This audit checklist reviews Orascom Construction's quality assurance program for corrective action procedures. It contains 6 items to be audited, including checking that the corrective action procedure was properly prepared, approved, and implemented. Corrective action reports were reviewed to ensure they were properly approved and addressed per requirements. The checklist also includes verifying the corrective action log is available and used correctly, as well as ensuring follow-up on corrective actions within two weeks. It closes by checking the availability and approval of the last six months of quality trend analysis reports.
This audit checklist reviews Orascom Construction's quality assurance program for corrective action procedures. It contains 6 items to be audited, including checking that the corrective action procedure was properly prepared, approved, and implemented. Corrective action reports were reviewed to ensure they were properly approved and addressed per requirements. The checklist also includes verifying the corrective action log is available and used correctly, as well as ensuring follow-up on corrective actions within two weeks. It closes by checking the availability and approval of the last six months of quality trend analysis reports.
This audit checklist reviews Orascom Construction's quality assurance program for corrective action procedures. It contains 6 items to be audited, including checking that the corrective action procedure was properly prepared, approved, and implemented. Corrective action reports were reviewed to ensure they were properly approved and addressed per requirements. The checklist also includes verifying the corrective action log is available and used correctly, as well as ensuring follow-up on corrective actions within two weeks. It closes by checking the availability and approval of the last six months of quality trend analysis reports.
Quality Program Reviewed: OC Nuclear Department:-Quality Assurance
Organization:- Orascom Construction Quality Assurance Program
Reference: CORRECTIVE ACTION
PROCEDURE NQAP 16.01 REV1, NQAM REV1 Vendor Name :- NA Location :- OC Head Office
Audit Reference: 06/19
Objective Evidence Ser No. Item to be Surveyed / Audited Results 1 Check that the preparation, review and approval of the CORRECTIVE ACTION PROCEDURE NQAP 16.01 Rev.1 is done as per Table 6.1.1 2 Select sample from Corrective action reports (Exhibit NQAME16.01) and check the following: * CAR was reviewed and approved By NCQAM. P. CL. 2.2 *In case the CAR on the Quality assurance department, it should approved by NCQD. P.CL.4.2. *Be sure that the selected sample have all the requirements in CL. 4.3 3 Check the CAR Log (Exhibit NQAME 16.02) and be sure it is available and applied, reviewed and approved by the NCQAM or by the NCQD. P.CL.4.4 4 Check the follow-up on the CARs and be sure it is conducted by the issuer within two weeks after the scheduled implementation date. P.CL.5.1.
Exhibit NQAME 18.02 Sheet 1 of 1 Rev. 0
5 Ask about the availability of The Quality Trend Analysis Report for the last six months. P.CL.6.1 6 Be sure that the quality trend analysis prepared by the Nuclear Corporate Quality Assurance Engineer and reviewed by the Nuclear Corporate Quality Assurance Manager (NCQAM) and approved by the Nuclear Corporate Quality Director (NCQD). P.CL.6.2 Prepared by : Lead Auditor Ramy Moharram Date : 2/2/2020