Professional Documents
Culture Documents
Studi Case - Ded Rumah Eco Living
Studi Case - Ded Rumah Eco Living
Studi Case - Ded Rumah Eco Living
2-2 1-1
1 2 3 4 5 6
10,500
3,000 4,500 750 2,250
B
2,000 1,000 2,500
A TAMAN
A
B
988
C LAUNDRY C
1,025
1,225
3-3 D DAPUR
D 3-3
TOILET
1,800
2,825
TERAS
E E
R MAKAN
4-4 F F
1,500
WALK IN
4-4
13,300
CLOSET
750
G G
NO PERUBAHAN / REVISION TGL/DATE PARAF/SIGN
KM TIDUR UTAMA
H H
13,300
PROYEK / PROJECT
3,500
3,580
TERRUANG RAMU RUMAH TINGGAL
I GARASI
I PEMILIK / OWNER
1,500
1,420
FOYER
TAMAN TERAS
1,705
ARSITEK / ARCHITECT DENI HERMAWAN
AHLI STRUKTUR /
-
STRUCTURAL ENGINEER
AHLI MEP /
-
MEP ENGINEER
1 2 3 4 5 6
2-2 DENAH LT 1
1-1
DENAH LT 1
DIGAMBAR/DRAWN By - Tanggal/
Date
DIPERIKSA/CHECKED By - Tanggal/
Date
1:100
Tanggal/
DISETUJUI/APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
2-2 1-1
1 2 3 4 5 6
10,500
3,000 7,500
3,000 3,000 825 1,425
B
2,300 700
913
714
R KERJA
C C
BALKON
1,025
KAMAR TIDUR
3-3 D D 3-3
3,100
2,850
MEZZANINE
E E
TOILET
4-4 F F
1,500
4-4
750
10,339
G G
NO PERUBAHAN / REVISION
KAMAR TIDUR TGL/DATE PARAF/SIGN
PROYEK / PROJECT
3,500
3,580
RUMAH TINGGAL
VOID
I I PEMILIK / OWNER
1,500
1,420
KONSULTAN PERENCANA / DESIGN CONSULTANT
J J
ARSITEK / ARCHITECT DENI HERMAWAN
1,705
AHLI STRUKTUR /
-
2,787
STRUCTURAL ENGINEER
AHLI MEP /
-
MEP ENGINEER
1 2 3 4 5 6
DIGAMBAR/DRAWN By - Tanggal/
2-2 1-1
Date
DIPERIKSA/CHECKED By - Tanggal/
Date
DENAH LT 2
Tanggal/
DISETUJUI/APPROVED By -
Date
2-2 1-1
10,500
6,000 4,500
913
739
3-3 3-3
3,850
ROOF TOP
4,600
4-4 4-4
750
NO PERUBAHAN / REVISION TGL/DATE PARAF/SIGN
3,500
PROYEK / PROJECT
5,000
VOID
RUMAH TINGGAL
1,500
PEMILIK / OWNER
1,705
ARSITEK / ARCHITECT DENI HERMAWAN
2,787
AHLI STRUKTUR /
-
STRUCTURAL ENGINEER
AHLI MEP /
-
MEP ENGINEER
Tanggal/
DISETUJUI/APPROVED By -
Date
1:100
KODE GAMBAR/ NO GAMBAR/ REVISI/
DRAWING CODE DRAWING N. REVISION
ARS 000
KETERANGAN / REMARKS
ROOF TOP
PROYEK / PROJECT
RUMAH TINGGAL
PEMILIK / OWNER
AHLI STRUKTUR /
-
STRUCTURAL ENGINEER
AHLI MEP /
-
MEP ENGINEER
DENAH ATAP
1:100
DIPERIKSA/CHECKED By - Tanggal/
Date
Tanggal/
DISETUJUI/APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
kolom beton
rangka besi hollow 5x10 cm
galvalum metal pasir
roster 20x20 ± 9.85
± 9.57
± 2.40 ± 2.40
± 7.20 ± 7.37
± 7.20
± 6.90
± 3.00 ± 3.100 ± 3.00
± 2.80
± 2.55
cor kedap air
tanah
cor kedap air
± 4.37 ± 4.37
± 3.62
± 3.62 ± 3.62
± 3.20 ± 3.20
