Download as pdf
Download as pdf
You are on page 1of 5
Type 01B 5-30A 240 Vac 50 Hz CL-1 Genus Power Infrastructures Ltd., Haridwar (india) 6LOWPAN LPREF communication 3200 imp/k¥?h = 9) 5 a Genus se Genus Bei ines ructures Ltd,Hdr eave -30A, 240V,CL-1 As Per IS 13779:1999 Meter Serial No. : ee Date: 4/2022 No Load Ok, HV Test ai oR Test OK. Starting Current Ok ee % Error U1 = 240 11 = 900%Ib PF = 1 0.07 % Load Points U1 = 240 11=900%lb PF =0.5 -0.08 % U1 =240 11 =100%lb PF =1 -0.06 % =240 1 ee 240 1 = 100%Ib PF =-08 0.02 % -0.06 % = 100%lb PF =0.5 -0.24% -0.13 % Testing Incharge:- Nitin Saini U1=Applied Voltage,I11=% OF Basic Current ____ This is System Generated report a ———————— Génus energizing lives User Manual > In . enn Specifications * Display Detaisg ¢ Connections * Installation % Safety * Contact us INTRODUCTION; GENUS Single Phase 2 Wire kWh Meter is an Electronic Energy Meter which is Suitable Sor metering in 1 Phase 2 Wire distribution system for residential and commercial applications, This meter is based on Micro-Controller for meeting power and energy measurement requirements. TECHNICAL SPECIFICA TIONS [ Connection Type 1-Phase, 2-Wire, AC Static Energy Meter Class 1.0 Compliance as per 1S:13773/1EC62052-11/ Aru 1£C62053-21 Rated Voltage 240V/230V/ 220V (Operating range -40% to +20%) 5-20A/ 5-30A/ 10-60A/ 20-80A or as per requirement Active Energy(kWh), Max Demand (kw) Measured value/ units Phase Voltage (V), Line Current (A) Power Factor Range As per 1S:13779/IEC62052-11/1EC62053-21 Frequency 50 Hz +5% i Display LCD with Backlit (Seven Segment display with Icons for other indications) Meter has CAL LED which acts as an indication for Visual indications availability of CAL pulse. a Miles ‘pica Pod OFA Per oF Pox ——— INSTALLATION: ete cy en CIN HF cone eth cemmancerion otonal communication f reaured ‘ne Ph coomon en oo bat meter ‘henszi2coomancetos 7m ha bata meter for Femperatureronge | As peri33779 NOTE Ft i ia, ng DR PN peers to the meter pre DISPLAY DETAILS: ‘Meter Display Parameters can be viewed in auto mode cycle and push nade cyte by pressing push bution os pe customer requirements below (Opt a energizing lives PRECAUTION & SAFETY PRACTICES 1)To minimize the risk of electrical shock, avoid any loose or exposed electrical connections near the installation. 2) Disconnect the supply during installation and use insulated hand gloves while working. 3) Always use proper tools and accessories. Avoid using damaged tools 4) Do not use the meter without Terminal Cover. This may cause severe electric shock 4) To prevent any potential damage, always install the meter at a height that is considered to be safe from street animals (for meter installation in public area). 6) Use the right cross section of cables / conductors for installation. 7) Meter must not be operated beyond the Specified limits. (Refer nameplate for rating). 8) If equipment is used in a manner not specified by the manufacture, the precision promised by the equipment may be affected. OPERATING CONDITION: o°ctos5°c

You might also like