InTER— OFFICE CORRESPONDENCE
SEG-REDCO JVDBO-WORKPKGS-001
18.une 2023
‘Allan Damen, Senior Vie President
\
‘Mehmood Anwer, Project Controls Manager, SP
Work Paakes require LOA (Levels of Author) Approval
Project: P180-ESEC-REDGD Jolt Venture, Design Build and Operate PrecestFclites
Dear si,
Please find herewith enclosed the following Work Packages for your apprava, which also required
SEC internal approval as per below detls inline with the signed Interim (LOA) Levels of Authority
by Chairman dated 25 February 2029.
w
Ne Paclage Amount ‘Approver
1 1,252736.00 | Greater than 10 millon but | (COO) Mi. Ashrat Al America
Less than SO milion {£0} Mr Omer than
@
‘Over
sito Package hae LOA Requirement Approver
1 | Faa=200 subcontract | 140,785.00 Greater than or equale 100) (CEO)
Package thousand but Less than 10 milion | Mi. Ahmed Al
unprnarse Bassam
‘Thanks & cegards,
—n
2
Melos Anwar
Projet Controls Manager
special Projets