A-SUB STRUCTURE
1 EXCAVATION & EARTH WORK
Clear and remove top soil to an average depth of
1.1 m2 366.54
20 cm.
Bulk excavation in ordinary soil to reduce levels to the
1.2 designed level up to 500mm . m3
309.168
1.3 Pit excavation in ordinary soil from reduced level to m3 92.93
depth not exceeding 1.5m.
1.4 m3 93.05
Trench excavation for masonery wall under oridinary so
1.5 Back Fill m3 401.8815
1.6 Cart away m3 93.266
Total carried to
m3 1356.84
Summary ...................................................
2 CONCRETE WORK
2.1 50mm lean concrete quality C-5, 150 kg of m²
2.1.1 cement/m3: under
a) Under foundation pad m² 39.29
2.1.2 b) Under Trench Masonry m² 54
Reinforced concrete Grade C-25
2.2 For Footing Pad m3 16.68
2.4 For Grade Beam m3 11.095
2.5 For Ground Slab m3 24.162
2.6 For outside Stairs m3
Reinforced concrete Grade C-30
2.3 Foundation column m3 6.62
Total carried to 151.84
Summary ...................................................
Mild steel reinforcement
a) dia 6 mm plain bar kg
b) dia 8 mm deformed bar kg 709.37
c) dia 10 mm deformed bar kg 1270.04
d) dia 12 mm deformed bar kg 478.2527
e) dia 14 mm deformed bar kg 1341.15
f) dia 16 mm deformed bar kg 872.08
g) dia 20 mm deformed bar kg
h) dia 24 mm deformed bar kg
Total carried to summary kg 4671
MASONRY WORKS kg
3
3.1 500mm thick hard trachytic roughly dressed stone m3 72.5
3.2 masonry foundation
250mm basaltic wall below
hardcore underground
groundlevel bedded
supported floor m² 97.76
in cement mortar mix
Total carried to ratio (1:3)
170.26
Summary ...................................................
4 Form Work
4.1 For Footing Pad m² 47.92
4.2 For Foundation Column m² 88.20
4.3 For Grade Beam m² 96.74
B-SUPER STRUCTURE
1 CONCRETE WORK
Reinforced concrete Grade C-15,
1.1 For Lintel Beam m3 1.151
Reinforced concrete Grade C-25,
1.2 For Stair m3 8.4
1.3 For Slab m3 107.10
1.4 For Beam m3 31.35
Reinforced concrete Grade C-30,
1.5 For Foundation Column m3 12.96
2 FORM WORK
2.1 For Slab m² 734.69
2.2 For Elevation Column m² 184.32
2.3 For Beam m² 260
2.4 For Stair m² 61.4
3 BLOCK WORK
3.1 20CM*20CM*40CM HCB m² 654.43
3.2 30CM*20CM*40CM HCB (Two 15cm HCB thick wall) m² 13.02
3.3 15CM*20CM*40CM HCB m² 703.58
3.4 10CM*20CM*40CM HCB m² 29.70
Mild steel reinforcement according to structural
drawings.
a) dia 6 mmPrice
plain includes
bar cutting, bending, Kg
placing in position ,
b) dia 8 mm deformed bar tying wire, concrete spacers Kg
and chairs.
c) dia 10 mm deformed bar Kg 1860.9026
d) dia 12 mm deformed bar Kg 394.33146
e) dia 14 mm deformed bar Kg 4954.53
f) dia 16 mm deformed bar Kg 647.737
g) dia 20 mm deformed bar Kg 400.075
h) dia 22mm deformed bar Kg 731.81
Total carried to Summary ................. Kg 8989.38
4 Finishing Work
4.1 Cement Sand Plastering m² 3510
4.2 Gypsum Plastering m² 1711.6
4.3 Painting m² 2334.6
4.4 Ceiling Finish m² 1170.0
4.5 Ceram Tile Floor Finish m² 901.56
4.6 Ceramic Tile Wall Finish m² 486.41
4.7 Skirting m 422.36
5 Metal Work
5.1 Aluminium N/A 114.3
5.4 Steel for Stair Case m 264.3
5.3 Steel for Sliding m² 13.755
A1
A2
A1
A2
A1=15.8*11.3, A2=11.3*13
A2
a. along Axis-A
L=3.2m+3.2m=6.4m
1 6.4 1 1 6.4 m3
b. along Axis-B
L=3.25m+3.25m+1.25m+3.05m+3.1m=13.9m
1 13.9 1 1 13.9 m3
c. along Axis-C
L=3m+3.05m+1.25m+3.25m+3.25m=13.8m
1 13.8 1 1 13.8 m3
d. along Axis-D
L=3.2m+3.15m+1.2m+3.15m+3.2m=13.9m
1 13.9 1 1 13.9 m3
e. along Axis-1
L=2.8m+2.75m+3.75m=9.3m
1 9.3 1 1 9.3 m3
f. along Axis-2
L=2.5m+2.35m+3.45m=8.3m
