JOB TITLE / AIM: Construction of amine sump tank Footing and welding .
JSA DATE: 23/11/06 JSA NO./ REVISION:
SUPERVISOR/ JSA LEADER: Zafar Iqbal SCRIBE: Abdullah Khan/Masood Memon
PARTICIPANTS: Zafar, Tufail, Fida , Bruce Boxshall ,Ihsan
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1. Mobilization of equipment
2. Construction of last pipe rack footings
a. Lean concreting
b. Steel fixing
c. Form Works
d. Concrete pouring with concrete pump
3 Welding of ten compressor pedestals (footing 7) and six pipe rack footings anchor bolts(footings 1-6)
4Demobilization
Equipment required: Generator ,Welder, grinder , hand tools ,wheel barrow, vibrator , concrete machine ,Crane
Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,S First aid kit must be present at the area and the Hse personnel is the first response in case of emergency
File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of workers & Unauthorised equipment/tools brought out Before mobilization equipment must be
equipment to site inspected by E & P like (Generator, Welding
Machine, , vibrator , concrete
machine ,Crane, grinder)
Unskilled Person Start the job. Ensure that the permit recipient and all
personnel prior to start the have been
inducted and oriented about the hazard in the
job site.
Ensure trained permit recipients manages
work interface with operations
Workers starting the job unfit to work All personnel must undergone fitness
certificate from the Del doctor. Not fit to work
shall not be allowed to work at the project
site.
Workers starting the job unaware of work Ensure that permit recipent mustt conduct
plan ,role ,responsibilities tool box meeting and people are aware of job
and hazards enclosed in the job they are
doing. Jsa was discussed in the TBM and
every one is required to sign at the back.
Without double eye protection Use double eye protection to save the eye injury