 250 HOURS FOR GENSET
COMPLETED SERVICE REGULAR 250 HOURS FOR MUD PUMP
22.08.2019 N/S CONNECTED HOSE AND TEST NEW ENGINE S. KAMAL
559 26.08.2019
560 05.09.2019 D/S SCHEDULE SERVICE REGULAR 250 HOURS COMPLETED SERVICE REGULAR 250 HOURS 582 12 ABDUL R/SURATMAN
CHANGED OUT ENGINE OIL
REPLACED OIL FILTER
REPLACED FUEL FILTER
LF130-02
LF130-02
LF130-02
LF130-02
LF130-02
LF130-02
LF130-02
LF130-02
Date
REQ No PO#
Repaired
9/4/2014
9/9/2014
9/4/2014
9/8/2014
9/8/2014
9/8/2014
PO00923
PO#021 9/17/2014
PO#021 9/18/2014
9/9/2014
PO#00872 10/23/2014
9/8/2014
WAITING FOR P.O
This is old data from BIMO (there is no issue regarding this at now)
REQ#021 9/18/2014
9/9/2014
PO#00872
PO#00873
9/10/2014
9/11/2014
9/13/2014
WAITING FOR
P.O APPROVAL
This is old data from BIMO (there is no issue regarding this at now)
11/7/2014
10/17/2014
9/15/2014
10/16/2014
This is old data from BIMO (there is no issue regarding this at now)
11/5/2014
13-Jun-16
15-Jun-16
15-Jun-16
17-Jun-16
LF130-02
LF130-02
22-Jun-16
23-Jun-16
30-Jun-16
05.10.2016
19.09.2016
22.09.2016
04.10.2016
19.09.2016
22.09.2016
27.09.2016
22.07.2016
23.07.2016
25.07.2016
27.07.2016
29.07.2016
29.07.2016
10.10.2016
13.10.2016
26.09.2016
LF130-02
LF130-02
27.09.2016
02.10.2016
04.10.2016
On Going
06.10.2016
On going
08.10.2016
On going
On going
10.10.2016
On going
On going
29.12.2016
06.02.2017
06.06.2017
07.06.2017
08.06.2017
09.06.2017
10.06.2017
LF130-02
LF130-02
15.07.2017
17.07.2017
19.09.2017
09.09.2017
10.09.2017
18.09.2017
24.10.2017
28.10.2017
07.11.2017
17.11.2017
17.11.2017
20.11.2017
21.11.2017
22.11.2017
24.11.2017
27.11.2017
28.11.2017
10.12.2017
12.12.2017
13.12.2017
14.12.2017
LF130-02
LF130-02
17.12.2017
19.12.2017
20.12.2017
21.12.2017
22.12.2017
24.12.2017
25.12.2017
03.01.2018
05.01.2018
06.01.2018
07.01.2018
08.01.2018
10.01.2018
10.01.2018
12.01.2018
13.01.2018
LF130-02
LF130-02
14.01.2018
15.01.2018
17.01.2018
18.01.2018
20.01.2018
21.01.2018
22.01.2018
24.01.2018
26.01.2018
02.02.2018
04.02.2018
07.02.2018
08.02.2018
11.02.2018
13.02.2018
18.02.2018
28.02.2018
03.03.2018
LF130-02
LF130-02
09.03.2018
12.03.2018
14.03.2018
17.03.2018
18.03.2018
21.03.2018
21.03.2018
26.03.2018
27.03.2018
02.04.2018
03.04.2018
21.04.2018
25.04.2018
28.04.2018
28.04.2018
02.05.2018
02.05.2018
03.05.2018
04.05.2018
06.05.2018
07.05.2018
09.05.2018
10.05.2018
11.05.2018
13.05.2018
14.05.2018
LF130-02
LF130-02
30.05.2018
05.06.2018
07.06.2018
08.06.2018
14.06.2018
21.06.2018
22.06.2018
08.07.2018
09.07.2018
09.07.2018