1 8.3 1 1 8.3 m3
g. along Axis-3
L=2.75m+2.55m+3.55m=8.85m
1 8.85 1 1 8.85 m3
h. along Axis-4
L=2.6m+3.55m=6.15m
1 6.15 1 1 6.15 m3
i. along Axis-5
L=2.5m+3.45m=5.95m
1 5.95 1 1 5.95 m3
j. along Axis-6
L=2.75m+3.75m=6.5m
1 6.5 1 1 6.5 m3
93.05 m3 Total volume of trench excavation
Dimensions
Times L (m) W (m) H(m) Square Unit Description
2. CONCRETE WORK
2.1 C-5 LEAN CONCRETE
2.1.1 UNDER FOOTING PAD
2 1.7 1.7 5.78 m2 F1
a. along Axis-A
2
1 7.5 0.5 3.75 m
b. along Axis-B
2
1 16.4 0.5 8.2 m
c. along Axis-C
1 15.1 0.5 7.55 m2
d. along Axis-D
2
1 16.4 0.5 8.2 m
e. along Axis-1
2
1 10.8 0.5 5.4 m
f. along Axis-2
2
1 9.85 0.5 4.925 m
g. along Axis-3
2
1 10.35 0.5 5.175 m
h. along Axis-4
2
1 7.15 0.5 3.575 m
i. along Axis-5
2
1 6.95 0.5 3.475 m
j. along Axis-6
2
1 7.5 0.5 3.75 m
54 m2 Total area of lean concrete under masonry wall
Times L (m) W (m) H(m) Square Unit 2.2 C-25 CONCRETE FOR FOOTING PAD
3
2 1.7 1.7 0.5 2.89 m F1
Times L (m) W (m) H(m) Square Unit 2.3 C-30 FOUNDATION COLUMN
3
17 0.3 0.3 3.5 5.355 m CS-01
Times L (m) W (m) H(m) Square Unit 2.4 C-25 GRADE BEAM
3
3 14.8 0.2 0.35 3.108 m on axis 1 A to D cb7, cb6, cb5
Times L (m) W (m) H(m) Square Unit 2.5 C-25 GROUND SLAB CONCRETE WORK
2 63.94 0.1 12.788 m3 on axis 1and 2 A to D
Times L (m) W (m) H(m) Square Unit 4.2 FORM WORK FOR FOUNDATION COLUMN (20mm THICK SWAN ZIGBA FORMWORK)
2
17 1.2 3.5 71.4 m CS01
Times L (m) W (m) H(m) Square Unit 4.3 FORM WORK FOR GRADE BEAM (20mm THICK SWAN ZIGBA FORMWORK)
1 27.2 0.35 9.52 m2 along axis1 Ato D
SUPER STRUCTURE
Dimensions
Times L (m) W (m) H (m) squaring unit Description
1 CONCRETE WORK
1.1 C-15 CONCRETE FOR LINTEL BEAM (GROUND FLOOR)
1 1.3 0.2 0.2 0.052 m 3
above 90cm wide exterior door offset 20cm from each side
4 1.3 0.15 0.2 0.156 m3 above 90cm wide interior door offset 15cm from each side
5 1.1 0.15 0.2 0.165 m3 above 90cm wide interior door offset 15cm from each side
2 2.4 0.15 0.2 0.144 m3 above 200cm wide interior and exterior door offset 20cm from each side
Times L (m) W (m) H (m) squaring unit C-15 CONCRETE FOR LINTEL BEAM (FIRST FLOOR)
1 1.3 0.15 0.2 0.039 m3 above 90cm wide interior door offset 15cm from each side
6 1.1 0.15 0.2 0.198 m3 above 80cm wide interior door offset 15cm from each side
0.237 m3 Total C-15 concrete for lintel beam (first floor)
Times L (m) W (m) H (m) squaring unit C-15 CONCRETE FOR LINTEL BEAM (SECOND FLOOR)
0.237 m3 ditto as above but for second floor
0.237 m3 Total C-15 concrete for lintel beam (second floor)
Times L (m) W (m) H (m) squaring unit C-15 CONCRETE FOR LINTEL BEAM (ROOF)
2 1.3 0.2 0.2 0.104 m3 above 90cm wide interior door offset 15cm from each side
0.104 m3 Total C-15 concrete for lintel beam (roof)
1.151 m3 TOTAL C-15 CONCRETE WORK
Times L (m) W (m) H (m) squaring unit 1.2 C-25 CONCRETE FOR STAIR (GROUND FLOOR)
2 3.25 1.2 0.14 1.092 m3 Waist slab flight from ground floor to first floor
Times L (m) W (m) H (m) squaring unit C-25 CONCRETE FOR STAIR (FIRST FLOOR)
2 3.25 1.2 0.14 1.092 m3 waist slab flights from second floor to roof
Times L (m) W (m) H (m) squaring unit C-25 CONCRETE FOR SLAB (SECOND FLOOR)
34.6334 m3 ditto as above
34.6334 m3 Total C-25 concrete for slab (second floor)
Times L (m) W (m) H (m) squaring unit C-25 CONCRETE FOR SLAB (ROOF)
1 4.85 4.35 0.14 2.95365 m3 Along Axis-1 and Axis-2 (A-B)
1 4.2 2.7 0.14 1.5876 m3 Roof stair cover along Axis-3 and Axis-4(B-C)
1 2.8 5.35 0.14 2.0972 m3 Roof stair cover along Axis-3 and Axis-4(C-D)
