Kurdistan Region ~ Iraq
Council of Ministers
Ministry of Munepality
(General Directorate of Water & Sewerage
Resident Engineer Office
Water Prolect ofS villages in Barzan Area
No: \4f us
pate: 2/2» 2023 noes
To / ARGE company
Sub. / Generators
Reference to both your letterno.928 dated 29/11/2023 and 984 dated 30/11/2023 regarding your firm reply
on our letter no 137 date 27/11/2023 and 139 date 29/11/2023, it appears from the your firm reply they are
misunderstanding from your side regarding what we mentioned in our mentioned letters, so we would like
draw your firm attention again about procurement mentioned in this project and
1- We insist on the mentioned in both.our letters above.
2- The time and location of testing materials and equipment and machine need for this project its our authority
and your responsibility to obligate, thats clearly mentioned in both letters above, those based in contract
condition and contract document.
3- The arrangement any any site visit for our engineering to any test at any location its your obligation
according to contract and condition related to investigation process according to what mentioned in the
employer requirement.
4- During the site visit test our engineer they doing his jobs based on what mentioned in the related standard
specification according to the contract but may be your staff whos combined with our engineer they doing
tourist and this subject is going back to your firm.
5- Regarding item 3.2 in the contract amendment it clearly mentioned the special situation like covid-19 where if
effecting on the travelling condition and made the international regulation to delay visa obtain, so its not general
and its not item take as justification for approving material without employer permission or witnessing any test.
General Directorate
Se water and Sexe a
Izesident Engineet OF
an Water Prol
Email: barzanproject51@gmail.comSE EE ne nrc seen
6- We would like to remind’your firm that according to first vendor list project submitted by your company and
approved by us, the Caterpillar brand was determined and it took a long time and you did not submit the
documents for this brand and your firm decided to delay it until the beginning of the year 2023, when you
informed us verbally that you intend to change the brand under the pretext of health conditions and
transportation of the companies and factories did not submit the document for new for the new brand until the
date 6/2023 , which means eightsmonths of delay, and at the time there was no objection to submitting the
documents and tajing the time on your consideration, and now , under the pretext of delay, your company wants,
to pass the issue of generators without fully complying with the terms of the contacts.
In the light of our above explanation any activity regarding this subject without our confirmation to all
related process your firm will take the responsibility if your firm faces our rejections.
With regards.
Project Manager