12.07.2018
14.07.2018
15.07.2018
16.07.2018
18.07.2018
06.08.2018
08.08.2018
16.08.2018
17.08.2018
18.08.2018
20.08.2018
21.08.2018
23.08.2018
25.08.2018
26.08.2018
27.08.2018
28.08.2018
02.09.2018
04.09.2018
04.09.2018
LF130-02
LF130-02
07.09.2018
15.09.2018
16.09.2018
18.09.2018
19.09.2018
20.09.2018
22.09.2018
30.09.2018
04.10.2018
05.10.2018
06.10.2018
10.10.2018
12.10.2018
16.10.2018
19.10.2018
19.10.2018
17.10.2018
23.10.2018
27.10.2018
30.10.2018
31.10.2018
01.11.2018
02.11.2018
LF130-02
LF130-02
05.11.2018
09.11.2018
12.11.2018
15.11.2018
18.11.2018
19.11.2018
25.11.2018
28.11.2018
01.12.2018
02.12.2018
11.12.2018
13.12.2018
19.12.2018
25.12.2018
25.12.2018
26.12.2018
27.12.2018
11.01.2019
12.01.2019
14.01.2019
11.02.2019
21.02.2019
24.02.2019
25.02.2019
01.03.2019
06.03.2019
09.03.2019
11.03.2019
12.03.2019
03.03.2019
15.03.2019
LF130-02
LF130-02
15.03.2019
28.03.2019
09.04.2019
12.04.2019
08.05.2019
10.05.2019
10.05.2019
11.05.2019
18.05.2019
19.05.2019
23.05.2019
11.06.2019
13.06.2019
30.06.2019
02.07.2019
19.07.2019
20.07.2019
21.07.2019
08.08.2019
08.08.2019
09.08.2019
10.08.2019
11.08.2019
12.08.2019
13.08.2019
15.08.2019
22.08.2019
22.08.2019
05.09.2019
LF130-02
LF130-02
05.09.2019
06.09.2019
09.09.2019
14.09.2019
18.09.2019
18.09.2019
19.09.2019
29.09.2019
30.09.2019
03.10.2019
04.10.2019
09.10.2019
14.10.2019
15.10.2019
18.10.2019
18.10.2019
24.10.2019
27.10.2019
30.10.2019
04.11.2019
10.11.2019
13.11.2019
16.11.2019
17.11.2019
20.11.2019
22.11.2019
08.12.2019
12.12.2019
20.12.2019
LF130-02
LF130-02
05.01.2020
10.01.2020
11.01.2020
14.01.2020
19.01.2020
22.01.2020
21.01.2020
23.01.2020
24.01.2020
26.01.2020
27.01.2020
30.01.2020
31.01.2020
02.02.2020
03.02.2020
06.02.2020
07.02.2020
08.02.2020
10.02.2020
12.02.2020
15.02.2020
19.02.2020
LF130-02
LF130-02
23.02.2020
25.02.2020
26.02.2020
27.02.2020
28.02.2020
02.03.2020
05,03.2020
LF130-02
WAREHOUSE FORKLIFT CAT PROBLEM REPORT & MAINTENANCE RECO
SERIAL NUMBER CT14E-10062
MODEL DP30NT
Date Hours
№ Shift Problem Repair to be carried out
Reported meter
1 04.07.2016 D/S Reverse Lamp not Working REPLACED LAMP 1831.1
2 12.07.2016 D/S Battery Need Change With New Changed Battery 1835.5
3 25.07.2016 D/S There is no First Aid kit 1856.5
02.07.2016 D/S Oil Brake Less Changed oil brake 1872.1
Casing lamp Front faded Replaced Casing Lamp
3 15.07.2016 D/S Schedule service 250HR Completed Service 250 HR 1842.8
Changed out engine oil
Replaced fuel filter
Replaced oil filter
Clean Up water Saparator