37.8007 m3 Total C-25 concrete for slab (roof)
107.068 m3 Total C-25 concrete for slab
Times L (m) W (m) H (m) squaring unit 1.4 C-25 CONCRETE FOR BEAM (FIRST FLOOR)
6 4.2 0.2 0.35 1.764 m3 Along Axis-1,Axis-2 and Axis-3 between Axis-A&B and Axis-B&C
3 5.2 0.2 0.35 1.092 m3 Along Axis-1,Axis-2 and Axis-3 between Axis-C&D
3 4.2 0.2 0.35 0.882 m3 Along Axis-4,Axis-5 and Axis 6 between Axis B&C
3 5.2 0.2 0.35 1.092 m3 Along Axis-4,Axis-5 and Axis-6 between Axis-C&D
8 4.7 0.2 0.35 2.632 m3 Along Axis-A, Axis-B, Axis-C and Axis-D between Axis-1&2 and Axis-2&3
3 2.7 0.2 0.35 0.567 m3 Along Axis-B, Axis-C and Axis-D between Axis 3&4
6 4.7 0.2 0.35 1.974 m3 Along Axis-B, Axis-C and Axis-D between Axis 4&5 and 5&6
10.003 m3 Total C-25 concrete for beam (first floor)
Times L (m) W (m) H (m) squaring unit C-25 CONCRETE FOR BEAM (SECOND FLOOR)
10.003 m3 ditto as above
10.003 m3 Total C-25 concrete for beam (second floor)
Times L (m) W (m) H (m) squaring unit C-25 CONCRETE FOR BEAM (ROOF)
6 4.2 0.2 0.35 1.764 m3 Along Axis-1,Axis-2 and Axis-3 between Axis-A&B and Axis-B&C
3 5.2 0.2 0.35 1.092 m3 Along Axis-1,Axis-2 and Axis-3 between Axis-C&D
3 4.2 0.2 0.35 0.882 m3 Along Axis-4,Axis-5 and Axis 6 between Axis B&C
3 5.2 0.2 0.35 1.092 m3 Along Axis-4,Axis-5 and Axis-6 between Axis-C&D
8 4.7 0.2 0.35 2.632 m3 Along Axis-A, Axis-B, Axis-C and Axis-D between Axis-1&2 and Axis-2&3
3 2.7 0.2 0.35 0.567 m3 Along Axis-B, Axis-C and Axis-D between Axis 3&4
6 4.7 0.2 0.35 1.974 m3 Along Axis-B, Axis-C and Axis-D between Axis 4&5 and 5&6
2 4.2 0.2 0.35 0.588 m3 Top tie beam Along Axis-3 and Axis-4 between Axis-B&C
2 5.2 0.2 0.35 0.728 m3 Top tie beam Along Axis-3 and Axis-4 between Axis-C&D
11.319 m3 Total C-25 concrete for beam (roof)
146.696 m3 TOTAL C-25 CONCRETE WORK
Times L (m) W (m) H (m) squaring unit 1.5 C-30 CONCRETE FOR COLUMN (GROUND FLOOR)
14 0.3 0.3 3 3.78 m3 on all axis points (1A,1B,1C,1D,2A,2B,2C,2D,3A,3B,3C………..)
3.78 m3 Total C-30 concrete for column (ground floor)
Times L (m) W (m) H (m) squaring unit C-30 CONCRETE FOR COLUMN (FIRST FLOOR)
3.78 m3 ditto as above
3.78 m3 Total C-30 concrete for column (first floor)
Times L (m) W (m) H (m) squaring unit C-30 CONCRETE FOR COLUMN (SECOND FLOOR)
3.78 m3 ditto as above
3.78 m3 Total C-30 concrete for column (second floor)
Times L (m) W (m) H (m) squaring unit C-30 CONCRETE FOR COLUMN (ROOF)
6 0.3 0.3 3 1.62 m3 Along axis 3B,3C,3D,4B,4C,4D
1.62 m3 Total C-30 concrete for column (roof)
12.96 m3 TOTAL C-30 CONCRETE WORK
2. FORM WORK
Times L (m) W (m) H (m) squaring unit 2.1 FORM WORK FOR SLAB (FIRST FLOOR) 20mm thick swan zigaba form work for Slab
1 4.85 4.35 21.0975 m2 Along Axis-1 and Axis-2 (A-B)
Times L (m) W (m) H (m) squaring unit FORM WORK FOR SLAB (SECOND FLOOR) 20mm thick swan zigaba form work for Slab
243.795 m2 ditto as above
243.795 m2 total form work for slab (second floor)
Times L (m) W (m) H (m) squaring unit FORM WORK FOR SLAB (ROOF) 20mm thick swan zigaba form work for Slab
1 4.85 4.35 21.0975 m2 Along Axis-1 and Axis-2 (A-B)
4 4.2 0.05 0.84 m2 Along Axis-A and Axis-D between Axis-1&2 and Axis 2&3
1 4.2 2.7 11.34 m2 Roof stair cover along Axis-3 and Axis-4(B-C)
1 2.8 5.35 14.98 m2 Roof stair cover along Axis-3 and Axis-4(C-D)
247.095 m2 total form work for slab (roof)
Times L (m) W (m) H (m) squaring unit 2.2 FORM WORK FOR COLUMN (GROUND FLOOR) 20mm thick swan zigaba form work for Slab
14 1.28 3 53.76 m2 on all axis points (1A,1B,1C,1D,2A,2B,2C,2D,3A,3B,3C………..)