± 2.90 NO PERUBAHAN / REVISION TGL/DATE PARAF/SIGN
PROYEK / PROJECT
± 0.00 ± 0.00
RUMAH TINGGAL
± 0.00 ± 0.00
- 0.30 - 0.30
PEMILIK / OWNER
- 1.40 - 1.40
AHLI STRUKTUR /
-
STRUCTURAL ENGINEER
AHLI MEP /
-
MEP ENGINEER
DIGAMBAR/DRAWN By - Tanggal/
Date
DIPERIKSA/CHECKED By - Tanggal/
Date
Tanggal/
DISETUJUI/APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
kolom beton
rangka besi hollow 5x10 cm
galvalum metal pasir
± 9.85
± 9.57
± 2.40
± 7.37 ± 7.20
± 7.20
± 6.90
± 3.00 ± 3.00
± 2.80
± 2.55
± 4.37
± 3.62 ± 3.62
± 3.62
NO PERUBAHAN / REVISION TGL/DATE PARAF/SIGN
± 3.22
± 2.65
± 1.67
RUMAH TINGGAL
AHLI MEP /
-
MEP ENGINEER
DIGAMBAR/DRAWN By - Tanggal/
Date
DIPERIKSA/CHECKED By - Tanggal/
Date
Tanggal/
DISETUJUI/APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
kolom beton
rangka besi hollow 5x10 cm
galvalum metal pasir
± 9.57 ± 9.57
± 2.40
± 7.20
± 7.20 ± 7.20
± 3.62 ± 3.62
± 3.62 ± 3.62
NO PERUBAHAN / REVISION TGL/DATE PARAF/SIGN
± 2.90
PROYEK / PROJECT
± 3.00
± 2.65 ± 2.12
± 1.67
RUMAH TINGGAL
AHLI MEP /
-
MEP ENGINEER
DIGAMBAR/DRAWN By - Tanggal/
Date
DIPERIKSA/CHECKED By - Tanggal/
Date
Tanggal/
DISETUJUI/APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
kolom beton
rangka besi hollow 5x10 cm
galvalum metal pasir
± 9.85
± 9.57
± 2.40
± 7.20
± 7.20 ± 7.20
± 3.62 ± 3.62
± 3.62 ± 3.62
NO PERUBAHAN / REVISION TGL/DATE PARAF/SIGN
± 2.90
PROYEK / PROJECT
± 2.12
± 1.67
RUMAH TINGGAL
AHLI MEP /
-
MEP ENGINEER
DIGAMBAR/DRAWN By - Tanggal/
Date
DIPERIKSA/CHECKED By - Tanggal/
Date
Tanggal/
DISETUJUI/APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
PROYEK / PROJECT
RUMAH TINGGAL
PEMILIK / OWNER
AHLI STRUKTUR /
-
STRUCTURAL ENGINEER
TAMPAK DEPAN
AHLI MEP /
-
MEP ENGINEER
1:100
TAMPAK DEPAN
DIGAMBAR/DRAWN By - Tanggal/
Date
DIPERIKSA/CHECKED By - Tanggal/
Date
Tanggal/
DISETUJUI/APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
PROYEK / PROJECT
RUMAH TINGGAL
PEMILIK / OWNER
1:100
AHLI MEP /
-
MEP ENGINEER
TAMPAK BELAKANG
DIGAMBAR/DRAWN By - Tanggal/
Date
DIPERIKSA/CHECKED By - Tanggal/
Date
Tanggal/
DISETUJUI/APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
PROYEK / PROJECT
RUMAH TINGGAL
PEMILIK / OWNER
1:100
AHLI MEP /
-
MEP ENGINEER
DIGAMBAR/DRAWN By - Tanggal/
Date
DIPERIKSA/CHECKED By - Tanggal/
Date
Tanggal/
DISETUJUI/APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
PROYEK / PROJECT
RUMAH TINGGAL
PEMILIK / OWNER
1:100
AHLI MEP /
-
