1.

Writing the specifications

F1
829 m (F.O)

207 m (F.O)

R1 (100 m3) 6.7 Km (BLR) R2 (250 m3) 7 Km (BLR)


816 m (F.O)

F2

Captage Liaison Pompage Supervision


F1 and F2 : drilling in the water catchment area.
R1 : reservoir in the catchment area to group water with gravity conveyance to R2.
R2 : Reservoir of the pumping zone, bringing together water from other catchment areas before pumping towards the town located at a distance of 7 km
from the station.
Catchment zone
The collection station includes submerged pumps with identical characteristics, the cabinet must ensure:
Level detection in the well.
Pump on/off control.
Control control of flow in the pipes for filling tank R1.
Water metering.

Pump Power Startup type


P 5.5KW Direct

Link area
The connection area must contain an electrical cabinet for:
Regulate the water level in tank R1, according to the flow rate in the pipes on the capture side (inlet) and also on the pumping side (outlet).
Reception of drilling data and transmission to the pumping station cabinets.
Opening/closing of solenoid valves.

Pumping area
The pumping station has three 30 KW centrifugal pumps, with a flow rate of 110 m 3 /s and working alternately (two in operation and one in rest).
It must contain an electrical cabinet which ensures:
Pump stop/start control.
Flow control control for water delivery to the city.
Level detection in the tank
Water metering.
Opening/closing of solenoid valves.

Pump Brand Power Nominal Flow Startup type


P1 SIEMENS 30KW 110 m3 Progressive
P2 LOWARA 30KW 110 m3 Progressive
P3 SIEMENS 30KW 110 m3 Progressive

Supervision area
The supervision zone allows supervision of the system with the possibility of controlling the components (motor, solenoid valves).