10 V 05

You might also like

Download as pdf
Download as pdf
You are on page 1of 5
Enpp! PAGE 10F5 DATA SHEET Toe ‘DATA SHEET Ne urn GAsco ‘awe [ m0 | soa sey 10-vas ‘seme; WiDGASCOMPLEX-ALEX.-naver | TEMTAGNS. co rt nn eves [0 200 19-01-P | 22 cy MAXIMIZATIONOF C2a.c3 FROM |_ SUPPLIER POR PROIECE, Wosrutn DESERT GAS FIELDS. a oun; rESSUREVESEL senvice + LOW TEMPRATURE SEPARATOR 2 | 20906 ISSED FOR PURCHASE, Regs ac aim onnenT Arent steele) + [awe a nw cone ran eae = rumen PAGE 20F5 T. OPER PRESSURE Tglen'g s EXT. OPER. TEMP. q INT, DESIGN PRESSURE Zz eng INT DESIGN TEM, arm fext: pesto PRESSURE" ——~"igen'ysEXT-DESTGN Teed} faba. =O AT PRESSURE ‘DESIGN DATA [no sr_ GRAVITY 73 [STATIC HEAD: JseRvICE: ORWAL ISOUR SERVICE: DIOGRAFHY: WIND SPEED- MECHANICAL DATA SSE VERTICAT. [SUPPORT: OP HEAD: ELL21 [BOTTOM HEAD: LIFTING LUGS: YES Inc. COVER: [LIFTING TRUNTON: NO INSULATION SUPPORTS: TES ‘AILING LUG: YES [FIRE PROOFING SUPPORTS: YES. (RTHING LUGS: YES [LADDERS (OR BOLTS: YES [PLATFORNS E. TEMPLATE: PIPE GUIDES TES OP DAVIT: TES NaF ‘SAIS AD 30a [SATE SABES SASF 304. ‘S500 SAI8E ‘SSS. ‘mm ANCHOR BOLTS. 436 ‘SURFACE PREPARATION & PAINTING "EXTERNAL PAINTING SYSTEM (FOR CSONLY) TINTERNAL COATING SYSTEM. SURFACE PREP: ‘SAZS GRIT BLAST ~~ |SURFACEPREP. ‘NO IMR TeINE aDDUCr CURED EPOXY (aiems |COATING: IN [INTER COAT — ame anoocr cons eroxy 5m) [LINING: NA OP CORT: Na (CLADDING: NA TAL COLOR PAINS MANUAL STANDARD [CP NO INSULATION IRSOLATIOR: TEXT CONSERVATION 7 OE | exTERIAT: [THICKNESS Co Exnpp! raon. sors aT PROTESTS TOTS mF ECT AA RINZATION OF Ch C3 PROM WES TERY DESERT AS MLDS Tasco ian TD OAS COMPLET ACER RTE Tors Soa ane Ze TORESEPTRTIO WEIGHT Taga RE RE RE RE RE RE RE RF RE RE RE RE SSS SiaSfS 58 PAGE SOF ALL DIMENSIONS ARE IN mi UNLESS OTHERWISE NOTED. MANHOLE SHALL BE PROVIDED WITH BLIND COVER, BOLTING, CASKET AND EITHER HINGE OR DAVTT, AS REQUIRED INDATASHERT, ALL NOZZLES SHALL BE PROTECTED WITH METAL COVERS DURING SHIPPING. FLANGE FACING SHALL BE3.2 10 63 um RA. FOR RF FLANGES. [ANY REMOVABLE INTERNALS SHALL PASS THROUGH MANHOLE INNER DIAMETER. ANY MENTIONED THICKNESSES IN DATA SHEET SHALL BE CONSIDERED MINIMUM AND THE SUPPLIER ‘SHALL BE RESPONSIBLE FOR THE CODE VERIFICATION OF SUCH THICKNESSES. ALL MISSING DATA SHALL BE COMPLETED BY SUPPLIER AND SHALL BE SUBJECT TOENFP REVIEW AND “SKIRT UPPER SECTION SHALL RE SA240-304 WITH MINIMUM LENGTH OF 100m. IPE GUIDE & PFE SUPPORTS ARE SPECIAL TYPE FOR LOW TEMPERATURE SERVICE COMPLETE WITH POLYURTHANE BLOCKS, “TE VESSEL. AND ALL TS COMPONENTS SHALL BS SHIPPED TO WESTERN DISET GAS COMPLEX. ‘SPARE PARTS FOR COMMISSIONING AND START UPSHALL 111 THREE COMPLETE SETS OF GASKETS FOR MANOLES, BLIND CONNECTION ANIINTERNALS (ANY). 112 10% OF BOLTING (MIN. 5 PIECES OF EACH SIZE) FOR MANHOLES, BLIND CONNECTIONS AND newts “TWO YEARS OPERATIONAL SPARE PARTS (OPTIONAL), SHALL BE: 121 THREE COMPLETE SETS OF GASKETS FOR MANHOUES, BLIND CONNECTIONS AND INTERNALS 123 10% OF BOLTING (INS PIDCES OF EACH SIZE) FOR MANHOLE, BLIND CONNECTIONS AND INTERNALS. ALL DIMENSIONS MARKED ( SHALL BE DEFINED BY SUPPLIER. (GASKET SHALL BESS SPIRAL. WOUND CW NON ASBESTOS FILLER AND SS INNER AND CENTERING RING.

You might also like