SAP ERP (Enterprise Resource Planning) is commercial software that will integrate
all information altogether in a single software considering various factors like time
and cost. Organizations can easily meet their business demands with the help of
SAP.
It is the backbone of the Logistics area which incorporates modules like Sales and Distribution,
Production Planning, Plant Maintenance, Project Systems, Warehouse Management which are extremely
obsessed on Materials Management module.
Features of SAP MM
The features of SAP MM system are as follows:
SAP MM is one of the modules of SAP that deals with material management and inventory
management.
Material Management process ensures that there is never a shortage of materials or any gaps in the
supply chain process of the organization. SAP MM speeds up the procurement and material management
activities making the business run smoother with complete time and cost efficiency.
It deals with managing the materials (products and or services) resources of an organization with the
aim of accelerating productivity, reducing costs and increase improvement and at a similar time be
versatile to accommodate changes in day to day life.
It deals with the Procurement Process, Determination & Valuation of Material, Requirement Planning
etc.
Master Data (Material & Vendor Master), Account
This process describes the procurement process of raw materials from indigenous source of supply with
Country Version India (CIN) relevant process like processing of Excise Duty (ED) and Sales Tax (ST)
process.
1.1.2 Prerequisites
The following scenario specific master data must be created for operation of this building block.
Select the required views and press Enter to input the organizational levels.
Press Enter to input the details of the Material.
Basic Data Views
Enter the Material
Enter the Unit of Measure and material Group
Enter the division if Stock Transfer will happen for this
Blocking for Procurement or BOM enter here
Enter the Gross and Net Weight for the Finished Goods
Enter here if the material is returnable packing as VERP and non returnable packing as LEIH Press
Additional Data to maintain Alternate Unit of
Press Additional Data to maintain the Alternate Unit of Measures (for e.g. 1000G= 20Nos for the Semi
finished goods)
Press Main data to go to the next view
Purchasing Views
If the Ordering Unit is other than the Base UoM, enter the Unit and make VAR. OUn as 1
Enter the Purchasing Value Key as G1 (5% Delivery Tolerance) or G2 (10%
Select if QM is not active and want to post to Inspection Stock (Mainly used for
Enter the appropriate Valuation Class (Various Valuation Classes given below)
If Price Control is V enter the Moving Average price, S enter the Standard Price
Costing Views
Click on the CIN Details to enter the Vendor Excise and Sales Tax details
Excise Indicator for Vendor as 1
– 100% Taxable
Reconciliation Accounts:
Enter the appropriate Payment Terms and Select the Chk double inv
Enter the appropriate Payment Methods C – Cheque, E– Cash Payment, T– Bank Transfer
Press
to save the Vendor master and the no is generated automatically.
You use this component if you wish to store information on a vendor and a material as master data at
purchasing organization or plant level. You can create purchasing info records for different procurement
types (standard, subcontracting, pipeline, consignment).
Enter the Info Category as
Standard – For normal Procurement (Domestic, Import, etc)
Sub-Contracting– For Sub-Contracting
It is defaulted from the Material Master but change for this VendorMaterial combination if different.
It is defaulted from the Material Master but change for this VendorMaterial combination if different.
Result
Purchasing Info Record is created
Example
Purchasing Info Record 5300000384 is created.
1.1.6 Source List
ME01 – Maintain
T Code ME03 – Display
ME04 - Changes
Materials Management Purchasing Master
Menu Path J1ILN SAP Menu Indirect Taxes Master Data Excise Rate Maintenance
T Code J1ID
Chapter IDs
Press
to save the data.
Use
When you enter a purchasing document, for example, a purchase order, the R/3 System automatically
calculates the applicable excise duties using the condition technique.
Procedure
Access the transaction choosing one of the following navigation options: SAP R/3 menu No Menu path
available for this transaction
Transaction code FV11
Enter the appropriate Condition type (various condition types given in next page) and maintain the
respective values.
For Raw Material / Packing Material maintain the Plant/Vendor/Material Combination. For Service
Tax /Assets maintain the Plant/Material Group Combination.
.
Enter the Plant and Vendor
Enter the Material No. Enter the Value / amount
3. Press Ctrl+S or
4.
Result Condition records saved.
Request for Quotation is used to float enquiries in market to obtain quotations from prospective vendors.
This transaction is optional for the process.
1.2.2 Procedure
1. Access the transaction choosing one of the following navigation options: SAP R/3 menu
LogisticsMaterial Management Purchasing RFQ/quotation Request for QuotationCreate Transaction
code ME41
2. RFQ can be created with reference to Purchase Requisition, Outline Agreement (Contract) and
another RFQ.
3. On the Create RFQ: Initial Screen, make the following entries:
Enter the appropriate Item category for SubContracting & Service 1. Enter the Material No
2. Enter the RFQ Quantity
3. Enter the Deliv. Date
4. Enter the Plant if it is Plant specific Enter the Submission date
Choose
(header details icon) on the toolbar, then on screen Create RFQ: Header Data, enter information in
the fields as specified in the table below:
Press this button to enter the vendor
code for which it has to be sent?
Enter the Collective No to have a track of all RFQs related to particular instance
Enter the Your Reference if any
reference given by the vendor
Choose
(vendor address button) on the toolbar, then on screen Create RFQ: Vendor Address, enter
information in the fields as specified below:
After entering the vendor code and pressing enter the details of vendor will be displayed automatically.
Press
to Save the RFQ. This will refresh the Create RFQ: Vendor Address screen to allow creation of the
same RFQ data to a new vendor by following the steps outlined above.
1.2.3 Result
RFQ created
Similarly create for other vendor in the same screen and various RFQ Nos will be generated
1.2.4 Example
A RFQ needs to be printed for transmitting to vendor. This transaction is optional for the process.
1.3.2 Procedure
2. On the Message Output screen, make the following entries: Enter the RFQ Nos to be printed and
Execute (F8)
Press this button to Execute
Select the check box For Printout click this button which will create Spool Request. For Print Preview
click this button For Direct Printout click this button
You will see out put as
Maintaining Quotation
Use
This transaction is used to maintain the quotation, which is submitted by vendors. Vendor communicates
price for material and as a result the RFQ (Request for Quotation) needs to be updated. This transaction
is optional for the process.
1.4.2 Procedure
Access the transaction choosing one of the following navigation options: SAP R/3 menu
LogisticsMaterials ManagementPurchasing RFQ/quotationQuotationMaintain Transaction code ME47
2. On the Maintain Quotation: Initial Screen, make the following entries:
Enter information in the fields as specified in the table below. Some fields will not be available for input,
as they are reference fields only.
2. Press to enter the conditions
1. Press to select the line
Once all necessary header data has been maintained, the user can then enter the price information in one
of two fashions:
Enter the price in the Net Price field on the Maintain Quotation: Item Overview screen by Choosing
overview icon on toolbar.
To enter more detailed information in addition to the net price, select the line item and choose the Item
Details icon. Choose the green Back arrow to return to the„Overview‟ screen once data has been
maintained.
After entering tax code, after choosing this system may give an information message showing the
effective price, Choose Enter to continue.
