Power

Plug RCCB
63A 40A
L1
L2
L3
N
F1
E
F2 F3 F4 F6
F5
C.B 32 A C.B 32 A C.B 10 A C.B 10 A C.B 16 A
2 Pole 2 Pole 2 Pole 2 Pole 2 Pole
On / Off Switch On / Off Switch power outlet 1 power outlet 1 power plug 16 A
power outlet 2 power outlet 2 power outlet 1
AC 1 AC 2
On / Off Switch On / Off Switch power outlet 2
power outlet 3 power outlet 3
LF2 LF2
power outlet 3
power outlet 4 power outlet 4
Sym. Description LF2 LF2
F1 Main Circuit Breaker (Earth Leakage) Flood light
F2 Air Condition 1
F3 Air Condition 2 LF2
F4 Light + Power Room 1
F5 Light + Power Room 2
On / Off Switch On / Off Switch
F6 Flood Light
CLIENT : EGYCAMP
LF1 1*30 cm Fluorescent Lamp
LF2
LF3
2*120 cm Fluorescent Lamp
2*60 cm Fluorescent Lamp

LF4 LF4
REV DATE DRAWN
CHECKED APPROVED

AS BUILT
APPROVED FOR CONSTRUCTION
DESCRIPTION

SPS
Sinai Petroleum Services Co.

JOB TITLE : Accommodation Camp


LOCATION :
THIS IS A C.A.D DRAWING AND

EGYPT
NOT COPIED WITHOUT

Conference Room
CLIENT PO NO.
1
SPS DR NO. REV
A
LF4 Spot Over ENGINEER NOT CHANGE MANUALY PERMISSION SPS