MEP ENGINEER
DIGAMBAR/DRAWN By - Tanggal/
Date
DIPERIKSA/CHECKED By - Tanggal/
Date
Tanggal/
DISETUJUI/APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
1 2 3 4 5 6
913
C C
995
1,300
D D
1,800
2,655
E E
F F
1,349
799
G G
1,206
H H
NO PERUBAHAN / REVISION TGL/DATE PARAF/SIGN
PROYEK / PROJECT
3,651
2,445
RUMAH TINGGAL
I I
1,500
1,500
PEMILIK / OWNER
J J
KONSULTAN PERENCANA / DESIGN CONSULTANT
AHLI STRUKTUR /
-
STRUCTURAL ENGINEER
AHLI MEP /
-
3,000 2,500 2,000 750 MEP ENGINEER
1 2 3 4 5 6
RENCANA SLOOF
DAN PONDASI
DIPERIKSA/CHECKED By
-
-
Tanggal/
Date
Tanggal/
1:100
Date
Tanggal/
DISETUJUI/APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
1 2 3 4 5 6
429 200
B B' B'
913
739
C C
1,000
1,000
D D
2,100
2,754
E E
F F
1,500
846
G G
1,055
NO PERUBAHAN / REVISION TGL/DATE PARAF/SIGN
PROYEK / PROJECT
3,500
2,445
RUMAH TINGGAL
I I
1,500
1,500
PEMILIK / OWNER
J J
KONSULTAN PERENCANA / DESIGN CONSULTANT
2,300 700 3,350 1,150 750
AHLI STRUKTUR /
-
STRUCTURAL ENGINEER
AHLI MEP /
-
MEP ENGINEER
1 2 3 4 5 6
RENCANA KOLOM BALOK LT 2
DIPERIKSA/CHECKED By
-
-
Tanggal/
Date
Tanggal/
1:100
Date
Tanggal/
DISETUJUI/APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
739
2,600
2,600
1,154
2,000
846
NO PERUBAHAN / REVISION TGL/DATE PARAF/SIGN
PROYEK / PROJECT
3,500
5,000
RUMAH TINGGAL
1,500
PEMILIK / OWNER
AHLI STRUKTUR /
-
STRUCTURAL ENGINEER
AHLI MEP /
-
DIGAMBAR/DRAWN By - Tanggal/
Date
DIPERIKSA/CHECKED By - Tanggal/
Date
Tanggal/
DISETUJUI/APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
475 475
2,250
415 190 2,250
2,834
2,525
2,500
5,334
1,229
1,229
2,500
846
NO PERUBAHAN / REVISION TGL/DATE PARAF/SIGN
PROYEK / PROJECT
3,500
5,000
RUMAH TINGGAL
1,500
PEMILIK / OWNER
AHLI STRUKTUR /
-
STRUCTURAL ENGINEER
AHLI MEP /
-
RENCANA RINGBALOK LT 3
MEP ENGINEER
DIGAMBAR/DRAWN By - Tanggal/
Date
DIPERIKSA/CHECKED By - Tanggal/
Date
Tanggal/
DISETUJUI/APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
10,500
7,500 750 2,250
TAMAN
1,025
LAUNDRY
DAPUR
TOILET
2,825
TERAS
R MAKAN
WALK IN
13,300
CLOSET
750
NO PERUBAHAN / REVISION TGL/DATE PARAF/SIGN
PROYEK / PROJECT
13,300
3,500
3,580
KM TIDUR UTAMA RUMAH TINGGAL
TERRUANG RAMU
PEMILIK / OWNER
GARASI
METERAN MCB
1,500
1,420
FOYER
KONSULTAN PERENCANA / DESIGN CONSULTANT
1,705
AHLI STRUKTUR /
-
STRUCTURAL ENGINEER
AHLI MEP /
-
MEP ENGINEER
1:100
DIPERIKSA/CHECKED By - Tanggal/
Date
Tanggal/
DISETUJUI/APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
