CIVIL & STRUCTURAL ENGINEERING CONSULTANTS

DOCUMENT REVIEW REPORT (DRR)


(PRIVATE) LIMITED
No772/A, Wijesinghe Mw, Madinnagoda, Rajagiriya, Sri Lanka DRR No. : 31
Tel : 94- 11 – 2501727
Fax : 94- 71 – 8802859
Email contact@csec.lk Date : 14.05.2022

Project : Proposed Condominium Development for South Beach Weligama Properties (Pvt) Ltd
Employer : South Beach Weligama Properties (Pvt) Ltd Proposed Condominium Development
for South Beach Weligama Properties
Engineer : Global Project Management Consultants (Pvt) Ltd (Pvt) Ltd
Engineer's Office - Global Project
Contractor : Buildmart Lanka (Pvt) Ltd. Management Consultants (Pvt) Ltd.
(GPMC)
Contractor's Transmittal No : -
No Exception Taken
To : Mr. Mihiru Perera (Contractor's Representative) - Buildmart Lanka (Pvt) Ltd.
Revise & Submit

Approved With Comments


Contractor's Doc Ref. No. Rev Description Status * Expected Re-issue Date
Reject

MS007 00 Method Statement – Waterproofing C Submit Specified Item

Signed By :
Comments Date :
The recommendations in the manufacturer’s method statement shall be incorporated
in to waterproofing method Statement. (Refer the given illustration in the attachments - page 06 & 07)
• Sample of waterproofing material shall be provided for approval.
• A sample installation shall be carried out at a location chosen by the engineer and it shall be 10m2
minimum completed with jointing, sealing, flashing and ancillary work to demonstrate finished work.
• All work shall be carried out in a manner, which ensures that warranties of the installers are not restricted
or voided.
• In the event of leak, water proofing company should be liable for the removal or reinstallation and related
cost there of screeds or any other layer that may have been laid over the water proofing.
Refer to the attachment for more comments on the method statement.

Notes

From: Reviewed By:

Civil & Structural Engineering Consultants (Pvt) Ltd Eng. Shiromal Fernando
No772/A, Wijesinghe Mw, Madinnagoda, Rajagiriya, Sri Lanka
Tel: +94 11 250 1727
Signature: ……………………………………

Name: ……………………………………

Acknowledgement Receipt
Name :
Signature :
Date :

* Status
A – Approved B – Approved with Comments C – Not Approved - Resubmit D – Rejected
RECORD NO: FRM/DES-002 REV NO: 01 ISSUE NO: 03 DATE OF ISSUE: 04 SEPTEMBER 2020 PAGE NO: 1 OF 1
13th May 2022

METHOD STATEMENT

PROJECT : PROPOSED SOUTH BEACH WELIGAMA CONDOMINIUM PROJECT

SUBJECT : WATERPROOFING IN BASEMANT

PRODUCTS

SikaBIT 1150 – AAP modified bituminous torch welded sheet membrane

Bituprim SB - Solvent base bituminous emulsion


Data sheets to be
Bitumastic - Bituminous single component mastic sealant provided

METHOD STATEMENT

The floor screed concrete is laid with necessary slope to the de watering outlets. (If necessary)
Concrete shall be laid over well compacted surface
Then construct the block wall around the perimeter, height of 1000 mm over the base floor
concrete thickness (it will act as a form work for base floor concrete)

If any mortar, debris and foreign matter are present on this screed, they are to be removed.

A cement sand fillet minimum of 25mm X 25 mm to be laid at the intersection point of any
vertical and horizontal section such as the wall – slab edge, etc.

Polyprime SB primer is now brush applied on the surface (floor and vertical block wall) to act
and the key coat for the torch membrane.
Application shall be done as recommended by the manufacturer
Torch membrane in now torch laid over the prime surface (floor and vertical block wall)

Each sheet is lapped to the next sheet – both at side laps and end laps. Minimum laps to be 100-
75mm.
Minimum lap to be 100mm at all locations as recommended by the supplier
The torch membrane is laying on the horizontal is continued up to the groove on surface and
terminate and sealing as per drawing. (No. DWG Basement 01)

The torch membrane laying on the horizontal is continued along the vertical wall and
terminated on horizontal face of the vertical block wall then lay polythene strip over
waterproofing membrane and will protect with cement sand screed for temporary.

A protection cement sand screed to be laid over the horizontal waterproofing and for vertical
walls protected with cement sand plaster.

Then continue the structural construction works.


A cement sand fillet minimum of 25mm X 25 mm to be laid at the intersection point of any
vertical and horizontal section such as the wall – slab edge, etc.

Polyprime SB primer is now brush applied on the surface (floor and vertical RCC wall) to act
and the key coat for the torch membrane.

Torch membrane in now continue to lay starting with where the temporary termination
and along the floor and vertical RCC wall over the prime surface.

The vertical walls waterproofing membrane will be terminating at 1000 mm above from the
ground level, will fasten using with aluminum strip and seal with Bitumastic sealant

A protection cement sand screed to be laid over the horizontal waterproofing and for vertical
walls will place 10 mm thick high density Styrofoam board or protected with cement sand
plaster .

1. Concrete grade 15 shall be laid with a thickness of 75mm and the screed shall be kept
damp for at least 5 days.
2. The block wall and laid screed shall be cleaned and free from damp, laitance, dust and
dirt prior to application of primer.
3. At interruption of work the edges of the sheets have to be finished in such a manner that
rain water or duct shall not penetrate underneath.
4. The waterproofing membrane shall be laid 6m beyond vertical construction joints of
basement walls and shall be laid 3m beyond horizontal construction joints of basement
wall.
Aluminum strip for termination of waterproofing
membrane not shown

Dimentions

75mm?

WATERPROOFING DETAIL - A

Vertical dimensions to be indicated

Project

Contractor
SALIK ENGINEERING
WATERPROOFING DETAIL - B
Drawing Title

Designed Recommended
...............................................
Senior Officer
Drawn
Approved
Checked ...............................................
Senior Officer
Approved Scale Date Status
09/5/2022
CAD File B9/5/22
Sheet Size Drawing No. Rev. No.
A3 DWG-Basement - 01
NOTE :-
1. ALL DIMENSIONS ARE IN MILLIMETRES AND
LEVELS ARE IN METERS

2. 1 : 5 CEMENT SAND PLASTER USING THE CHICKEN


MESH ALONG THE TERMINATION (SEALENT AREA)

Dimentions

WATERPROOFING DETAIL FOR LIFT WELL &


SWIMMING POOL

Project

Note:Provided section is not clear enough to identify the exact location. Contractor
SALIK ENGINEERING

Drawing Title

Designed Recommended
...............................................
Senior Officer
Drawn
Approved
Checked ...............................................
Senior Officer
Approved Scale Date Status
11/5/2022
CAD File B11/5/22
Sheet Size Drawing No. Rev. No.
A3 DWG-Basement - 02