PROJECT QUALITY PLAN

CLIENT: DCHI DCHIData Centre Service

sW-DC-CL-MEP-HA-HO03 GIPipe for Dehumidifier Drainage REV. NO. 01


Location: DC Hall. Ground Date:22-08-2023
Floor

Checklist for Instaliation of do hrat &Accessories


Sn. Check Points Yes / No / NA Remarks if any
1 GIPipe for Dehumidifier Drainage are as
per approved mnaterial submittal. Yes

2 Location / Levels / Dimensions/ for the Na


Dehumidifier are as per approved shop
drawing
3 Coordination with other related services are Yes
done.

4 Drain line, insulation, water flowing are Yes


checked
All equipment's are installed properly. Yes
5.

6 Drain piping insulation are properly fixed. Yes


Drain piping supports are painted. Yes
7.
Yes
8 Overall workmanship on completed works is
found o.k.

Any other check point which is not covered


Yes
9.
above Yes
10. Snag list points are cleared.

project requirements.
and inspected in contormance with the
Allabove points have been executed
Approved by Client
Inspected by
Contractor Representative Representative
CPragat) Date & Sign
Date & Sign

Page 1 of 1
Copyrights Reserved O tngcsan
PROJECT QUALITY PLAN
CLIENT: DCHI DCHIData Centre Service

SW-DC-CL-MEP-HA-H003 GIPipe for Dehum1difier Power Supply REV NO 01


Ocation DC Hall, Ground Date 22-08-2023
Floor
fower
Checklist for Installation of Khdrast &AncessOrRs
Sn. Check Points Yes /No / NA Remarks if any
1 Supplied cables for dehumidifier power
supply are as per approved material Yes
submittal.

2 Location / Levels / Dimensions/ for the Yes


Dehumidifier power socket are as per
approved by the Client.

3 Coordination with other related services are Yes


done.

4 Allequipment's are installed properly. Yes

5 All Switches and sockets are checked Yes


visually.
6 Incoming supply to the switch and sockets Yes
are checked by using Voltmeter.
7 Cable laying are done as per standard by Yes
using MS conduit /tray
8 Overall workmanship oncompleted works is Yes
found o.k.

9 Any other check point which is not covered Yes


above
10. Snag list points are cleared. Yes

All above points have been executed and inspected in conformance with the project requirements
Inspected by Contractor Represerntative Approved by Client
(Praopadi fng9 ork) Representative
Date & Sign fradip m. pahl 23Aua2o L

C Reserved 9 ny Page 1 of 1