This audit checklist summarizes the verification of compliance with the Audit Personnel Qualification Procedure of the Quality Assurance program. It was found that:
1) The procedure was properly approved according to requirements.
2) The lead auditor passed the required communication skills test and participation requirements of conducting 5 audits in the last 3 years including one nuclear audit.
3) The lead auditor passed the required qualification examination under supervision of the Nuclear Corporate Quality Assurance Manager.
4) The Nuclear Corporate Quality Assurance Manager certified the qualification of the lead auditor as required.
5) Sample auditor personnel were found to have the proper competency certificates.
6) The list of certified audit personnel prepared by the Nuclear
This audit checklist summarizes the verification of compliance with the Audit Personnel Qualification Procedure of the Quality Assurance program. It was found that:
1) The procedure was properly approved according to requirements.
2) The lead auditor passed the required communication skills test and participation requirements of conducting 5 audits in the last 3 years including one nuclear audit.
3) The lead auditor passed the required qualification examination under supervision of the Nuclear Corporate Quality Assurance Manager.
4) The Nuclear Corporate Quality Assurance Manager certified the qualification of the lead auditor as required.
5) Sample auditor personnel were found to have the proper competency certificates.
6) The list of certified audit personnel prepared by the Nuclear
This audit checklist summarizes the verification of compliance with the Audit Personnel Qualification Procedure of the Quality Assurance program. It was found that:
1) The procedure was properly approved according to requirements.
2) The lead auditor passed the required communication skills test and participation requirements of conducting 5 audits in the last 3 years including one nuclear audit.
3) The lead auditor passed the required qualification examination under supervision of the Nuclear Corporate Quality Assurance Manager.
4) The Nuclear Corporate Quality Assurance Manager certified the qualification of the lead auditor as required.
5) Sample auditor personnel were found to have the proper competency certificates.
6) The list of certified audit personnel prepared by the Nuclear
Quality Program Reviewed: OC Nuclear Department:-Quality Assurance
Organization:- Orascom Construction Quality Assurance Program
Reference: AUDIT PERSONNEL
QUALIFICATION PROCEDURE NQAP 02.04 REV1, NQAM REV1 Vendor Name :- NA Location :- OC Head Office
Audit Reference: 06/19
Objective Evidence Ser No. Item to be Surveyed / Audited Results 1 Singed procedure with the mentioned Check that the preparation, review and approval of the positions AUDIT PERSONNEL QUALIFICATION PROCEDURE Table 6.1.1 (with the same positions) NQAP 02.04 Rev.1 is done as per Table 6.1.1 2 Check the availability of the written test for communication Letter for the communication skills test of for the lead auditor that done by (NCQAM). CL. 3.1.2 Lead auditor (Hussain Elkersh ) 3 Check the Lead auditor participation requirements and be sure that five audits done actually by him in the last 3 years. 5 Audit reports of Lead auditor (Hussain And one of them is nuclear QA audit. Check the audits Elkersh). report availability. And be sure that all of them are recorded Audit Participation Record (Exhibit NQAP in Audit Participation Record (Exhibit NQAP 02.04.01) 02.04.01) CL. 3.1.4 4 Check the examination of the lead auditor and be sure that it is Examination of Code as per Para. 3.1.3. under supervision of NCQAM. CL. 3.1.5 Examination of Manual and procedures. Examination of auditing techniques.
Exhibit NQAME 18.02 Sheet 1 of 1 Rev. 0
5 Be sure that The Nuclear Corporate Quality Assurance Manager (NCQAM) certifies each Lead Auditor’s qualification on the Form NQAPE 02.04.02 and related Record of Lead Auditor Qualification Exhibit (NQAPE documents. 02.04.02). CL.3.2.3 6 Take sample from the Each Personnel who fulfills the qualification requirements and check the competency certificate Certificate of Ibrahim or Magdy (Exhibit NQAPE 02.04.03) for each one. CL. 3.5.2.e
6 Check the list of certified Audit personnel (Exhibit NQAPE
The list 02.04.04) that prepared by NCQAM. CL.4.1.1.
Prepared by : Lead Auditor Hussien Elkersh Date : 25/01/2020