IN THIS ISSUE:
Restoring Basra's Water Network
Riyadh Smart Square: an Intelligent
and Resource-Efficient Community
Reviving Al-Jahra Waterfront in
Kuwait
K&A Designs Sustainable Park for
Growing Dubai Community
Bahr Al-Baqar Tackling Water
Scarcity in Egypt
FOREWORD
As we enter the final months Perhaps the most powerful Records for its huge capacity, OVERCOMING CHALLENGES Through its success, the
of 2021, the world is finally example of this is in Iraq, will treat 5.6 million cubic The fact that such impressive, Kingdom has established a
looking forward with a level of where our water and utilities meters of wastewater every large-scale projects were all leadership position in the field
hope and optimism that has experts are assisting in the day, enabling the irrigation of completed during the of emergency management
been missing for much of the delivery of multiple large-scale more than 1,400 km² of challenges of the past 12 and health disasters. This was
past two years. While we have projects which will bring safe, farmland along the Suez months is a testament to all recognized in October, when
been fortunate in our sector to clean water to Basra Canal. K&A colleagues were stakeholders involved, and the NHEOC became the first
have escaped the worst Governorate for the first time recently delighted to be clearly reflects the facility in the Eastern
impacts of the pandemic, it is in three decades. recognized for their work on extraordinary determination Mediterranean region to be
nevertheless a great relief that the project when it was and capability of this region to accredited by the World
some sense of normality is In October, K&A oversaw the awarded an Engineering Health Organization (WHO).
completion of Mahila Reverse progress, no matter what
returning. The evidence of this News-Record (ENR) Global obstacles stand in the way.
is felt nowhere more strongly Osmosis Plant, one of the Best Project Award. The leadership and forward-
most complex projects in the This is all the more reassuring, thinking demonstrated by
than the UAE, where all eyes given the fact that Covid-19 is
turned at the beginning of portfolio. This facility is able to Another project which was projects such as the NHEOC
operate under remarkable recognized by ENR, with an likely to be among us in some will ensure that whatever
October for the launch of capacity for some time
Expo 2020 Dubai. variations in salinity, varying Award of Merit, was Qatar uncertainties lie ahead, this
from 2,000 to 30,000 mg/l, University’s New College of to come. region is well positioned to
K&A was privileged to play a enabling it to produce potable Education. The 59,000 m² Nevertheless, governments in maintain its strong progress.
role in the delivery of five water despite the changeable building, for which K&A the region are taking As ever, K&A is looking
different pavilions – the conditions of the Shatt Al- provided lead design and important and necessary steps forward to working closely
Kingdom of Saudi Arabia, Arab river. construction supervision to ensure they are prepared with its clients to assist in the
Egypt, USA, Pakistan and services, is a model of for any future escalations. realization of their ambitions,
Palestine – so we understand sustainable development, and you will find many more
RECORD BREAKER having been built to 4-Star
and appreciate the enormous examples of how we’re already
effort that has gone into its In Egypt, K&A’s work is also Design and Construction BEACON OF EXCELLENCE doing this throughout the
production over several years. playing a vital role to treat Standards in line with Qatar’s An example of this is the pages of our latest newsletter.
Staging such a showpiece polluted water through a Global Sustainability Kingdom of Saudi Arabia’s
global event is a huge project which is creating jobs, Assessment System (GSAS). National Health Emergency On behalf of the K&A Board
achievement, and we look driving prosperity, improving Operations Center (NHEOC). and all our people, thank you
forward to witnessing its the environment and In addition, City Centre Al This exceptional project, for for taking the time to read
success over the months significantly supporting the Zahia, the largest mall in the which K&A was lead more about the company’s
ahead as it attracts new country’s drive for greater UAE’s Northern Emirates, was consultant, seamlessly latest activities, and we wish
audiences to the region. self-sufficiency. Bahr Al Baqar named Retail Project of the integrates WebEOC you a healthy, happy and
wastewater treatment plant, Year at the MEP Middle East emergency management successful end to the year.
K&A colleagues have been for which K&A was lead Awards. This stunning LEED software with other
celebrating a number of other consultant, was inaugurated in Gold project, for which K&A Najib Khatib, Ph.D.
technologies, such as GIS, to Chairman & CEO
important project milestones September by President Abdel was lead consultant, was the digitally transform the
across our geographies which Fattah El-Sisi. The project, first major retail development Kingdom’s emergency
are together improving the which has been recognized by to be launched in the MENA management services and
lives of millions of people. the Guinness Book of World region during the pandemic. healthcare delivery.