Once all quotation information has been successfully entered, save the data by Choosing on the Save
button, or Choose the <Ctrl + S> keys. A message will be displayed that the data has been saved.
1.4.3 Result
Quotation is maintained.
Maintain the same for other RFQs.
1.4.4 Example
Price Comparison
1.5.1 Use
Required to compare prices from all quotations received as a result of a competitive bidding process.
This transaction is optional for the process.
1.5.2 Procedure
1. Access the transaction choosing one of the following navigation options: SAP R/3 menu
LogisticsMaterials ManagementPurchasing RFQ/QuotationQuotationPrice Comparison Transaction
code ME49
2. On the Price Comparison List screen, make the following entries:
Enter the Purchasing Organisation
Enter the Quotations to be compared or the Collective RFQ
Parameters included for Comparison
Choose the comparison values to be used:
Reference quotation: You can compare the quotations within the list with a sample quotation. The
system displays the percentage deviation between each quotation in the list and the sample quotation.
Mean/minimum value quotation: The price comparison list can also display a "fictitious" quotation
reflecting the average or minimum value of all quotations. Select either the "Mean value" or "Minimum
value" quotation field to choose the type of fictitious quotation. Percentage basis: The price comparison
list displays the percentage of each item in relation to the maximum, minimum, or average price. To
determine the display type, enter one of the following:
1.5.3 Result
A Purchase Requisition is created to indicate purchase department to procure materials or services with
details like how much quantity is required, when required. Generally it is created automatically for Raw
materials and Packing Materials through MRP Run and Spares and Service related to Plant Maintenance
Purchase Requisition is generated automatically from Plant maintenance Order.
This transaction is optional for the process.
Procedure
Result
Example
This section explains the functions provided by the SAP System for converting requisitions into external
purchasing documents (purchase orders, contract release orders, scheduling agreement delivery
schedules, RFQs), and the processing options thereby available to you:
Assigning means defining the desired source for each purchase requisition item Further processing
involves generating lists of requisitions that have been assigned or flagged as outlined above, and the
subsequent creation of RFQs, purchase orders, or lines of delivery schedules under scheduling
agreements.
Procedure
5. Press
or F8 to enter into the next screen.
1. If Source List is
1. Select the check boxes required PR which are to be converted in to Pos. 1. Since only one source is
assigned in Source list system assigns the source automatically or else if more than one source available
a Popup window will be coming where one vendor has to be selected.
A purchase order is a legal document used to record an individual purchase with the vendor. It also
provides the vendor with a reference document to link to shipping (goods receipt) and invoicing (invoice
verification) processes. The purchase order is a commitment to a vendor for a given material, in a
specified quantity at a predetermined price and delivery date.
Please ensure that Purchase Order Value does not exceed specified value and if the purchase order value
crosses this limit a release procedure is applied on this purchase order. To release the Purchase Order go
to ME28 for collective release and ME29N for individual release.
1.9.2 Procedure
Access the transaction choosing one of the following navigation options: SAP R/3 menu
LogisticsMaterials ManagementPurchasingPurchase OrderCreate Vendor/Supplying Plant Known
Transaction code ME21N
If you want create purchase order with reference to the purchase requisition, on item details screen enter
the purchase requisition number and item number at Purch. Req. field. System will automatically adopt
all the data from requisition.
Click the
Purchasing
Requisitions
and Press
Adopt
Press this button to view
the Tax Calculation
1.9.4 Example
Procedure
2. Access the transaction choosing one of the following navigation options: SAP R/3 menu
LogisticsMaterials ManagementPurchasingPurchase OrderMessagesPrint/Transmit
Transaction code ME9F
3. On the Message Output screen, make the following entries
4. Choose
to Execute.
5. On screen Message Output select the appropriate Document number and perform the following:
Goods are received from the Vendor as a result of a Purchase Order at the receiving plant. A goods
movement is entered into the system referencing this PO and a goods receipt material document is
posted. Appropriate general ledger accounts are also posted and stocks are updated.
1.12.2 Prerequisites
Purchase Order
1.12.3 Procedure
On the Goods Receipt Purchase Order screen, make the following entries:
Check for correct
101
Comment
Document
Date
Delivery Note Document Date
Enter
R Enter document date
in Header
Vendor Vendor
Posting Date Bill of lading Header text Posting date Bill of lading Header text
O Delivery Number from Vendor
R Defaulted from purchase order
Close Header Detail data to enlarge the Detail data. Select Material tab at Detailed Data.
Material Material tab R Defaulted from Purchase Order
Grayed out
Grayed out
Select Quantity tab in Detail data. Qty in unit of Quantity in unit ofR entry entry
Qty in Quantity in delivery O delivery note note
Goods Recipient O Enter the quantity you have received from vendor. As a default system will give
purchase order quantity Enter the quantity as per vendor delivery challan Quantity
defaulted from Purchase Order
Defaulted from material master or purchase order Defaulted from purchase order
1000
Defaulted from purchase order if entered
1010
Enter the name of person who received goods
Unloading Unloading point O
point
Purchase Purchase Order RDefaulted from header data Grayed out Order
Qty = GR Qty
Del. Delivery completion O Defaulted by system if PO completed indicator
ind.
Select Partner tab in Detail data.
Vendor Vendor name OGrayed out
For this material batch management is not active. Just for reference purpose the
following data is given.
Select Batch tab in Detail data.
This tab will come only if material is managed in batches.
Proceed with the following steps if material is batch managed only. Batch Batch
number
Vendor batch Vendor batch R
O
Enter vendor batch number for reference
Select the Check box Item OK, after entering all the data.
You will get Excise Invoice tab at Header Data for capturing vendor excise invoice details and
for posting Part I and Part II.
6. On the Excise Invoice tab at Header Data make the following entries. Select Appropriate Excise
settings While posting in Case of dealer only
System defaults the Excise Duty (BED & ECS)
Field name
Capture &
Post Excise invoice
Close Header Detail data to enlarge the Detail data. Select Excise Item tab at Detailed
Data (at the last). Chapter ID Chapter ID of material
EI Quantity Excise Invoice Quantity
R Defaulted by the system R Defaulted by the system O Defaulted by the system O Defaulted by the
system O Defaulted by the system O Defaulted by the system
Please cross check the BED, AED, SED, NCCD and ECS amount of item as per the Vendor Excise
Invoice, legally you cannot avail more than what mentioned in Vendor Excise Invoice. All other
information is defaulted by the system. Hence, no action required by the user.
Choose Check at the top of screen.
In this process of Logistics Invoice Verification all the Incoming Invoices are verified in terms of their
content, prices and arithmetic. When the invoice is posted, the invoice data is saved in the system. The
system updates the data saved in the invoice documents in Materials Management and Financial
Accounting.
1.13.2 Procedure
Access the transaction choosing one of the following navigation options: SAP R/3 menu
LogisticsMaterials ManagementLogistics invoice VerificationDocument EntryEnter Invoice Transaction
code MIRO
If you are opening for the first time this transaction, system will ask for Company Code, please give
1000 to go in side the transaction.
