Risk assessment form

Name of assessor Mustafa Adnan Shaban Da June 13th, 2020


te

Ti 10: 30 Am Work area Oil and Gas Station


me

Task being assessed Welding & Cutting pipeline

How New risk Action/ Action/


What Existing
might Risk rating Additional controls rating monitored monitored
is Who might risk
people (Residual) by whom? by when?
the be control
haza harmed? be L C R L C R
measure
rd? harme
s
d?
Fire Welder, heat and PTW (OTL) 4 4 1  Qualified and Dedicated 1 2 2 Site Daily (Before
(Welding Helper flames isolation 6 persons shall be designated to Supervisor start of the
& Cutting and other (Burn) pipe direct the operations. Or Welder work)
Operatio coordinator gas test  Welding Mask
n) s in the smoke, toolbox  FR PPE
working which can  Shelter and suitable fireproof
area suffocate canvas are built when hot work
or poison nearby live facilities to prevent
fire or spark
them
 Combustible materials are kept
to a minimum to minimize the
risk of fire and trip hazards. All
combustible waste is kept in
lidded bins/containers.
 The fire extinguisher should be
prepared at work site (Powder).
Risk assessment form
 Fire watcher should be
presented during hot work.
 Use the fire blanket if needed
 First aider and fully stocked
first aid kit to be available at
site.

 Additional personal multi gas


detectors to be used when
performing hot cutting

Electricit Worker and  Electric PTW 4 5 2  All person referred to the work 2 2 4 Site Daily, before
y other al isolation 0 shall have attended the safety Supervisor start of the
training and got the safety
(Welding coordinator Shock pipe passport with competent ability work
Machine, in the  Burn gas test to their job
Grinder, working and fire toolbox  Sign and barricades shall be set
Wires area for the workplace
and  Check cables and the device by
electrician before daily work
cables)
 Proper PPE shall be provided
 Fire extinguishers and fire
watchers must be in the place
 Operate the device following
the specification of
manufacture
 Cable management
 Ensure proper color code
electrical equipment tag is
provided for updated
inspections
 First aider and fully stocked
first aid kit to be available at
site
 Additional personal multi gas
detectors to be used
 Ensure all welding machines
Risk assessment form
are grounded/earthing by use
of proper earth cable and
copper rod.
New risk
How
What Existing rating Action/ Action/
might
is Who might risk Risk rating Additional controls (Residual monitored by monitored by
people
the be control whom? when?
be )
haza harmed? measure
harme
rd? s L C R L C R
d?
Mechanic The grinder Personal PTW 4 2 Site Before or
al Hazard  All person referred to the work
worker injury Toolbox shall have attended the safety
supervisor during the
(cuts and training and got the safety Or Forman work period
(Grinder bruises) passport with competent ability
Machine to their job

)  Proper PPE shall be provided

 Always ensure the safe guard is in


place and the handle, never
remove any safe guard.

 Check expiry dates on the cutting


4 16 and grinding discs to make sure it 3 6
is valid for use.

 First aider and fully stocked first


aid kit to be available at site.

 Make inspection for the device


before start of the work
 Grinding wheels shall be chosen
appropriate to the material
which will grinded or cut.

 Suitable shields and goggles are


supplied to give eye protection
Environment Workers in hearing PTW 2 1 Site Before or
al Hazard the working loss Toolbox  wear ear protection must supervisor during the
(Noise) place be used (Earplugs) Or work period
From Worker
grinding 2 4  Check the earplugs and 1 1
and make sure they match
welding to the noise level
machine

Review date June 21st, 2020 Signature


Training Provider name ROYAL CROWN