400 60MM WIDE 6-8 THK SPLICE PLATE FITTED ON

TOP & BOTTOM SURFACES OF BEAMS TO BE What is prefabrication?


STEEL ANGLE WELDED CONNECTED Prefabrication is the practice of
TO STEEL PLATES CAST assembling components of a
INTO BEAM AND structure in a factory or other
COLUMN
PRECAST COLUMN manufacturing site, and transporting
8 O STIRRUPS

150
complete assemblies or
PROJECTING TO sub-assemblies to the construction
T-BEAM RECEIVE BEAM site where the structure is to be

300
BASE PLATE TOP BARS AND located.
SLAB Advantages:
NUT AND WASHER REINFORCEMENTS

250
100 100 · Saving in cost, material, time
75

SYNTHETIC RUBBER
IN SITU CONCRETE MORTAR BEARING PAD & manpower.
DOWEL CONNECTION
· Shuttering and scaffolding is
40

BAR not necessary.


TAPERED SLEVES 300 HAUNCH WITH CAST NUT & BOLT · Installation of building services
CONCRETE COLUMN and finishes can be done
FITTED WITH
immediately.
600

HOLDING DOWN PLATE WASHER TO FIX · Independent of weather


HOLDING DOWN BOLT SPLICE PLATE condition.
· Components produced at
CAST IN SITU
close supervision .so quality is
FOUNDATION PRECAST COLUMN PRECAST RCC BEAM TO BEAM
200

(400X400MM) good 23
CONNECTION
Disadvantages:
FOUNDATION TO COLUMN JOINT · Handling and transportation
PERIPHERAL TIE may cause breakages of
BAR
600 members during the transit and
COLUMN TO BEAM CONNECTION PRECAST
extra provision is to be made.
R.C.C COLUMN STRUCTURAL · Difficulty in connecting precast
CONCRETE
450
units so as to produce same
TOPPING
PRECAST COLUMN
PRECAST COLUMN effect as monolithic. This leads
to non-monolithic construction.
125
· They are to be exactly placed
PRECAST in position, otherwise the loads
R.C.C BEAM
coming on them are likely to
POCKETS 350
get changed and the member
may be affected.
150 PRECAST EXPOSED
LAPEED REINFORCEMENT
ANCHOR BOLTS
200

WIOTH NUTS IN
EACH CORNER
JOINT COMPLETED
END OF PRECAST
IN SITU CONCRETE
BASE PLATE SLAB NOTCHED FOR
COLUMN
PRECAST COLUMN
PRECAST COLUMN STEEL BOX CAST IN
COLUMN TIE BAR
THE END OF BEAM
THROUGH HOLE IN
BEARS IN ANGLE
COLUMN
IN REBATE IN
COLUMN TO COLUMN CONNECTION COLUMN PRECAST REINFORCED
COLUMN TO COLUMN CONCRETE STRUCTURAL
REINFORCING TIE EXPOSED REINFORCEMENT FRAME
`

50MM THICK SITU


CONSTRUCTION AND MATERIALS
TOPPING
BARS FIT IN SLOT CUT
IN ENDS OF THE
CONNECTION
FLOOR UNITS. R.C EDGE
BEAM IN SITU RIBS PREFABRICATION CONNECTION
AT 800C/C

PRATEEK SHARMA
TYPICAL WAFFLE
FLOOR
MOULD ROLL NO. 1903270810018
RIVETS
PLAN 800X800
L CLEAT DEPTH -225
B.ARCH SHEET NO.
UNIVERSAL
BEAM
9TH SEM

05
STANCHION
REINFORCED
UNIVERSAL
CONCRETE
COLUMN RIB REINFORCEMENT
BEAM CAST IN HONEYCOMB FACULTY- AR. ABHA
TO BEAM
SITU INDENTS LEFT
CONNECTION OF BEAM BY MOULDS
PRECAST CONCRETE
FLOOR UNIT WITH THE COLUMN SDCA, GZB
BEAM TO SLAB JOINT WAFFLE SLAB