Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

action or Task

TRX/SDCCH/PDCH Expansion
Geo-based neighbor auditing using basic optimization tools like infovista xeus
Automatic Neighbor Auditing using tools
activation of concentric cell feature
activation of load based handover feature
GPRS/EDGE Timers Optimization
abis utilization audit
Gb interface Audit
A interface Audit
BSC DPU boards utilization audit
BSC CS/PS CP/UP processing boards utilization audit
BSC INT boards audit (GOU/OIU … etc)
Handover timers optimization
optimization of power control feature
optimization of cell selection and reselection
signaling analysis to resolve KPI issue
signaling analysis to resolve complain issue
resolving HOSR issues caused by common reasons
resolving HOSR issues caused by rare reasons
resolving DCR issues caused by common reasons
resolving DCR issues caused by rare reasons
resolving accessibility issues caused by common reasons
resolving accessibility issues caused by rare reasons
tuning of GUL inter-operability parameters and features activation
tuning of CS/MCS intial and adaptive modes in GPRS/EDGE
tuning of PDCH resources to resolve Board limitation failures
AFP on cell /cluster /rural small city
AFP on major city using planning tool
tuning of TRX priority based on quality
resolving paging success rate issue
tuning of handover parameters on major cluster level to optimize quality and HOSR
extracting and cleaning DL/UL and UL-Main/UL-Div imbalance issues
extracting and cleaning overshooting cells using TA measurements
extracting and cleaning overshooting cells using tool
extracting and cleaning silent calls on abis interface level
extracting and cleaning silent calls on BSC or CN level
multi-band inter-layer handover tuning to optimize quality and congestion
activating EDA EDGE feature
activating EICC/MICC feature
activating RF hopping feature
activating AMR feature
activating Speeach Frame Repairing feature
activating RACH storm filtering feature
activating SAIC feature
activating VQI feature
activating PS DTX feature
activating CS DTX feature
activating DL PS power control feature
activating repeated SAACH/FAACH feature
activating call restablishment and handover re-establishment
activating flex abis feature
activating abis over ip feature
activating dynamic power sharing feature
check 2G external definitions in other BSCs and RNCs
LAC re-dimensioning and splitting
abis interface congestion/High BER/faulty Flex issues troubleshooting
tuning of AMR/FR HR load balance
performing TRX power audit
resolving VSAT related issues
after refarming optimization activities
extracting and resolving KPIs issues caused by CN causes
extracting and resolving KPIs issues caused by abnormal UE behavior or UE SIM box
activating adaptive Um interference suppression
extracting and resolving Lapd congestion and rejection issues
optimization of SDCCH channels distribution and resources
performing license audit on BSC level features
extracting and resolving issues caused by specific BSC boards
prepare DT analysis report
analysis of drive test using TEMS investigation/discovery /Actix
minor frequency clashes cleaning using basic optimization tools like infovista xeus
extracting worst frequency clashes on network level
prepare basic 2G KPIs report
send analysis of daily KPIs degradation
building new interference matrix from neighbor level measurement
monthly auditing of very basic parameters on BSC level
extracting and cleaning silent calls using CDIG logs and mean holding time on network level
prepare 2G site database sheet
preparing power query based KPIs dashboard
BSC /BTS hardware vs configuration mismatch inconsistency check
engineer minimum required level
RNO engineer level:1
RNO engineer level:1
RNO engineer level:2
RNO engineer level:3
RNO engineer level:2
RNO engineer level:3
RNO engineer level:2
RNO engineer level:2
RNO engineer level:3
RNO engineer level:3
RNO engineer level:3
RNO engineer level:3
RNO engineer level:3
RNO engineer level:3
RNO engineer level:2
RNO engineer level:4
RNO engineer level:3
RNO engineer level:2
RNO engineer level:3
RNO engineer level:2
RNO engineer level:3
RNO engineer level:2
RNO engineer level:3
RNO engineer level:4
RNO engineer level:3
RNO engineer level:3
RNO engineer level:2
RNO engineer level:3
RNO engineer level:3
RNO engineer level:3
RNO engineer level:4
RNO engineer level:2
RNO engineer level:2
RNO engineer level:3
RNO engineer level:2
RNO engineer level:3
RNO engineer level:2
RNO engineer level:3
RNO engineer level:2
RNO engineer level:2
RNO engineer level:2
RNO engineer level:3
RNO engineer level:3
RNO engineer level:2
RNO engineer level:2
RNO engineer level:3
RNO engineer level:2
RNO engineer level:3
RNO engineer level:3
RNO engineer level:2
RNO engineer level:3
RNO engineer level:3
RNO engineer level:2
RNO engineer level:1
RNO engineer level:3
RNO engineer level:2
RNO engineer level:3
RNO engineer level:2
RNO engineer level:3
RNO engineer level:2
RNO engineer level:4
RNO engineer level:4
RNO engineer level:3
RNO engineer level:3
RNO engineer level:2
RNO engineer level:4
RNO engineer level:4
RNO engineer level:1
RNO engineer level:1
RNO engineer level:1
RNO engineer level:4
RNO engineer level:1
RNO engineer level:2
RNO engineer level:4
RNO engineer level:2
RNO engineer level:4
RNO engineer level:1
RNO engineer level:3
RNO engineer level:3

You might also like