Download as pdf or txt
Download as pdf or txt
You are on page 1of 20

NOVEMBER 2021

FOR BETTER
CITIES

IN THIS ISSUE:
Restoring Basra's Water Network
Riyadh Smart Square: an Intelligent
and Resource-Efficient Community
Reviving Al-Jahra Waterfront in
Kuwait
K&A Designs Sustainable Park for
Growing Dubai Community
Bahr Al-Baqar Tackling Water
Scarcity in Egypt
FOREWORD

A NOTE FROM OUR


CHAIRMAN AND CEO

As we enter the final months Perhaps the most powerful Records for its huge capacity, OVERCOMING CHALLENGES Through its success, the
of 2021, the world is finally example of this is in Iraq, will treat 5.6 million cubic The fact that such impressive, Kingdom has established a
looking forward with a level of where our water and utilities meters of wastewater every large-scale projects were all leadership position in the field
hope and optimism that has experts are assisting in the day, enabling the irrigation of completed during the of emergency management
been missing for much of the delivery of multiple large-scale more than 1,400 km² of challenges of the past 12 and health disasters. This was
past two years. While we have projects which will bring safe, farmland along the Suez months is a testament to all recognized in October, when
been fortunate in our sector to clean water to Basra Canal. K&A colleagues were stakeholders involved, and the NHEOC became the first
have escaped the worst Governorate for the first time recently delighted to be clearly reflects the facility in the Eastern
impacts of the pandemic, it is in three decades. recognized for their work on extraordinary determination Mediterranean region to be
nevertheless a great relief that the project when it was and capability of this region to accredited by the World
some sense of normality is In October, K&A oversaw the awarded an Engineering Health Organization (WHO).
completion of Mahila Reverse progress, no matter what
returning. The evidence of this News-Record (ENR) Global obstacles stand in the way.
is felt nowhere more strongly Osmosis Plant, one of the Best Project Award. The leadership and forward-
most complex projects in the This is all the more reassuring, thinking demonstrated by
than the UAE, where all eyes given the fact that Covid-19 is
turned at the beginning of portfolio. This facility is able to Another project which was projects such as the NHEOC
operate under remarkable recognized by ENR, with an likely to be among us in some will ensure that whatever
October for the launch of capacity for some time
Expo 2020 Dubai. variations in salinity, varying Award of Merit, was Qatar uncertainties lie ahead, this
from 2,000 to 30,000 mg/l, University’s New College of to come. region is well positioned to
K&A was privileged to play a enabling it to produce potable Education. The 59,000 m² Nevertheless, governments in maintain its strong progress.
role in the delivery of five water despite the changeable building, for which K&A the region are taking As ever, K&A is looking
different pavilions – the conditions of the Shatt Al- provided lead design and important and necessary steps forward to working closely
Kingdom of Saudi Arabia, Arab river. construction supervision to ensure they are prepared with its clients to assist in the
Egypt, USA, Pakistan and services, is a model of for any future escalations. realization of their ambitions,
Palestine – so we understand sustainable development, and you will find many more
RECORD BREAKER having been built to 4-Star
and appreciate the enormous examples of how we’re already
effort that has gone into its In Egypt, K&A’s work is also Design and Construction BEACON OF EXCELLENCE doing this throughout the
production over several years. playing a vital role to treat Standards in line with Qatar’s An example of this is the pages of our latest newsletter.
Staging such a showpiece polluted water through a Global Sustainability Kingdom of Saudi Arabia’s
global event is a huge project which is creating jobs, Assessment System (GSAS). National Health Emergency On behalf of the K&A Board
achievement, and we look driving prosperity, improving Operations Center (NHEOC). and all our people, thank you
forward to witnessing its the environment and In addition, City Centre Al This exceptional project, for for taking the time to read
success over the months significantly supporting the Zahia, the largest mall in the which K&A was lead more about the company’s
ahead as it attracts new country’s drive for greater UAE’s Northern Emirates, was consultant, seamlessly latest activities, and we wish
audiences to the region. self-sufficiency. Bahr Al Baqar named Retail Project of the integrates WebEOC you a healthy, happy and
wastewater treatment plant, Year at the MEP Middle East emergency management successful end to the year.
K&A colleagues have been for which K&A was lead Awards. This stunning LEED software with other
celebrating a number of other consultant, was inaugurated in Gold project, for which K&A Najib Khatib, Ph.D.
technologies, such as GIS, to Chairman & CEO
important project milestones September by President Abdel was lead consultant, was the digitally transform the
across our geographies which Fattah El-Sisi. The project, first major retail development Kingdom’s emergency
are together improving the which has been recognized by to be launched in the MENA management services and
lives of millions of people. the Guinness Book of World region during the pandemic. healthcare delivery.
IN THIS 14 30
ISSUE
EXPO 2020 DUBAI: UNITED
ARAB EMIRATES
Stunning Saudi Pavilion Enthralls
Visitors to Expo 2020 Dubai

06
INFRASTRUCTURE: IRAQ
Khatib & Alami (K&A) is set to bring
32
lasting benefits to Basra in southern Iraq. TRANSPORTATION: KUWAIT
How K&A saved 25% of time spent
on design, using BIM as it reimagines

09 Fahaheel Expressway

18 34
PARTNERSHIP
K&A has further extended its
Geographic Information System (GIS)
and Building Information Modelling MASTER PLAN: STATE OF NEWS IN BRIEF
(BIM) capabilities. KUWAIT Celebrating achievments, milestones,
An ambitious project that envisages a and new partnerships

10
holistic transformation of Al-Jahra’s
7.3 km2 water strip.

TECHNOLOGY
The Missing Link Between BIM and GIS
in Construction Industry.
22
SUSTAINABILITY: UNITED
ARAB EMIRATES
K&A has been awarded the design and
supervision of a green community space
for the Dubai Science Park.

24
WATER SCARCITY: EGYPT
Bahr Al-Baqar Tackling Water Scarcity
27
in Egypt

12 27
WATER SCARCITY: KINGDOM
INDUSTRY AWARDS OF SAUDI ARABIA
Our ability to keep pushing boundaries Saudi Arabia’s Arafat-Taif Water Tunnel
has been instrumental in winning Achieved in Record Time Despite the
notable industry awards. Pandemic

14 28
SMART CITY: KINGDOM OF Q&A ON COVID-19 AS 'GAME

30
SAUDI ARABIA CHANGER'

18
K&A has completed the design of How has it changed the face of
Riyadh Smart Square. business?
INFRASTRUCTURE | IRAQ
TOTAL LENGTH OF
PROPOSED
BASRA BACK WATER STRATEGY TOTAL SERVED
POPULATION TRANSMISSION
PROJECTS BY AT YEAR 2045 & DISTRIBUTION
TO LIFE NUMBERS 7.5 MILLION WATER LINES To find a long term, sustainable
REBUILDING RESILIENT 850 KM solution, K&A has been
commissioned by Basra
INFRASTRUCTURE AND
Governorate to deliver a water
SUPPORTING RECOVERY
TOTAL CAPACITY OF strategy that will build resilience
IN IRAQ
PROPOSED in the water system against
DESALINATION natural hazards and climate
K&A is set to bring lasting Shatt Al-Arab, together with PLANTS risks in both the short and
medium terms.
benefits to Basra in southern
Iraq through working on several
saltwater intrusion from the
Arabian Gulf, culminated in acute
TOTAL SERVED
AREA FOR
12,000 M /HR 3
TOTAL CAPACITY OF
WATER TREATMENT
“Most of the water treatment
projects focused on restoring water and environmental crisis, facilities are aged, damaged
infrastructure and supporting affecting the health of more than
BASRAH PLANTS or eroded and, as a result, are
PROVINCE
local communities. four million inhabitants. TOTAL PROPOSED
30,000 M /HR 3 inadequate to treat raw water
For many decades, Basra
Governorate has suffered from
Basra, once one of the biggest
producers of dates in the
19,070 KM 2 WATER
PROJECTS
for drinking,” said Nassif Abi
Abdallah, Design Manager.
low accessibility to safe drinking
water despite having enormous
Middle East, has lost much of
its capability due to the lack 14 “After undertaking a thorough
assessment of the existing
natural water resources, like of sufficient fresh water. Rain infrastructure and the future
the Tigris and Euphrates shortages and the high salinity population demand, our
rivers flowing to the north of the Shatt waters damaged teams developed a water
and forming the Shatt al-Arab
river towards the Gulf. In 2018,
the soil and killed plants, which
led to farmers losing their main
INFRASTRUCTURE TOTAL SERVED
AREA
TOTAL SERVED
POPULATION
implementation strategy which
includes the construction
environmental pollution in the source of income. PROJECTS BY AROUND AT YEAR 2045 timeframe for several water
NUMBERS 55 KM 2
1.3 MILLION treatment plants, with a total
capacity of 1 million m3/
day, and around 160 km of
TOTAL LENGTH OF transmission lines.”
TOTAL LENGTH OF SEWER K&A will also spearhead full
ROADS NETWORK infrastructure design and
NETWORK
1,380 KM supervision for wet utilities