53.76 m2 total form work for column (ground floor)
Times L (m) W (m) H (m) squaring unit FORM WORK FOR COLUMN (FIRST FLOOR) 20mm thick swan zigaba form work for Slab
53.76 m2 ditto as above
53.76 m2 total form work for column (first floor)
Times L (m) W (m) H (m) squaring unit FORM WORK FOR COLUMN (SECOND FLOOR) 20mm thick swan zigaba form work for Slab
53.76 m2 ditto as above
53.76 m2 total form work for column (second floor)
Times L (m) W (m) H (m) squaring unit FORM WORK FOR COLUMN (ROOF) 20mm thick swan zigaba form work for Slab
6 1.28 3 23.04 m2 Along axis 3B,3C,3D,4B,4C,4D
23.04 m2 total form work for column (roof)
Times L (m) W (m) H (m) squaring unit 2.3 FORM WORK FOR BEAM (FIRST FLOOR) 20mm thick swan zigaba form work for Slab
6 0.58 4.2 14.616 m2 Along Axis-1,Axis-2 and Axis-3 between Axis-A&B and Axis-B&C Perimeter= 0.19+0.2+0.19
3 0.58 5.2 9.048 m2 Along Axis-1,Axis-2 and Axis-3 between Axis-C&D Perimeter= 0.19+0.2+0.19
3 0.58 4.2 7.308 m2 Along Axis-4,Axis-5 and Axis 6 between Axis B&C Perimeter= 0.19+0.2+0.19
3 0.58 5.2 9.048 m2 Along Axis-4,Axis-5 and Axis-6 between Axis-C&D Perimeter= 0.19+0.2+0.19
8 0.58 4.7 21.808 m2 Along Axis-A, Axis-B, Axis-C and Axis-D between Axis-1&2 and Axis-2&3 Perimeter= 0.19+0.2+0.19
3 0.58 2.7 4.698 m2 Along Axis-B, Axis-C and Axis-D between Axis 3&4 Perimeter= 0.19+0.2+0.19
6 0.58 4.7 16.356 m2 Along Axis-B, Axis-C and Axis-D between Axis 4&5 and 5&6 Perimeter= 0.19+0.2+0.19
82.882 m2 total form work for beam (first floor)
Times L (m) W (m) H (m) squaring unit FORM WORK FOR BEAM (SECOND FLOOR) 20mm thick swan zigaba form work for Slab
82.882 m2 ditto as above
82.882 m2 total form work for beam (second floor)
Times L (m) W (m) H (m) squaring unit FORM WORK FOR BEAM (ROOF) 20mm thick swan zigaba form work for Slab
6 0.58 4.2 14.616 m2 Along Axis-1,Axis-2 and Axis-3 between Axis-A&B and Axis-B&C Perimeter= 0.19+0.2+0.19
3 0.58 5.2 9.048 m2 Along Axis-1,Axis-2 and Axis-3 between Axis-C&D Perimeter= 0.19+0.2+0.19
3 0.58 4.2 7.308 m2 Along Axis-4,Axis-5 and Axis 6 between Axis B&C Perimeter= 0.19+0.2+0.19
3 0.58 5.2 9.048 m2 Along Axis-4,Axis-5 and Axis-6 between Axis-C&D Perimeter= 0.19+0.2+0.19
8 0.58 4.7 21.808 m2 Along Axis-A, Axis-B, Axis-C and Axis-D between Axis-1&2 and Axis-2&3 Perimeter= 0.19+0.2+0.19
3 0.58 2.7 4.698 m2 Along Axis-B, Axis-C and Axis-D between Axis 3&4 Perimeter= 0.19+0.2+0.19
6 0.58 4.7 16.356 m2 Along Axis-B, Axis-C and Axis-D between Axis 4&5 and 5&6 Perimeter= 0.19+0.2+0.19
2 0.58 4.2 4.872 m2 Top tie beam Along Axis-3 and Axis-4 between Axis-B&C Perimeter= 0.19+0.2+0.19
2 0.58 5.2 6.032 m2 Top tie beam Along Axis-3 and Axis-4 between Axis-C&D Perimeter= 0.19+0.2+0.19
93.786 m 2
total form work for beam (roof)
Times L (m) W (m) H (m) squaring unit 2.4 FORM WORK FOR STAIR (GROUND FLOOR) 20mm thick swan zigaba form work for Slab
2 3.25 1.2 7.8 m2 waist slab shuttering for flights from ground to first floor
Times L (m) W (m) H (m) squaring unit FORM WORK FOR STAIR (FIRST FLOOR) 20mm thick swan zigaba form work for Slab
20.435 m2 ditto as above
20.435 m2 total form work for stair (first floor)
Times L (m) W (m) H (m) squaring unit FORM WORK FOR STAIR (SECOND FLOOR) 20mm thick swan zigaba form work for Slab
20.435 m2 ditto as above
20.435 m2 total form work for stair (second floor)
1239.86 m 2
TOTAL FORMWORK (20mm THICK SWAN ZIGBA FORMWORK)
-1.00 0.95 2.1 -1.995 m2 Right elevation Door size deduction Axis A-B
-3.00 0.65 1.8 -3.51 m2 Right elevation window size deduction Axis A-D
-1.00 1.25 1.8 -2.25 m2 Right elevation window size deduction Axis B-C
-1.00 2.5 2.1 -5.25 m2 Front elevation Door size deduction Axis 3-4
-1.00 1.15 2 -2.3 m2 Front elevation window size deduction Axis 5-6
-1.00 1.05 2.1 -2.205 m2 Left elevation Door size deduction Axis C-D
-4.00 0.65 1.8 -4.68 m2 Rear elevation window size deduction Axis 2-6
