Weekly Report H80069-PR-00
Weekly Report H80069-PR-00
ACTIVITIES
PIPING DEPARTMENT
PROGRESS
PROGRESS PIPING H80069-PR-00
FABRICATION INSTALLATION REINSTATEMENT TESTING & FINISHING
Physical Progress
Progress Realization (%) Progress Realization (%) Progress Realization (%) Progress Realization (%)
No. No. Drawing System Total Spool
45% 35% 10% FINAL INSPECTION 10% Total Project Project's
Fit Up Welding Fit Up Welding Fit Up Welding
Inspect. Inspect. Inspect. Hydrotest Finishing Project Realization Realization Last Month Progress This Week
45% 35% 10% 10%
42.91% 41.40% 1.50%
40% 50% 10% 40% 45% 15% 35% 50% 15% 80% 20%
1 P2 Tank Vent and Sounding 76 100% 100% 100% 97% 97% 97% 50% 50% 50% 97% 0% 93.8% 93.8% 0.0%
2 P3 Bilge and Ballast System 132 95% 83% 83% 83% 83% 0% 50% 50% 50% 83% 0% 85.1% 80.0% 5.1%
3 P4 Fireman And Deckwash System 29 72% 72% 72% 72% 72% 0% 50% 50% 50% 72% 0% 70.2% 70.2% 0.0%
4 P5 Fuel Oil System 196 89% 68% 68% 4% 1% 1% 0% 0% 0% 44% 0% 45.8% 43.5% 2.3%
5 P6 SW and FW Cooling System 100 93% 69% 69% 44% 44% 0% 0% 0% 0% 44% 0% 61.7% 61.7% 0.0%
6 P7 Domestic FW and SW System 40 100% 100% 100% 80% 80% 0% 50% 50% 50% 80% 0% 86.0% 86.0% 0.0%
7 P-044 External Deck Scupper Arg. 8 100% 100% 100% 0% 0% 0% 0% 0% 0% 0% 0% 45.0% 45.0% 0.0%
8 P8 Soil and Drain System 75 81% 3% 3% 3% 3% 0% 0% 0% 0% 0% 0% 37.5% 37.5% 0.0%
9 P9 Oily Bilge and Dirty Oil System 64 59% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 26.7% 11.6% 15.1%
10 P10 Engines Exhaust System 13 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0.0% 0.0% 0.0%
11 P12 Quick Closing Valve System 35 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0.0% 0.0% 0.0%
12 P0 Hydraulic System 25 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0.0% 0.0% 0.0%
13 P0 CO2 System 20 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0.0% 0.0% 0.0%
14 VSE/Q858-043 Compressed Air System 65 100% 100% 100% 91% 91% 0% 50% 50% 50% 100% 0% 91.8% 91.8% 0.0%
15 VSE/Q858-030 Lubricating Oil System 20 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0.0% 0.0% 0.0%
898 59% 46% 46% 32% 31% 7% 17% 17% 17% 35% 0%
Resume
Physical Progress :
Progress Present Month = 42,91 %
Progress Previous Month = 41,40 %
Progress This Month = 1,50 % (1st Week on July)
Total accumulation Manpower on this week (02nd July to 08th July 2023) is 208 and total accumulation Man Hours on 02nd July to 08th
July 2023 is 2118 hours.
Day/Date 19 20 21 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
A Fabrication
C Fit up 12 13 10 9 2 8 76
Welding 12 16 4 8 10 4 76
T S Inspection (Fit up) 12 13 10 9 8 76
U P
Inspection (Visual/Welding) 20 14 11 76
O
A O Installation and Testing
L L Fit up 14 5 5 2 6 12 8 2 74
Welding 2 1 2 2 3 1 2 1 2 2 1 74
Inspection (Fit up) 16 3 7 6 74
Inspection (Welding) 19 74
T S Welding 3 2 2 1 110
Inspection (Fit up) 3 2 7 2 126
U P
Inspection (Visual/Welding) 5 2 1 110
O
A O
Installation and Testing
Fit up 105
L L
Welding 105
Inspection (Fit up) 23
Testing (Line Check) 0
Total Spool Bilge and Ballast System is 132 Spool (By Spool Drawing)
3.Firemain and Deckwash System
DAILY WORKING SPOOL ACTUAL (H80069-PR-00)
Month MARCH (2023) APRIL (2023) JUNE (2023)
Week Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 22 Week 23 Week 24 Week 25 Week 26 Total Spool
Day/Date 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
A Fabrication
C Fit up 6 6 4 4 1 21
Welding
T S
Inspection (Fit up) 16 5
4 4 5 4 4 21
21
P
U Inspection (Visual/Welding) 16 5 21
O
A O
Installation and Testing
Fit up 6 4 4 4 1 2 21
L L
Welding 16 3 2 21
Inspection (Fit up) 19 2 21
Testing (Line Check) 0
Calculated Working Firemain and Deckwash System :
Fabrication
• Fit up : 21 Spool
• Welding : 21 Spool
• Inspection (Fit up) : 21 Spool
• Inspection (Visual/Welding) : 21 Spool
Installation
• Fit up : 21 Spool
• Welding : 21 Spool
• Inspection (Fit up) : 21 Spool
• Testing (Line Check) : 00 Spool
Total Spool Firemain and Deckwash System is 29 Spool (By Spool Drawing)
T S
Welding 7 6 6 6 4 6 6 3 6 4 6 2 1 69
Inspection (Fit up) 29 28 18 93
U P
Inspection (Visual/Welding) 14 31 5 10 9 69
O
A O
Installation and Testing
Fit up 7 2 6 7 6 8 8 44
L L
Welding 7 2 6 7 6 8 8 44
Inspection (Fit up) 3 6 4 6 6 8 4 2 2 3 44
Testing (Line Check) 0
T S
Welding 8 12 16 4 40
Inspection (Fit up) 40 40
U P
Inspection (Visual/Welding) 40 40
O
A O
Installation and Testing
Fit up 12 20 8 40
L L
Welding 0
Inspection (Fit up) 0
Inspection (Welding) 0
Total Spool Fresh Water and Sea Water System is 40 Spool (Routing Spool Line on Board Vessel)
Total Spool External Deck Scupper System is 08 Spool (By Spool Drawing)
T S
Welding 6 8 8 8 5 5 7 8 6 6 8 6 4 6 4 3 4 6 6 6 7 1 2 2 2 134
Inspection (Fit up) 30 32 29 20 35 27 2 175
U P
Inspection (Visual/Welding) 24 26 18 22 32 6 134
O
A O
Installation and Testing
Fit up 0
L L
Welding 0
Inspection (Fit up) 0
Inspection (Welding) 0
Total Spool Fuel Oil System is 196 Spool (By Spool Drawing)
Total Spool Soil and Drain System is 75 Spool (By Spool Drawing)
Total Spool Compressed Air Piping System is 65 Spool (Routing Spool Line on Board Vessel)
Day/Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
A Fabrication
Fit up
C 6 6 6 2 6 6 6 38
Welding 0
T S Inspection (Fit up) 18 20 38
U P
Inspection (Visual/Welding) 0
O
A O Installation and Testing
L L Fit up 0
Welding 0
Risk/Delay