No.

Description
A-SUB STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Demolish an existing barbed wire Fence and store it in an appropriate place
1.2 Clearing of the site to remove top soil & other rubbish materials to an average depth of 200mm from NG
1.3 Remove trees of 200mm to 400mm
1.4 Bulck excavation to reduce level to an average depth not exceeding 1000mm
1.4 Pit excavation in ordinary soil for footings to a depth not exceeding 1500mm from natural ground level
1.5 Trench excavation in ordinary soil to a depth not exceeding 700mm from natural ground level
1.6 Back fill with sellected material from the site, around the masonry wall
1.7 Load and cart away surplus excavated material to an average distance not exceeding 1500m
Total to summary
2. CONCRETE WORK
2.1 50mm thick lean concrete class C-5 under masonry foundation wall
2.2 Reinforced concrete, C-25, 326 kg cement/m3 of concrete filled in to form work and vibrated around rei
2.3 Provide cut and fix in position sawn zigba formwork or equivalent.
a) In footing pad & footing column
2.4 Steel reinforcement according to drawing cut, bend & placed in position, unit price shall include cutting,
c) Q 14mm
Total to
summary 3. MASONRY WORK
3.1 500mm thick hard Trychatic or equivalent stone masonry foundation wall well placed, dressed, & pointe
Total to summary
rage depth of 200mm from NGL

mm from natural ground level


natural ground level

exceeding 1500m

m work and vibrated around reinforcement measured separately

unit price shall include cutting, bending & placing in position & tying wires.

well placed, dressed, & pointed below ground level bedded in cement mortar mix (1:4)