IN THIS 14 30
ISSUE
EXPO 2020 DUBAI: UNITED
ARAB EMIRATES
Stunning Saudi Pavilion Enthralls
Visitors to Expo 2020 Dubai
06
INFRASTRUCTURE: IRAQ
Khatib & Alami (K&A) is set to bring
32
lasting benefits to Basra in southern Iraq. TRANSPORTATION: KUWAIT
How K&A saved 25% of time spent
on design, using BIM as it reimagines
09 Fahaheel Expressway
18 34
PARTNERSHIP
K&A has further extended its
Geographic Information System (GIS)
and Building Information Modelling MASTER PLAN: STATE OF NEWS IN BRIEF
(BIM) capabilities. KUWAIT Celebrating achievments, milestones,
An ambitious project that envisages a and new partnerships
10
holistic transformation of Al-Jahra’s
7.3 km2 water strip.
TECHNOLOGY
The Missing Link Between BIM and GIS
in Construction Industry.
22
SUSTAINABILITY: UNITED
ARAB EMIRATES
K&A has been awarded the design and
supervision of a green community space
for the Dubai Science Park.
24
WATER SCARCITY: EGYPT
Bahr Al-Baqar Tackling Water Scarcity
27
in Egypt
12 27
WATER SCARCITY: KINGDOM
INDUSTRY AWARDS OF SAUDI ARABIA
Our ability to keep pushing boundaries Saudi Arabia’s Arafat-Taif Water Tunnel
has been instrumental in winning Achieved in Record Time Despite the
notable industry awards. Pandemic
14 28
SMART CITY: KINGDOM OF Q&A ON COVID-19 AS 'GAME
30
SAUDI ARABIA CHANGER'
18
K&A has completed the design of How has it changed the face of
Riyadh Smart Square. business?
INFRASTRUCTURE | IRAQ
TOTAL LENGTH OF
PROPOSED
BASRA BACK WATER STRATEGY TOTAL SERVED
POPULATION TRANSMISSION
PROJECTS BY AT YEAR 2045 & DISTRIBUTION
TO LIFE NUMBERS 7.5 MILLION WATER LINES To find a long term, sustainable
REBUILDING RESILIENT 850 KM solution, K&A has been
commissioned by Basra
INFRASTRUCTURE AND
Governorate to deliver a water
SUPPORTING RECOVERY
TOTAL CAPACITY OF strategy that will build resilience
IN IRAQ
PROPOSED in the water system against
DESALINATION natural hazards and climate
K&A is set to bring lasting Shatt Al-Arab, together with PLANTS risks in both the short and
medium terms.
benefits to Basra in southern
Iraq through working on several
saltwater intrusion from the
Arabian Gulf, culminated in acute
TOTAL SERVED
AREA FOR
12,000 M /HR 3
TOTAL CAPACITY OF
WATER TREATMENT
“Most of the water treatment
projects focused on restoring water and environmental crisis, facilities are aged, damaged
infrastructure and supporting affecting the health of more than
BASRAH PLANTS or eroded and, as a result, are
PROVINCE
local communities. four million inhabitants. TOTAL PROPOSED
30,000 M /HR 3 inadequate to treat raw water
For many decades, Basra
Governorate has suffered from
Basra, once one of the biggest
producers of dates in the
19,070 KM 2 WATER
PROJECTS
for drinking,” said Nassif Abi
Abdallah, Design Manager.
low accessibility to safe drinking
water despite having enormous
Middle East, has lost much of
its capability due to the lack 14 “After undertaking a thorough
assessment of the existing
natural water resources, like of sufficient fresh water. Rain infrastructure and the future
the Tigris and Euphrates shortages and the high salinity population demand, our
rivers flowing to the north of the Shatt waters damaged teams developed a water
and forming the Shatt al-Arab
river towards the Gulf. In 2018,
the soil and killed plants, which
led to farmers losing their main
INFRASTRUCTURE TOTAL SERVED
AREA
TOTAL SERVED
POPULATION
implementation strategy which
includes the construction
environmental pollution in the source of income. PROJECTS BY AROUND AT YEAR 2045 timeframe for several water
NUMBERS 55 KM 2
1.3 MILLION treatment plants, with a total
capacity of 1 million m3/
day, and around 160 km of
TOTAL LENGTH OF transmission lines.”
