3rd SLAB 1st SLAB Plinth Lvl. Foundation 2nd SLAB

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PLAN AT VADOD ,SURAT

OWNER'S NAME -- H.K ESTATE AT VADOD,SURAT RCC DETAIL 1:1.5:3 MIX


FOOTING & COLUMN SCHEDULE
COLUMNS FROM SIZE
STEEL 9''X15'' 9''X15'' 9''X18''
SECOND FLOOR
CONF. STEEL (L0) 4-12# 6-12# 6-12#
3rd SLAB

LVL. TO
THIRD FLOOR REST STEEL (L1) 8# @ 4'' C/C 8# @ 4'' C/C 8# @ 4'' C/C
LVL. CONC. GRADE 8# @ 6''C/C 8# @ 6''C/C 8# @ 6''C/C
M:20 M:20 M:20
COLUMNS FROM SIZE
STEEL
9''X18'' 9''X18'' 9''X18''
FIRST FLOOR
6-12# 6-12# 6-12#
2nd SLAB

LVL. TO CONF. STEEL (L0)


2 ND FLOOR LVL. REST STEEL (L1) 8# @ 4'' C/C 8# @ 4'' C/C 8# @ 4'' C/C
CONC. GRADE 8# @ 6''C/C 8# @ 6''C/C 8# @ 6''C/C
M:20 M:20 M:20
COLUMNS FROM SIZE 9''X18'' 9''X18'' 9''X18''
PLINTH LVL. STEEL 8-12# 6-12# 8-12#
1st SLAB TO CONF. STEEL (L0)
REST STEEL (L1)
8# @ 4'' C/C 8# @ 4'' C/C 8# @ 4'' C/C
1 ST FLOOR LVL.
CONC. GRADE 8# @ 6''C/C 8# @ 6''C/C 8# @ 6''C/C
M:20 M:20 M:20
SIZE 9''X18'' 9''X18'' 9''X18''
COLUMNS

FOUNDATION PLINTH LVL.


STEEL 8-12#
FROM CONF. STEEL (L0)
6-12# 8-12#
8# @ 4'' C/C 8# @ 4'' C/C 8# @ 4'' C/C
FOOTING TO REST STEEL (L1)
PLINTH LVL. CONC. GRADE 8# @ 6''C/C 8# @ 6''C/C 8# @ 6''C/C
M:20 M:20 M:20
SIZE (BXL) 3'-9''X4'-3'' 3'-9''X4'-9'' 3'-9''X4'-9''
FOOTING
CONCRETE
DEPTH (D) 15'' 18'' 21''
DEPTH (d) 7'' 7'' 7''
MIX
STEEL //L
(M-20)
STEEL// B
10# @ 4'' C/C 10# @ 4'' C/C 10# @ 4'' C/C
10# @ 4'' C/C 10# @ 4'' C/C 10# @ 4'' C/C
PEDESTAL SIZE 15''X 21'' 15''X 24'' 15''X 24''
FOOTING NO F1 F2 F2
P.C.C. SIZE (BXL) 4'-9''X 5'-0'' 4'-9''X 5'-6'' 4'-9''X 5'-6''
THICKNESS OF P.C.C. 7'' 7'' 7''
COLUMN NO. C2 C3
C1