ANALISA BIAYA PRODUKSI PABRIK CRUSHE

NO URAIAN KEBUTUHAN JUMLAH HARGA SATUAN


1 STONE CRUSHER 1.0 SET 11,000,000,000 5 TAHUN
2 SPARE PART CRUSHER 0.5 % 11,000,000,000
3 GAJI KEPALA CRUSER 1.0 18,000,000
4 GAJI CREW CRUSER 4.0 4,000,000
5 LISTRIK 1,000.0 KWH 1,645 KWH
6 PAJAK DAN RETRIBUSI DI LUAR PPN PPh 12.5 % 150,000 HARGA PASAR
7 ROYALTY LAHAN 800.0 M3 20,000
PEMAKAIAN ALAT
1 EXCA BRAEKER PC 200 2.0 UNIT 55,000,000 BULAN
2 EXCA LOADING DI QUARY PC 300 1.0 UNIT 65,000,000 BULAN
3 LOADER DI CRUSER WA-320 1.0 UNIT 70,000,000 BULAN
4 LOADER STOCK PILE WA-320 1.0 UNIT 70,000,000 BULAN
5 EXCA TONGKANG PC 200 1.0 UNIT 55,000,000 BULAN
6 DUMP 10 RODA DI QUARY 3.0 UNIT 35,000,000 BULAN
7 DUMP 10 RODA DI TONGKANG 1.0 UNIT 35,000,000 BULAN
PEMAKAIAN BBM ALAT
1 EXCA BRAEKER 2.0 UNIT 160 LITER
2 EXCA LOADING 1.0 UNIT 160 LITER
3 LOADER 1.0 UNIT 160 LITER
4 LOADER STOCK PILE 1.0 UNIT 160 LITER
5 EXCA TONGKANG 1.0 UNIT 160 LITER
6 DUMP 10 RODA 3.0 UNIT 125 LITER
7 DUMP 10 RODA 1.0 UNIT 150 LITER
UPAH TENAGA KERJA
1 KTT 1.0 ORG 5,000,000 BULAN
2 KARYAWAN ADMIN 1.0 ORG 4,000,000 BULAN
3 PENGAWAS/MERANGKAP CEKER LOADING 2.0 ORG 4,000,000 BULAN
4 CEKER 1.0 ORG 4,000,000 BULAN
5 MEKANIK 1.0 ORG 4,000,000 BULAN
6 HELPER MEKANIK 1.0 ORG 4,000,000 BULAN
7 KEUANGAN 1.0 ORG 4,000,000 BULAN
8 SECURITY 4.0 ORG 4,000,000 BULAN
9 BPJS TENAGA KERJA 27.0 ORG 450,000 BULAN

CATERING

1 CATERING 27.0 ORG 50,000 HARI


DUKSI PABRIK CRUSHER
JUMLAH HARGA WAKTU MODAL VOLUME MODAL/M3
11,000,000,000 60 BULAN 183,333,333 20,000 9,167
55,000,000 1 BULAN 55,000,000 20,000 2,750
18,000,000 1 BULAN 18,000,000.00 20,000 900
16,000,000 1 BULAN 16,000,000.00 20,000 800
1,644,520 25 HARI 41,113,000.00 20,000 2,056
18,750 12,500
16,000,000 25 HARI 400,000,000 20,000 20,000

110,000,000 25 HARI 110,000,000 20,000 5,500


65,000,000 25 HARI 65,000,000 20,000 3,250
70,000,000 25 HARI 70,000,000 20,000 3,500
70,000,000 25 HARI 70,000,000 20,000 3,500
55,000,000 25 HARI 55,000,000 20,000 2,750
105,000,000 25 HARI 105,000,000 20,000 5,250
35,000,000 25 HARI 35,000,000 20,000 1,750

21,000 25 HARI 168,000,000 20,000 8,400


21,000 25 HARI 84,000,000 20,000 4,200
21,000 25 HARI 84,000,000 20,000 4,200
21,000 25 HARI 84,000,000 20,000 4,200
21,000 25 HARI 84,000,000 20,000 4,200
21,000 25 HARI 196,875,000 20,000 9,844
21,000 20 HARI 63,000,000 20,000 3,150