TOTAL LENGTH OF SEWER K&A will also spearhead full
ROADS NETWORK infrastructure design and
NETWORK
1,380 KM supervision for wet utilities
Batching Plant
Design Manager DIAMETERS UP TO 2400MM
281 MVA 145 KM
DIAMETERS UP TO 500MM
Client:
Basra Governorate, Beneficiary K&A PARTNERS
WITH VGIS
party: Basra Governorate
Role of K&A:
TO OFFER
Main consultant for the Entire
Project
AUGMENTED
Project Specifications:
Construction Cost: $ 1.73 Billion
REALITY
Design Completion Date: 2021
Construction Completion Date: 2023
EXPERTISE
Services Provided:
• Design
• Construction Supervision
Al-Askari/Zubeir PS6 (Sewer (860 l/sec) and Stormwater (9,800 l/sec))
GIS IN CONSTRUCTION INDUSTRY could simply draw a red mark on the spot where a
pipe should go; or if they could quickly locate existing
into an open platform, available to anyone
in a truly digital format. Engineers want to
underground infrastructure assets know what installations, for example, the
Mohammad Hammoud, Senior Account Manager in K&A’s Geographic
(water/electrical pipes, fiber electrician has made in a certain time frame.
Systems Integration team, looks at the transformational role augmented Workers need to receive the information
cables) to avoid damaging or
reality (AR) can play in the construction sector. they need for their installation task on site.
obstructing them.
In addition, users should be able to add
The last decade has Augmented Reality (AR) has the feedback to their BIM models on the go, and
seen BIM (Building potential to transform the way such AR applications enable this two-way
Information people work on construction sites information transfer in real-time.
Modelling) and GIS and could be the
(Geographic “next big thing”
Project status tracking in Augmented Reality
Information Systems) in the AEC
(AR)
become widely industry. AR A simple status AR tracking app can be
adopted tools across provides a deployed, allowing anyone to understand
the engineering and construction user-friendly the progress of the project in a visually
industry. Both enable people, means of understandable way. Stakeholders,
technology, and processes to deliver zooming in and out while regardless of their technical expertise, can
improvements in project delivery. looking at BIM and GIS now access and interact with the project
models, making it easy to model in real-time, making it easy to follow
While BIM is known as the digital the project’s progress.
observe any mismatches between
representation of a facility’s physical
model and reality. This could provide
and functional models, by including
"the missing link" between BIM models On-site clash review
information in three dimensions
and GIS reality. Design and construction data can be
(3D) and integrating information
combined and visualized into a one-single
required for architecture, AR applications can be used to visualize BIM
model. Accordingly, clashes and interference
engineering and construction data, enabling users to introduce any missing problems can be identified and resolved
(AEC) projects, GIS looks at the objects, correct errors in the model or address before construction, while aggregating data
positioning of structures with their the mismatches for further investigation. This will from multiple sources. Because AR enables
surroundings. It is used to manage Image
result in many benefits: the visualization of BIM and GIS together, an
and analyze spatial data, focusing courtesy of STW automatic overlay of both the design and
more on real-world modeling. Architects real-world is now possible.
Another recently completed building project to reduction in water use. All the main MEP
be recognized for its outstanding design was Al functions are housed in a separate Energy
Zahia City Center in Sharjah, UAE, which was Center that holds the primary mechanical plant
named best retail project at the Middle East MEP and equipment and a 33 kilovolt station.
Awards. With a total built up area of 363,976m², In addition to our
and a gross leasable area of 136,200 m², it is projects, K&A’s people
the largest mall in the Northern Emirates of the have also been honored
UAE. It was the first major retail development with industry plaudits.
to be completed and launched in the MENA Talented urban planner
region during the pandemic, reflecting client and architect, Dana Al
Majid Al Futtaim’s commitment to delivering this Haremi, was named
ambitious project despite challenging times. Rising Star of the Year at
The project is LEED GOLD certified, having the Construction Week
achieved 15.47% energy reduction and a 37.81% Oman Awards in March,
in recognition of her vast
Bahr Al Baqar Wastewater Treatment Plant in potential and ability to
Northern Sinai, Egypt, has scooped two top bring fresh perspectives
awards – ENR Global Best Project of the Year in to the projects she works
the infrastructure category, and ‘national winner’ on. Dana was also praised by the judges for her
at the MEED Projects Awards. The project now dedication towards constant self-improvement
enters MEED’s regional competition, with the for the benefit of her company, colleagues,
chance to win overall best water project of the clients, and community.
year. Read more about this record-breaking
This was followed, in
project on pages 24-26.