10,500
3,000 7,500
3,000 3,000 825 1,425
2,300 700
913
714
BALKON
R KERJA
1,025
BALKON
KAMAR TIDUR
3,100
2,850
TOILET
1,500
750
10,339
NO PERUBAHAN / REVISION TGL/DATE PARAF/SIGN
PROYEK / PROJECT
MEZZANINE
3,500
3,580
KAMAR TIDUR
RUMAH TINGGAL
VOID
PEMILIK / OWNER
1,500
1,420
KONSULTAN PERENCANA / DESIGN CONSULTANT
1,705
2,787
AHLI STRUKTUR /
-
STRUCTURAL ENGINEER
AHLI MEP /
-
MEP ENGINEER
1:100
DIPERIKSA/CHECKED By - Tanggal/
Date
Tanggal/
DISETUJUI/APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
10,500
6,000 4,500
913
739
ROOF TOP
3,850
4,600
750
NO PERUBAHAN / REVISION TGL/DATE PARAF/SIGN
PROYEK / PROJECT
3,500
RUMAH TINGGAL
5,000
VOID
PEMILIK / OWNER
1,500
1,705
2,787
AHLI STRUKTUR /
-
STRUCTURAL ENGINEER
AHLI MEP /
-
MEP ENGINEER
1:100
DIPERIKSA/CHECKED By - Tanggal/
Date
Tanggal/
DISETUJUI/APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
215
600 600
2,200
200 150
1,600
1,450
NO PERUBAHAN / REVISION TGL/DATE PARAF/SIGN
600
PROYEK / PROJECT
RUMAH TINGGAL
157 172
1,000 555
AHLI STRUKTUR /
-
STRUCTURAL ENGINEER
AHLI MEP /
-
MEP ENGINEER
DIGAMBAR/DRAWN By - Tanggal/
Date
DIPERIKSA/CHECKED By - Tanggal/
Date
KODE GAMBAR/
-
NO GAMBAR/
Tanggal/
Date
REVISI/
1:100
DRAWING CODE DRAWING N. REVISION
ARS 000
KETERANGAN / REMARKS
1,560
150
200
400
650
200
550
250
1,425 325
825 2,850 2,500
450
1,600
1,350
800
NO PERUBAHAN / REVISION TGL/DATE PARAF/SIGN
1,150
PROYEK / PROJECT
1,200
PEMILIK / OWNER
AHLI STRUKTUR /
-
STRUCTURAL ENGINEER
2,495
AHLI MEP /
-
MEP ENGINEER
DIGAMBAR/DRAWN By - Tanggal/
Date
DIPERIKSA/CHECKED By - Tanggal/
Date
KODE GAMBAR/
-
NO GAMBAR/
Tanggal/
Date
REVISI/
1:100
DRAWING CODE DRAWING N. REVISION
ARS 000
KETERANGAN / REMARKS
PROYEK / PROJECT
800
150
1,650
RUMAH TINGGAL
600
PEMILIK / OWNER
1,200
AHLI STRUKTUR /
2,800
-
STRUCTURAL ENGINEER
2,200
AHLI MEP /
-
MEP ENGINEER
DETAIL TAMPAK
SAMPING KANAN
DIGAMBAR/DRAWN By - Tanggal/
Date
DIPERIKSA/CHECKED By - Tanggal/
Date
KODE GAMBAR/
-
NO GAMBAR/
Tanggal/
Date
REVISI/
1:100
DRAWING CODE DRAWING N. REVISION
ARS 000
KETERANGAN / REMARKS
210
1,600 1,600
1,200
1,200
958
750 939
200
4,400
100 100
NO PERUBAHAN / REVISION TGL/DATE PARAF/SIGN
1,500
PROYEK / PROJECT
895
RUMAH TINGGAL
PEMILIK / OWNER
AHLI STRUKTUR /
-
STRUCTURAL ENGINEER
AHLI MEP /
-
MEP ENGINEER
DETAIL TAMPAK
SAMPING KIRI
DIGAMBAR/DRAWN By - Tanggal/
Date
DIPERIKSA/CHECKED By - Tanggal/
Date
KODE GAMBAR/