5,000,000 1 BULAN 5,000,000 20,000 250


4,000,000 1 BULAN 4,000,000 20,000 200
8,000,000 1 BULAN 8,000,000 20,000 400
4,000,000 1 BULAN 4,000,000 20,000 200
4,000,000 1 BULAN 4,000,000 20,000 200
4,000,000 1 BULAN 4,000,000 20,000 200
4,000,000 1 BULAN 4,000,000 20,000 200
16,000,000 1 BULAN 16,000,000 20,000 800
12,150,000 1 BULAN 12,150,000 20,000 608

1,350,000 30 HARI 40,500,000 20,000 2,025

JUMLAH MODAL 116,949


HARGA JUAL 150,000
33,051
PROFIT 22
PALU - IKN
270 FEET
MUATAN 3.500 M3
LOADING 2 HARI
MENGANTAR & PULANG KAPAL 6 HARI
BONGKAR 3 HARI
11 HARI

BONUS SEWA KAPAL 2 BULAN 5 KALI MEMUAT


ADA 1 KALI BONUS MEMUAT UNTUK SEWA KAPAL
KETENTUAN : ASALKAN TEMBAT BONGKAR TIDAK ANTRI UNTUK SANDAR KAPAL

MUATAN
LITER HARGA TOTAL HARGA 3,500
SOLAR 13,000 21,000 273,000,000 78,000
AGENCY 20,000,000 5,714
CREW TONGKANG 10,000,000 2,857 86,571
TONGKANG 900,000,000 128,571
215,143 128,571

PALU - IKN
270 FEET
MUATAN 3.500 M3
MUATAN
LITER HARGA TOTAL HARGA 3,500
SOLAR 13,000 17,000 221,000,000 63,143
AGENCY 20,000,000 5,714
CREW TONGKANG 10,000,000 2,857
TONGKANG 675,000,000 96,429
168,143

270 FEET
MUATAN 3.500 M3
MUATAN
LITER HARGA TOTAL HARGA 3,500
SOLAR 13,000 17,000 221,000,000 63,143
AGENCY 20,000,000 5,714
CREW TONGKANG 10,000,000 2,857 71,714
TONGKANG 900,000,000 128,571
200,286 128,571

PALU - IKN
270 FEET
MUATAN 3.500 M3
MUATAN
LITER HARGA TOTAL HARGA 3,500
SOLAR 13,000 17,000 221,000,000 63,143
AGENCY 20,000,000 5,714
CREW TONGKANG 10,000,000 2,857
TONGKANG 675,000,000 96,429
168,143

UNTUNG 10% TC TONGKANG 10 % 20,029


TOTAL MODAL TONGKANG 220,314
MODAL BATU 150,000
TOTAL BATU + TONGKANG 370,314

UNTUNG 10% TC TONGKANG 10 % 16,814


TOTAL MODAL TONGKANG 184,957
MODAL BATU 150,000
TOTAL BATU + TONGKANG 334,957
450,000,000.00 225,000,000.00 1 BULAN BONUS