September, by Ghida
In addition, ENR recognized Qatar University’s Kaddah’s success in
New College of Education (NCE) with an Award winning the Mechanical
of Merit in the education category. This 59,000 Engineer of the Year
m² project was designed to accommodate 2,500 trophy at the MEP
students, supported by 200 academic and Middle East Awards.
administrative staff. Ghidah, who joined K&A
Located within Qatar University Campus, the in 2003 after gaining her
project is a model of sustainable development, master's in mechanical
having been built to 4-Star Design and engineering degree at
Construction Standards by Qatar’s Global the Lebanese University,
Sustainability Assessment System (GSAS). Its has proven her expertise
open-air courtyards are symmetrically located on many projects, such
on both ends of the building cores, making as La Perle Water Theatre in Dubai Habtoor City
four natural light sources. A key feature within and The Peninsula at Business Bay, Dubai. She
the access halls and staircases is a series of impressed judges with her willingness to go
hydroponic green walls that simultaneously above and beyond to meet or exceed
improve air quality and the aesthetics of the client expectations.
indoor space.
RIYADH SMART
SQUARE AN
INTELLIGENT
AND RESOURCE-
EFFICIENT
COMMUNITY
Khatib & Alami (K&A)
has completed the
design of Riyadh Smart
Square, one of the first
projects by Aqalat that
adopts the smart city
development concept.
REVIVING
inside the city. They mirror the mangrove’s reserve west, the nature immersion in local
city’s identity and contribute Jaber al Ahmad city in the environment, and physical and
significantly to the socio- south and a direct frontage onto mental well-being. The ‘genius
AL-JAHRA economic and cultural aspects
of urban life.
the sea.
Design Manager, Rania
loci’ - spirit of the place - was
very inspiring to create a
CALL IT A DESTINATION
Khatib & Alami (K&A)
was appointed by Kuwait
Municipality - Projects
Development Sector to develop
a comprehensive master plan
for the area. City & Regional
Planning Director, Edgar
Mourad, said: “The waterfront
has vast potential to become a
prime touristic and recreational
destination for local residents
and visitors alike. In association
with our local partner Kuwait
Technical Consulting Bureau,
we are addressing the
“WE ARE ADDRESSING
project's environmental and
urban planning challenges to THE PROJECT'S
create a sustainable, socio- ENVIRONMENTAL, AND
environmental waterfront URBAN PLANNING
that expresses the Kuwaiti CHALLENGES TO CREATE
cultural identity.” A SUSTAINABLE, SOCIO-
One of the eminent challenges ENVIRONMENTAL
was solving the site’s contextual WATERFRONT THAT
constraints while safeguarding EXPRESSES THE KUWAITI
its pristine ecological value CULTURAL IDENTITY.”
and developing a sustainable
Edgar Mourad,
financial model with a feasible
City & Regional Planning Director
implementation plan. The area
INSIDE K&A I 19
The waterfront was designed such as the entertainment
with connecting decks and pier, a music venue on the
green blue corridors that deck, an aquarium, sports and
allow this seamless integration therapeutical areas, in addition
between the natural, to different types of hotels that
recreational, and touristic attract tourists alike.
components. On the northern By introducing a buffer zone
strip that is adjacent to the to the site, the accessibility
mangrove reserve –Kuwait’s was made easy with smart and
first protected area and globally light multimodal transportation
recognized in the Green List systems that optimize
of the International Union for mobility and enhance project
Conservation of Nature (IUCN) attractiveness throughout the
– the master plan boasts an eco- year, the week, and the day.
park, featuring a desert botanic
garden, a bird observatory, and
an eco-cloud with a view on the
intertidal wetland. “THE ‘GENIUS LOCI’
The sustainable design of the - SPIRIT OF THE
master plan fosters adaptability PLACE - WAS VERY
to many changes that bring all INSPIRING TO CREATE
kind of visitors to enjoy a unique A UNIQUE SPATIAL
place. For instance, the Kuwait EXPERIENCE THAT
Lifestyle Museum, the Friday WILL REMAIN WITH
Mosque and the souk are among THE VISITORS AS A
many iconic landmarks of the HAPPY MEMORY.”
development, reflecting on local
identity, history and culture. Rania Sassine,
Moreover, we devised additional Design Manager
activities to attract users to the
waterfront but also generate
interest among onlookers
BECAUSE WATERFRONTS
ARE NOT ONLY AN EDGE A NEW VISION FOR AL-JAHRA
WATERFRONT
BETWEEN URBAN FABRIC
AND WATER
Our experts developed a
comprehensive feasibility study
and master plan that recognize
the environmental asset of the
site. “We focused the master
plan to positively contribute
to Al-Jahra social and cultural
integration and environmental RECONNECT NEW IDENTITY
preservation while securing RECONNECTING PEOPLE FOR THE NEIGHBOURHOOD
TO THE WATERFRONT AND THE CITY
financial feasibility. The
overarching principle of this
project is ensuring sustainability
in a multi-layered sense -
environmental, socio-cultural
and economic,” added
Edgar Mourad.