On the Enter Incoming Invoice: Company Code 1000 screen, make the following entries:
Enter Invoice Date
If Part II entry is not done then system will not allow you to POST Invoice
Unless and until you post part2 system will not allow invoice verification
Enter the amount
Bus.place/se ctn
Business place or R section code
Text Text O
Enter the currency in which the bill is presented by vendor, if not entered by user system will default the
document currency from purchase order
INR
Check this tick box, system will calculate tax amount Select the tax code from drop down list
V1
Enter section code if Tax deduction for source is active for this vendor
Payment terms of
document, if entered will be defaulted from purchase order
Will be calculated by
system
System will give current date as default
Amount
mentioned is
only an example
Grayed out Discount Cash discount O Enter if cash discount is offered by vendor
Hide Header data for getting full screen of items if required. Purchase order /
Schedule Agreement
Purchase order number
Goods / service items
Layout Layout of invoice verification
R Select Purchase order / Schedule Agreement in the reference document category from drop down list
Choose Enter to complete the document feeding part. Defaulted for user
To check the document credit and debit is balanced on the top right corner of your screen a traffic light
is displayed. Beside that Balance of the document is displayed.
Ensure that the Balance is ZERO before posting the document and the traffic light is green or
yellow color.
If you want to see the accounting postings in simulation mode, Choose Simulation on middle of fourth
row of your screen.
Check Simulate Tab
7. Choose Save / Post, for posting the document.
1.13.3 Result
1.13.4 Example
A material has been received and it needs to be returned for various reasons (i.e. poor quality,
incomplete, damaged). The user can use this transaction to return the material to the vendor via the
original GR document.
This transaction itself is an independent transaction and it is not mandatory in J81 process. This Return
Delivery transaction is used only when material is rejected and needs to be returned to vendor.
If material is rejected by using QM process there is no need to this transaction. This transaction
can be used only without QM process materials.
This transaction is used basically when purchased material is needs to be sent back to vendor
because of various reasons like poor quality, incomplete items, damaged etc.
b)
Bore proceeding with return delivery to vendor please ensure that sufficient stock is available in
storage location and if batch managed in particular batch stocks also. Other wise system will give error
message.
Before doing Return Delivery to vendor, check if you have already done Invoice Verification to that
Goods Receipt. If you have already done invoice verification please raise Credit Memo to the extent of
Returns quantity and then proceed with this process. Other wise system will give an error message. How
to create Credit Memo transaction is explained in the chapter mentioned 1.17 below.
1.14.2 Procedure
Enter
R Enter document date
in Header
Posting Date Posting date
O Delivery Number. Will be defaulted if you have already entered in original document
O Enter bill of lading. O Enter header text R Tick the check box
Close Header Detail data to enlarge the Detail data. Select Material tab at Detailed Data.
Material Material tab R Defaulted from Purchase Order
Grayed out
Select Quantity tab in Detail data.
Qty in
delivery note
Movement type
Movement type R
Stock type R
Plant Plant R
Storage location Storage location R
Goods
Recipient Unloading point
Reason for Movement
Unloading point O
Reason for Movement R
Text Text O
Select from the drop down list the reason for this movement of material 0001
Enter the text if required
Select Purchase Order tab in Detail data. Purchase Purchase Order R Order
Defaulted from header data Grayed out
Grayed out
Proceed with the following steps if material is batch managed only. Batch Batch
number
Vendor batch Vendor batch R
Enter batch number if externally maintained by you or system will allocate batch number
O
Enter vendor batch number for reference
Field name
BED
Description R/O /C Select Create Excise R Invoice
User action and values Choose Create Excise Invoice from drop down list
Comment
Select from drop down list
Close Header Detail data to enlarge the Detail data. Select Excise Item tab at Detailed Data (at
the last). Chapter ID Chapter ID of material R Defaulted by the system No action required
Grayed out
Grayed out
Grayed out EI Quantity Excise Invoice R Quantity
Defaulted by the system Defaulted by the system Select from drop down list IPD for this process
Please cross check the BED, AED, SED, NCCD and ECS amount of item as per the Vendor Excise
Invoice, legally you cannot avail more than what mentioned in Vendor Excise Invoice. All other
information is defaulted by the system. Hence, no action required by the user.
Choose Check at the top of screen. Choose Post to post the document.
2. On the Excise Invoice Other Movements– Main Menu screen, make the following entries:
R Enter the return delivery document number which you have created in above step
0000000126
1.15.2 Result
1.15.3 Example
Excise Invoice has to be printed and sent along with the material. This is legal requirement in India.
1.16.2 Prerequisites
1.16.3 Procedure
Excise
internal
reference
Select internal excise invoice number from drop down list, you can find it with reference to the Excise
Invoice number generated in above step 1100400070 for example with the combination of Excise Group
10 and vendor code 10006.
To take printout, select Goto from the top main menu and select Print Document from the list. Or
Choose Control + P to get the access of Excise Invoice Printing screen.
6. Choose Execute icon to get list of excise invoice ready to be printed.
From the list select the excise invoice number by choosing the check box left side of number.
To take printout on printer Choose the Printer icon or Choose F8.
To display excise invoice on screen Choose Display icon or Choose F9.
System will give popup asking for pre-printed invoice serial number, Enter pre-printed excise invoice
number. In this process Choose 99 for testing purpose (since it is not expected to have pre-printed
invoice for testing purpose).
Select printer from the drop down list. Check box for Print Immediately and New spool request.
Choose Print Preview or Print icons to display on screen or to print on printer mentioned above. If
printer is connected system will print the document on printer.
1.16.4 Result
In this process of Logistics Invoice Verification a credit memo is generated on vendor . Please be
careful that during the total process after making logistics invoice verification you have made
return delivery to vendor. To recover that money you need to do this credit memo transaction.
1.17.2 Prerequisites
1.17.3 Procedure
Access the transaction choosing one of the following navigation options: SAP R/3 menu
LogisticsMaterials ManagementLogistics invoice VerificationDocument EntryEnter Invoice Transaction
code MIRO
If you are opening for the first time this transaction, system will ask for Company Code, please give
1000 to go in side the transaction.
3. On the Enter Incoming Invoice: Company Code 1000 screen, make the following entries:
Select Credit Memo in this tab
Put the Qty and Price
to be returned
Field name Description R/O /C User action and values Comment
Transaction Credit memo R
Header Data Basic tab
Header data of Invoice R Basic information tab R
Bus.place/se ctn
Business place or R section code
Text Text O
Enter the currency in which the bill is presented by vendor, if not entered by user system will default the
document currency from purchase order
Check this tick box, system will calculate tax amount Select the tax code from drop down list
Enter section code if Tax deduction for source is active for this vendor
Will be calculated by
system
Enter if cash discount is offered by vendor
Hide Header data for getting full screen of items if required. Purchase order / R Select Purchase
order / Grayed out
Defaulted for Schedule Agreement
Purchase order
number
Goods / service items
Layout Layout of invoice verification Schedule Agreement in the user reference document
category from drop down
list
Ensure that the Balance is ZERO before posting the document and the traffic light is green or
yellow color.
If you want to see the accounting postings in simulation mode, Choose Simulation on middle of fourth
row of your screen.
7. Choose Save posting the document.
1.17.4 Result
1.17.5 Example
Invoice documents in Invoice Verification are either invoices or credit memos. These documents can be
cancelled. There are two different cases:
If an invoice is cancelled, the system automatically creates a credit memo. If a credit memo is
cancelled, the system automatically creates an invoice.
