Work Inspection Request (WIR)

Contract Title: LA MER SOUTH DEVELOPMENT– MAIN CONTRACT WORKS


Contract/ LOA No.: Contract No. MI-0002/CW-OT-01 Plot No. 3321843
Employer: LA MER RETAIL L.L.C.
Employer Representative: DUBAI HOLDING REAL ESTATE
Engineer: SSHIC INTERNATIONAL ENGINEERING CONSULTANTS LLC
Main Contractor: ARCO TURNKEY SOLUTIONS CONTRACTING LLC
Sub Contractor INFRANETS CONTRACTING LLC
Reference No.: MI-0002- ARCO-WIR-INFRA-01608 Revision: 00 Date: 22.11.2023

Item to be checked: Telecom works


Description: Inspection for Excavation, Formation preparation and FDT for Telecom ducts
Inspection of Excavation, Formation preparation and FDT test for proposed Telecom ducts 1) from MH-36 to connection
# 35 length 8.33M (2W, D56-100mm), 2) from MH-35 to connection # 34 length 3M (2W, D56-100mm), 3) from MH-31 to
connection # 31 length 3.71M (2W, D56-100mm) 4) from MH-31 to connection # 30 length 16.37M (2W, D56-100mm) 5)
from MH-26 to connection # 29 length 5.09M (2W, D56-100mm) 6) from MH-26 to MH-27 length 15.74M (2W, D54-
100mm), 7) from MH-27 to connection # 26 length 16.18M (2W, D56-100mm)
Location/Zone/Level: Phase 2

Type of Inspection:
☐ Architectural ☐ HVAC ☐ Electrical ☒ Others: INFRA ☐ Plumbing
☐ Fire Fighting ☐ Concrete Work Volume: Type:
Reference Drawings: As attached Date of Inspection: 23.10.2023 Time: 10.15 AM

Coordination of Trades:
Other Addendum Contractors and/or Sub-contractors:
☐ Civil / Structural ☐ Architectural ☐ HVAC ☐ Plumbing ☐ Electrical
☐ Fire Fighting ☐ Conveying ☐ Landscaping ☐ Storm Water ☐ Sanitary Drainage
☐ Road ☐ Street lighting ☒ Telecom ☐ Low voltage ☐ Other

SECTION B: Confirmation of Contractor's Q.C. Inspection Note: Original with this section to be completed and hand it to A/E prior to inspection
Confirmation of co-ordination and compliance with Specifications, Approved Drawings, Method Statement and Quality Control
Plan ☒ Yes ☐ No
Note: If NO, any departure from Specifications, Approved Drawings, Method Statement and Quality Control Plan to be recorded below.
Non-Conformity and/or reference of attached Non-Conformity Report (NCR) ____________
Preceding activity approved: Ref. Documents included :
☐ Yes, Reference Number ☐ Yes, Reference Number
(……………………………) (……………………………)
☐ No ☐ No
☒ Not applicable ☒ Not applicable

Sub Contractor’s Eng:_________ Contractor’s QA/QC Manager_____________________ Date ______________

Engineer Comments SSH Safety KPI Action Code:


☐ Safe Access ☐ A- Approved
☐ Fall Protection ☐ B- Approved_As_Noted
☐ Fire Protection ☐ C- Not_Approved_Resubmit
☐ Safe Work ☐ D- Incomplete Resubmit
Engineer: ____________ Date ________ Procedure ☐ E- Information Record
If all 4 KPI’s not provided,
reject inspection (D)
The checking and approval by Engineer & his Representative shall not relieve the Contractor of his obligation to perform the work in accordance with the contract documents.

Distribution:
To Original Copy

Employer ☐ ☐

Engineer ☐ ☐

February 2023 CS_FR_14_v2.0 Page 1 of 2


February 2023 CS_FR_14_v2.0 Page 2 of 2
Work Inspection Request (WIR)
Contract Title: LA MER SOUTH DEVELOPMENT– MAIN CONTRACT WORKS
Contract/ LOA No.: Contract No. MI-0002/CW-OT-01 Plot No. 3321843
Employer: LA MER RETAIL L.L.C.
Employer Representative: DUBAI HOLDING REAL ESTATE
Engineer: SSHIC INTERNATIONAL ENGINEERING CONSULTANTS LLC
Main Contractor: ARCO TURNKEY SOLUTIONS CONTRACTING LLC
Sub Contractor INFRANETS CONTRACTING LLC
Reference No.: MI-0002- ARCO-WIR-INFRA-01609 Revision: 00 Date: 22.11.2023