-1.00 1.25 1.8 -2.25 m2 Rear elevation window size deduction Axis 5-6
-2.00 1.8 1.8 -6.48 m2 Rear elevation window size deduction Axis 4-5
-1.00 2.5 2.5 -6.25 m2 Rear elevation window size deduction Axis 3-4
-1.00 8.5 2.1 -17.85 m2 Rear elevation Door size deduction Axis 2-3
2
-55.02 m
104.49 m2 Total 20cm*20cm*40cm HCB for External Ground Floor
TIMES L W H SQUARE UNIT 3.2 30cm*20cm*40cm HCB for External First Floor
2
1 1.4 3.3 4.62 m
4.62 m2 Total 30cm*20cm*40cm HCB for External First Floor
1 12.1 3.3 39.93 m2 ditto as above for Front elevation Axis 1-6
1 12.1 3.3 39.93 m2 ditto as above for Left elevation Axis A-D
1 9.4 3.3 31.02 m2 ditto as above for Rear elevation Axis 1-6
155.76 m2
-1.00 1.2 1.8 -2.16 m2 Right Side Window size Deduction Axis C-D, Axis 1-2
-1.00 0.75 2.1 -1.575 m2 Front Side Door size Deduction Axis D, Axis 1-2
-2.00 0.65 1.8 -2.34 m2 Front Side Window size Deduction Axis D, Axis 2-5
-1.00 0.85 2.1 -1.785 m2 Front Side Door size Deduction Axis D, Axis 5-6
-1.00 2.5 2.5 -6.25 m2 Front Side Window size Deduction Axis D, Axis 3-4
-1.00 1.2 1.8 -2.16 m2 Left Side Window size Deduction Axis C-D, Axis 5-6
-5.00 0.65 1.8 -5.85 m2 Rear Side Window size Deduction Axis A, Axis 1-3 and Axis B , Axis 4-6
-3.00 1.25 1.8 -6.75 m2 Rear Side Window size Deduction Axis B, Axis 3-4 and Axis A , Axis 1-3
-1.00 2.5 2 -5 m2 Rear Side Window size Deduction Axis B, Axis 3-4
-33.87 m2
121.89 m2 Total 20cm*20cm*40cm HCB for External First Floor
TIMES L W H SQUARE UNIT 3.3 15cm*20cm*40cm HCB for Internal Ground Floor
2
1 9.4 3 28.2 m Restaurant Axis B-D
-1.00 2.5 2.1 -5.25 m2 Restaurant Door size Deduction Axis C-D
-1.00 0.95 2.1 -1.995 m2 Restaurant Door size Deduction Axis A-B
-4.00 0.75 2.1 -6.3 m2 Restaurant Door size Deduction Axis A-B. Axis 2-3
-1.00 0.85 2.1 -1.785 m2 Restaurant Door size Deduction Axis A-B. Axis 1-2
-1.00 0.95 2.1 -1.995 m2 Mini Market Door size Deduction Axis C-D. Axis 4-5
-1.00 0.95 2.1 -1.995 m2 Guard Room Door size Deduction Axis C-D, Axis 5-6
-2.00 0.85 2.1 -3.57 m2 water Closet Door size Deduction Axis B-C, Axis 4-5
-1.00 0.95 2.1 -1.995 m2 Office Door size Deduction Axis B-C, Axis 5-6
-1.00 0.85 2.1 -1.785 m2 Store Door size Deduction Axis B-C, Axis 5-6
2
-26.67 m
265.83 m2 Total 15cm*20cm*40cm HCB for internal ground floor
-4.00 0.85 2.1 -7.14 m2 Twin Bed Room Door size Deduction
1 4.7 3 14.1 m2
87.9 m2
-1.00 0.85 2.1 -1.785 Single bed room door size deduction
2
-1.785 m
86.115 m2 Total 20cm*20cm*40cm HCB for internal second floor
-2.00 0.85 2.1 -3.57 m2 Suite Room door size deduction AXIS A-C, Axis 1-3
-1.00 0.85 2.1 -1.785 m2 Single Bed door size deduction Room Axis C-D, Axis 1-2
-1.00 0.95 2.1 -1.995 m2 Store door size deduction Axis C-D, Axis 2-3
-1.00 0.75 2.1 -1.575 m2 Single Bed Room door size deduction Axis B-C, Axis 4-5
-1.00 0.75 2.1 -1.575 m2 Single Bed Room door size deduction Axis B-C, Axis 5-6
-1.00 0.85 2.1 -1.785 m2 ditto as above
-1.00 0.85 2.1 -1.785 m2 Single Bed Room door size deduction Axis C-D, Axis 4-5
-1.00 0.65 1.8 -1.17 m2 Single Bed Room window size deduction Axis C-D, Axis 4-5
-1.00 0.85 2.1 -1.785 m2 Single Bed Room door size deduction Axis C-D, Axis 5-6
-1.00 0.65 1.8 -1.17 m2 Single Bed Room Window size deduction Axis C-D, Axis 5-6
2
-22.92 m
190.83 m2 Total 15cm*20cm*40cm HCB for internal second floor
29.7 m2 TOTAL 10cm*20cm*40cm HCB (3.4)
703.575 m2 TOTAL 15cm*20cm*40cm HCB (3.3)
654.425 m2 TOTAL 20cm*20cm*40cm HCB (3.1)
13.02 m2 TOTAL 30cm*20cm*40cm HCB (Two 15cm thick wall)(3.2)
-1.00 1.9 2.1 -3.99 m2 Right elevation Door size deduction Axis A-B
-3.00 1.3 0.65 -2.535 m2 Right elevation window size deduction Axis A-D
-1.00 2.5 1.5 -3.75 m2 Right elevation window size deduction Axis B-C
-1.00 5 2.1 -10.5 m2 Front elevation Door size deduction Axis 3-4
-1.00 2.3 1 -2.3 m2 Front elevation window size deduction Axis 5-6