The system takes the amount and quantity for the credit memo or invoice from the invoice or credit
memo to be cancelled, thus avoiding any differences between the invoice and the credit memo or the
credit memo and the invoice.
1.18.2 Prerequisites
When you cancel documents in Logistics Invoice Verification, the document line items are not
automatically cleared in Financial Accounting. We recommend that you periodically clear such items
(using daily background jobs, for example).
1.18.3 Procedure
In the fields Invoice doc. number and Fiscal year, enter the data for the invoice document you want to
cancel.
In the Reversal reason field, select the reason for cancelling the invoice. This allows you to differentiate
between different types of cancellations.
Enter the
reversal reason
You can display the document to check. Choose Display document to do this. You can look at the items
of the document to be cancelled. Return to the initial screen by choosing Back.
6. Choose Invoice document and reverse or Press Ctrl+S or
.
1.18.4 Result
1.18.5 Example
When any data entered incorrect during GR posting it has to be reversed. To do the cancellation of GR,
all the follow on documents should be reversed.
1.19.2 Prerequisites
Procedure
Press enter so that all the data will be captured automatically by the system. If any comment is there to
mention it can be mentioned in the Head Text and Text which is available at the Item level.
4. Press Enter to continue and check all the details
5. Select the Check box Item OK, after entering all the data.
You will get Excise Invoice tab at Header Data and Item Details.
6. Choose Check at the top of screen.
7. Press Ctrl+S or
to post the document
1.19.4 Result
1.19.5 Example
When the Material Document is cancelled the CENVAT Posting should also be reversed or cancelled.
1.20.2 Prerequisites
Procedure
1.20.4 Result
1.20.5 Example
When the Material Document is cancelled the CENVAT Posting should also be reversed or cancelled.
Prerequisites
Material Document (GR) should be reversed.
1.21.5 Example
This process Procurement of Imported Materials shows you how to handle the Countervailing duty
(CVD) on imports, which is levied in place of excise duty. Unlike other forms of customs duties, such as
basic customs duty or special customs duty, you can credit CVD paid on imports to your CENVAT
account.
Prerequisites
The following scenario specific master data must be created for operation of this building block and
subsequent dependent building blocks.
Material Master record
Vendor Master record
Ensure that GR based IV is not selected in Purchasing Data. (Refer User Manual– Procurement of
Stock Materials (Domestic)
CIN Master Data
(Refer User Manual– Procurement of Stock Materials (Domestic)
A purchase order is a legal document used to record an individual purchase with the vendor. It also
provides the vendor with a reference document to link to goods receipt and invoice verification
processes. The purchase order is a commitment to a vendor for a given material, in a specified quantity
at a predetermined price and delivery date.
2.2.2 Prerequisites
In master record of main imported vendor GR-based invoice verification tick should not be there on
Purchasing Data screen of vendor master. And Schema group, Vendor is filled with schema group ZI.
For example vendor code 200000 in this process.
These are basic master data changes with respect to this process only.
Procedure
Access the transaction choosing one of the following navigation options: SAP R/3 menu
LogisticsMaterials ManagementPurchasingPurchase OrderCreate Vendor/Supplying Plant Known
Transaction code ME21N
6. On the Create Purchase Order screen, make the following entries: Put Doc Type as Import
Don‟t Put Tick in GR BasedMention Tax code as V0
For Basic Customs Duty(JCDB),CVD(JCV1),Addition Customs Duty(JADC),E-cess on CVD(JECV) E-
Cess (JEDB)
System will take to new Item – Conditions– Detail: screen. In this screen at right bottom of screen you
can find the vendor code 60000 the main imported vendor is defaulted here. You have to replace this
vendor code with respective vendors and Choose enter and green arrow to come back (F3) to condition
tab of purchase order.
Change DS200 to DS250(appropriate
vendor) for each condition types
10. Repeat the same for other condition types such as JCV1, JECV, JADC, and JEDB etc.
11. Purchase Order may be posted by Choosing on the Save icon.
Result
A message will be displayed stating that the purchase order was saved, with the purchase order number,
please note the purchase order number.
Example
2.4.2Procedure
Access the transaction choosing one of the following navigation options: SAP R/3 menu
LogisticsMaterials ManagementPurchasingPurchase OrderMessagesPrint/Transmit
Transaction code ME9F
9. On the Message Output screen, make the following entries
10. Choose
to Execute.
11. On screen Message Output select the appropriate Document number and perform the following:
In this process of Logistics Invoice Verification all the Incoming Invoices are verified in terms of their
content, prices and arithmetic. When the invoice is posted, the invoice data is saved in the system. The
system updates the data saved in the invoice documents in Materials Management and Financial
Accounting.
2.5.2Procedure
Access the transaction choosing one of the following navigation options: SAP R/3 menu
LogisticsMaterials ManagementLogistics invoice VerificationDocument EntryEnter Invoice Transaction
code MIRO
If you are opening for the first time this transaction, system will ask for Company Code, please give
1000 to go in side the transaction.
On the Enter Incoming Invoice: Company Code 1000 screen, make the following entries:
Choose Planned Delivery Costs
Enter the Amounts of the Customs Duties Manually in the Amount Column with referring to PO.
Field name Description R/O /C User action and values Comment
Transaction Invoice R
Bus.place/se ctn
Business place or R section code
Text Text O
Payment tab BaselineDt Payment tab R
Enter the currency in which the bill is presented by vendor, if not entered by user system will default the
document currency from purchase order
USD
Check this tick box, system will calculate tax amount Select the tax code from drop down list
V0
Enter section code if Tax deduction for source is active for this vendor
Payment terms of
document, if entered will be defaulted from purchase order
Will be calculated by
system
System will give current date as default
Amount
mentioned is
only an example
R Select Purchase order / Defaulted for Schedule Agreement in the user reference document
category from drop down
list
R Enter the first purchase
order number generated
above
Ensure that the Balance is ZERO before posting the document and the traffic light is green or
yellow color.
If you want to see the accounting postings in simulation mode, Choose Simulation on middle of fourth
row of your screen.
Choose Display Currency which will lead to small pop-up window having the company code currency
and Document Currency, position the cursor on the INR to convert to Document Currency and press the
details button.
8. Choose Save / Post, for posting the document.
Result
Example
Goods are received from the Vendor as a result of a Purchase Order at the receiving plant. A goods
movement is entered into the system referencing this PO and a goods receipt material document is
posted. Appropriate general ledger accounts are also posted and stocks are updated.
2.6.2Procedure
Since this is imported purchase order and you have already done invoice verification for planned
delivery cost. System will give a new popup Excise Invoice item number screen (which is not there in
normal other process) asking for Commercial invoice number and year.
Please enter the invoice verification document number which you have done in above 5105600792 and
year 2006.