Item to be checked: Telecom line


Description: Inspection for sand bedding for Telecom ducts
Inspection for laying of sand bedding for proposed Telecom ducts 1) from MH-36 to connection # 35 length 8.33M (2W,
D56-100mm), 2) from MH-35 to connection # 34 length 3M (2W, D56-100mm), 3) from MH-31 to connection # 31 length
3.71M (2W, D56-100mm) 4) from MH-31 to connection # 30 length 16.37M (2W, D56-100mm) 5) from MH-26 to
connection # 29 length 5.09M (2W, D56-100mm) 6) from MH-26 to MH-27 length 15.74M (2W, D54-100mm), 7) from
MH-27 to connection # 26 length 16.18M (2W, D56-100mm)
Location/Zone/Level: Phase 2

Type of Inspection:
☐ Architectural ☐ HVAC ☐ Electrical ☒ Others: INFRA ☐ Plumbing
☐ Fire Fighting ☐ Concrete Work Volume: Type:
Reference Drawings: As attached Date of Inspection: 23.11.2023 Time: 10.30 AM

Coordination of Trades:
Other Addendum Contractors and/or Sub-contractors:
☐ Civil / Structural ☐ Architectural ☐ HVAC ☐ Plumbing ☐ Electrical
☐ Fire Fighting ☐ Conveying ☐ Landscaping ☐ Storm Water ☐ Sanitary Drainage
☐ Road ☐ Street lighting ☒ Telecom ☐ Low voltage ☐ Other

SECTION B: Confirmation of Contractor's Q.C. Inspection Note: Original with this section to be completed and hand it to A/E prior to inspection
Confirmation of co-ordination and compliance with Specifications, Approved Drawings, Method Statement and Quality Control
Plan ☒ Yes ☐ No
Note: If NO, any departure from Specifications, Approved Drawings, Method Statement and Quality Control Plan to be recorded below.
Non-Conformity and/or reference of attached Non-Conformity Report (NCR) ____________
Preceding activity approved: Ref. Documents included :
☒ Yes, Reference Number: MI-0002 ☒ Yes, Reference Number:MI-0002
ARCO-WIR-INFRA-01608 ARCO-WIR-INFRA-01608
☐ No ☐ No
☐ Not applicable ☐ Not applicable

Sub Contractor’s Eng:_________ Contractor’s QA/QC Manager_____________________ Date ______________

Engineer Comments SSH Safety KPI Action Code:


☐ Safe Access ☐ A- Approved
☐ Fall Protection ☐ B- Approved_As_Noted
☐ Fire Protection ☐ C- Not_Approved_Resubmit
☐ Safe Work ☐ D- Incomplete Resubmit
Engineer: ____________ Date ________ Procedure ☐ E- Information Record
If all 4 KPI’s not provided,
reject inspection (D)
The checking and approval by Engineer & his Representative shall not relieve the Contractor of his obligation to perform the work in accordance with the contract documents.

Distribution:
To Original Copy

Employer ☐ ☐

Engineer ☐ ☐
February 2023 CS_FR_14_v2.0 Page 1 of 2
February 2023 CS_FR_14_v2.0 Page 2 of 2
8Work Inspection Request (WIR)
Contract Title: LA MER SOUTH DEVELOPMENT– MAIN CONTRACT WORKS
Contract/ LOA No.: Contract No. MI-0002/CW-OT-01 Plot No. 3321843
Employer: LA MER RETAIL L.L.C.
Employer Representative: DUBAI HOLDING REAL ESTATE
Engineer: SSHIC INTERNATIONAL ENGINEERING CONSULTANTS LLC
Main Contractor: ARCO TURNKEY SOLUTIONS CONTRACTING LLC
Sub Contractor INFRANETS CONTRACTING LLC
Reference No.: MI-0002- ARCO-WIR-INFRA-01610 Revision: 00 Date: 22.11.2023

Item to be checked: Telecom line


Description: Inspection for Laying of Telecom ducts 2W for proposed Telecom ducts
Inspection for laying of Telecom ducts 1) from MH-36 to connection # 35 length 8.33M (2W, D56-100mm), 2) from MH-
35 to connection # 34 length 3M (2W, D56-100mm), 3) from MH-31 to connection # 31 length 3.71M (2W, D56-100mm)
4) from MH-31 to connection # 30 length 16.37M (2W, D56-100mm) 5) from MH-26 to connection # 29 length 5.09M
(2W, D56-100mm) 6) from MH-26 to MH-27 length 15.74M (2W, D54-100mm), 7) from MH-27 to connection # 26 length
16.18M (2W, D56-100mm)
Location/Zone/Level: Phase 2

