InTER— OFFICE CORRESPONDENCE SEG-REDCO JVDBO-WORKPKGS-001 18.une 2023 ‘Allan Damen, Senior Vie President \ ‘Mehmood Anwer, Project Controls Manager, SP Work Paakes require LOA (Levels of Author) Approval Project: P180-ESEC-REDGD Jolt Venture, Design Build and Operate PrecestFclites Dear si, Please find herewith enclosed the following Work Packages for your apprava, which also required SEC internal approval as per below detls inline with the signed Interim (LOA) Levels of Authority by Chairman dated 25 February 2029. w Ne Paclage Amount ‘Approver 1 1,252736.00 | Greater than 10 millon but | (COO) Mi. Ashrat Al America Less than SO milion {£0} Mr Omer than @ ‘Over sito Package hae LOA Requirement Approver 1 | Faa=200 subcontract | 140,785.00 Greater than or equale 100) (CEO) Package thousand but Less than 10 milion | Mi. Ahmed Al unprnarse Bassam ‘Thanks & cegards, —n 2 Melos Anwar Projet Controls Manager special Projets Lolt|Page