Choose Enter where a small pop-up window will prompt to enter the Commercial Invoice No. and Year
(i.e., the Invoice Verification posted for Bill of Entry)
Enter the No generated for the posting of Bill of Entry
4. After pressing Enter system will fetch all the data from the Purchase Order as shown below:
Whichever material is in Blue those detail will be seen in the Item detail
5. System defaults the balance quantity in Purchase Order.
Enter the
storage location
Select Item Ok and Press Enter and the Excise tab will appear both in Header and Item Level
101
Document
Date
Delivery Note Document Date
Enter
R Enter document date
in Header
Vendor Vendor
Select Quantity tab in Detail data. Qty in unit of Quantity in unit ofR entry entry
Qty in Quantity in deliveryO delivery note note
Enter the quantity you have received from vendor. As a default system will give purchase order quantity
Enter the quantity as per vendor delivery challan Quantity
defaulted from Purchase Order
Defaulted from material master or purchase order Defaulted from purchase order
1000
Defaulted from Inbound delivery if entered
1010
Enter the name of person who received goods
Unloading point O
Text O Enter the text if required
Select Purchase Order tab in Detail data. Purchase Purchase Order R Order
Del. Delivery completion O completed indicator
ind.
Select Partner tab in Detail data. Vendor Vendor name O Defaulted from header data Grayed
out
Defaulted by system if PO Qty = GR Qty
Grayed out
For this material batch management is not active. Just for reference purpose the
following data is given.
Select Batch tab in Detail data.
This tab will come only if material is managed in batches.
Proceed with the following steps if material is batch managed only.
Vendor batch
Vendor batch
O
Enter vendor batch number for reference
7. Select the Check box Item OK, after entering all the data.
You will get Excise Invoice tab at Header Data for capturing vendor excise invoice details and
for posting Part I and Part II.
8. On the Excise Invoice tab at Header Data make the following entries.
Field name
Capture &
Post Excise invoice
Choose Capture & Post Excise Invoice from drop down list
Close Header Detail data to enlarge the Detail data. Select Excise Item tab at Detailed Data (at the last).
Base value of material Basic Excise Duty Additional Excise Duty NCCD
Special Excise Duty Education Cess
R Defaulted by the system R Defaulted by the system O Defaulted by the system O Defaulted by the
system O Defaulted by the system O Defaulted by the system
Comment Defaulted
Grayed out
Grayed out
Grayed out
Grayed out
Grayed out
Please cross check the BED, ECS (CVD in this case) amount of item as per the bill of
lading, legally you can not avail more than what mentioned in Vendor Excise Invoice.
In case of imported purchase order in normal case system will default CVD and ECess
(invoice verification made on commissioner of customs) amount as BED and ECS i.e. CENVAT
amount. Choose Check at the top of screen. Choose Post to post the document.
Result
Example
In this process of Logistics Invoice Verification all the Incoming Invoices are verified in terms of their
content, prices and arithmetic. When the invoice is posted, the invoice data is saved in the system. The
system updates the data saved in the invoice documents in Materials Management and Financial
Accounting.
2.7.2Procedure
Access the transaction choosing one of the following navigation options: SAP R/3 menu
LogisticsMaterials ManagementLogistics invoice VerificationDocument EntryEnter Invoice Transaction
code MIRO
If you are opening for the first time this transaction, system will ask for Company Code, please give
1000 to go in side the transaction.
On the Enter Incoming Invoice: Company Code 1000 screen, make the following entries:
Select Goods /Service Items
Field name Transaction
Description R/O /C Invoice R
Amount
Currency R
Calculate tax Check box calculate O tax
Tax code R
Bus.place/se ctn
Business place or R section code
Text Text O
Enter the currency in which the bill is presented by vendor, if not entered by user system will default the
document currency from purchase order
USD
Check this tick box, system will calculate tax amount Select the tax code from drop down list
V0
Enter section code if Tax deduction for source is active for this vendor
Payment terms of
document, if entered will be defaulted from purchase order
Will be calculated by
system
Enter if cash discount is offered by vendor
Hide Header data for getting full screen of items if required. Grayed out
Purchase order / R Schedule Agreement
Purchase order R number
Goods / service items R
Layout Layout of invoice R verification
Select Purchase order / Schedule Agreement in the reference document
category from drop down list
Ensure that the Balance is ZERO before posting the document and the traffic light is green or
yellow color.
If you want to see the accounting postings in simulation mode, Choose Simulation on middle of fourth
row of your screen.
Choose Display Currency to change in INR Choose Display Currency which will lead to small pop-up
window having the company code currency and Document Currency, position the cursor on the INR to
convert to Document Currency and press the details button.
9. Choose Save / Post, for posting the document.
Result
Example
In Indian subcontracting process when you issue materials to a subcontractor, you need to keep track of
what materials you have issued and when they have to be returned by subcontractor. The reason for this
close monitoring has to do with Indian tax law. Under excise law 57AC, when you send materials to a
subcontractor for processing, you are not required to pay any excise duty, even though the materials
have left your premises. However, if the materials have not been returned to you within 180 days
specified by the law, you will have to reverse any excise credit that you posted when you have
purchased the materials. When you send material out of your factory premises you need to send with
57F4 Challan. In this process you are going to do the same.
Prerequisites
The following scenario specific master data must be created for operation of this building block and
subsequent dependent building blocks.
Material Master record (Refer User Manual – Procurement of Stock Materials (Domestic))
Vendor Master record (Refer User Manual – Procurement of Stock Materials (Domestic))
Purchasing Info Record (Optional)
Ensure that Sub-Contracting as Info Category.
o Chapter IDs
o Material ID and chapter ID combination (Ensure Sub-Contract check box is selected for the
Materials that provided to vendor)
o CENVAT Determination
o Vendor Excise Details
o Excise Indicator for Plants
o Excise Indicator for Plant and Vendor
o Excise Tax Rates
A purchase order is a legal document used to record an individual purchase with the vendor. It also
provides the vendor with a reference document to link to goods receipt and invoice verification
processes. The purchase order is a commitment to a vendor for a given subcontracting activity, in a
specified quantity at a predetermined price and delivery date.
Prerequisites
3.2.3Procedure
Access the transaction choosing one of the following navigation options: SAP R/3 menu
LogisticsMaterials ManagementPurchasingPurchase OrderCreate Vendor/Supplying Plant Known
Transaction code ME21N
2. On the Create Purchase Order screen, make the following entries: Select ZSC Document Type for
Subcontracting Order
Enter L as Item Category for
Sub-Contracting Procurement
Click here to enter Bill of components that are supplying to Subcontractor
After filling the above data, choose on Material Data tab at item Details screen. There you will find a
new icon called Components, you have to choose on that icon to give the components list which you are
likely to transfer post to vendors and give the flowing inputs.
3. Click on the Components or Explode BOM and enter the materials that had to be sent:
Choose on Green Arrow or F3 to come back to main purchase order screen.
Ensure appropriate tax code have been entered for both the line items (V0 – Nil Tax for Sub-Contracting
Item)
Ensure Taxcode V0 for Sub-Contracting Item and
click on the Taxes to view the tax calculation
A message will be displayed stating that the purchase order was saved, with the purchase order number.
Example
Procedure
1. Access the transaction choosing one of the following navigation options: SAP R/3 menu
LogisticsMaterials ManagementPurchasingPurchase OrderMessagesPrint/Transmit
Transaction code ME9F
2. On the Message Output screen, make the following entries
Choose
to Execute.