Type of Inspection:
☐ Architectural ☐ HVAC ☐ Electrical ☒ Others: INFRA ☐ Plumbing
☐ Fire Fighting ☐ Concrete Work Volume: Type:
Reference Drawings: As attached Date of Inspection: 23.11.2023 Time: 10.45 AM

Coordination of Trades:
Other Addendum Contractors and/or Sub-contractors:
☐ Civil / Structural ☐ Architectural ☐ HVAC ☐ Plumbing ☐ Electrical
☐ Fire Fighting ☐ Conveying ☐ Landscaping ☐ Storm Water ☐ Sanitary Drainage
☐ Road ☐ Street lighting ☒ Telecom ☐ Low voltage ☐ Other

SECTION B: Confirmation of Contractor's Q.C. Inspection Note: Original with this section to be completed and hand it to A/E prior to inspection
Confirmation of co-ordination and compliance with Specifications, Approved Drawings, Method Statement and Quality Control
Plan ☒ Yes ☐ No
Note: If NO, any departure from Specifications, Approved Drawings, Method Statement and Quality Control Plan to be recorded below.
Non-Conformity and/or reference of attached Non-Conformity Report (NCR) ____________
Preceding activity approved: Ref. Documents included :
☒ Yes, Reference Number: MI-0002 ☒ Yes, Reference Number:MI-0002
ARCO-WIR-INFRA-01609 ARCO-WIR-INFRA-01609
☐ No ☐ No
☐ Not applicable ☐ Not applicable

Sub Contractor’s Eng:_________ Contractor’s QA/QC Manager_____________________ Date ______________

Engineer Comments SSH Safety KPI Action Code:


☐ Safe Access ☐ A- Approved
☐ Fall Protection ☐ B- Approved_As_Noted
☐ Fire Protection ☐ C- Not_Approved_Resubmit
☐ Safe Work ☐ D- Incomplete Resubmit
Engineer: ____________ Date ________ Procedure ☐ E- Information Record
If all 4 KPI’s not provided,
reject inspection (D)
The checking and approval by Engineer & his Representative shall not relieve the Contractor of his obligation to perform the work in accordance with the contract documents.

Distribution:
To Original Copy

Employer ☐ ☐

Engineer ☐ ☐

February 2023 CS_FR_14_v2.0 Page 1 of 1


Work Inspection Request (WIR)
Contract Title: LA MER SOUTH DEVELOPMENT– MAIN CONTRACT WORKS
Contract/ LOA No.: Contract No. MI-0002/CW-OT-01 Plot No. 3321843
Employer: LA MER RETAIL L.L.C.
Employer Representative: DUBAI HOLDING REAL ESTATE
Engineer: SSHIC INTERNATIONAL ENGINEERING CONSULTANTS LLC
Main Contractor: ARCO TURNKEY SOLUTIONS CONTRACTING LLC
Sub Contractor INFRANETS CONTRACTING LLC
Reference No.: MI-0002- ARCO-WIR-INFRA-01611 Revision: 00 Date: 22.11.2023

Item to be checked: Telecom works


Description: Inspection for Excavation, Formation preparation and FDT for Telecom ducts
Inspection of Excavation, Formation preparation and FDT test for proposed Telecom ducts 1) from MH-22 to connection
# 18 length 9.54M (2W, D56-100mm), 2) from MH-22 to connection # 19 length 4.50M (2W, D56-100mm), 3) from MH-22
to connection # 20 length 15.67M (2W, D56-100mm) 4) from MH-15 to connection # 12 length 4.98M (2W, D56-100mm) 5)
from MH-12 to connection # 08 length 4.75M (2W, D56-100mm) 6) from Connection-17 to connection # 13 length 5.96M
(2W, D56-100mm), 7) from MH-2 to Tie In-2 length 6.76M (2W, D54-100mm)
Location/Zone/Level: Phase 1

Type of Inspection:
☐ Architectural ☐ HVAC ☐ Electrical ☒ Others: INFRA ☐ Plumbing
☐ Fire Fighting ☐ Concrete Work Volume: Type:
Reference Drawings: As attached Date of Inspection: 23.10.2023 Time: 11.00 AM

Coordination of Trades:
Other Addendum Contractors and/or Sub-contractors:
☐ Civil / Structural ☐ Architectural ☐ HVAC ☐ Plumbing ☐ Electrical
☐ Fire Fighting ☐ Conveying ☐ Landscaping ☐ Storm Water ☐ Sanitary Drainage
☐ Road ☐ Street lighting ☒ Telecom ☐ Low voltage ☐ Other