770 KMS DIAMETERS UP TO 2200MM TOTAL NUMBER OF


(potable water, sewer,
stormwater and irrigation
SEWER AND/OR networks), dry utilities (medium
TOTAL LANDSCAPED
STORMWATER and low voltage, SCADA and
TOTAL LENGTH OF GREEN AREA PUMP STATIONS telecom networks in addition
to street lighting networks),
POTABLE WATER
NETWORK 817,500 M 2 57 NOS. roads, and landscaping in Naft,
Moallemeen and Mowazzafeen
1,070 KM TOTAL CAPACITY OF
areas of Touba and Nakheela
district, in addition to Qornah
DIAMETERS UP TO 1800MM SEWAGE and Zubeir districts, with a
TREATMENT sewage treatment plant
TOTAL NUMBER OF
PLANTS for each.
Al-Mribad/Zubeir PS1 (Sewer (2,390 l/sec) and Stormwater (7,110 l/sec)) STREET LIGHTING QORNAH DISTRICT Project Director, Michel Saba
TOTAL LENGTH OF
POLES
“OUR TEAMS DEVELOPEDA GROUNDWATER 35,000 M3/DAY said: “A multidisciplinary team
WATER IMPLEMENTATION NETWORK 13,568 NOS. ZUBEIR DISTRICT
of 80 specialists has been
working in tandem to champion
STRATEGY WHICH
INCLUDES THE
259 KM 140,000 M /DAY 3
the detailed infrastructure
design of five areas with a
CONSTRUCTION TIMEFRAME STORMWATER construction cost of more than
FOR SEVERAL WATER TOTAL TOTAL LENGTH OF
NETWORK IRRIGATION
$1.7 Billion.”
TREATMENT PLANTS.” ELECTRICAL
Nassif Abi Abdallah,
450 KM POWER NETWORK

Batching Plant
Design Manager DIAMETERS UP TO 2400MM
281 MVA 145 KM
DIAMETERS UP TO 500MM

6 I INSIDE K&A INSIDE K&A I 7


PROJECT HIGHLIGHTS PARTNERSHIP

Client:
Basra Governorate, Beneficiary K&A PARTNERS
WITH VGIS
party: Basra Governorate
Role of K&A:

TO OFFER
Main consultant for the Entire
Project

AUGMENTED
Project Specifications:
Construction Cost: $ 1.73 Billion

REALITY
Design Completion Date: 2021
Construction Completion Date: 2023

EXPERTISE
Services Provided:
• Design
• Construction Supervision
Al-Askari/Zubeir PS6 (Sewer (860 l/sec) and Stormwater (9,800 l/sec))

“We are currently leading all


design works head-on thanks to
our growing team’s capabilities,
and this is enabling us to
overcome the difficulties of
operating for the first time in a
new geography with challenging
projects’ requirements.”
K&A in Iraq goes beyond the
water sector and is playing an
important role in rehabilitating
the country’s infrastructure.
“Our work in Basra is among
a growing number of projects
being undertaken by K&A in
Images courtesy of vGIS
Iraq. Our office has grown to
more than 80 employees and is
expanding its expertise to take Khatib & Alami (K&A) has the detection of potential data around them in the most
on multidisciplinary projects, further extended its Geographic clashes or other errors which understandable way possible.”
such as the recently designed Information System (GIS) and can lead to delays or cost Like K&A, vGIS is an award-
Safwan land port at the border Building Information Modelling overruns while supporting winning partner of Esri and
between Iraq and Kuwait,” (BIM) capabilities after stakeholder collaboration. Microsoft. The
added Senior Manager – partnering with Canada-based “GIS, BIM and company’s product
Infrastructure, Dr. Maher Kahil. vGIS, a leader in visualizing AR can be “USERS WILL BE portfolio includes a
hidden infrastructure used together ABLE TO SEE visual GIS platform
through Augmented Reality to display THEIR GEOSPATIAL and a range of
(AR) technology.
SAFWAN Governorate. The project efficiency of customs infrastructure DATA AROUND custom mixed reality
AR provides users with an and utilities in-
will enhance the passage revenue collection and THEM IN THE MOST applications designed
interactive experience of a real- field and in real- for Microsoft HoloLens.
LAND PORT
of commercial goods reduce overcrowding, while
world environment, enabling time, helping UNDERSTANDABLE
and people by increasing maintaining preventive K&A is a
capacity to around 1,000 health measures. them to visualize digitally- designers, WAY POSSIBLE.”
A CATALYST OF ECONOMIC multidisciplinary
RECOVERY AND TOURISM vehicles per day, with the created objects within the real- project Manal Sayed, consultancy company
DEVELOPMENT BETWEEN seamless separation of world view. AR can also offer managers and Senior Director of GSI and a global leader in
IRAQ AND OTHER traffic between commercial the ability to interact with these field workers providing Geospatial
GULF COUNTRIES. goods and travelers. The objects via smartphones and to locate the solutions and the
final designs and plans for headset devices. right assets faster, saving time Platinum Partner for Geographic
The recently delivered the circa 727,500 m² site Through its strategic and preventing costly errors Information Systems (GIS)
design for Safwan Land include industry-leading partnership with vGIS, K&A and delays,” says Manal Sayed, software specialist Esri in
Port in Southern Iraq technologies for customs provides clients with accurate Senior Director of GSI at K&A. the Middle East & Africa.
is among several other transactions and goods AR views of the surrounding “By incorporating AR into The company’s experts are
high profile infrastructure clearance. These will infrastructure at project sites, enterprise GIS data that can be supporting the development of
projects being undertaken improve the experience such as utility networks or viewed as a natural extension geo-enabled smart cities across
by K&A on behalf of Basra of travelers, increase the proposed engineering designs. of the real world, users will be the region.
This will significantly enhance able to see their geospatial

8 I INSIDE K&A INSIDE K&A I 9


TECHNOLOGY

THE MISSING LINK BETWEEN BIM AND THE MISSING LINK


Imagine how much simpler it would be if site workers
Platform as a Vision
Yet the greatest benefit of AR in construction
is to integrate all of your BIM and GIS data

GIS IN CONSTRUCTION INDUSTRY could simply draw a red mark on the spot where a
pipe should go; or if they could quickly locate existing
into an open platform, available to anyone
in a truly digital format. Engineers want to
underground infrastructure assets know what installations, for example, the
Mohammad Hammoud, Senior Account Manager in K&A’s Geographic
(water/electrical pipes, fiber electrician has made in a certain time frame.
Systems Integration team, looks at the transformational role augmented Workers need to receive the information
cables) to avoid damaging or
reality (AR) can play in the construction sector. they need for their installation task on site.
obstructing them.
In addition, users should be able to add
The last decade has Augmented Reality (AR) has the feedback to their BIM models on the go, and
seen BIM (Building potential to transform the way such AR applications enable this two-way
Information people work on construction sites information transfer in real-time.
Modelling) and GIS and could be the
(Geographic “next big thing”
Project status tracking in Augmented Reality
Information Systems) in the AEC
(AR)
become widely industry. AR A simple status AR tracking app can be
adopted tools across provides a deployed, allowing anyone to understand
the engineering and construction user-friendly the progress of the project in a visually
industry. Both enable people, means of understandable way. Stakeholders,
technology, and processes to deliver zooming in and out while regardless of their technical expertise, can
improvements in project delivery. looking at BIM and GIS now access and interact with the project
models, making it easy to model in real-time, making it easy to follow
While BIM is known as the digital the project’s progress.
observe any mismatches between
representation of a facility’s physical
model and reality. This could provide
and functional models, by including
"the missing link" between BIM models On-site clash review
information in three dimensions
and GIS reality. Design and construction data can be
(3D) and integrating information
combined and visualized into a one-single
required for architecture, AR applications can be used to visualize BIM
model. Accordingly, clashes and interference
engineering and construction data, enabling users to introduce any missing problems can be identified and resolved
(AEC) projects, GIS looks at the objects, correct errors in the model or address before construction, while aggregating data
positioning of structures with their the mismatches for further investigation. This will from multiple sources. Because AR enables
surroundings. It is used to manage Image
result in many benefits: the visualization of BIM and GIS together, an
and analyze spatial data, focusing courtesy of STW automatic overlay of both the design and
more on real-world modeling. Architects real-world is now possible.

