Final Sheet-Model - PDF 5
Final Sheet-Model - PDF 5
150
complete assemblies or
PROJECTING TO sub-assemblies to the construction
T-BEAM RECEIVE BEAM site where the structure is to be
300
BASE PLATE TOP BARS AND located.
SLAB Advantages:
NUT AND WASHER REINFORCEMENTS
250
100 100 · Saving in cost, material, time
75
SYNTHETIC RUBBER
IN SITU CONCRETE MORTAR BEARING PAD & manpower.
DOWEL CONNECTION
· Shuttering and scaffolding is
40
(400X400MM) good 23
CONNECTION
Disadvantages:
FOUNDATION TO COLUMN JOINT · Handling and transportation
PERIPHERAL TIE may cause breakages of
BAR
600 members during the transit and
COLUMN TO BEAM CONNECTION PRECAST
extra provision is to be made.
R.C.C COLUMN STRUCTURAL · Difficulty in connecting precast
CONCRETE
450
units so as to produce same
TOPPING
PRECAST COLUMN
PRECAST COLUMN effect as monolithic. This leads
to non-monolithic construction.
125
· They are to be exactly placed
PRECAST in position, otherwise the loads
R.C.C BEAM
coming on them are likely to
POCKETS 350
get changed and the member
may be affected.
150 PRECAST EXPOSED
LAPEED REINFORCEMENT
ANCHOR BOLTS
200
WIOTH NUTS IN
EACH CORNER
JOINT COMPLETED
END OF PRECAST
IN SITU CONCRETE
BASE PLATE SLAB NOTCHED FOR
COLUMN
PRECAST COLUMN
PRECAST COLUMN STEEL BOX CAST IN
COLUMN TIE BAR
THE END OF BEAM
THROUGH HOLE IN
BEARS IN ANGLE
COLUMN
IN REBATE IN
COLUMN TO COLUMN CONNECTION COLUMN PRECAST REINFORCED
COLUMN TO COLUMN CONCRETE STRUCTURAL
REINFORCING TIE EXPOSED REINFORCEMENT FRAME
`
PRATEEK SHARMA
TYPICAL WAFFLE
FLOOR
MOULD ROLL NO. 1903270810018
RIVETS
PLAN 800X800
L CLEAT DEPTH -225
B.ARCH SHEET NO.
UNIVERSAL
BEAM
9TH SEM
05
STANCHION
REINFORCED
UNIVERSAL
CONCRETE
COLUMN RIB REINFORCEMENT
BEAM CAST IN HONEYCOMB FACULTY- AR. ABHA
TO BEAM
SITU INDENTS LEFT
CONNECTION OF BEAM BY MOULDS
PRECAST CONCRETE
FLOOR UNIT WITH THE COLUMN SDCA, GZB
BEAM TO SLAB JOINT WAFFLE SLAB