SECTION B: Confirmation of Contractor's Q.C. Inspection Note: Original with this section to be completed and hand it to A/E prior to inspection
Confirmation of co-ordination and compliance with Specifications, Approved Drawings, Method Statement and Quality Control
Plan ☒ Yes ☐ No
Note: If NO, any departure from Specifications, Approved Drawings, Method Statement and Quality Control Plan to be recorded below.
Non-Conformity and/or reference of attached Non-Conformity Report (NCR) ____________
Preceding activity approved: Ref. Documents included :
☐ Yes, Reference Number ☐ Yes, Reference Number
(……………………………) (……………………………)
☐ No ☐ No
☒ Not applicable ☒ Not applicable

Sub Contractor’s Eng:_________ Contractor’s QA/QC Manager_____________________ Date ______________

Engineer Comments SSH Safety KPI Action Code:


☐ Safe Access ☐ A- Approved
☐ Fall Protection ☐ B- Approved_As_Noted
☐ Fire Protection ☐ C- Not_Approved_Resubmit
☐ Safe Work ☐ D- Incomplete Resubmit
Engineer: ____________ Date ________ Procedure ☐ E- Information Record
If all 4 KPI’s not provided,
reject inspection (D)
The checking and approval by Engineer & his Representative shall not relieve the Contractor of his obligation to perform the work in accordance with the contract documents.

Distribution:
To Original Copy

Employer ☐ ☐

Engineer ☐ ☐

February 2023 CS_FR_14_v2.0 Page 1 of 2


February 2023 CS_FR_14_v2.0 Page 2 of 2
Work Inspection Request (WIR)
Contract Title: LA MER SOUTH DEVELOPMENT– MAIN CONTRACT WORKS
Contract/ LOA No.: Contract No. MI-0002/CW-OT-01 Plot No. 3321843
Employer: LA MER RETAIL L.L.C.
Employer Representative: DUBAI HOLDING REAL ESTATE
Engineer: SSHIC INTERNATIONAL ENGINEERING CONSULTANTS LLC
Main Contractor: ARCO TURNKEY SOLUTIONS CONTRACTING LLC
Sub Contractor INFRANETS CONTRACTING LLC
Reference No.: MI-0002- ARCO-WIR-INFRA-01612 Revision: 00 Date: 22.11.2023

Item to be checked: Telecom line


Description: Inspection for sand bedding for Telecom ducts
Inspection for laying of sand bedding for proposed Telecom ducts 1) from MH-22 to connection # 18 length 9.54M (2W,
D56-100mm), 2) from MH-22 to connection # 19 length 4.50M (2W, D56-100mm), 3) from MH-22 to connection # 20
length 15.67M (2W, D56-100mm) 4) from MH-15 to connection # 12 length 4.98M (2W, D56-100mm) 5) from MH-12 to
connection # 08 length 4.75M (2W, D56-100mm) 6) from Connection-17 to connection # 13 length 5.96M (2W, D56-
100mm), 7) from MH-2 to Tie In-2 length 6.76M (2W, D54-100mm)
Location/Zone/Level: Phase 1

Type of Inspection:
☐ Architectural ☐ HVAC ☐ Electrical ☒ Others: INFRA ☐ Plumbing
☐ Fire Fighting ☐ Concrete Work Volume: Type:
Reference Drawings: As attached Date of Inspection: 23.11.2023 Time: 11.15 AM

Coordination of Trades:
Other Addendum Contractors and/or Sub-contractors:
☐ Civil / Structural ☐ Architectural ☐ HVAC ☐ Plumbing ☐ Electrical
☐ Fire Fighting ☐ Conveying ☐ Landscaping ☐ Storm Water ☐ Sanitary Drainage
☐ Road ☐ Street lighting ☒ Telecom ☐ Low voltage ☐ Other

SECTION B: Confirmation of Contractor's Q.C. Inspection Note: Original with this section to be completed and hand it to A/E prior to inspection
Confirmation of co-ordination and compliance with Specifications, Approved Drawings, Method Statement and Quality Control
Plan ☒ Yes ☐ No
Note: If NO, any departure from Specifications, Approved Drawings, Method Statement and Quality Control Plan to be recorded below.
Non-Conformity and/or reference of attached Non-Conformity Report (NCR) ____________
Preceding activity approved: Ref. Documents included :
☒ Yes, Reference Number: MI-0002 ☒ Yes, Reference Number:MI-0002
ARCO-WIR-INFRA-01611 ARCO-WIR-INFRA-01611
☐ No ☐ No
☐ Not applicable ☐ Not applicable

Sub Contractor’s Eng:_________ Contractor’s QA/QC Manager_____________________ Date ______________

Engineer Comments SSH Safety KPI Action Code:


☐ Safe Access ☐ A- Approved
☐ Fall Protection ☐ B- Approved_As_Noted
☐ Fire Protection ☐ C- Not_Approved_Resubmit
☐ Safe Work ☐ D- Incomplete Resubmit
Engineer: ____________ Date ________ Procedure ☐ E- Information Record
If all 4 KPI’s not provided,
reject inspection (D)
The checking and approval by Engineer & his Representative shall not relieve the Contractor of his obligation to perform the work in accordance with the contract documents.