While the roles of BIM and GIS


can be complementary, the AEC On-site construction documents
industry hasn’t yet widely adopted Professionals on the ground can overlay
designs in AR on top of the ongoing
a method for truly consolidating the WHY GIS IN CONSTRUCTION? construction project, as well as surface
power of both technologies.
GIS can link project activities construction documents from Revit and
on sites with 3D drawings to others software tied to their exact position.
WHY BIM IN CONSTRUCTION? provide better visualization of Instead of shuffling through thousands of
Briefly, BIM improves collaboration actual construction progress. It paper-based construction documents or
while reducing errors. For instance, is designed to integrate, manage, PDFs, the on-site team is armed with the
information they need to catch design flaws
construction documentation can be and analyze spatial and non-spatial
early and perform their jobs more efficiently.
produced automatically, workflows information, related to real-world
can be accelerated immensely, assets, such as buildings and
and 3D building models can be infrastructure. Most, if not all, of
created and shared, which widens new constructions, renovations, real
the accessibility of the data and estate management, infrastructure
enables non-specialists to engage maintenance and environmental
and edit building designs. This 3D plans are based on GIS. While BIM IN SUMMARY
modelling has brought tremendous is best suited for managing data Construction sites can’t be
improvements to design related to the buildings themselves, managed without information –
and construction. GIS is more applicable for the more readily available that
It provides freedom to experiment everything outside and around the information is, the better it is for
with ideas digitally before buildings. BIM and GIS are therefore all involved with the project. AR is
committing project money. very different. set to bridge the gap between BIM
Architects can experiment with new But is there an efficient way to and GIS by bringing together the
materials and push the pragmatic overlap both technologies? And physical and virtual space onsite.
limits of design without risking the what would the connection look like
physical construction. between the two? Image courtesy of vGIS

10 I INSIDE K&A INSIDE K&A I 11


INDUSTRY AWARDS

AWARD SUCCESSES SHINE LIGHT


ON K&A PROJECTS AND PEOPLE
Despite the challenges posed by the pandemic over the past two years, the construction market
across the Middle East & Africa region has proven to be remarkably resilient. This is set to be the
central theme at awards events throughout the year as the industry comes together to celebrate its
many achievements.
Although it was still early in the awards season when this edition of Inside K&A went to press, our
teams were already pleased to have won recognition for their exceptional work.

Another recently completed building project to reduction in water use. All the main MEP
be recognized for its outstanding design was Al functions are housed in a separate Energy
Zahia City Center in Sharjah, UAE, which was Center that holds the primary mechanical plant
named best retail project at the Middle East MEP and equipment and a 33 kilovolt station.
Awards. With a total built up area of 363,976m², In addition to our
and a gross leasable area of 136,200 m², it is projects, K&A’s people
the largest mall in the Northern Emirates of the have also been honored
UAE. It was the first major retail development with industry plaudits.
to be completed and launched in the MENA Talented urban planner
region during the pandemic, reflecting client and architect, Dana Al
Majid Al Futtaim’s commitment to delivering this Haremi, was named
ambitious project despite challenging times. Rising Star of the Year at
The project is LEED GOLD certified, having the Construction Week
achieved 15.47% energy reduction and a 37.81% Oman Awards in March,
in recognition of her vast
Bahr Al Baqar Wastewater Treatment Plant in potential and ability to
Northern Sinai, Egypt, has scooped two top bring fresh perspectives
awards – ENR Global Best Project of the Year in to the projects she works
the infrastructure category, and ‘national winner’ on. Dana was also praised by the judges for her
at the MEED Projects Awards. The project now dedication towards constant self-improvement
enters MEED’s regional competition, with the for the benefit of her company, colleagues,
chance to win overall best water project of the clients, and community.
year. Read more about this record-breaking
This was followed, in
project on pages 24-26.
September, by Ghida
In addition, ENR recognized Qatar University’s Kaddah’s success in
New College of Education (NCE) with an Award winning the Mechanical
of Merit in the education category. This 59,000 Engineer of the Year
m² project was designed to accommodate 2,500 trophy at the MEP
students, supported by 200 academic and Middle East Awards.
administrative staff. Ghidah, who joined K&A
Located within Qatar University Campus, the in 2003 after gaining her
project is a model of sustainable development, master's in mechanical
having been built to 4-Star Design and engineering degree at
Construction Standards by Qatar’s Global the Lebanese University,
Sustainability Assessment System (GSAS). Its has proven her expertise
open-air courtyards are symmetrically located on many projects, such
on both ends of the building cores, making as La Perle Water Theatre in Dubai Habtoor City
four natural light sources. A key feature within and The Peninsula at Business Bay, Dubai. She
the access halls and staircases is a series of impressed judges with her willingness to go
hydroponic green walls that simultaneously above and beyond to meet or exceed
improve air quality and the aesthetics of the client expectations.
indoor space.

12 I INSIDE K&A INSIDE K&A I 13


SMART CITY | KINGDOM OF SAUDI ARABIA

RIYADH SMART
SQUARE AN
INTELLIGENT
AND RESOURCE-
EFFICIENT
COMMUNITY
Khatib & Alami (K&A)
has completed the
design of Riyadh Smart
Square, one of the first
projects by Aqalat that
adopts the smart city
development concept.

Smart cities have been increasingly Al-Mursalat district is a prime


gaining attention in the Kingdom of example of this initiative in action.
Saudi Arabia in recent years. Both K&A was appointed to design
the government and developers and deliver masterplan solutions
have embarked on major projects incorporating a mix of residential,
that leverage technology to boost commercial and retail units. The
citizen wellbeing and deliver design phase is complete, with
smart, sustainable, and inclusive construction expected to start in
growth. Saudi Arabia’s goal under the coming months.
Vision 2030 is to have three cities “The challenge of this project
recognized in the top-ranked 100 was to deliver a smart sustainable
cities in the world. development for Aqalat that
An important catalyst of this harnesses latest technological
strategy is Saudi Telecom Company advancements and innovations from
(STC), whose real estate developer STC,” said Riyadh-based Project
subsidiary Aqalat has been Manager, Omer Al-Hali. “A key part
spearheading communities in which of achieving this goal was to deliver
information and communications an integrated ICT infrastructure
technology (ICT) is utilized to from the very outset of the project
deliver smart infrastructure. that combines the best-of-breed of
Riyadh Smart Square in the city’s digital technologies."

14 I INSIDE K&A INSIDE K&A I 15


SUSTAINABILITY AT THE DESIGN CORE Photovoltaic Roof Panels
Rooftops are covered with photovoltaic
A bespoke sustainability strategy was designed for panels to generate solar energy capable
this project, right from the inception stage, aimed of meeting essential energy load
at achieving high-performance, resource-efficient, demands through clean and renewable
smart, innovative, and people centric design. Several energy. In addition, more than 30% of
sustainability Key Performance Indicators (KPIs) were the outdoor space will be vegetated or
to measure the achievement of the sustainability finished with high albedo material, all
strategy, throughout design, construction and of which will improve outdoor thermal
operational stages. Some of the primary attributes of comfort and contribute to a variety
targeted sustainability KPIs include: of additional passive energy
reduction methods.
Double Skin Façade
The office building features a highly User Wellbeing
efficient double-skin façade composed The design integrates enhanced indoor
of external screen, designed to reduce air quality levels, healthy construction
direct solar heat gains, regulate glare, materials and thermal comfort measures
and improve occupant indoor comfort. to maximize building occupant
productivity and wellbeing.

Low Carbon Embodied Material


Regional and recycled materials, as well Energy Efficient Technologies
as, certified products with Environmental Utilizing the latest energy recovery
Product Declarations (EPDs) and other technologies, demand-controlled
approaches have been used to promote ventilation, optimized interior lighting,
resource efficiency, circularity and low smart controls, and monitoring systems
carbon development. all contribute to energy efficiency.