-
NO GAMBAR/
Tanggal/
Date
REVISI/
1:100
DRAWING CODE DRAWING N. REVISION
ARS 000
KETERANGAN / REMARKS
2-2 1-1
1 2 3 4 5 6
10,500
3,000 4,500 750 2,250
B
2,000 1,000 2,500
A SP TAMAN
A
B 988
SAB
C LAUNDRY C
1,025
1,225
3-3 D DAPUR
D 3-3
TOILET
1,800
2,825
TERAS
E E
R MAKAN
4-4 F F
1,500
WALK IN
4-4
13,300
CLOSET
750
G G
NO PERUBAHAN / REVISION TGL/DATE PARAF/SIGN
KM TIDUR UTAMA
H H
13,300
PROYEK / PROJECT
3,500
3,580
TERRUANG RAMU RUMAH TINGGAL
I GARASI
I PEMILIK / OWNER
1,500
KETERANGAN
1,420
FOYER
SP
ST
SALURAN LIMBAH CAIR
AHLI STRUKTUR /
-
1 2 3 4 5 6 SP SUMUR PERESAPAN
2-2 RENCANA SANITASI
1-1
RENCANA SANITASI
DIGAMBAR/DRAWN By - Tanggal/
Date
DIPERIKSA/CHECKED By - Tanggal/
Date
1:100
Tanggal/
DISETUJUI/APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
PROYEK / PROJECT
RUMAH TINGGAL
PEMILIK / OWNER
AHLI STRUKTUR /
-
STRUCTURAL ENGINEER
AHLI MEP /
-
MEP ENGINEER
3D EKSTERIOR
DIGAMBAR/DRAWN By - Tanggal/
Date
DIPERIKSA/CHECKED By - Tanggal/
Date
Tanggal/
DISETUJUI/APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
PROYEK / PROJECT
RUMAH TINGGAL
PEMILIK / OWNER
AHLI STRUKTUR /
-
STRUCTURAL ENGINEER
AHLI MEP /
-
MEP ENGINEER
3D EKSTERIOR
DIGAMBAR/DRAWN By - Tanggal/
Date
DIPERIKSA/CHECKED By - Tanggal/
Date
Tanggal/
DISETUJUI/APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
PROYEK / PROJECT
RUMAH TINGGAL
PEMILIK / OWNER
AHLI STRUKTUR /
-
STRUCTURAL ENGINEER
AHLI MEP /
-
MEP ENGINEER
3D EKSTERIOR
DIGAMBAR/DRAWN By - Tanggal/
Date
DIPERIKSA/CHECKED By - Tanggal/
Date
Tanggal/
DISETUJUI/APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
PROYEK / PROJECT
RUMAH TINGGAL
PEMILIK / OWNER
KONSULTAN
AHLI STRUKTUR /
STRUCTURAL ENGINER -
AHLI MEP /
-
MEP ENGINEER
Tanggal /
DIGAMBAR /DRAWN By -
Date
Tanggal /
DIPERIKSA /CHECKED By -
Date
Tanggal /
DISETUJUI /APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
PROYEK / PROJECT
RUMAH TINGGAL
PEMILIK / OWNER
KONSULTAN
AHLI STRUKTUR /
STRUCTURAL ENGINER -
AHLI MEP /
-
MEP ENGINEER
Tanggal /
DIGAMBAR /DRAWN By -
Date
Tanggal /
DIPERIKSA /CHECKED By -
Date
Tanggal /
DISETUJUI /APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
PROYEK / PROJECT
RUMAH TINGGAL
PEMILIK / OWNER
KONSULTAN
AHLI STRUKTUR /
STRUCTURAL ENGINER -
AHLI MEP /
-
MEP ENGINEER
Tanggal /
DIGAMBAR /DRAWN By -
Date
Tanggal /
DIPERIKSA /CHECKED By -
Date
Tanggal /
DISETUJUI /APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