The sea, the intertidal zone,
and the mangrove reserve
were the greatest asset of the
masterplan, becoming the WATERFRONT BALANCE
centerpiece for programming DESTINATION THE NEEDS OF AN ENGAGED
LOCAL COMMUNITY WITH
and activities. FOR THE NEIGHBOURHOOD PROGRESSIVE PLANNING
AND THE CITY GOALS
BAHR AL-
BAQAR
TACKLING
WATER
SCARCITY
IN EGYPT
SUSTAINABLE WATER
MANAGEMENT AT BAHR
AL-BAQAR WASTEWATER
TREATMENT PLANT
SAUDI ARABIA’S
the Egyptian
Minister of
ARAFAT-TAIF WATER
International
Cooperation,
Rania Al Mashat,
this project will
make a great impact on the TUNNEL ACHIEVED IN
agricultural development in
North Sinai, creating more than RECORD TIME DESPITE
THE PANDEMIC
100,000 and 1.2 million direct
and indirect job opportunities
respectively that can help
sustain families.
Ensure access to affordable, DRILLING HAS BEEN and falls into the Kingdom's reservoirs in the cities of Taif,
reliable, sustainable and modern COMPLETED FOR THE ambitious plan to increase water Al-Baha, and nearby villages.
energy Goal ARAFAT-TAIF WATER desalination capacity A housing compound and an
Moreover, and transmission supply, administration area will be built
TRANSMISSION TUNNEL,
instead of a matching its rapidly growing near the SWCC Taif Terminal as
PART OF WHAT IS
conventional water consumption. part of the project.
sludge drying Make cities inclusive, safe, resilient, Conserve and sustainably use the BELIEVED TO BE ONE OF
THE LONGEST WATER Despite the terrain challenges K&A has a long-standing
bed, a sludge and sustainable Goal oceans, seas & marine resources Goal
TRANSMISSION TUNNELS and coronavirus pandemic, the relationship with SWCC and is
solar drying Aligned with the Domestic
project was completed ahead of proud to support the Kingdom
system will be Sinai Peninsula sewage, industrial IN THE WORLD.
schedule. Our experts adopted in this vital project that will
adopted to capture solar energy Development and agricultural
Characterized by water several measures to achieve transport the required water
inside 128 green beds and turn Program, this waste used to
scarcity and no perennial this milestone. For instance, needs to the western villages in
sludge into a year-long asset project aims to flow untreated
rivers, Saudi Arabia is one of they have shortened the drilling Saudi Arabia.
that can be used in the optimally utilise through the
the driest regions in the world. distance by 40 kilometers
agricultural and industrial fields. water resources and reduce 135-kilometre Bahr Al-Baqar
To overcome this challenge, by starting the excavation at
A total of approximately waste, as it will work towards channel, discharging into Lake
the Saudi government has the bottom of the Al-Hada
475,000 tons of dewatered increasing the agricultural area, Manzala in the northeast Nile
undertaken substantial Mountains to reach the ring
sludge per year are to be dried especially in the Sinai Peninsula. Delta. The discharge from Bahr
investments in seawater road in Taif city. They have
from 24% dry solids (DS) to Also, it will help establish Al-Baqar, heavily loaded with
desalination, sewerage and also peaked the daily drilling
approximately 75% DS. integrated agricultural bacteria, heavy metals and toxic
wastewater treatment, and speed using a specialized
This modern system will avoid development projects covering organics, resulted in high fish
water distribution projects. tunnel boring machine (TBM),
polluting the air and reduce the agricultural, animal, and mortality and malformation. This
One example is the Arafat-Taif characterized by its rotating
carbon footprint by not having industrial production. project will help to sustainably
water tunnel, spearheaded by cutter head and double shields.
to consume the energy that was manage and protect Lake
Manzala’s ecosystem and the Saline Water Conversion With this achievement, we have
needed to transport the liquid Take urgent action to combat Corporation (SWCC). Believed
strengthen its resilience. completed the first milestone
sludge to the sludge landfills. climate change and its impacts Goal to be one of the world's largest of a critical project to supply
According to the water transmission tunnels, the potable water from Arafat,
Build resilient infrastructure, United Nations, Sustainably manage forests, 8.4 m tunnel extends 12.5 km, outside Makkah, to strategic
promote sustainable Egypt will face combat desertification, halt and
industrialization, and foster critical water reverse land degradation, halt
innovation Goal shortages by biodiversity loss Goal
By reusing and 2025 that could The treated water
treating affect around from the Bahr
resources from 0.5 million people in the Sinai Al-Baqar water
wastewater, the region. With a capacity of 5.6 reclamation plant
Bahr Al-Baqar million m³/day, the Bahr Al- will be used for
plant helps to Baqar water reclamation plant irrigation to
reduce the will provide a new source of restore 400,000
environmental footprint of treated water, which will be feddan of plantation east of the
wastewater treatment, used for the irrigation of Suez Canal, combating the
minimizes contamination, and plantation in the Sinai Peninsula, aridity nature of the region and
ensures the availability of where water shortages were restoring the degraded land and
valuable resources for presenting a threat to soil affected by mismanagement
surrounding communities. agriculture and the economy. of the Bahr Al-Baqar drain.