A SMART-EMPOWERED “THE INTEGRATION OF sensors, autonomous cars, home


SMART AND INNOVATIVE appliances, and data centers. This
COMMUNITY will enhance operational efficiencies
TECHNOLOGIES IN THIS
As the design consultant, and user experiences and provide
K&A harnessed ICT and other DEVELOPMENT, WAS ONE
new revenue opportunities.
physical devices connected to OF THE KEY ELEMENTS IN
a centralized and integrated DELIVERING HIGH- "The integration of smart and
command and control center PERFROMANCE, RESOURCE innovative technologies in this
(CCC) for intelligent building EFFICIENT AND USER- development, was one of the
systems linking all core services, key elements in delivering high-
CENTRIC DEVELOPMENT”
such as lighting, power, and performance, resource efficient
water meters, pumps, heating, Waseem Al Azzeh, and user-centric development,"
fire alarms, cooling, elevators, Head of Sustainability Sector said Waseem Al Azzeh, Head of
and access control systems. Sustainability sector at K&A. “The
integrated use of ICT and the
This will help gather information evidence-based decisions,” said
deployment of renewable energy
and allow seamless and Elias Selwan, Electrical Team
technologies to regulate the
mass distribution of critical Leader. The efficiency of Riyadh
energy cooling and heating loads
instructions, notifications Smart Square relies heavily
helped improve user comfort and
and alerts. on its interconnected network
reduce energy consumption, with
availability and reliability.
“The CCC is a state-of-the-art energy savings of 24%, indoor
By leveraging emerging
building considered nowadays water savings of 38%, and outdoor
technologies, such as Artificial
as the spinal cord of any smart water savings of 44%.”
Intelligence, Internet of Things
city’s compound capable of (IoT), and Big Data Analytics, The project received the
monitoring, controlling and the project was designed Masterplan Project Award at the
commanding its operations. to prioritize mission-critical 2019 Cityscape Jeddah Awards
Moreover, it helps to analyze applications such as security, and is currently pursuing LEED
the massive amounts of data traffic management, and daily certification. K&A will continue
from different sensors and residents’ activities. With STC to explore the full potential of
instruments placed strategically being the first telecom provider digital technologies to design
to allow real-time exchange of of 5G technology in the region, comprehensive urban planning
data, optimize efficiency and the advanced technology has concepts for livable smart cities.
operations, save resources, unlocked IoT potential by
and access analytical tools for connecting mobile devices,

16 I INSIDE K&A INSIDE K&A I 17


Waterfronts are multipurpose is surrounded by a multitude sustainable and lively public
public places that boost of towns, adjacent to the realm that focuses on lifestyle,
MASTER PLAN | STATE OF KUWAIT
activity while curating nature Doha power plant east, the multi-sensory experiences,

REVIVING
inside the city. They mirror the mangrove’s reserve west, the nature immersion in local
city’s identity and contribute Jaber al Ahmad city in the environment, and physical and
significantly to the socio- south and a direct frontage onto mental well-being. The ‘genius
AL-JAHRA economic and cultural aspects
of urban life.
the sea.
Design Manager, Rania
loci’ - spirit of the place - was
very inspiring to create a

WATERFRONT Developing the Al-Jahra


waterfront “Al-Corniche”
Sassine said: “Our vision was
to turn Al-Jahra into a well-
unique spatial experience that
will remain with the visitors as

IN KUWAIT is among many initiatives connected, safe, comfortable, a happy memory.”


launched by the Government of
Kuwait in line with the National
Ambitious project envisages a
Development Plan - Vision 2035.
holistic transformation of Al-Jahra’s
Located north of Kuwait’s Bay,
7.3 km2 water strip, preserving its
the 7.3 km² waterfront is a key
biodiversity and stimulating
site as it represents one of the
widespread of recreational and
last developable areas before
cultural activities in a unique sense
the national reserve network.
of place.

CALL IT A DESTINATION
Khatib & Alami (K&A)
was appointed by Kuwait
Municipality - Projects
Development Sector to develop
a comprehensive master plan
for the area. City & Regional
Planning Director, Edgar
Mourad, said: “The waterfront
has vast potential to become a
prime touristic and recreational
destination for local residents
and visitors alike. In association
with our local partner Kuwait
Technical Consulting Bureau,
we are addressing the
“WE ARE ADDRESSING
project's environmental and
urban planning challenges to THE PROJECT'S
create a sustainable, socio- ENVIRONMENTAL, AND
environmental waterfront URBAN PLANNING
that expresses the Kuwaiti CHALLENGES TO CREATE
cultural identity.” A SUSTAINABLE, SOCIO-
One of the eminent challenges ENVIRONMENTAL
was solving the site’s contextual WATERFRONT THAT
constraints while safeguarding EXPRESSES THE KUWAITI
its pristine ecological value CULTURAL IDENTITY.”
and developing a sustainable
Edgar Mourad,
financial model with a feasible
City & Regional Planning Director
implementation plan. The area

ADOPTED APPROACHES AND GUIDING PRINCIPLES

Urban Social & Cultural


Integration Acceptance

Environmental Smart Economic


Sustainability & Light & Financial
Mobility Sustainability

INSIDE K&A I 19
The waterfront was designed such as the entertainment
with connecting decks and pier, a music venue on the
green blue corridors that deck, an aquarium, sports and
allow this seamless integration therapeutical areas, in addition
between the natural, to different types of hotels that
recreational, and touristic attract tourists alike.
components. On the northern By introducing a buffer zone
strip that is adjacent to the to the site, the accessibility
mangrove reserve –Kuwait’s was made easy with smart and
first protected area and globally light multimodal transportation
recognized in the Green List systems that optimize
of the International Union for mobility and enhance project
Conservation of Nature (IUCN) attractiveness throughout the
– the master plan boasts an eco- year, the week, and the day.
park, featuring a desert botanic
garden, a bird observatory, and
an eco-cloud with a view on the
intertidal wetland. “THE ‘GENIUS LOCI’
The sustainable design of the - SPIRIT OF THE
master plan fosters adaptability PLACE - WAS VERY
to many changes that bring all INSPIRING TO CREATE
kind of visitors to enjoy a unique A UNIQUE SPATIAL
place. For instance, the Kuwait EXPERIENCE THAT
Lifestyle Museum, the Friday WILL REMAIN WITH
Mosque and the souk are among THE VISITORS AS A
many iconic landmarks of the HAPPY MEMORY.”
development, reflecting on local
identity, history and culture. Rania Sassine,
Moreover, we devised additional Design Manager
activities to attract users to the
waterfront but also generate
interest among onlookers

BECAUSE WATERFRONTS
ARE NOT ONLY AN EDGE A NEW VISION FOR AL-JAHRA
WATERFRONT
BETWEEN URBAN FABRIC
AND WATER
Our experts developed a
comprehensive feasibility study
and master plan that recognize
the environmental asset of the
site. “We focused the master
plan to positively contribute
to Al-Jahra social and cultural
integration and environmental RECONNECT NEW IDENTITY
preservation while securing RECONNECTING PEOPLE FOR THE NEIGHBOURHOOD
TO THE WATERFRONT AND THE CITY
financial feasibility. The
overarching principle of this
project is ensuring sustainability
in a multi-layered sense -
environmental, socio-cultural
and economic,” added
Edgar Mourad.
The sea, the intertidal zone,
and the mangrove reserve
were the greatest asset of the
masterplan, becoming the WATERFRONT BALANCE
centerpiece for programming DESTINATION THE NEEDS OF AN ENGAGED
LOCAL COMMUNITY WITH
and activities. FOR THE NEIGHBOURHOOD PROGRESSIVE PLANNING
AND THE CITY GOALS

20 I INSIDE K&A INSIDE K&A I 21


The Peacock Garden
A flock (or muster) of peacocks
is being relocated to a fenced
off garden of 18,000 m² from
their current home in the
Emirates Towers park. As the
birds breed, there will be room
in the garden to house up to
200 of the spectacular birds,
and paths will run through it
to enable visitors to walk
among them.
A pond and various low-water-
demand plant species will be
used to create a microclimate
and biodiversity similar to the
peacocks’ existing habitat.
The Peacock Garden features
the transplanted ghaf trees,

The district park will


feature a community herbal
garden, a multi-use lawn for
neighbourhood events, and
a plaza space for weekend
SUSTAINABILITY | UNITED ARAB EMIRATES
markets and pop-up retail.
The streetscape includes