4 10.08.2016 D/S Schedule Monthly Inspection Completed Monthly Inspection 1877.6
Hose Fuell damage Repaired hose
5 09.09.2016 D/S Roller Side of lift bracket damage Replaced new roller 1902.6
6 13.09.2016 D/S Schedule Monthly Inspection Completed Monthly Inspection
7 31.10.2016 D/S Schedule Monthly Inspection Completed Monthly Inspection 1938.7
16 23.05.2018 D/S Schedule Inspection & Grease Completed Inspection & Grease 2382
17 26.05.2018 D/S Washed / cleaned up unit 2385
18 23.06.2018 D/S Schedule Washing Forklift Completed Washing Forklift 2398
19 25.06.2018 D/S Schedule Inspection & Grease Completed Inspection & Grease 2399
20 18.07.2018 D/S Brake system not work properly Replaced Master brake cylinder
Water coolant need to be added Replaced wheel cylinder
21 21.07.2018 D/S Schedule Inspection & Grease Completed Inspection & Grease 2422
Changed out engine oil
Replaced Oil Filter
Replaced Fuel Filter
22 05.10.2018 D/S SCHEDULE WEEKLY INSPECTION & GREASE COMPLETED INSPECTION & GREASE 2476
23 20.10.2018 D/S SCHEDULE WEEKLY INSPECTION & GREASE COMPLETED INSPECTION & GREASE 2492
22 22.10.2018 D/S 1 EA BOLT MISSING FOR REAR WHEEL
RADIATOR COOLANT DIRTY/BLACK
23 14.11.2018 D/S SERCIVER REGULAR 250HRS COMPLETED SERVICE 250 HRS
CHANGED OUT ENGINE OIL
REPLACED FUEL FILTER
REPLACED OIL FILTER
24 12.11.2018 D/S SCHEDULE WASHING FORKLIFT WASHED UNIT 2503
25 24.11.2018 D/S SCHEDULE GREAS & WASH UNIT COMPLETED INSPECTION & GREASED 2518
26 05.01.2019 D/S SCHEDULE WEEKLY INSPECTION & GREASE COMPLETED INSPECTION & GREASE 2546
26 12.01.2019 D/S SCHEDULE WEEKLY INSPECTION & GREASE COMPLETED INSPECTION & GREASE 2556
N/S
Date
Part Desc Part No QTY Fitter REQ No PO#
Repaired 2326
1 Agus.N 16.07.2016
Battery NS-70 DRY 1 Heryanto 16.08.2016
Brake shoe 2
Cartenz (Sigit)
17.05.2017 DP 30 N Caterpillar - Tech
Master Brake 1 Nominal load at COG 3 t
Master Brake 2 Standard tyres 2x/2SE
Brake oil Centre of gravity 500 mm
Agung/Solikhin 20.03.2018 Transmission type W
Weight 4.48 t
Total width 1710 mm
Fuel Filter 32A620 1020C 1 Construction height 2173 mm
Abu Toyib 11.05.2018 Turning radius 2.38 m
Tyre PIO 6.50-10m Solid 2 PT. Cartenz 21.07.2018 Lifting height 3.27 m
Tyre PIO 28x9-15 Solid 2
Abu Toyib 23.05.2018
Abu Toyib 26.06.2018 Travel speed with / without load 19/19.5 km/h
Abu Toyib 23.06.2018
Abu Toyib 25.06.2018 Hoisting with / without load 0.51/0.54 m/s
Master Brake 1 PT. Cartenz 21.07.2018 Lowering with load 0.53/0.5 m/s
Wheel cylinder 2 max. climbing ability 24 %
PT. Cartenz 21.07.2018 Engine manuf. Mitsubishi