1. What were the challenges 2. From an operational with ISO 19650-1 and ISO 19650- were customized to meet in the first month at Bangalore about digital solutions which
created for K&A by Covid-19? perspective, what new processes 2. The ISO 19650 standards project requirements in Design Center, remote working would never have been
Mohammad Saad: Time was our did K&A introduce? Specifically, provide a structured process to each department. attendance was 100% which is a considered previously.
biggest challenge. K&A has digital changes and applications support BIM implementation record for itself, showcasing the
on projects. This creates a 3. What was the impact of these commitment and dedication of Micheline Nader: New
always been an early adopter of on specific projects? technologies and tools brought
cloud computing; we already common approach which changes on our operations and our team.
Ahmad Faeq: K&A was quick to improves collaboration and about by the pandemic helped
had the foundations in place to deploy remote working projects? Efficiency and accountability
understanding among design us operate in a much larger
respond to key challenges such strategies followed by an Ahmad Faeq: Tools such as increased during work in virtual
teams, while improving cost and digital environment, benefiting
as remote working. extensive training program BIM360 and Teams have played mode and we were highly
time efficiency. from remote collaboration
But instead of being able to across our design centers to a vital role in supporting productive, and managed to
across virtual design teams in
pilot, test and roll out the ensure digital solutions were Vijaya Venkata: By embracing collaboration and meet the client’s expectations
various geographies. It’s a great
home-working programme consistently and efficiently used digital technologies, we have communication among K&A’s and project deliverables by
opportunity for us to leverage
over several months, the for communication and created a shared culture remote-working, geographically working around the clock.
communication and
urgency created by the collaboration on projects. through regular meetings and dispersed teams. Communicating with design
collaboration to build
pandemic demanded an brainstorming sessions. Global centres was instantaneous
The two main collaboration Visibility was improved for capabilities and skills and bring
immediate transition. implementation procedures and helped us to resolve
platforms used by the company project managers, ensuring they even more talent and innovation
were also put in place to set up problems quickly.
Another rising difficulty was are BIM360 for technical design are better equipped to monitor into our design projects.
remote working practices. For
managing logistics during the and Microsoft Teams for non- and control project tasks and 4. What do you think will be the
successful project delivery, we Vijaya Venkata: The pandemic
pandemic, ensuring everyone technical collaboration, schedules. Although K&A’s long-term legacy of these
streamlined BIM process and gave an impetus to hasten the
had the right equipment they document management and digital transformation was
workflows which, in turn, changes on your operations and process of change management
needed, as well as fast and project management. already well underway, the
increased productivity and
pandemic was responsible for
projects? And on the wider in ways that would not have
secure internet connectivity. A dedicated Microsoft Teams reduced time on repetitive tasks
catalysing adoption, both construction industry? been possible in normal times.
site was created for every by using automation tools such As they say out here in the East:
Micheline Nader: The pandemic technically and behaviourally. Ahmad Faeq: K&A believes the
project and all of K&A’s BIM as Plugins and Dynamo Scripts. “An Adversity is also an
brought forward a new reality of The company estimates that the past 12 months have swung the
families and libraries were Smart ideas were captured opportunity in a Disguise”. The
project delivery that was efficiency of its project delivery door open to greater
pushed to the cloud to ensure through the creation of smart pandemic has completely
challenging at the very and collaboration has improved digitalization in the construction
online accessibility and project-specific Revit Family for shifted how we think about
beginning. We needed to adapt by more than 40% compared to sector. Although it will take time
production standardization, tagging details and number work and lifestyle. The lesson
to a new remote working traditional methods, resulting in to change some elements of the
unified across all design centers. sequencing, and adding learned is that we need to be
routine and a fast-changing higher productivity, lower costs, ecosystem, there has been an
digital ecosystem that Mohamed Saad: We have Invert Elevations. acceptance of new ways of open to change which can
and greater consistency.