HITUNGAN KALAU DAPAT BONUS DALAM 1 BULAN

450,000,000.00 225,000,000.00 1 BULAN BONUS

HITUNGAN KALAU DAPAT BONUS DALAM 1 BULAN


KAPASITAS JAM KERJA KONVERSI
200 TON/JAM 8 JAM 1,600 TON 1.132 M3 1,811.20 M3

200 TON/JAM 8 JAM 1,600 TON 1.4 M3 1,142.86

3,679.00
226.4 9.090909
ASUMSI
MOBIL

22 TON 1 X MUAT 3 RET/JAM


25 HARI 45,280
65 % 29,432
25 28,571
70 % 20,000
KEBUTUHAN ALAT TENAGA DAN BBM VERSI TAMBANG YANGG SUDAH BERJALAN
ANALISA BIAYA PRODUKSI PABRIK CRUSHER
NO URAIAN KEBUTUHAN JUMLAH
1 STONE CRUSHER 1
2 MAITENANCE
3 PAJAK DAN RETRIBUSI DI LUAR PPN PPh
4 MOBIL TANGKI 1
5 EXCA PC 300 UTK LOADING DAN PASANGAN BREAKER 2
6 LOADER ATUR HASIL PRODUKSI 2, 1 UNTUK BANTU PEMUATAN KALAU ADA 2
7 TANGKI BBM MIN 8 TON 1
8 EXCA PC 200 UTK BRAEKER 1, ATUR MUATAN DI PONTON 1 2
9 DUMP 10 RODA, 4 UTK PRODUKSI, 4 UNTUK LOADING DAN ATUR STOK PILE 8
10 GENSET 550 KVA 1
PEMAKAIAN BBM
11 EXCA BRAEKER
12 EXCA PC 300 UTK LOADING DAN PASANGAN BREAKER 2
13 LOADER ATUR HASIL PRODUKSI 2, 1 UNTUK BANTU PEMUATAN KALAU ADA 2
14 LOADER STOCK PILE
15 EXCA PC 200 UTK BRAEKER 1, ATUR MUATAN DI PONTON 1 2
16 DUMP 10 RODA, 4 UTK PRODUKSI, 4 UNTUK LOADING DAN ATUR STOK PILE 8
17 INSTAL JARINGAN LISTRIK 1
18 PEMAKAIAN LISTRIK 1
19 SPARE PART CRUSHER
20 GAJI KARYAWAN 30
21 GEDUNG GENSET 1
22 KANTOR 6X8 1
23 PEMBUATAN JALAN LEBAR 10 METER SEPANJANG 900 METER 1
24 BASECAMP 8X 15 1

1 ALAT 1 OPERATOR
HELP CUKUP 3 UTK SEMUA ALAT
GAJI OPERATOR
HELPER
TUNJANGAN LOKASI
MELANGGAR KE SP DAN HILANG TUNJANGAN LOKASI
PEGAWAI PRODUKSI TUNJANGAN VOLUME PRODUKSI, SETELAH ADA PERHITUGAN AWAL

17 TENAGA OPERATOR DAN HELPER


2 ADMIN
1 KEPALA PRODUKSI
2 PENGAWAS/MERANGKAP CEKER LOADING
1 CEKER
1 MEKANIK
1 HELPER MEKANIK
1 KEUANGANBIASANYA DARI PEMILIK MODAL
4 SECURITY

KTT
TANGKI AIR
TANGKI BBM
GENSET 550 KV
JARINGAN LISTRIK PAKET 550 KVA
GEDUNG GENSET
WORK SHOP ALAT BERAT 16 X 12
KANTOR 6X8
BASECAMP 8X 15

LISTRIK CRUSHER
INTALASI CRUSHER DAN CRUSHER
PEMBENTUKAN BADAN JALAN 1000 METER

BAN
OLI
RIK CRUSHER
JUMLAH HARGA SATUAN
SET 9,500,000,000 5 TAHUN
LS
14,000 /M3
UNIT 200,000,000
UNIT 70,000,000 /BULAN
UNIT 60,000,000 /BULAN
UNIT 75,000,000
UNIT 65,000,000 /BULAN
UNIT 50,000,000 /BULAN
UNIT 1,500,000,000

UNIT 200 LTR/HARI


UNIT 144 LTR/HARI

UNIT 144 LTR/HARI


UNIT 112 LTR/HARI
SET 1,500,000,000
set 30,000,000 /BULAN

ORANG 4,000,000 /ORG/BULAN


UNIT 50,000,000
UNIT 144,000,000
PAKET 700,000,000
UNIT 360,000,000

4,500,000.00 INCLUDE BPJS KESEHATAN DAN TENAGA KERJA


3,000,000.00 TANGGUNGAN PERUSAAAN 100 IRBU LEBIH (200 RIBU)
250,000.00 TIDAK BOLEH ABSEN 6 HARI

3,500,000.00
2,250,000.00 TUNJANGAN 200-3000
3,500,000.00 TUNJANGAN KUBIKASI HINGGA TOTAL 4,5 JUTA

2,250,000.00 TUNJANGAN KUBIKASI 300


5,000,000.00
2,250,000.00 TUNJANGAN 300
2,750,000.00

25,000,000.00
1 UNIT PENJAGA DEBU
MIN 8 TON
1,500,000,000.00
140,000,000.00
25,000,000.00
250,000,000.00
50,000,000.00 48
75,000,000.00 120

23,000,000.00
9,500,000,000.00 INCLUE DUDUKAN SEKITAR 950 JUTA
700,000,000.00

SETIAP 3-4 BULAN


OLI SETIAP 5 BULAN