K&A DESIGNS SUSTAINABLE shaded reading and seating


areas, a playground featuring a

PARK FOR GROWING DUBAI


multi-games court and spacious
urban kids playing area, a
jogging track, and outdoor
COMMUNITY exercise pods, all of which will
encourage healthy physical and
intellectual activities.
Green community space services, provides a stunning in addition to public parks, A Sustainable Landscape Design
provides a balanced and 78,000 m² community space to provide healthy spaces for Greywater recycling and desert environment and remain mixed with big shade trees,
pleasant area at the heart of where professionals and people to exercise and enjoy renewable energy will reduce green, such as ghaf trees and shrubs, hedging and ground
the neighborhood. residents can work, live being outdoors. It’s great to energy loads through the date palms. cover, which will provide
As cities become more densely and flourish. have contributed to a project installation of photovoltaic
As part of Dubai’s initiative to nesting grounds for the birds.
Dubai Science Park is the which very much meets these panels and kinetic wind
populated and concern Deciduous and
criteria today.” sculptures. The park also plant one million
about the impact of climate region’s first free zone salt-tolerant
features a green roof system, ghaf trees, 32 “WE ARE PLEASED TO
change increases, planners, community that serves the trees were part
AN INNOVATIVE AND and solar-powered light pads were transplanted BE SUPPORTING
governments, and communities entire value chain of science, of the planting
and charging stations. from different COMMUNITY GREENING
across the world are taking a health and pharma sectors, MULTI-FUNCTIONAL DSP locations design strategy,
fresh look at parks and their fostering an environment that PROJECTS IN DUBAI” with careful
ARCHITECTURAL DESIGN... into the proposed
potential to help address critical supports research, creativity, … THAT PROMOTES District Park Marlon Van Maastricht, selection of
urban infrastructure and public innovation and passion. K&A and Tecom went through SUSTAINABLE LIVING, Senior Manager of Landscape softscape
to provide a
health issues. Parks are now ”We are pleased to be a series of design workshops Architecture, Urban Planning materials and
recognized as powerful tools to create a place that promotes CLIMATE CHANGE natural shade
plant species
supporting community greening and thermal and Design
for urban communities and projects in Dubai,” said outdoor play, fitness and ADAPTATION, AND to maximise
comfort and help
local economies. Marlon Van Maastricht, K&A’s recreation while including family BIODIVERSITY. sustainability criteria.
combat climate change. The
Senior Manager of Landscape and community interaction
Dubai Science Park (DSP) In response to UAE’s intense Park planting design features “A key focus for Dubai Science
Architecture, Urban Planning within the DSP business district.
in the city’s Al Barsha heat and the need to save trees for shading in prime Park is to ensure it will stand the
neighborhood now boasts an and Design. One Community water, xeriscaping methods locations, such as the seating test of time, fulfilling its role as
excellent example of the value “Since we were appointed to To promote a healthy lifestyle have been used to minimize and family areas. It also provides a treasured community space,”
that green spaces can bring the project, Dubai has released and create a sense of belonging or eliminate the need for an outdoor recreational adds Marlon Van Maastricht.
to a community. It’s recently its 2040 Master Plan, which to the community, the core of irrigation. The park has and activity space for the “Using quality materials and
completed district park, for envisions improving quality of the site includes a central open therefore been planted with community, while ensuring careful design, we trust it will
which K&A provided full design life by doubling the number of space designed as a retreat for drought-tolerant plant species shade and thermal comfort live on as a community asset for
and construction supervision green and leisure areas, visitors and residents. able to withstand the harsh throughout the year. many years to come.”

22 I INSIDE K&A INSIDE K&A I 23


WATER SCARCITY | EGYPT

BAHR AL-
BAQAR
TACKLING
WATER
SCARCITY
IN EGYPT
SUSTAINABLE WATER
MANAGEMENT AT BAHR
AL-BAQAR WASTEWATER
TREATMENT PLANT

For many years now, the area of


Northern Sinai has been facing
a number of serious challenges.
Rapid population growth along
with dryland expansion, water
pollution and lack of safe
drinking water are among the
many pressing issues that the
Government intends to resolve.
To help address these challenges,
Egypt developed Bahr Al-Baqar
wastewater treatment plant in
the east of Suez Canal, which has
been recognised in the Guinness
Book of World Records as the
world’s largest with a capacity of
with an estimated capacity of
5.6 million m³/day.
Commissioned by Egyptian
Armed Forces Engineering
Authority, Khatib & Alami (K&A)
has successfully completed this
ambition project from conception
to execution to a fast-track
schedule of 24 months.
The plant comprises four decantation, filtration, and
FROM WATER SCARCITY water treatment lines with a disinfection, the facility will
TO SUSTAINABLE WATER daily processing capacity of produce safe and clean water
USE 1,250,000 cubic meters each. that will be reused to irrigate AN EXEMPLAR PROJECT THAT CONTRIBUTES TO ACHIEVING THE UNITED NATION'S
The Egyptian government The effluents entering the drain 140,000 hectares of farmland SUSTAINABLE DEVELOPMENT GOALS (SDGS)
come from Sinai households, alongside the Suez Canal.
sought to tackle water resource The Bahr Al-Baqar wastewater Ensure access to water and water needs. The Bahr Al-Baqar
shortages and fill the current industries and plantations in Moreover, the project will
treatment plant goes hand- sanitation for all Goal wastewater treatment plant will
gap, estimated at 20 billion the region. The raw water is support government efforts to
in-hand with the SDGs by The project’s improve water quality by
cubic feet of water annually, transported to the proposed “green” areas of the desert and
providing high-quality reclaimed primary focus decontaminating water from
by establishing a clean-water treatment plant through deep convert them for agricultural
water, protecting marine and is to allow organic substances, households,
system for the Bahr Al-Baqar tunnels passing down the new use and traditional farming
coastal ecosystems from farmers and industrial wastes that used to
drain within the Sinai Peninsula Suez Canal to the eastern side regions; thus, linking the Sinai
pollution, reducing poverty by workers to get be drained to Lake Manzala
Development Plan. The new of the Canal. Peninsula with the Delta region,
creating new job opportunities, access to then discharged to the
Bahr Al-Baqar plant will help to Equipped with advanced and providing job opportunities
ensuring clean energy, and high-quality reclaimed water Mediterranean Sea.
treat all the wastewater flowing processes for pumping raw and better quality of life.
combating climate change. covering their agro-industrial
along the drain. water, coagulation, flocculation,

24 I INSIDE K&A INSIDE K&A I 25


End poverty Goal WATER SCARCITY | KINGDOM OF SAUDI ARABIA
As stated by

SAUDI ARABIA’S
the Egyptian
Minister of

ARAFAT-TAIF WATER
International
Cooperation,
Rania Al Mashat,
this project will
make a great impact on the TUNNEL ACHIEVED IN
agricultural development in
North Sinai, creating more than RECORD TIME DESPITE
THE PANDEMIC
100,000 and 1.2 million direct
and indirect job opportunities
respectively that can help
sustain families.

Ensure access to affordable, DRILLING HAS BEEN and falls into the Kingdom's reservoirs in the cities of Taif,
reliable, sustainable and modern COMPLETED FOR THE ambitious plan to increase water Al-Baha, and nearby villages.
energy Goal ARAFAT-TAIF WATER desalination capacity A housing compound and an
Moreover, and transmission supply, administration area will be built
TRANSMISSION TUNNEL,
instead of a matching its rapidly growing near the SWCC Taif Terminal as
PART OF WHAT IS
conventional water consumption. part of the project.
sludge drying Make cities inclusive, safe, resilient, Conserve and sustainably use the BELIEVED TO BE ONE OF
THE LONGEST WATER Despite the terrain challenges K&A has a long-standing
bed, a sludge and sustainable Goal oceans, seas & marine resources Goal
TRANSMISSION TUNNELS and coronavirus pandemic, the relationship with SWCC and is
solar drying Aligned with the Domestic
project was completed ahead of proud to support the Kingdom
system will be Sinai Peninsula sewage, industrial IN THE WORLD.
schedule. Our experts adopted in this vital project that will
adopted to capture solar energy Development and agricultural
Characterized by water several measures to achieve transport the required water
inside 128 green beds and turn Program, this waste used to
scarcity and no perennial this milestone. For instance, needs to the western villages in
sludge into a year-long asset project aims to flow untreated
rivers, Saudi Arabia is one of they have shortened the drilling Saudi Arabia.
that can be used in the optimally utilise through the
the driest regions in the world. distance by 40 kilometers
agricultural and industrial fields. water resources and reduce 135-kilometre Bahr Al-Baqar
To overcome this challenge, by starting the excavation at
A total of approximately waste, as it will work towards channel, discharging into Lake
the Saudi government has the bottom of the Al-Hada
475,000 tons of dewatered increasing the agricultural area, Manzala in the northeast Nile
undertaken substantial Mountains to reach the ring
sludge per year are to be dried especially in the Sinai Peninsula. Delta. The discharge from Bahr
investments in seawater road in Taif city. They have
from 24% dry solids (DS) to Also, it will help establish Al-Baqar, heavily loaded with
desalination, sewerage and also peaked the daily drilling
approximately 75% DS. integrated agricultural bacteria, heavy metals and toxic
wastewater treatment, and speed using a specialized
This modern system will avoid development projects covering organics, resulted in high fish
water distribution projects. tunnel boring machine (TBM),
polluting the air and reduce the agricultural, animal, and mortality and malformation. This
One example is the Arafat-Taif characterized by its rotating
carbon footprint by not having industrial production. project will help to sustainably
water tunnel, spearheaded by cutter head and double shields.
to consume the energy that was manage and protect Lake
Manzala’s ecosystem and the Saline Water Conversion With this achievement, we have
needed to transport the liquid Take urgent action to combat Corporation (SWCC). Believed
strengthen its resilience. completed the first milestone
sludge to the sludge landfills. climate change and its impacts Goal to be one of the world's largest of a critical project to supply
According to the water transmission tunnels, the potable water from Arafat,
Build resilient infrastructure, United Nations, Sustainably manage forests, 8.4 m tunnel extends 12.5 km, outside Makkah, to strategic
promote sustainable Egypt will face combat desertification, halt and
industrialization, and foster critical water reverse land degradation, halt
innovation Goal shortages by biodiversity loss Goal
By reusing and 2025 that could The treated water
treating affect around from the Bahr
resources from 0.5 million people in the Sinai Al-Baqar water
wastewater, the region. With a capacity of 5.6 reclamation plant
Bahr Al-Baqar million m³/day, the Bahr Al- will be used for
plant helps to Baqar water reclamation plant irrigation to
reduce the will provide a new source of restore 400,000
environmental footprint of treated water, which will be feddan of plantation east of the
wastewater treatment, used for the irrigation of Suez Canal, combating the
minimizes contamination, and plantation in the Sinai Peninsula, aridity nature of the region and
ensures the availability of where water shortages were restoring the degraded land and
valuable resources for presenting a threat to soil affected by mismanagement
surrounding communities. agriculture and the economy. of the Bahr Al-Baqar drain.