-1.00 2.1 2.1 -4.41 m2 Left elevation Door size deduction Axis C-D
-4.00 1.3 0.65 -3.38 m2 Rear elevation window size deduction Axis 2-6
-1.00 2.5 1.5 -3.75 m2 Rear elevation window size deduction Axis 5-6
-2.00 3.6 0.65 -4.68 m2 Rear elevation window size deduction Axis 4-5
-1.00 5 2.5 -12.5 m2 Rear elevation window size deduction Axis 3-4
-1.00 17 2.1 -35.7 m2 Rear elevation Door size deduction Axis 2-3
2
-87.495 m
231.525 m2 Total external cement-sand plastering Ground floor
INTERNAL
TIMES L W H Square UNIT DESCRIPTION
2
1 18.8 3 56.4 m Restaurant Axis B-D
-1.00 1.9 2.1 -3.99 m2 Restaurant Door size Deduction Axis A-B
-4.00 1.5 2.1 -12.6 m2 Restaurant Door size Deduction Axis A-B. Axis 2-3
-1.00 1.7 2.1 -3.57 m2 Restaurant Door size Deduction Axis A-B. Axis 1-2
-1.00 1.9 2.1 -3.99 m2 Mini Market Door size Deduction Axis C-D. Axis 4-5
-1.00 1.9 2.1 -3.99 m2 Guard Room Door size Deduction Axis C-D, Axis 5-6
-2.00 1.7 2.1 -7.14 m2 water Closet Door size Deduction Axis B-C, Axis 4-5
-1.00 1.9 2.1 -3.99 m2 Office Door size Deduction Axis B-C, Axis 5-6
-1.00 1.7 2.1 -3.57 m2 Store Door size Deduction Axis B-C, Axis 5-6
-4.00 1.5 2.1 -12.6 m2 water Closet Door size Deduction Axis B-C, Axis 4-5
2
-65.94 m
577.86 m2 Total internal cement-sand plastering Ground floor
-1.00 2.4 1.5 -3.6 m2 Right Side Window size Deduction Axis C-D, Axis 1-2
-1.00 1.5 2.1 -3.15 m2 Front Side Door size Deduction Axis D, Axis 1-2
-2.00 1.3 0.65 -1.69 m2 Front Side Window size Deduction Axis D, Axis 2-5
-1.00 1.7 2.1 -3.57 m2 Front Side Door size Deduction Axis D, Axis 5-6
-1.00 4 2 -8 m2 Front Side Window size Deduction Axis D, Axis 3-4
-1.00 2.4 1.5 -3.6 m2 Left Side Window size Deduction Axis C-D, Axis 5-6
-5.00 1.3 0.65 -4.225 m2 Rear Side Window size Deduction Axis A, Axis 1-3 and Axis B , Axis 4-6
-3.00 2.5 1.5 -11.25 m2 Rear Side Window size Deduction Axis B, Axis 3-4 and Axis A , Axis 1-3
INTERNAL
-4.00 1.7 2.1 -14.28 m2 Twin Bed Room Door size Deduction
-4.00 1.5 2.1 -12.6 m2 Twin Bed Room Door size Deduction
INTERNAL
TIMES L W H Square UNIT DESCRIPTION
3 8.4 3 75.6 m2 Stair Case Axis B-C, Axis 3-4
1 7.8 3 23.4 m2 Waiting Area Axis C-D, Axis 3-4
1 9.4 3 28.2 m2
-1.00 1.7 2.1 -3.57 Single bed room door size deduction
-2.00 1.7 2.1 -7.14 m2 Suite Room door size deduction AXIS A-C, Axis 1-3
-1.00 1.7 2.1 -3.57 m2 Single Bed door size deduction Room Axis C-D, Axis 1-2
-1.00 1.9 2.1 -3.99 m2 Store door sixe deduction Axis C-D, Axis 2-3
-1.00 1.5 2.1 -3.15 m2 Single Bed Room door size deduction Axis B-C, Axis 4-5
-1.00 1.5 2.1 -3.15 m2 Single Bed Room door size deduction Axis B-C, Axis 5-6
-1.00 1.7 2.1 -3.57 m2 Single Bed Room door size deduction Axis C-D, Axis 4-5
-1.00 1.7 2.1 -3.57 m2 Single Bed Room door size deduction Axis C-D, Axis 5-6
-1.00 1.3 0.65 -0.845 m2 Single Bed Room Window size deduction Axis C-D, Axis 5-6
2
-46.42 m
546.98 m2 Total internal cement-sand plastering Second floor
-4.00 1.5 2.1 -12.6 m2 Restaurant Door size Deduction Axis A-B. Axis 2-3
-1.00 1.7 2.1 -3.57 m2 Restaurant Door size Deduction Axis A-B. Axis 1-2
-1.00 1.9 2.1 -3.99 m2 Mini Market Door size Deduction Axis C-D. Axis 4-5
-1.00 1.9 2.1 -3.99 m2 Guard Room Door size Deduction Axis C-D, Axis 5-6
-2.00 1.7 2.1 -7.14 m2 water Closet Door size Deduction Axis B-C, Axis 4-5
-1.00 1.9 2.1 -3.99 m2 Office Door size Deduction Axis B-C, Axis 5-6
-1.00 1.7 2.1 -3.57 m2 Store Door size Deduction Axis B-C, Axis 5-6
-4.00 1.5 2.1 -12.6 m2 water Closet Door size Deduction Axis B-C, Axis 4-5
2
-65.94 m
577.86 m2 Total internal gypsum plastering Ground floor
-4.00 1.7 2.1 -14.28 m2 Twin Bed Room Door size Deduction
-4.00 1.5 2.1 -12.6 m2 Twin Bed Room Door size Deduction
1 9.4 3 28.2 m2
-1.00 1.7 2.1 -3.57 Single bed room door size deduction
-2.00 1.7 2.1 -7.14 m2 Suite Room door size deduction AXIS A-C, Axis 1-3
-1.00 1.7 2.1 -3.57 m2 Single Bed door size deduction Room Axis C-D, Axis 1-2
