Revision Philosophy
All revisions for review will be issued at R01, with subsequent R02, R03, etc as required.
All revisions approved for issue or design will be issued at A01, with subsequent A02, A03,
etc as required.
Documents approved for Construction will be issued at C01, C02, and C03 respectively.
Documents or drawings revised as “As built” will be issued as Z01, Z02 Z03 etc.
Narrative sections revised from previous approved issues are to be noted in the table
below and/or highlighted in the RH margin (using the appropriate revision status) thus: |
A02
Previous revision highlighting to be removed at subsequent issues.
Drawings/diagrams revised from previous approved issues are highlighted by 'clouding'
the affected areas and the use of a triangle containing the revision status.
Revision History
Page 1 of 25
1 INTRODUCTION 4
2 GENERAL 7
4 ORDER OF PRECEDENCE 14
5.1 General 14
6 SCOPE OF WORK 16
6.1 General 16
7 DESIGN REQUIREMENTS 17
7.1 General 17
Page 2 of 25
9 MATERIAL REQUIREMENTS 18
9.1 Manufacture 18
10 WELDING 19
10.1 General 19
11.1 General 20
11.3 Re-Tests 20
12.1 Identification 20
13 QUALITY ASSURANCE 21
13.1 General 21
14 CERTIFICATION 21
Page 3 of 25
Page 4 of 25
Page 5 of 25
Page 6 of 25
Page 7 of 25
Page 8 of 25
Page 9 of 25
Page 10 of 25
Page 11 of 25
Page 12 of 25
Page 13 of 25
4 ORDER OF PRECEDENCE
All materials to be supplied under this specification shall conform to the requirements specified
herein. In the event of any conflict between specification, data sheets, codes and standards, then
the following precedence shall apply.
This Specification
Other Relevant Project Specification
International Code and Standards.
National/ Local Codes and Standards
Nigerian Government Legislation
Project Scope of Work
Shell DEPs and Standards
Page 14 of 25
Page 15 of 25
Page 16 of 25
Page 17 of 25
9 MATERIAL REQUIREMENTS
9.1 Manufacture
Forged quick opening end closure shall be manufactured by a hot forging process in accordance
with ASTM A182 F51 and shall be suitable for welding to major barrel manufactured in accordance
with ASME Section VIII Div 1, Section UG-35, (b) (Quick Actuating Closures) and DEP
Page 18 of 25
10 WELDING
10.1 General
All welding shall be done by qualified welders, and in accordance to qualified procedure.
Qualification tests for welders and welding procedures shall comply with ASME IX specification.
Type of connection shall be Butt Welded with mitre for inclined/declined barrel, reduced access
or flanged to clients requirements. Bevel preparation of the welding end hub shall meet the
requirements of the design code. Barrel closures shall be suitable for vacuum service.
Page 19 of 25
11.3 Re-Tests
If any of the results does not conform to the specified requirements, the SUPPLIER may heat-
treat the batch forgings again provided they have COMPANY acceptance. The material shall then
be tested in accordance with this Specification.
Page 20 of 25
13 QUALITY ASSURANCE
13.1 General
All certification, test results, reports, and any other documentation submitted to the COMPANY
relative to the inspection system and results of inspections shall be in English language.
The CONTRACTOR shall establish and maintain a fully documented Quality System in
accordance with ISO 9001.
14 CERTIFICATION
A certification to BS EN 10204 3.2 is required, containing, as a minimum:
Purchaser Order Number
Purchase Order Item Number/Sub-item Number
SUPPLIER Identification
Nominal Size
Material Designation and Specification Number
Heat or Melt Number
Steel Making Process