Batch Graduation No:76

Evaluation No:001 Name: Mohamed Khalil

Practice Title : Activity list


Project Name New Flare 53-PK-03

A-Riser KS-01
SN Define Scope
1A Civil Work
1.1A soil test
1.2A servey Report
1.3A concret activity basement

2A Steal structure platform


2.1A pre fabrication
2.2A installation and erection of S.S
2.3A Inspection for tighting

3A Riser installation
3.1A install Derrik N01
3.2A install Derrik N02
3.3A install Derrik N03
3.4A install Derrik N04
3.5A install Derrik N05
3.6A install Derrik N06
3.7A install Derrik N07
3.8A install Derrik N08
3.9A Flange Mangement and bolt Torque for each derrik

4A Attached piping
4.1A pre fabrication of piping
4.2A hydro test activity
4.3A erection for attached piping

5A Riser Tip
5.1A Flang Mangement bettwen Derrik no 8 to the Rasir Tip
5.2A SAT Test by the Vendor