-1.00 1.5 2.1 -3.15 m2 Single Bed Room door size deduction Axis B-C, Axis 4-5
-1.00 1.5 2.1 -3.15 m2 Single Bed Room door size deduction Axis B-C, Axis 5-6
-1.00 1.7 2.1 -3.57 m2 Single Bed Room door size deduction Axis C-D, Axis 4-5
-1.00 1.3 0.65 -0.845 m2 Single Bed Room window size deduction Axis C-D, Axis 4-5
-1.00 1.7 2.1 -3.57 m2 Single Bed Room door size deduction Axis C-D, Axis 5-6
-1.00 1.3 0.65 -0.845 m2 Single Bed Room Window size deduction Axis C-D, Axis 5-6
2
-46.42 m
546.98 m2 Total internal gypsum plastering Secondfloor
-1.00 1.9 2.1 -3.99 m2 Right elevation Door size deduction Axis A-B
-3.00 1.3 0.65 -2.535 m2 Right elevation window size deduction Axis A-D
-1.00 2.5 1.5 -3.75 m2 Right elevation window size deduction Axis B-C
-1.00 5 2.1 -10.5 m2 Front elevation Door size deduction Axis 3-4
-1.00 2.3 1 -2.3 m2 Front elevation window size deduction Axis 5-6
-1.00 2.1 2.1 -4.41 m2 Left elevation Door size deduction Axis C-D
-4.00 1.3 0.65 -3.38 m2 Rear elevation window size deduction Axis 2-6
-1.00 2.5 1.5 -3.75 m2 Rear elevation window size deduction Axis 5-6
-2.00 3.6 0.65 -4.68 m2 Rear elevation window size deduction Axis 4-5
-1.00 5 2.5 -12.5 m2 Rear elevation window size deduction Axis 3-4
-1.00 17 2.1 -35.7 m2 Rear elevation Door size deduction Axis 2-3
2
-87.495 m
231.525 m2 Total external Painting Ground floor
INTERNAL
TIMES L W H Square UNIT DESCRIPTION
1 18.8 3 56.4 m2 Restaurant Axis B-D
-1.00 1.9 2.1 -3.99 m2 Restaurant Door size Deduction Axis A-B
-4.00 1.5 2.1 -12.6 m2 Restaurant Door size Deduction Axis A-B. Axis 2-3
-1.00 1.7 2.1 -3.57 m2 Restaurant Door size Deduction Axis A-B. Axis 1-2
-1.00 1.9 2.1 -3.99 m2 Mini Market Door size Deduction Axis C-D. Axis 4-5
-1.00 1.9 2.1 -3.99 m2 Guard Room Door size Deduction Axis C-D, Axis 5-6
-2.00 1.7 2.1 -7.14 m2 water Closet Door size Deduction Axis B-C, Axis 4-5
-1.00 1.9 2.1 -3.99 m2 Office Door size Deduction Axis B-C, Axis 5-6
-1.00 1.7 2.1 -3.57 m2 Store Door size Deduction Axis B-C, Axis 5-6
-4.00 1.5 2.1 -12.6 m2 water Closet Door size Deduction Axis B-C, Axis 4-5
2
-65.94 m
577.86 m2 Total internal Painting Ground floor
-1.00 2.4 1.5 -3.6 m2 Right Side Window size Deduction Axis C-D, Axis 1-2
-1.00 1.5 2.1 -3.15 m2 Front Side Door size Deduction Axis D, Axis 1-2
-2.00 1.3 0.65 -1.69 m2 Front Side Window size Deduction Axis D, Axis 2-5
-1.00 1.7 2.1 -3.57 m2 Front Side Door size Deduction Axis D, Axis 5-6
-1.00 2.4 1.5 -3.6 m2 Left Side Window size Deduction Axis C-D, Axis 5-6
-5.00 1.3 0.65 -4.225 m2 Rear Side Window size Deduction Axis A, Axis 1-3 and Axis B , Axis 4-6
-3.00 2.5 1.5 -11.25 m2 Rear Side Window size Deduction Axis B, Axis 3-4 and Axis A , Axis 1-3
INTERNAL
-4.00 1.7 2.1 -14.28 m2 Twin Bed Room Door size Deduction
-4.00 1.5 2.1 -12.6 m2 Twin Bed Room Door size Deduction
-1.00 1.9 2.1 -3.99 m2 Laundry Room Door size Deduction
INTERNAL
TIMES L W H Square UNIT DESCRIPTION
3 8.4 3 75.6 m2 Stair Case Axis B-C, Axis 3-4
1 9.4 3 28.2 m2
-1.00 1.7 2.1 -3.57 Single bed room door size deduction
-2.00 1.7 2.1 -7.14 m2 Suite Room door size deduction AXIS A-C, Axis 1-3
-1.00 1.7 2.1 -3.57 m2 Single Bed door size deduction Room Axis C-D, Axis 1-2
-1.00 1.9 2.1 -3.99 m2 Store door sixe deduction Axis C-D, Axis 2-3
-1.00 1.5 2.1 -3.15 m2 Single Bed Room door size deduction Axis B-C, Axis 4-5
-1.00 1.5 2.1 -3.15 m2 Single Bed Room door size deduction Axis B-C, Axis 5-6
-1.00 1.7 2.1 -3.57 m2 Single Bed Room door size deduction Axis C-D, Axis 4-5
-1.00 1.3 0.65 -0.845 m2 Single Bed Room window size deduction Axis C-D, Axis 4-5
-1.00 1.7 2.1 -3.57 m2 Single Bed Room door size deduction Axis C-D, Axis 5-6
-1.00 1.3 0.65 -0.845 m2 Single Bed Room Window size deduction Axis C-D, Axis 5-6
2
-46.42 m
546.98 m2 Total internal Painting Second floor
ROOF PAINTING
TIMES L W H Square UNIT DESCRIPTION
2