PROYEK / PROJECT
RUMAH TINGGAL
PEMILIK / OWNER
KONSULTAN
AHLI STRUKTUR /
STRUCTURAL ENGINER -
AHLI MEP /
-
MEP ENGINEER
Tanggal /
DIGAMBAR /DRAWN By -
Date
Tanggal /
DIPERIKSA /CHECKED By -
Date
Tanggal /
DISETUJUI /APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
PROYEK / PROJECT
RUMAH TINGGAL
PEMILIK / OWNER
KONSULTAN
AHLI STRUKTUR /
STRUCTURAL ENGINER -
AHLI MEP /
-
MEP ENGINEER
Tanggal /
DIGAMBAR /DRAWN By -
Date
Tanggal /
DIPERIKSA /CHECKED By -
Date
Tanggal /
DISETUJUI /APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
PROYEK / PROJECT
RUMAH TINGGAL
PEMILIK / OWNER
KONSULTAN
AHLI STRUKTUR /
STRUCTURAL ENGINER -
AHLI MEP /
-
MEP ENGINEER
Tanggal /
DIGAMBAR /DRAWN By -
Date
Tanggal /
DIPERIKSA /CHECKED By -
Date
Tanggal /
DISETUJUI /APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
PROYEK / PROJECT
RUMAH TINGGAL
PEMILIK / OWNER
KONSULTAN
AHLI STRUKTUR /
STRUCTURAL ENGINER -
AHLI MEP /
-
MEP ENGINEER
Tanggal /
DIGAMBAR /DRAWN By -
Date
Tanggal /
DIPERIKSA /CHECKED By -
Date
Tanggal /
DISETUJUI /APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
PROYEK / PROJECT
RUMAH TINGGAL
PEMILIK / OWNER
KONSULTAN
AHLI STRUKTUR /
STRUCTURAL ENGINER -
AHLI MEP /
-
MEP ENGINEER
Tanggal /
DIGAMBAR /DRAWN By -
Date
Tanggal /
DIPERIKSA /CHECKED By -
Date
Tanggal /
DISETUJUI /APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
PROYEK / PROJECT
RUMAH TINGGAL
PEMILIK / OWNER
KONSULTAN
AHLI STRUKTUR /
STRUCTURAL ENGINER -
AHLI MEP /
-
MEP ENGINEER
Tanggal /
DIGAMBAR /DRAWN By -
Date
Tanggal /
DIPERIKSA /CHECKED By -
Date
Tanggal /
DISETUJUI /APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
PROYEK / PROJECT
RUMAH TINGGAL
PEMILIK / OWNER
KONSULTAN
AHLI STRUKTUR /
STRUCTURAL ENGINER -
AHLI MEP /
-
MEP ENGINEER
Tanggal /
DIGAMBAR /DRAWN By -
Date
Tanggal /
DIPERIKSA /CHECKED By -
Date
Tanggal /
DISETUJUI /APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
PROYEK / PROJECT
RUMAH TINGGAL
PEMILIK / OWNER
KONSULTAN
AHLI STRUKTUR /
STRUCTURAL ENGINER -
AHLI MEP /
-
MEP ENGINEER
Tanggal /
DIGAMBAR /DRAWN By -
Date
Tanggal /
DIPERIKSA /CHECKED By -
Date
Tanggal /
DISETUJUI /APPROVED By -
Date
ARS 000
KETERANGAN / REMARKS
PROYEK / PROJECT
RUMAH TINGGAL
PEMILIK / OWNER
KONSULTAN
AHLI STRUKTUR /
STRUCTURAL ENGINER -
AHLI MEP /
-
MEP ENGINEER
Tanggal /
DIGAMBAR /DRAWN By -
Date
Tanggal /
DIPERIKSA /CHECKED By -
Date
Tanggal /
DISETUJUI /APPROVED By -
Date
ARS 000