On screen Message Output select the appropriate Document number and perform the following:
The Nature of subcontracting purchase order is that company will provide components to subcontractor.
This process describes how to transfer post materials to subcontractor.
Prerequisites
2. On the Enter Transfer Posting: Initial Screen, make the following entries:
Description
Document Date
Plant
Storage location
R 1000 R 1010
Choose on To Purchase Order icon on the top of the screen or choose F9 on key board. System will give
new popup screen asking for purchase order number. Give the 45000000## purchase order number and
choose enter to continue.
System will display components from purchase order with quantities
Choose only the Material that you are sending and enter the Storage Location from which it has to be
issued.
Result
3.4.5 Example
3.5.2 Prerequisites
Select the Sub-Contracting Material in Material and Chapter ID Combination of the Excise Master
(J1ID) for the sending Material.
Ensure that the details of the receiving Material maintained in the Excise Master (J1ID). CENVAT
Determination of the Excise Master (J1ID) Maintained for the both sending and
receiving Material.
Ensure that the Assessable value for the sending material is maintained in the Excise Master (J1ID)
Procedure
Access the transaction choosing one of the following navigation options: SAP User menu CIN Menu
Transaction code
Indirect TaxesProcurementSubcontracting Subcontracting ChallansCreate
J1IF01
2. On the Subcontracting Challan - Create, make the following entries:
Field name
Material Doc. Mat. Doc. Year Excise Group Series Group
Description R/O /C Material document number R Material document year R Excise Group R Series
Group R
Choose Enter to continue, system will take new Subcontracting Challan– Create screen, make the
following entries:
Field name Description
Select Posting tab
Posting date & time
R/O /C User action and values Comment
3.5.4 Result
3.5.5 Example
Access the transaction choosing one of the following navigation options: SAP User menu CIN Menu
Transaction code
Indirect TaxesProcurementSubcontracting Subcontracting ChallansChange
J1IF11
Click the Print Immediately Tab
Normally Goods are received from the Vendor as a result of a Purchase Order at the receiving plant
3.7.2 Prerequisites
Purchase Order
Procedure
After pressing Enter system will fetch all the data from the Purchase Order as shown below:
13. System defaults the balance quantity in PO, change the quantity to the received quantity if it is
different from defaulted quantity:
14. Ensure that the Movement Type is 101.
Select Item
Ok and
Field name Goods
Receipt
Purchase Order
Movement Type
Document
Date
Delivery Note
Vendor
Description
R/O /C Goods Receipt R
Purchase Order R
101
Enter Document Date R
in Header O
Vendor R
User action and values Comment Select from drop down list
for action
Posting Date
Bill of lading
Header text
Close Header Detail data to enlarge the Detail data. Delivery Number from
Vendor
Select Quantity tab in Detail data. Qty in unit of Quantity in unit ofR entry entry
Qty in Quantity in deliveryO delivery note note
Defaulted from material master or purchase order Defaulted from purchase order
1000
Enter the name of person who received goods
Unloading point O
Text O Enter the text if required
Select Purchase Order tab in Detail data. Purchase Purchase Order R Order
Select Partner tab in Detail data. Vendor Vendor name O Defaulted from header data Grayed
out
Defaulted by system if PO Qty = GR Qty
Grayed out
For this material batch management is not active. Just for reference purpose the
following data is given.
Select Batch tab in Detail data.
This tab will come only if material is managed in batches.
Proceed with the following steps if material is batch managed only. Batch
Batch number
R
Enter batch number as date for batch managed
15. Select the Check box Item OK, after entering all the data.
NCCD NCCD O SED Special Excise Duty O ECS Education Cess O Defaulted by the system Defaulted
by the system Defaulted by the system
Please cross check the BED, AED, SED, NCCD and ECS amount of item as per the Vendor Excise
Invoice, legally you cannot avail more than what mentioned in Vendor Excise Invoice. All other
information is defaulted by the system. Hence, no action required by the user.
Choose Check at the top of screen. Choose Post to post the document.
3.7.4 Result
After making Goods Receipt the GR has to be reconciled with the challan sent to subcontractor.
Procedure
2. On the Quantity reconciliation for Subcontracting Challan screen, make the following entriees.
Field name
Material Document
Here you need to allocate the components consumed in GR stage are reconciled with challan to do this,
choose on Allocate based on FIFO icon in the middle of screen with calculator icon.
Or you can do allocation by entering manually also in respective line items at bottom, where Assigned
quantity filed is located in white color.
After assignment save the document by choosing Save icon or choose Control + S
3.8.3 Result
3.8.4 Example
This transaction is basically used to complete the challan if you have reconciled as stated above step.
There may be cases subcontractor may not able to supply within stipulated 180 days limit then in this
case also same transaction is used for reversal of challan or re-crediting the amount.
Procedure
Description
Subcontacting challan No
Document year
3.9.3 Result
3.9.4 Example
In this process of Logistics Invoice Verification all the Incoming Invoices are verified in terms of their
content, prices and arithmetic. When the invoice is posted, the invoice data is saved in the system. The
system updates the data saved in the invoice documents in Materials Management and Financial
Accounting.
Procedure
Access the transaction choosing one of the following navigation options: SAP R/3 menu
LogisticsMaterials ManagementLogistics invoice VerificationDocument EntryEnter Invoice Transaction
code MIRO
If you are opening for the first time this transaction, system will ask for Company Code, please give
1000 to go in side the transaction.
On the Enter Incoming Invoice: Company Code 1000 screen, make the following entries:
Choose only the Subcontracting material to post the document:
Enter the currency in which the bill is presented by vendor, if not entered by
Comment
Amount
mentioned is
only an example
Bus.place/se ctn
Business place or R section code
Text Text O
Check this tick box, system will calculate tax amount Select the tax code from drop down list
V0
Enter section code if Tax deduction for source is active for this vendor
Payment terms of
document, if entered will be defaulted from purchase order
Will be calculated by
system
Enter if cash discount is offered by vendor
Hide Header data for getting full screen of items if required. Grayed out
Purchase order /
Schedule Agreement
Purchase order number
Goods / service items
Layout Layout of invoice verification
R Select Purchase order / Schedule Agreement in the reference document category from drop down list
5. Choose Enter to complete the document feeding part. Defaulted for user
To check the document credit and debit is balanced on the top right corner of your screen a traffic light
is displayed. Beside that Balance of the document is displayed.
Ensure that the Balance is ZERO before posting the document and the traffic light is green or
yellow color.
If you want to see the accounting postings in simulation mode, Choose Simulation on middle of fourth
row of your screen.
10. Choose Save / Post, for posting the document.
3.10.3 Result
Prerequisites
The following scenario specific master data must be created for operation of this building block and
subsequent dependent building blocks.
Service Master record
AMC Charges for Testing Machine
The service master record counts as part of the master data within External Services Management and
serves as a source of data for you to draw upon when creating services. This enables you to save time
and reduces the frequency of errors, since you need only enter the complete service descriptions in the
service master record once.