1 29.6 1.5 44.4 m Right elevation Axis A-D
1 8 1.25 10 m2 Corridor
1 16.15 1.5 24.225 m2 ditto as above but for Toilet on Ground Floor
2 17.31 1.5 51.93 m2 ditto as above but for WC (Male and Female) on Ground Floor
106.155 m 2
Total Ceramic Wall finish on Ground Floor
-2.00 0.7 2.1 -2.94 m2 Door Size deduction at Twin Bed room WC First Floor
-2.00 0.65 1.8 -2.34 m2 Window Size deduction at Twin Bed room WC First Floor
-2.00 0.7 3 -4.2 m2 Door Size deduction at Twin Bed room WC First Floor
-2.00 0.65 1.8 -2.34 m2 Window Size deduction at Twin Bed room WC First Floor
-1.00 1.2 1.8 -2.16 m2 Window Size deduction at Laundry room First Floor
-2.00 0.65 1.8 -2.34 m2 Window Size deduction WC (Male and Female) First Floor
-2.00 0.7 3 -4.2 m2 Door Size deduction at WC (Male and Female) First Floor
2
-24.63 m
190.32 m2 Total Ceramic Wall finish on First Floor
-1.00 0.65 1.8 -1.17 Window Size deduction at Suite room WC Second Floor
-5.00 0.65 1.8 -5.85 ditto as above but for single Bedroom WC
-1.00 0.7 3 -2.1 Door Size deduction at Suite room WC Second Floor
-5.00 0.7 1.5 -5.25 Ditto as above but for single Bedroom WC
2
-14.37 m
189.93 m2 Total Ceramic Wall finish on Second Floor
1 24 24 m ditto as above
-2.00 0.7 -1.4 m Changing Room (Male and Female) Door size deduction
2 14 28 m ditto as above
-2.00 0.8 -1.6 m Suite Room (Living,Dining and Kitchen) Door size deduction
-1.00 0.8 -0.8 m Suite Room (Bed room) Door size deduction
5 Metal Work
5.1Metal work for windows made of aluminium
Times L W H Square Unit A/ 60cm*60cm aluminium frame window on ground floor
13 0.6 1.5 11.7 m²
B/ Ditto but on first floor
7 0.6 1.5 6.3 m²
C/ Ditto but on second floor
10 0.6 0.6 3.6 m²
21.6 m²
D/ 110cm*150cm aluminium frame window on GF
1 1.1 1.5 1.65 m²
E/ 115cm*150cm aluminium frame window on FF
2 1.15 1.5 3.45 m²
F/ Ditto but on second floor
2 1.15 1.5 3.45 m²
6.9 m²
G/ 150cm*150cm aluminium window on FF
1 1.5 1.5 2.25 m²
H/ Ditto but on second floor
1 1.5 1.5 2.25 m²
4.5 m²
I/ 200cm*200cm aluminium frame window on GF,FF and SF
3 2 2 12 m²
J/ 120cm*150cm aluminium frame window on GF
2 1.2 1.5 3.6 m²
K/ 120cm*150cm aluminium frame window on FF
3 1.2 1.5 5.4 m²
L/120cm*150cm aluminium frame window on SF
5 1.2 1.5 9 m²
18
66.45 m² Total metal work for windows made of aluminium
7. Glazing
7.1 2mm thick clear glass
a.same sized window found in the all building
6 10.73 17.02 1095.75 m2
b.same sized window found in the all building
7 4.73 17.02 563.532 m 2
c.
5 4.63 17.02 394.013 m 2
8.Waterproof work
8.1 Water Proof for floor area
a. Toilet at Ground Floor
1 2.15 3.58 7.697 m2
b.Wc at ground floor
1 4.85 4.3 20.855 m 2
c. Wc 1st floor
2 1.83 3 10.98 m 2
d. Wc 1st floor
1 1.86 4 7.44 m 2
teracc
1 143.55 m 2
b.laundary
1 5.13 1.5 7.695 m2
c. Wc For Ground Floor
1 16.5 1.5 24.75 m 2
81.88 m2
h.door size deduction at twin bed room Wc 1st floor
-2 0.7 2.1 -2.94 m 2
-9.48 m2 total
72.4 m2 Total Water Proof On 1St Floor
k. water Proof Wc For Second Floor
1 16.61 1.5 24.915 m2
l. ditto As Above But For Kitchen
1 8.98 1.5 13.47 m2
m. ditto As Above But For Wc as Single Room
5 9.4 1.5 70.5 m 2
108.885 m2
n. window Size Deduction at Suite room Second Floor
-1 0.65 1.8 -1.17 m2
o. ditto as above but for single bedroom wc
-5 0.65 1.8 -5.85 m 2
-14.37 m2
94.515 m2 Total water proof second floor
565.992 m2 Total area of water proof
Reinforcement Bar Schedule
SUB STRUCTURE Total Length of bar based on diameter(m)
Dia Total Length
No of Bar
No of Member
Total No o Dia Dia Dia Dia Dia Dia Dia Dia Dia Remark
Location Shape
(mm) (m) (pcs) (pcs) (m) 6 8 10 12 14 16 20 22 25
FOUNDATION
F1 Both Longtudinal and Transvers 16 2.4 8 2 38.4 38.4
F2 Both Longtudinal and Transvers 16 2.2 7 3 46.2 46.2
F3 Both Longtudinal and Transvers 16 1.9 5 2 19 19
F4 Both Longtudinal and Transvers 16 1.8 5 7 63 63
F5 Both Longtudinal and Transvers 16 1.7 4 7 47.6 47.6