26 I INSIDE K&A INSIDE K&A I 27


INTERVIEW

Q&A ON COVID-19 AS 'GAME CHANGER':


HOW HAS IT CHANGED THE FACE OF BUSINESS?
Specialists from K&A Design Centers respond to questions, reflecting on
how covid-19, remote working, and digital technologies have paved the way
for more opportunity, innovation, and inclusiveness in project delivery.
Thanks to Ahmad Faeq, Senior Director - Operation Excellence; Mohamed
Saad, IT Director; Micheline Nader, Senior Project Engineer; and Vijaya “BY EMBRACING DIGITAL
Venkata, BIM Lead. TECHNOLOGIES, WE HAVE
CREATED A SHARED
CULTURE THROUGH
REGULAR MEETINGS AND
BRAINSTORMING
SESSIONS.”
Vijaya Venkata,
BIM Lead, K&A India, Bangalore

AHMAD FAEQ MOHAMED SAAD MICHELINE NADER VIJAYA VENKATA

1. What were the challenges 2. From an operational with ISO 19650-1 and ISO 19650- were customized to meet in the first month at Bangalore about digital solutions which
created for K&A by Covid-19? perspective, what new processes 2. The ISO 19650 standards project requirements in Design Center, remote working would never have been
Mohammad Saad: Time was our did K&A introduce? Specifically, provide a structured process to each department. attendance was 100% which is a considered previously.
biggest challenge. K&A has digital changes and applications support BIM implementation record for itself, showcasing the
on projects. This creates a 3. What was the impact of these commitment and dedication of Micheline Nader: New
always been an early adopter of on specific projects? technologies and tools brought
cloud computing; we already common approach which changes on our operations and our team.
Ahmad Faeq: K&A was quick to improves collaboration and about by the pandemic helped
had the foundations in place to deploy remote working projects? Efficiency and accountability
understanding among design us operate in a much larger
respond to key challenges such strategies followed by an Ahmad Faeq: Tools such as increased during work in virtual
teams, while improving cost and digital environment, benefiting
as remote working. extensive training program BIM360 and Teams have played mode and we were highly
time efficiency. from remote collaboration
But instead of being able to across our design centers to a vital role in supporting productive, and managed to
across virtual design teams in
pilot, test and roll out the ensure digital solutions were Vijaya Venkata: By embracing collaboration and meet the client’s expectations
various geographies. It’s a great
home-working programme consistently and efficiently used digital technologies, we have communication among K&A’s and project deliverables by
opportunity for us to leverage
over several months, the for communication and created a shared culture remote-working, geographically working around the clock.
communication and
urgency created by the collaboration on projects. through regular meetings and dispersed teams. Communicating with design
collaboration to build
pandemic demanded an brainstorming sessions. Global centres was instantaneous
The two main collaboration Visibility was improved for capabilities and skills and bring
immediate transition. implementation procedures and helped us to resolve
platforms used by the company project managers, ensuring they even more talent and innovation
were also put in place to set up problems quickly.
Another rising difficulty was are BIM360 for technical design are better equipped to monitor into our design projects.
remote working practices. For
managing logistics during the and Microsoft Teams for non- and control project tasks and 4. What do you think will be the
successful project delivery, we Vijaya Venkata: The pandemic
pandemic, ensuring everyone technical collaboration, schedules. Although K&A’s long-term legacy of these
streamlined BIM process and gave an impetus to hasten the
had the right equipment they document management and digital transformation was
workflows which, in turn, changes on your operations and process of change management
needed, as well as fast and project management. already well underway, the
increased productivity and
pandemic was responsible for
projects? And on the wider in ways that would not have
secure internet connectivity. A dedicated Microsoft Teams reduced time on repetitive tasks
catalysing adoption, both construction industry? been possible in normal times.
site was created for every by using automation tools such As they say out here in the East:
Micheline Nader: The pandemic technically and behaviourally. Ahmad Faeq: K&A believes the
project and all of K&A’s BIM as Plugins and Dynamo Scripts. “An Adversity is also an
brought forward a new reality of The company estimates that the past 12 months have swung the
families and libraries were Smart ideas were captured opportunity in a Disguise”. The
project delivery that was efficiency of its project delivery door open to greater
pushed to the cloud to ensure through the creation of smart pandemic has completely
challenging at the very and collaboration has improved digitalization in the construction
online accessibility and project-specific Revit Family for shifted how we think about
beginning. We needed to adapt by more than 40% compared to sector. Although it will take time
production standardization, tagging details and number work and lifestyle. The lesson
to a new remote working traditional methods, resulting in to change some elements of the
unified across all design centers. sequencing, and adding learned is that we need to be
routine and a fast-changing higher productivity, lower costs, ecosystem, there has been an
digital ecosystem that Mohamed Saad: We have Invert Elevations. acceptance of new ways of open to change which can
and greater consistency.
necessitates an increased invested to drive consistent, BIM coordination and working which are likely to transform our business and lead
collaboration across internationally certified BIM generating clash reports have Vijaya Venkata: When a remain post-pandemic, such as us to success.
design teams. standards across the business, helped to isolate errors, thereby complete lockdown was holding some meetings virtually
In spite of all challenges, the
Especially in delivering large and have been recognized by enhancing our existing enforced in India, for many of us instead of face-to-face.
resilience and commitment
scale projects, it was imperative the British Standards Institution preventive maintenance who did not have computer At a deeper level, K&A has also of our team resulted in
we foster a high-performing (BSI) for achieving BIM for processes. This has helped to systems, the office systems observed a change in mindsets, incredible performance.
virtual environment that ensures design, construction and fine-tune our project-related were delivered to our homes. and has entered dialogue with
timely and outstanding delivery. commissioning in accordance BIM trainings which Despite the challenges we faced some clients and partners