Procedure
8. Access the transaction choosing one of the following navigation options: SAP R/3 Menu
LogisticsMaterials ManagementService MasterService Service Master
Transaction code AC03
9. On the Display Service screen, make the following entries:
Click on Create new service icon or press F5 (white paper icon) to create new service master. Then you
will get Create Service Master Record screen, make the following entries:
Result
A Purchase Requisition is created to indicate purchase department to procure materials or services with
details like how much quantity is required, when required. Generally it is created automatically for Raw
materials and Packing Materials through MRP Run and Spares and Service related to Plant Maintenance
Purchase Requisition is generated automatically from Plant maintenance Order. In this process Purchase
Requisition is created against Quantity Contract created in above step 1.1.4 with exact delivery /
requirement date.
Procedure
Enter the A/c Assignment Category Enter the as K for Cost center and Item Short Text Category D for
Services
Enter the appropriate Material Group Plant and Purchasing Group
When Item Category D is enterer one new
tab in the Item Detail Services is
generated to enter the Service No.
Enter the Service No, Quantity and
Gross Price and press Enter
After pressing enter system shows a small pop-up window where respective G/L Account and Cost
Center to be entered.
5. Press
or Ctrl+S to Save the Purchase Requisition.
Result
Example
c) This section explains the functions provided by the SAP System for converting requisitions into
external purchasing documents (purchase orders, contract release orders, scheduling agreement delivery
schedules, RFQs), and the processing options thereby available to you:
Assigning means defining the desired source for each purchase requisition item Further processing
involves generating lists of requisitions that have been assigned or flagged as outlined above, and the
subsequent creation of RFQs, purchase orders, or lines of delivery schedules under scheduling
agreements.
Procedure
The assignment of sources to and further processing of purchase requisitions are two distinct functions.
You can choose whether you wish to perform the functions in two separate steps or in just one. 8. Below
are the Selection Parameters to restrict the process of PO from PR
9. Press
or F8 to enter into the next screen.
1. If Source List is For Manual Assignment available click this button of source click this Icon 1. Select
the check boxes
required PR which are to
be converted in to Pos.
Click SAVE Icon. Source has been assigned for this Requisition
Result
The source is assigned to PR and can be processed for PO. 5.5. For Releasing Purchase Requisition
Refer User Manual for Stock Procurement
A purchase order is a legal document used to record an individual purchase with the vendor. It also
provides the vendor with a reference document to link to shipping (goods receipt) and invoicing (invoice
verification) processes. The purchase order is a commitment to a vendor for a given material, in a
specified quantity at a predetermined price and delivery date.
1. Before creating purchase order if this vendor is subject to Tax Deduction at Source (TDS) or
with holding tax please ensures that necessary entries in vendor master is updated.
Procedure
6. Access the transaction choosing one of the following navigation options: SAP R/3 menu
LogisticsMaterials ManagementPurchasingPurchase OrderCreate Vendor/Supplying Plant Known
Transaction code ME21N
If you want create purchase order with reference to the purchase requisition, on item details screen enter
the purchase requisition number and item number at Purch. Req. field. System will automatically adopt
all the data from requisition.
Click the
Purchasing
Requisitions
and Press
Adopt
Select this check box if Invoice Verification is done after Service Entry Sheet
Press this button to view the Tax Calculation
Condition Record for JSVD and JEC4 should be Maintained in FV11 with Material Group/Plant
Combination.
Select
Invoice
tab
Tax code Enter Tax code R S1 Select S1 tax code Since the procurement services
covered with service tax of 10% (for example only, check for legal requirement), it is advised to select
V1 tax code.
Depending on for which plant you are procuring the services system will select Jurisdiction code. In
system the following Jurisdiction codes were configured IN00– Central
8. The Purchase Order may be posted by Choosing on the Save button or Choose Control + S for saving.
Result
Example
5.8.2Procedure
Access the transaction choosing one of the following navigation options: SAP R/3 menu
LogisticsMaterials ManagementPurchasingPurchase OrderMessagesPrint/Transmit
Transaction code ME9F
15. On the Message Output screen, make the following entries
Choose
to Execute.
On screen Message Output select the appropriate Document number and perform the following:
The services actually performed (work actually done) by a service vendor are recorded in a Service
Entry Sheet with reference to the purchase order.
5.9.2Procedure
Access the transaction choosing one of the following navigation options: SAP R/3 Menu
LogisticsMaterials ManagementService Entry Sheet Maintain
Transaction code ML81N
2. On the Service Entry Sheet screen, make the following entries:
3. Click on Other Purch. Orders icon or Shift + F5, system will popup new screen.
In this screen against Purchase Order field give the purchase order number which is created in above
steps and press enter to continue.
You will get new Service Entry Against Purchase Order
Here on this screen click Create Entry Sheet (white paper icon) or Shift + F1 to get new entry sheet.
System allocates service entry sheet number internally and you will get the number on screen.
Press Service Selection and a dialog box appears
8. System will give a popup screen with purchase order number on that, press enter to continue.
9. Select the line item 10 and click on Services or F9 (Adopt services) icon on top of screen.
10. For example the following screen name will come:
You can observe the system copied the service line item from purchase order with open item quantity i.e.
1 AU.
15. You can see the traffic light is become Yellow color. That means it is ready to save the service entry
sheet. The colour changes from red to yellow and Press Save
16. Press
or Ctrl+S to save the document.
Result
A message indicates that the service entry sheet saved, acceptance document posted.
Example
In this process of Logistics Invoice Verification all the Incoming Invoices are verified in terms of their
content, prices and arithmetic. When the invoice is posted, the invoice data is saved in the system. The
system updates the data saved in the invoice documents in Materials Management and Financial
Accounting.
5.10.2Procedure
Access the transaction choosing one of the following navigation options: SAP R/3 menu
LogisticsMaterials ManagementLogistics invoice VerificationDocument EntryEnter Invoice Transaction
code MIRO
If you are opening for the first time this transaction, system will ask for Company Code, please give
1000 to go in side the transaction.
On the Enter Incoming Invoice: Company Code 1000 screen, make the following entries:
Field name Transaction
Description R/O /C Invoice R
Bus.place/se ctn
Business place or R section code
Text Text O
Enter section code if Tax deduction for source is active for this vendor
Payment terms of
document, if entered will be defaulted from purchase order
Will be calculated by
system
Enter if cash discount is offered by vendor
Hide Header data for getting full screen of items if required. Grayed out
Purchase order / R Schedule Agreement
Purchase order R number
Goods / service items R
Choose Enter
Defaulted for user
Ensure that the Balance is ZERO before posting the document and the traffic light is green or
yellow color.
If you want to see the accounting postings in simulation mode, Choose Simulation on middle of fourth
row of your screen.
11. Choose Save / Post, for posting the document.
Result
Example
A purchase order is a legal document used to record an individual purchase with the vendor. It also
provides the vendor with a reference document to link to shipping (goods receipt) and invoicing (invoice
verification) processes. The purchase order is a commitment to a vendor for a given material, in a
specified quantity at a predetermined price and delivery date.
This transaction is mandatory for the process.
Prerequisites
Before creating purchase order if this vendor is subject to Tax Deduction at Source (TDS) or with
holding tax please ensures that necessary entries in vendor master is updated.
Asset Management Module Active.
