Pt. Caratwarsa Hangandana Prelim - Content - 1 The RBBC Ii Project Phase 2

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

CONTENTS

4.1.0 CONDITIONS OF TENDERING

4.1.1 Preparation and Submission of Tenders


4.1.2 Surat Ijin Usaha Jasa Konstruksi
4.1.3 Tenderers to visit Site
4.1.4 Area for the Works
4.1.5 Use of the Site
4.1.6 Alterations to text
4.1.7 Tendered Amount
4.1.8 Tenderers

4.2.0 PRELIMINARY PARTICULARS

4.2.1 Definitions
4.2.2 Description of the Works
4.2.3 Site of the Works
4.2.4 Possession of the Site
4.2.5 Contract Period

4.3.0 CONTRACT PARTICULARS

4.3.1 The Contract Documents


4.3.2 Conditions of Contract
4.3.3 Appendix to Conditions of Contract
4.3.4 Completion of the Contract Works
4.3.5 Practical Completion
4.3.6 Liquidated and Ascertained Damages for Non completion
4.3.7 Programme of Work
4.3.8 Approval of Programme
4.3.9 Method of Measurement
4.3.10 Contractor’s claims for extras and extensions of time
4.3.11 Taxes and Customs Duties
4.3.12 Specification
4.3.13 Discrepancies
4.3.14 The Contract Sum
4.3.15 Fixed Price Contracts
4.3.16 Variations
4.3.17 Pricing of Preliminaries
4.3.18 Contingency Sum
4.3.19 Tender Drawings
4.3.20 Surety Bond
4.3.21 Contractor’s address
4.3.22 Payments to the Contractor
4.3.23 Assignment or Sub-Letting
4.3.24 Insurance of the Works and Public Liability Insurance
4.3.25 Insurance of the Works
4.3.26 Public Liability Insurance
4.3.27 Employer not Liable for Workmen Compensation
4.3.28 Contractor to Insure Workmen
4.3.29 Remedy of Failure to Insure
4.3.30 Contractor to give Notice of Injury
4.3.31 Fluctuations in Exchange Rates

4.4.0 GENERAL MATTERS

4.4.1 Site Management and Establishment Costs


4.4.2 Plant, Tools, Materials, Labour etc
4.4.3 Labour on Costs

PT. CARATWARSA HANGANDANA PRELIM.CONTENT - 1 THE RBBC II PROJECT PHASE 2


4.4.4 Working Hours, Rates of Wages etc
4.4.5 Overtime
4.4.6 Contractor’s Employees
4.4.7 Workmen Living on Site
4.4.8 Safety, Health and Welfare of Workpeople
4.4.9 Report to Supervisor
4.4.10 Contractor’s Weekly Site Meetings
4.4.11 Site Instructions
4.4.12 Visitors
4.4.13 Permits and Fees
4.4.14 Drawings
4.4.15 Setting out the Works
4.4.16 Dimensions
4.4.17 Samples and Prototypes
4.4.18 Testing of Materials
4.4.19 Safeguarding the Works
4.4.20 Maintenance and Protection of existing roads, footpaths, fences, etc
4.4.21 Protection of private and Public Services
4.4.22 Protection of adjoining Property
4.4.23 Progress Photographs
4.4.24 Safety Helmets and Protective Clothing
4.4.25 Restricted use of the Site
4.4.26 Advertisements
4.4.27 Telephones
4.4.28 Water
4.4.29 Lighting and Power
4.4.30 Fire Protection
4.4.31 Defects Liability Period
4.4.32 Making Good Defects
4.4.33 Cartage of Materials to the Site and Removal of Spoil and
Surplus materials
4.4.34 Limiting Disturbances
4.4.35 Setlements for Nuisance

4.5.0 TEMPORARY WORKS

4.5.1 Temporary Access


4.5.2 Temporary Buildings
4.5.3 Sitting of Temporary Structures
4.5.4 Contractor’s Storage Sheds
4.5.5 Contractor’s Site Office
4.5.6 Removal of Temporary Structures Plant and equipment
4.5.7 Temporary Screens and Safety Netting
4.5.8 General Scaffolding and Staging
4.5.9 Shoring, Propping and Strutting
4.5.10 Protection of the Work
4.5.11 Removal of Rubbish

4.6.0 PREAMBLES FOR ALL TRADES

4.6.1 Notes
4.6.2 Abrevation
4.6.3 Definitions
4.6.4 Generally
4.6.5 Method of Measurement
4.6.6 Working Space
4.6.7 Rates to Include

PT. CARATWARSA HANGANDANA PRELIM.CONTENT - 2 THE RBBC II PROJECT PHASE 2

You might also like