necessitates an increased invested to drive consistent, BIM coordination and working which are likely to transform our business and lead
collaboration across internationally certified BIM generating clash reports have Vijaya Venkata: When a remain post-pandemic, such as us to success.
design teams. standards across the business, helped to isolate errors, thereby complete lockdown was holding some meetings virtually
In spite of all challenges, the
Especially in delivering large and have been recognized by enhancing our existing enforced in India, for many of us instead of face-to-face.
resilience and commitment
scale projects, it was imperative the British Standards Institution preventive maintenance who did not have computer At a deeper level, K&A has also of our team resulted in
we foster a high-performing (BSI) for achieving BIM for processes. This has helped to systems, the office systems observed a change in mindsets, incredible performance.
virtual environment that ensures design, construction and fine-tune our project-related were delivered to our homes. and has entered dialogue with
timely and outstanding delivery. commissioning in accordance BIM trainings which Despite the challenges we faced some clients and partners
THE SOLUTION
FASTER APPROVALS & SIMPLICITY
IN A COMPLEX ENVIRONMENT
K&A’s team used InfraWorks,
Civil 3D, 3DS Max and BIM 360,
during the feasibility study
and concept design phase,
to provide the client with the
three best alternatives that
would deliver the project on 3D models for each of the recommend changes inside the
time and budget. With support proposed alternatives, which program, leading to significant
of InfraWorks’ capacity to allowed the client to visualize time-savings in the typical back
handle large volumes of data, it the expressway more clearly and forth before final review.
became a highly useful tool for and make faster decisions at
all stakeholders to utilize it as
a consolidated source, leading
an earlier stage. Supporting THE SUCCESS
the design work within an
to a more cohesive integration already congested urban ONE STEP CLOSER TO VISION 2035
between departments, and environment, Civil 3D ensured From a high level, BIM 360 not
providing real time access that any design conflicts with only played a significant role
to all necessary parties. As a existing public services or in the smooth collaboration
project that relied on multi- utilities could be identified between project stakeholders
regional data visualization and and amended at the earliest but also optimized project
regular updates from various opportunity. It also aided in workflows to yield significant
stakeholder offices, providing a viable, five-level savings, particularly in the
BIM 360 was essential for solution for the interchanges design stage where the
syncing and sharing models which helped to work around development of 3D conceptual
across all disciplines and the existing traffic while causing and schematic designs were
OVERVIEW THE CHALLENGE Options included the potential enabling real-time coordination. minimal disruption to the area’s reduced by 25% and the
upgrade of the existing highway, coordination and approvals
RETURN TO THE OPEN ROAD THREE ROUTES TO SUCCESS the construction of an elevated In terms of overcoming the residents and commuters.
As one of the region’s oldest Considered a primary artery of multiple design challenges, In leveraging InfraWorks between the multi-disciplinary
highway or a hybrid of the two, teams saw a reduction of 18%.
and most trusted design and the country’s road network, the and three separate feasibility InfraWorks enabled the shareability, the client was also
engineering consultancies, 38-kilometer stretch of highway alternatives for the upgrade of production of highly accurate able to make comments and From a macroeconomic
Khatib & Alami (K&A) has long that connects the capital to the 22 existing interchanges. perspective, the overall solution
understood that its longevity governates of Hawali, Mubarak provided by K&A with the
and success in the market Al Kabeer and Ahmadi has Ultimately, K&A opted for the support of Autodesk, will
is largely due to its positive become increasingly congested. construction of an elevated ultimately lead to improved
outlook towards sustainable However, with the country’s road over the existing Route 30 highway safety, mobility, and
best practices and emphasis Vision 2035 on the horizon, the on a multi-span, 38-kilometer quality of life for Kuwaitis.
on time and cost-saving government decided to take viaduct, but this also brought
steps to revitalize this essential several challenges. Final challenge was that the
technology. At the core of its
corridor and thereby return free team would need to secure
design program capability is a First challenge was to produce
movement to its major roads, the necessary approvals and
long-standing relationship with the complete feasibility study
while helping to stimulate the constantly collaborate with
BIM, and a corporate attitude in a relatively tight schedule,
burgeoning commuter and more than ten key stakeholders
that embraces deep technical which would require a highly
trade routes between Kuwait and authorities, including the
expertise and digitalization collaborative process between
City and its satellite towns. Kuwait Municipality, Ministry
as part of its strategy. These the Beirut, Kuwait and Egypt- of Public Works, Ministry
foundations guided K&A’s team Split into two phases, the based engineering departments, of Finance and Ministry of
which was tasked with finding first phase required K&A covering aspects on roads & Electricity and Water Works
the right solution for Kuwait’s to propose three separate highways, survey, traffic, storm amongst others.