Procedure
Enter Code V1
Result
Goods are received from the Vendor as a result of a Purchase Order at the receiving plant. A goods
movement is entered into the system referencing this PO and a goods receipt material document is
posted. Appropriate general ledger accounts are also posted and stocks are updated.
Prerequisites
Purchase Order
Procedure
16. Access the transaction choosing one of the following navigation options:
Click Continue
6.4.2 Result
In this process of Logistics Invoice Verification all the Incoming Invoices are verified in terms of their
content, prices and arithmetic. When the invoice is posted, the invoice data is saved in the system. The
system updates the data saved in the invoice documents in Materials Management and Financial
Accounting.
6.5.2 Procedure
Access the transaction choosing one of the following navigation options: SAP R/3 menu
LogisticsMaterials ManagementLogistics invoice VerificationDocument EntryEnter Invoice Transaction
code MIRO
Click Simulate
Click Save.
6.5.3 Result
Excise Periodic Processing ‟s that are to be carried out at end of a period. Excise Periodic Processing
helps you prepare and carry out the activities required for day-end or month-end and year-end closing.
Proforma for Monthly Return under Rule 7 of the Cenvat Credit Rules, 2001
Prerequisites
Before execute business scenarios, you need to post the business processes transactions from other
scenarios.
As part of the integrated scenario, this scenario needs several User Manuals as prerequisites to
demonstrate these include:
Production Planning and Discrete Manufacturing Procurement of Stock Materials
Sales and Distribution
Details to submit an Annexure to the Excise Authorities as a Monthly Return Under Rule 57AE of the
Central Excise Rules, 2001. CENVAT Register displays input credit details for Raw materials or Capital
Goods. This report can be generated detailed as Annexure or summary as Abstract.
Prerequisites
Procedure
On the Proforma for Monthly Return Under Rule 57AE of the Central Excise Rule screen, make the
following entries:
C Select this radio button if the out put is being generated for Annexure
Abstract Output to be
generated Annexure or Abstract
C Select this radio button if the out put is being generated for Abstract
Inputs Annexure to be
C Select this radio button if the out put Annexure is being generated for Input Materials
C Select this radio button if the out put Annexure is being generated for Capital Goods
The date from the beginning of the month to
end of the
month
You are able to generate Proforma for Monthly Return Under Rule 57AE of the Central Excise Rule.
RG1 register maintained at Manufacturing Plants for excisable finished goods. The register shows goods
movements from the factory to a store and stores to customer, specifically for excisable finished goods.
The R/3 System generates all the necessary entries in the register.
This report only creates register entries for goods movements that have not already been entered. It does
not create duplicate entries.
Using this activity, you can also update the goods issue into RG23A Part I and RG23C
Part I, Register by select the radio button option in the Registers.
Prerequisites
To extract the data to RG1 Register, Material numbers has to be maintained in the table J_2IRG1BAL -
Opening/Closing balance table for RG1.
Procedure
2. On the Update of Registers RG1 and RG23(Part1) screen, make the following entries:
Material
Document Number
Document Year
Posting Date Company Code R 1000
Movement Type
Storage Location
Material
Document Date
Batch
Stock Type Rule
IIM
For updating of goods receipts from
Manufacturing plant use RMA
Receipts
RMA- Receipt from
manufacture
ROP-Receipt from
outside under any other provision
Issues
IDH-Removal from
factory on payment of duty for Home use
IDE-Removal on
payment of duty for export under no bond IWE-Removal without
Select the
RG23A radio
button to update the RG1
Register,
RG23C Pat1
RG1
Please press enter and ignore any messages.
Update the Receipts to RG1 Register and then update the issue to RG1 Registers. Follow
the sequence of transactions.
You can update the RG1 Register by selecting material document header values or
Material document line item level details or both together.
The following Classification codes need to be used while updating the Excise Registers: Register Type
Goods issues Goods receipts
3. System will display the ‘Update of Registers RG1 and RG23 (Part1’) screen:
Displays all the line items to meet the selection criteria to update the RG1 Register.
Select Check Boxes for which Updation to be
Select the line items which needs to be updated to RG1 Register by selecting the check box at the
beginning of the each line item
Press Simulate
5. Simulate the selection by using the Simulate function or use Shift+F10 to simulate the selection
System will display the selection Green or Red Traffic lights. The line items which can be updated will
be displayed with Green Traffic Lights and the line items which can not be updated will be displayed
with Red Traffic Lights.
After selecting the right documents select the line item and use the Create button to update the RG1
Register or use CTRL+Shit+F11 to make register entry.
Processing over for 3 records
Result
This step needs to be performed in order to create the RG1 details into the respective tables.
Prerequisites
You have to complete the update of RG1 Register before performing this step.
Procedure
Select the radio button Select Any Register option User can
generate all the registers
together or
individual
register wise
Select
individual
Registers
If the RG1 Register is being generated for the Period First Time, system will execute the report and
display the pop-screen with Register name and Green Tick mark, if it is successfully extracted,
otherwise it will show the Red Cross.
Result
Using this activity, you can also extract the following Excise Registers in addition to RG1.
RG23A Part I
RG23A Part II
RG23C Part I
RG23C Part II
PLA
In the Registers select option, if you select All registers, the system will create an extract for all
registers. If you only want to create an extract for specific registers, select Select any register and then
the registers that you want to extract.
The objective of this process is to print the RG1 Register or to display on the screen.
Prerequisites
The data must be extracted to the RG1 Register for the period to which RG1 Register need to be printed.
Procedure
Click on Execute icon or Press F8 or Program Execute On the Print RG1 Register screen, make the
following entries:
Choose
Field name Excise Group
Start Date
End Date
Description R/O /C
System will display the Print parameters maintenance screen assign the out put device name and select
the Print Preview option. System will display the output on the screen.
See the output on the screen and based on the requirement print the output using Ctrl + P option or
through menu Text Print.
Result
Using this activity, you can also view or print the following Excise Registers in addition to RG1
RG23A Part I
RG23A Part II
RG23C Part I
RG23C Part II
PLA
You have to print or see the registers one after another.
This step needs to be performed in order to extract the data relating to PLA Register to respective tables.
Prerequisites
The following process has been executed, if any transactions took place during the period of PLA
register extraction for payment of CENVAT and Sale of goods
TR6 Challan Updation Utilization of CENVAT
Procedure
If the PLA Register is being extract for the Period First Time, system will execute the report and display
the pop-screen with Register name and Green Tick mark, if it is successfully extracted, otherwise it will
show the Red Cross.
Result
The objective of this process is to print the PLA Register or to display on the screen.
Prerequisites
The data must be extracted to the PLA Register for the period to which PLA Register need to be printed.
Procedure
Ending Date System will display the Print parameters maintenance screen assign the out put device
name and select the Print Preview option. System will display the output on the screen.
See the output on the screen and based on the requirement print the output using Ctrl + P option or
through menu Text Print.
Result
Choose Execute
Choose Execute
Choose Execute
THANKS
Click this Icon to
have Detail View.
9.2.2 Diplay Warehouse Stock (MB52)
Choose Appropriate
Input for your selection.
Choose Execute or Press F8.
9.3.3 Stock on Posting Date (MB5B)