28 I INSIDE K&A INSIDE K&A I 29


EXPO 2020 DUBAI | UNITED ARAB EMIRATES

STUNNING SAUDI PAVILION SAUDI PAVILION WAS


ENTHRALLS VISITORS TO THE FIRST VISITING-
COUNTRY PAVILION TO
EXPO 2020 DUBAI OBTAIN:
• Dubai Electrical and
Water Authority (DEWA)
power-on tie-in and
approval, allowing the
The Kingdom of Saudi Arabia Delivering a project of such pavilion’s testing and
Pavilion, for which K&A scale and complexity at the commissioning activities
provided project management height of the pandemic was to start
consultancy and construction a significant challenge, made
• Dubai Civil Defense (DCD)
supervision services, conveys tougher by the fact that it was
approval of Pavilion’s
a message of dynamism and the first international pavilion
passive and active life
partnership to the world. to start construction. As a
safety components
Sitting on a 7,070 m2 plot close result, all the processes and
procedures of the Expo were • Dubai Electrical and
to the UAE Pavilion at the heart Water Authority (DEWA)
of the Expo 2020 Dubai site, being implemented for the first
time through this project. approval for potable
the Kingdom of Saudi Arabia’s water tie in to allow water
impressive pavilion features As the project manager and supply to the pavilion
the largest structure of all the construction supervision
visiting countries, with a built-up consultant, K&A played an
area of 13,000 m² and a height active role working alongside
of 27m. It’s eye-catching design a large team of stakeholders to • Water-efficient fixtures
features an inclined prism that support its successful delivery. are expected to reduce
opens like a large window, consumption by 50%
reflecting the welcoming compared to the baseline,
DELIVERING ON TIME AND while energy management
character of the Saudi nation
and the deeply-rooted culture WITHIN BUDGET strategies will reduce building
of its people and history, along Despite the impact of Covid-19, energy consumption by 25%,
with the Kingdom's ambition which resulted in the Expo 2020 external lighting by 25% and
for transformation. moving back 12 months to begin landscape lighting by 50%.
• The client introduced a first in • Construction progress • Renewable energy generated
first out (FIFO) design model documentation software was on-site via a “technological
K&A’S BUSY ROLE AT where the first critical items used to create a replica of the skin”, integrating solar and
DUBAI EXPO 2020 to be constructed on site (e.g. site, room by room, through photovoltaic panels, will
In addition to its work on the Steel Structure, Substructure) 360-degree images taken account for almost 30% of
KSA Pavilion, K&A was also were given priority in the daily – this improved visibility electricity usage. The project
involved as the construction design so that on site work while saving time and money. is on track to receive LEED
supervision consultant for could begin. In addition, the digitalization Platinum certification.
the USA, Egypt, Palestine, of all processes through the Commenting on the project,
• To allow a seamless
and Pakistan pavilions. use of advanced project Dubai-based supervision
transition between design
management software helped director, Amjad AlArdah, said:
and construction, the lead
in October 2021, the target for to manage all documentation “The target was to complete the
contractor was involved early
completing the project ahead and on-site procedures, such project before the original Expo
on, from the concept design
of the original opening date did as snagging and QA/QC. 2020 opening date. Thanks to
stage of the project, bringing
not change. And thanks to the design buildability and the effectively implemented
effective processes put in place cost efficiencies to the pre- SUSTAINABLE APPROACH processes, this milestone was
to achieve that target, with construction phase. Sustainability was a primary achieved despite the effects
innovative site management target for the project. For of the Covid-19 pandemic and
• To save time, 90% of all
and coordination, the pavilion all aspects of the Pavilion’s challenges such as site logistics
materials were ordered
was completed on time. What’s construction, reuse and and construction traffic.”
ahead of schedule. Chillers,
more, strict cost compliance escalators, elevators, led recycling of materials was a Congratulations to our client,
mechanisms ensured the project screens, and other long-lead key consideration: and to all stakeholders
was also within budget. items were designed well • 50% of used materials were involved in delivering this
Several factors contributed to ahead of time to procure redeployed or recycled, while exceptional project.
this project being an exemplar these items at an early stage 50% of construction waste
of international best practices: of the project. was recycled.

30 I INSIDE K&A INSIDE K&A I 31


TRANSPORTATION | KUWAIT utilities, structure, architecture
and geotechnical aspects.

HOW K&A SAVED 25% OF TIME Second challenge was to


deliver the project without

SPENT ON DESIGN, USING BIM AS IT disrupting movement on nearby


infrastructures such as the city’s

REIMAGINES FAHAHEEL EXPRESSWAY


metro line and the existing
utilities, bridges and pedestrian
bridges as the location of the
highway was in the center of a
populated urban environment.

THE SOLUTION
FASTER APPROVALS & SIMPLICITY
IN A COMPLEX ENVIRONMENT
K&A’s team used InfraWorks,
Civil 3D, 3DS Max and BIM 360,
during the feasibility study
and concept design phase,
to provide the client with the
three best alternatives that
would deliver the project on 3D models for each of the recommend changes inside the
time and budget. With support proposed alternatives, which program, leading to significant
of InfraWorks’ capacity to allowed the client to visualize time-savings in the typical back
handle large volumes of data, it the expressway more clearly and forth before final review.
became a highly useful tool for and make faster decisions at
all stakeholders to utilize it as
a consolidated source, leading
an earlier stage. Supporting THE SUCCESS
the design work within an
to a more cohesive integration already congested urban ONE STEP CLOSER TO VISION 2035
between departments, and environment, Civil 3D ensured From a high level, BIM 360 not
providing real time access that any design conflicts with only played a significant role
to all necessary parties. As a existing public services or in the smooth collaboration
project that relied on multi- utilities could be identified between project stakeholders
regional data visualization and and amended at the earliest but also optimized project
regular updates from various opportunity. It also aided in workflows to yield significant
stakeholder offices, providing a viable, five-level savings, particularly in the
BIM 360 was essential for solution for the interchanges design stage where the
syncing and sharing models which helped to work around development of 3D conceptual
across all disciplines and the existing traffic while causing and schematic designs were
OVERVIEW THE CHALLENGE Options included the potential enabling real-time coordination. minimal disruption to the area’s reduced by 25% and the
upgrade of the existing highway, coordination and approvals
RETURN TO THE OPEN ROAD THREE ROUTES TO SUCCESS the construction of an elevated In terms of overcoming the residents and commuters.
As one of the region’s oldest Considered a primary artery of multiple design challenges, In leveraging InfraWorks between the multi-disciplinary
highway or a hybrid of the two, teams saw a reduction of 18%.
and most trusted design and the country’s road network, the and three separate feasibility InfraWorks enabled the shareability, the client was also
engineering consultancies, 38-kilometer stretch of highway alternatives for the upgrade of production of highly accurate able to make comments and From a macroeconomic
Khatib & Alami (K&A) has long that connects the capital to the 22 existing interchanges. perspective, the overall solution
understood that its longevity governates of Hawali, Mubarak provided by K&A with the
and success in the market Al Kabeer and Ahmadi has Ultimately, K&A opted for the support of Autodesk, will
is largely due to its positive become increasingly congested. construction of an elevated ultimately lead to improved
outlook towards sustainable However, with the country’s road over the existing Route 30 highway safety, mobility, and
best practices and emphasis Vision 2035 on the horizon, the on a multi-span, 38-kilometer quality of life for Kuwaitis.
on time and cost-saving government decided to take viaduct, but this also brought
steps to revitalize this essential several challenges. Final challenge was that the
technology. At the core of its
corridor and thereby return free team would need to secure
design program capability is a First challenge was to produce
movement to its major roads, the necessary approvals and
long-standing relationship with the complete feasibility study
while helping to stimulate the constantly collaborate with
BIM, and a corporate attitude in a relatively tight schedule,
burgeoning commuter and more than ten key stakeholders
that embraces deep technical which would require a highly
trade routes between Kuwait and authorities, including the
expertise and digitalization collaborative process between
City and its satellite towns. Kuwait Municipality, Ministry
as part of its strategy. These the Beirut, Kuwait and Egypt- of Public Works, Ministry
foundations guided K&A’s team Split into two phases, the based engineering departments, of Finance and Ministry of
which was tasked with finding first phase required K&A covering aspects on roads & Electricity and Water Works
the right solution for Kuwait’s to propose three separate highways, survey, traffic, storm amongst others.
Route 30 Fahaheel Expressway. feasibility alternatives. water and drainage, dry and wet

32 I INSIDE K&A INSIDE K&A I 33


NEWS IN BRIEF SUPPORTING SUSTAINABLE DEVELOPMENT IN UPPER EGYPT

KHATIB & ALAMI PARTICIPATES AT THE WETEX 2021 EXHIBITION Upper Egypt is a strategic important project, which will communities. GIS will also
region for the Egyptian play a vital role in driving lay the foundations for asset
A PROUD GOLD SPONSOR OF AN INNOVATIVE FLAGSHIP EVENT
Government but faces various sustainable, impactful urban management systems at the
As a significant participant in challenges in economic planning and development to governorate level, integrating
the smart energy community, growth, employment support communities in Upper them with databases in relevant
Khatib & Alami (K&A) took part generation, connectivity, Egypt.” GIS tools will collect ministries and central-level
in the WETEX 2021 exhibition, service delivery access, and the vast amounts of data government agencies to
which focused on energy, water government capacities. required to balance competing present statistical and spatial
conservation, saving natural As a result, Khatib & Alami priorities, help decision-makers information on a platform
resources and building a (K&A) has been appointed to solve complex challenges, that promotes long-term
sustainable environment. a project for the development and identify opportunities decision-making.
of GIS infrastructure as part to support healthy, growing
This flagship event, organized
by Dubai Electricity & Water of the Upper Egypt Local
Authority - DEWA, provided us Development Program (UELDP),
with the opportunity to show an initiative of the Egyptian
our understanding of how these Government in the region.
sectors are fast developing. The program, co-financed
“Participating in this event gave by the World Bank, intends
us the opportunity to learn to promote sustainable local
more about the sustainable development, create new job
and innovative technology opportunities, and raise incomes
that’s propelling utilities and in Upper Egypt’s governorates
energy companies forward,” of Qena and Sohag.
said Walid Abou Chacra, Digital According to Water Treatment in design and supervision of Commenting on this project,
Energy Manager. “We have also Senior Manager, Maher Kahil, infrastructure projects. “It Dr Mohamed Misbah, GSI
provided a seminar highlighting this event has helped us to learn was very valuable to network director for the Middle East
K&A’s efforts to help the utilities more about advanced water with clients and partners, and and Africa region at K&A,
industry enhance performance treatment technologies and to share our thoughts on the said: “This is a strategically
and efficiency.” share our in-depth experience sector,” Maher explained.