Route 30 Fahaheel Expressway. feasibility alternatives. water and drainage, dry and wet
KHATIB & ALAMI PARTICIPATES AT THE WETEX 2021 EXHIBITION Upper Egypt is a strategic important project, which will communities. GIS will also
region for the Egyptian play a vital role in driving lay the foundations for asset
A PROUD GOLD SPONSOR OF AN INNOVATIVE FLAGSHIP EVENT
Government but faces various sustainable, impactful urban management systems at the
As a significant participant in challenges in economic planning and development to governorate level, integrating
the smart energy community, growth, employment support communities in Upper them with databases in relevant
Khatib & Alami (K&A) took part generation, connectivity, Egypt.” GIS tools will collect ministries and central-level
in the WETEX 2021 exhibition, service delivery access, and the vast amounts of data government agencies to
which focused on energy, water government capacities. required to balance competing present statistical and spatial
conservation, saving natural As a result, Khatib & Alami priorities, help decision-makers information on a platform
resources and building a (K&A) has been appointed to solve complex challenges, that promotes long-term
sustainable environment. a project for the development and identify opportunities decision-making.
of GIS infrastructure as part to support healthy, growing
This flagship event, organized
by Dubai Electricity & Water of the Upper Egypt Local
Authority - DEWA, provided us Development Program (UELDP),
with the opportunity to show an initiative of the Egyptian
our understanding of how these Government in the region.
sectors are fast developing. The program, co-financed
“Participating in this event gave by the World Bank, intends
us the opportunity to learn to promote sustainable local
more about the sustainable development, create new job
and innovative technology opportunities, and raise incomes
that’s propelling utilities and in Upper Egypt’s governorates
energy companies forward,” of Qena and Sohag.
said Walid Abou Chacra, Digital According to Water Treatment in design and supervision of Commenting on this project,
Energy Manager. “We have also Senior Manager, Maher Kahil, infrastructure projects. “It Dr Mohamed Misbah, GSI
provided a seminar highlighting this event has helped us to learn was very valuable to network director for the Middle East
K&A’s efforts to help the utilities more about advanced water with clients and partners, and and Africa region at K&A,
industry enhance performance treatment technologies and to share our thoughts on the said: “This is a strategically
and efficiency.” share our in-depth experience sector,” Maher explained.
SAUDI ARABIA’S NATIONAL HEALTH EMERGENCY OPERATIONS CENTER ACHIEVES A EGYPT’S LIGHT RAIL TRANSIT (LRT) IS NEARING COMPLETION
NEW MILESTONE IN HEALTH AND DISASTER MANAGEMENT (Ministry of Transport) aimed at
establishing a more integrated
The World Health Organization We are pleased to have
and sustainable transportation
(WHO) has designated the supported our client to deliver
system linking metro, railways,
National Health Emergency this critical project which will
monorail, Light Rail Transit, and
Operations Centre (NHEOC) as bring significant improvements
high-speed rail. For example, at
its first accredited collaborating to the public health and safety,”
the Adly Mansour interchange
centre in the Eastern said Manal el Sayed, Geospatial
station, commuters will be able
Mediterranean Region. Systems Integration
to switch between five different
The accreditation recognizes Senior Director.
modes of transport.
the centre's contribution to the The project’s customized
During peak hours, the LRT
growth of national and regional WebEOC-empowered
will have a single direction
capabilities. Since its completion solution, combined with other
transmission capacity of more
two years ago, the NHEOC has technologies such as geospatial
than 30,000 people per hour.
established a highly effective technology, provides a reliable
Its strategic location allows
emergency health management and efficient central data Egypt’s Light Rail Transit (LRT), K&A is responsible for the the residents of industrial,
system in the Kingdom of Saudi collection platform. which will connect Al-Salam, design review and construction residential and city center
Arabia, playing a crucial part Moreover, the NHEOC was able the New Administrative Capital, supervision of the LRT as the areas to reach their desired
in the nation’s response to the to assist other Ministry of Health and the 10th of Ramadan, is project's lead consultant for destination within 1 hour.
Covid-19 crisis. Saudi Vision 2030, especially (MoH) functions, including the close to completion, with construction supervision. This
In so doing, NHEOC contributes Goal 3: reducing health risks. national vaccination registry and construction and finishing trailblazing project is aligned
to the Saudi Ministry of “Congratulations to the Ministry the national ambulance services works of the first two phases with initiatives by Egypt's
Health's efforts to realize the of Health for this new milestone. operations centre. 95% completed. National Authority for Tunnels