Distribution:
To Original Copy

Employer ☐ ☐

Engineer ☐ ☐
February 2023 CS_FR_14_v2.0 Page 1 of 2
February 2023 CS_FR_14_v2.0 Page 2 of 2
8Work Inspection Request (WIR)
Contract Title: LA MER SOUTH DEVELOPMENT– MAIN CONTRACT WORKS
Contract/ LOA No.: Contract No. MI-0002/CW-OT-01 Plot No. 3321843
Employer: LA MER RETAIL L.L.C.
Employer Representative: DUBAI HOLDING REAL ESTATE
Engineer: SSHIC INTERNATIONAL ENGINEERING CONSULTANTS LLC
Main Contractor: ARCO TURNKEY SOLUTIONS CONTRACTING LLC
Sub Contractor INFRANETS CONTRACTING LLC
Reference No.: MI-0002- ARCO-WIR-INFRA-01613 Revision: 00 Date: 22.11.2023

Item to be checked: Telecom line


Description: Inspection for Laying of Telecom ducts 2W for proposed Telecom ducts
Inspection for laying of Telecom ducts 1) from MH-22 to connection # 18 length 9.54M (2W, D56-100mm), 2) from MH-
22 to connection # 19 length 4.50M (2W, D56-100mm), 3) from MH-22 to connection # 20 length 15.67M (2W, D56-
100mm) 4) from MH-15 to connection # 12 length 4.98M (2W, D56-100mm) 5) from MH-12 to connection # 08 length
4.75M (2W, D56-100mm) 6) from Connection-17 to connection # 13 length 5.96M (2W, D56-100mm), 7) from MH-2 to
Tie In-2 length 6.76M (2W, D54-100mm)
Location/Zone/Level: Phase 1

Type of Inspection:
☐ Architectural ☐ HVAC ☐ Electrical ☒ Others: INFRA ☐ Plumbing
☐ Fire Fighting ☐ Concrete Work Volume: Type:
Reference Drawings: As attached Date of Inspection: 23.11.2023 Time: 11.30 AM

Coordination of Trades:
Other Addendum Contractors and/or Sub-contractors:
☐ Civil / Structural ☐ Architectural ☐ HVAC ☐ Plumbing ☐ Electrical
☐ Fire Fighting ☐ Conveying ☐ Landscaping ☐ Storm Water ☐ Sanitary Drainage
☐ Road ☐ Street lighting ☒ Telecom ☐ Low voltage ☐ Other

SECTION B: Confirmation of Contractor's Q.C. Inspection Note: Original with this section to be completed and hand it to A/E prior to inspection
Confirmation of co-ordination and compliance with Specifications, Approved Drawings, Method Statement and Quality Control
Plan ☒ Yes ☐ No
Note: If NO, any departure from Specifications, Approved Drawings, Method Statement and Quality Control Plan to be recorded below.
Non-Conformity and/or reference of attached Non-Conformity Report (NCR) ____________
Preceding activity approved: Ref. Documents included :
☒ Yes, Reference Number: MI-0002 ☒ Yes, Reference Number:MI-0002
ARCO-WIR-INFRA-01612 ARCO-WIR-INFRA-01612
☐ No ☐ No
☐ Not applicable ☐ Not applicable

Sub Contractor’s Eng:_________ Contractor’s QA/QC Manager_____________________ Date ______________

Engineer Comments SSH Safety KPI Action Code:


☐ Safe Access ☐ A- Approved
☐ Fall Protection ☐ B- Approved_As_Noted
☐ Fire Protection ☐ C- Not_Approved_Resubmit
☐ Safe Work ☐ D- Incomplete Resubmit
Engineer: ____________ Date ________ Procedure ☐ E- Information Record
If all 4 KPI’s not provided,
reject inspection (D)
The checking and approval by Engineer & his Representative shall not relieve the Contractor of his obligation to perform the work in accordance with the contract documents.

Distribution:
To Original Copy

Employer ☐ ☐

Engineer ☐ ☐

February 2023 CS_FR_14_v2.0 Page 1 of 1