Engine Oil 10L Engine type S 4 S
Oil Filter 1 Engine power 44 kW
Fuel Filter 1
TOYIB 05.10.2018
TOYIB 20.10.2018
CV ANUGRAH 14.11.2018
TOYIB 12.11.2018
TOYIB 24.11.2018
TOYIB 05.01.2019
TOYIB 12.01.2019
BOLT M 19 x 25 mm
RAHMAD
s (3 Ton) @ 500mm load center
18 06.01.2018 D/S Relay lamp overheat when do the test Replaced new relay 6 Agung/Solikhin
Installed driver seat
Date
REQ No PO#
Repaired
02.11.2017
08.11.2017
AMNT - 112
09.11.2017
10.11.2017
11.11.2017
20.11.2017
04.12.2017
15.12.2017
16.12.2017
18.12.2017
18.12.2017
19.12.2017
On progress
20.12.2017
21.12.2017
PO0111217 22.12.2017
02.01.2017
03.01.2018
04.01.2018
05.01.2018
06.01.2018
HANJIN CRANE-03 (7125) PROBLEM REPORT & MAINTENANCE RECORD
MODEL CONSTRUCTION D&B-25CR
CHASSISS D&B-25CRCAN12091047
12.12.2018
LV MITSUBISHI B 9631 BBC PROBLEM REPORT & MAINTENANCE RECORD
MODEL CONSTRUCTION MITSUBISHI TRITON
Date
Part No QTY Fitter REQ No PO#
Repaired
PT.SRIKANDI 27.07.2016
PAK SUHA 28.12.2016
PT.SRIKANDI 27.07.2016
1230A045A 1
1770A233 1
1
7
BOLT M 19 x 25 mm
RAHMAD
LV MITSUBISHI PAJERO SPORT GLX B PROBLEM REPORT & MAINTENANCE RECOR
MODEL CONSTRUCTION MITSUBISHI PAJERO SPORT GLX
Date
Part No QTY Fitter REQ No PO#
Repaired
LV MITSUBISHI STRADA TRITON B9547BBC PROBLEM REPORT & MAINTENANCE RECORD
MODEL CONSTRUCTIOMITSUBISHI STRADA TRITON
Date
Fitter REQ No PO#
Repaired
Heryanto 06.09.2018
LV MITSUBISHI PAJERO SPORT GLX B1497SJM PROBLEM REPORT & MAINTENANCE RE
MODEL CONSTRUCTION MITSUBISHI PAJERO SPORT GLX
Date
Part No QTY Fitter REQ No PO#
Repaired
LV MITSUBISHI STRADA TRITON B9018NS PROBLEM REPORT & MAINTENANCE RECO
MODEL CONSTRUCTION
VIN NUMBER
Hour
№ Date Reported Shift Problem Repair to be carried out KM Part Desc
work
1
2
3
4
5
7
ORT & MAINTENANCE RECORD
Date
Part No QTY Fitter REQ No PO#
Repaired
LV MITSUBISHI PAJERO SPORT GLX B1878UJK PROBLEM REPORT & MAINTENANCE RE
MODEL CONSTRUCTION
VIN NUMBER
Hour
№ Date Reported Shift Problem Repair to be carried out KM Part Desc
work
1
2
3
4
5
7
EPORT & MAINTENANCE RECORD
Date
Part No QTY Fitter REQ No PO#
Repaired
Skid Number : PTL-SP-01, Engine : Yanmar TF85 Mrdi-12, Pump : PTL-NS80-01
Date
Part No QTY Fitter REQ No
Repaired
Agus N On Going
1 Agus N 21.10.2016
Agus N 24.10.2016
Skid Nmber :PTL-GS-01, Engine : Yanmar TF85 MLYdi-10, Generator : PTL-GE-01
Date
Part No QTY Fitter REQ No
Repaired
1 AGUS N On Going
1 AGUS N On Going
AGUS N On Going
AGUS N On Going
AGUS N On Going
AGUS N On Going
AGUS N On Going
AGUS N On Going
AGUS N 15.08.2016