SAUDI ARABIA’S NATIONAL HEALTH EMERGENCY OPERATIONS CENTER ACHIEVES A EGYPT’S LIGHT RAIL TRANSIT (LRT) IS NEARING COMPLETION
NEW MILESTONE IN HEALTH AND DISASTER MANAGEMENT (Ministry of Transport) aimed at
establishing a more integrated
The World Health Organization We are pleased to have
and sustainable transportation
(WHO) has designated the supported our client to deliver
system linking metro, railways,
National Health Emergency this critical project which will
monorail, Light Rail Transit, and
Operations Centre (NHEOC) as bring significant improvements
high-speed rail. For example, at
its first accredited collaborating to the public health and safety,”
the Adly Mansour interchange
centre in the Eastern said Manal el Sayed, Geospatial
station, commuters will be able
Mediterranean Region. Systems Integration
to switch between five different
The accreditation recognizes Senior Director.
modes of transport.
the centre's contribution to the The project’s customized
During peak hours, the LRT
growth of national and regional WebEOC-empowered
will have a single direction
capabilities. Since its completion solution, combined with other
transmission capacity of more
two years ago, the NHEOC has technologies such as geospatial
than 30,000 people per hour.
established a highly effective technology, provides a reliable
Its strategic location allows
emergency health management and efficient central data Egypt’s Light Rail Transit (LRT), K&A is responsible for the the residents of industrial,
system in the Kingdom of Saudi collection platform. which will connect Al-Salam, design review and construction residential and city center
Arabia, playing a crucial part Moreover, the NHEOC was able the New Administrative Capital, supervision of the LRT as the areas to reach their desired
in the nation’s response to the to assist other Ministry of Health and the 10th of Ramadan, is project's lead consultant for destination within 1 hour.
Covid-19 crisis. Saudi Vision 2030, especially (MoH) functions, including the close to completion, with construction supervision. This
In so doing, NHEOC contributes Goal 3: reducing health risks. national vaccination registry and construction and finishing trailblazing project is aligned
to the Saudi Ministry of “Congratulations to the Ministry the national ambulance services works of the first two phases with initiatives by Egypt's
Health's efforts to realize the of Health for this new milestone. operations centre. 95% completed. National Authority for Tunnels

34 I INSIDE K&A INSIDE K&A I 35


NEWS IN BRIEF K&A TO GEO-ENABLE ERES REAL ESTATE SOLUTION ON ESRI ARCGIS PLATFORM

K&A ACHIEVES INTERNATIONAL BIM STANDARDS RECOGNITION


Having gained the BSI BIM
Level 2 in 2019, we're
delighted to have now
attained the next level across
all of our design centres.
Khatib & Alami (K&A) has been
recognized for its international
BIM standards after achieving
the globally recognized
certification from the British
Standards Institution (BSI).
After a company-wide
assessment of the firm’s
projects by the BSI, including
client satisfaction and
collaborative engagement with common approach that with large-scale projects which
the delivery team, K&A can use improves collaboration and frequently involve multinational
the BSI Kitemark for achieving understanding among the teams working from different
BIM for design, construction and design team while improving office locations. "It represents
commissioning following ISO cost and time efficiency. an important step within our Khatib & Alami (K&A) is vital initiative, which provides board member, added: “ERES
19650-1 and ISO 19650-2. wider digitalization strategy, assisting Emirates Real Estate stakeholders in the UAE’s is pleased to have inked this
Sam Faekk, BIM Manager at
The ISO 19650 standards K&A, says: “Having a consistent which is ultimately aimed at Solutions (ERES) by geo- real estate industry with agreement with Esri and K&A,
provide a structured process set of internationally recognized driving continuous improvement enabling its services and innovative IT solutions, both of whom are prime leaders
to support BIM implementation standards adds enormous value in all aspects of our work for offerings to the international adding moreefficiency in cadastre solutions and the
on projects, creating a for design teams, especially clients and end-users.” land development and real and transparency to the land survey domain.”
estate market. marketplace,” said Faisal Alami, By incorporating Esri’s
Harnessing the real-time K&A Executive Vice President. capabilities for field collection,
capabilities of Esri’s ArcGIS “Our vast experience as a spatial analytics, and mapping
platform, our geospatial experts leading geospatial systems into its infrastructure and
A DOUBLE ACHIEVEMENT: NEW HEALTH AND SAFETY MILESTONES are helping investors and integrator will help us solutions, ERES will enable
A TOTAL OF 46 MILLIONS MAN-HOURS WITHOUT LTI AT TWO FIRST-CLASS PROJECTS regulators gain greater insights bringnew levels of visibility and investors and regulators to
on valuable locations, sales understanding for real estate establish equitable valuation
Khatib & Alami (K&A) was more than 16 million man- assessments, and rent indexes investors, which will support and property taxation through
proud to collaborate with hours without LTI. This by using contextual tools to their decision-making and embedded dashboards
Emaar, Majid Al Futtaim and all accomplishment comes from visualize and analyze data. ultimately drive confidence and and maps that provide an
involved stakeholders in the commitment of all involved “We are pleased to collaborate growth in the sector.” Khalifa instant view of the real estate
reaching 46 million man-hours parties to workplace safety, with Esri and ERES in this Al Suwaidi, ERES CEO and development market.
without LTI across two first which includes the adoption
class projects in UAE. of stringent safety standards,
procedures and systems.
THE ADDRESS RESIDENCES
DUBAI OPERA:
A Prime Residential Project AMIRA ELSAEED NAMED A 40 UNDER 40: CHAMPION OF CONSTRUCTION 2021
K&A worked actively with
its client Emaar, contractor Amira ElSaeed, a Cairo-based have demonstrated their ability
also included securing Covid-19
TAV Construction, and all architect who is playing a key to inspire, educate and advance
vaccines for all the project staff.
involved parties in reaching the role in advancing technology the industry.
sensational health and safety and innovation in design at Amira’s exceptional BIM skills
AL ZAHIA CITY CENTER:
milestone of 30 million man- K&A, has been recognized by and her forward-thinking
hours without LTI at Emaar A A Stunning new Leisure and Autodesk as one of its “40
Entertainment Destination nature leadership were
Plots – Opera District. under 40: Champions of highlighted by Autodesk for
We were delighted to mark the Construction 2021”.
The delivery at Emaar A Plots opening of Majid Al Futtaim City helping to deliver superior
is an outstanding indication of Centre Al Zahia mall in Sharjah Amira is one of just two outcomes for K&A's clients.
teamwork towards achieving by awarding the contractor, Middle Eastern nominees on
best safety practice. the Consolidated Contractors this prestigious list which is
TAV’s commitment to International Company (CCC), revealed by Autodesk every
occupational health and safety a trophy in recognition of year to celebrate those who

36 I INSIDE K&A INSIDE K&A I 37


We hope you enjoyed reading this issue of Inside
K&A. The aim of the magazine is to provide a brief
insight into our work, people, markets and ideas, www.khatibalami.com
drawing on our diverse skills and expertise across
the built environment sector.
Our multidisciplinary services span a wide spectrum
of industry sectors, including: architecture; city and
regional planning; transportation; water and
environment; geotechnical and heavy civil; power
and renewables; oil and gas; program management
services; and geospatial systems integration.
If you would like to find out more information about
anything you have read in Inside K&A, or to be put
in touch with one of our experts, please email us at
marketingandcommunications@khatibalami.com

You might also like