Professional Documents
Culture Documents
Plaster itp-TCE
Plaster itp-TCE
1.4 Approval of mock ups -to provide 1 m long by 1 m wide mock-up of exterior QMS Make Section Prior to H H H
and interior wall and ceiling system section 09220/P1 alternative engineer works
(mock-up may considered as a part of the work) part 1 CI- 1-5-2
2.0 Works
2.1 Procurement Ensure definition of full requirement of specifications Approved MS Reject resolve Materials Prior to H H --------
section 09220 part 2 with supplier / engineer works
CI 2.2 manufacture assigned
find good quality signatory
of resources
2.2 Storing -Deliver cementation materials to site in original package, Approved MS Make good QC Prior to M M M Accepted Location Revised as work
containers or bundles, labelled with manufactures name, section 09220 part 1 engineer works proceeds
product brand name and lot number CI 1.6
-Store materials under cover and dry protected from
weather, direct sunlight ,surface contamination ,aging
corrosion and damage
2.3 Plaster composition Plaster shall be cement-sand mortar Approved MS Make good QC ongoing M M M Test Reports,
Spatter-dash 450 Kg cement/m33 sand section 09220 part 3 engineer Qualification data
Interior plaster 250 Kg cement/m3 sand CI 3.4.1
Exterior plaster 300 Kg cement/m3 sand Egyptian specs-
ministerial degree
no:164
2.4 Execution -Termination of plaster (top beads) UOI Approved MS Make good Site Per plot H H H Work / inspection request
Step 1 -Intersections of masonry and concrete surface : install section 09220 part 3 engineer [Form 4.03]
Dash coat , dots , mesh strip 150 mm on each side of the intersection line CI 3.3.1
bands and section09220
accessories part 2
CI 2.4.2
CI 2.4.3
2.5 Execution Plaster mortar shall be mechanically mixed with the correct Approved MS Make good QC Per plot H H H Work / inspection request
Step 2 proportions. section 09220 part 3 engineer [Form 4.03]
Plaster completion Quantity shall be as sufficient as to be used without being section 09220
delayed for excess time. consultant
acceptance
2.6 Curing Plaster coats shall be kept moistened for 2 days Approved MS Make good QC ongoing M M M
section 09220 engineer
Part 3
CI.3.5.4
2.7 Tools for inspection Spirit level and measure tape and angles