Report No.: 17116 Bs Sheet: 2

Notes
Accreditation
The PEHLA GbR, PEHLA Testing Laboratory Berlin-Siemensstadt has been approved by Deutsche
Akkreditierungsstelle GmbH (DAkkS) according to EN ISO/IEC 17025 for tests in the field of high-voltage switchgear
and controlgear and power engineering equipment (Registration No. D-PL-12072-04).
STL-Member
PEHLA (DE, CH) is a founder member of the SHORT-CIRCUIT TESTING LIAISON (STL) which has been
established in 1969. STL is a forum for the international cooperation of the testing organisations with the further full
members ASTA (UK), CESI (IT), CPRI (IN), ESEF (FR), JSTC (JP), KEMA (NL), KERI (KR), SATS (FI, NO, SE),
STLNA (CA, MX, US) and VEIKI-VNL (HU). In the frame-work of EC, STL (EU) has been recognised in 1992 by
EOTC as agreement group.
PEHLA-Documents
A Type Test Certificate
is issued for type tests which have successfully been carried out in full compliance with the relevant standards and
STL Guides valid at the time of the test. For these tests the test object must be clearly identified by technical
description, drawings and additional specifications.
A Test Document
is issued for parts of type tests which have successfully been carried out in full compliance with the relevant
standards and STL Guides valid at the time of test. For these tests the test object must be clearly identified by
technical description, drawings and additional specifications.
A Test Report
is issued for all other tests which have been carried out according to standards, specifications and/or additional
instructions. Similarly, this test report contains all test results, details of the conditions under which the tests have
been carried out, also details relating to the behaviour of the test object, and its condition after the tests.
A Test Confirmation
is issued immediately after the tests. It confirms that the tests have been conducted and is valid only until publishing
the detailed results in an entire document.
Uncertainty of the measurement systems
The PEHLA Testing Laboratories apply the STL Technical Report “Handling of Measurement Uncertainties in Testing
and Test Documents” for determining the uncertainties of measurement. As long as no explicit statements are made,
the uncertainties required by the relevant standards have been complied with.
Addresses
Office: PEHLA-Geschäftsstelle Client: Siemens AG, Berlin und München
Hallenweg 40 Reply to: Siemens AG
68219 Mannheim-Rheinau EM HP GIS R&D LAB BD
Germany Nonnendammallee 104
Internet: www.pehla.com 13629 Berlin
as partner and contractor of PEHLA GbR

Testing Station: PEHLA Testing Laboratory


Berlin-Siemensstadt
Nonnendammallee 104
13629 Berlin
Germany

Manufacturer: Siemens Ltd.


EM HP AIS
E-76, MIDC Waluj
Aurangabad 431136
India

Tested for: Siemens Ltd.


EM HP AIS
E-76 MIDC Waluj
Aurangabad 431136
India

02PE1512
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 3

Table of Contents

Cover Sheet ............................................................................................................................................ 1


Notes ...................................................................................................................................................... 2
Table of Contents.................................................................................................................................... 3
List of Test Participants ........................................................................................................................... 4
Technical Data of Test Object ................................................................................................................. 5
List of Identified Drawings ....................................................................................................................... 6
Drawing of Test Object............................................................................................................................ 8
Technical Data of Test Circuit ................................................................................................................. 9
Circuit Diagram ......................................................................................................................................10
Test Results - No-load Operations Before Test.......................................................................................11
Test Results - Basic Short-circuit Making and Breaking Tests.................................................................13
Test Results - No-load Operations After Test .........................................................................................14
Test Results - Measurement of the Resistance of the Main Circuit..........................................................16
Photos of Test Object.............................................................................................................................17
List of Symbols and Abbreviations Used in Oscillograms ........................................................................22
Oscillograms ..........................................................................................................................................23

14PE1512
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 4

List of Test Participants

Representatives of Technical Committee:

Mr. Wagner PEHLA Testing Laboratory Berlin-Siemensstadt


Dr. Günther PEHLA Testing Laboratory Berlin-Marzahn

Test Engineer / Test Operator:

Mr. Koschnicke PEHLA Testing Laboratory Berlin-Siemensstadt

Representatives of Manufacturer:

Further Participants:

Dr. Cernat Siemens AG, EM HP AIS R&D TEC EE


Mr. Dobberstein Siemens AG, EM HP AIS R&D TEC EE

51PE1512
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 5

Technical Data of Test Object


Circuit-breaker
Test object: Single-pole operated three-pole outdoor SF6 circuit-breaker
Designation: 3AP2FI - 420 kV - 4000 A - 63 kA - 50 Hz
Manufacturer: Siemens Ltd., EM HP AIS , E-76 MIDC Waluj , Aurangabad , India
Serial No.: 2017/IND/03/T046
Year of manufacture: 2017
Serial No. of drive: 167203697
Drawing No.: Dimension drawing: 3HM 427-48800-002
Circuit-breaker: 1HZ 427-48000-801

Ratings assigned by the manufacturer:


Rated voltage [Ur] 420 kV
Rated normal current [Ir] 4000 A
Rated frequency [fr] 50 Hz
Rated lightning impulse withstand voltage [Up] 1425 kV
Rated switching impulse withstand voltage [Us] 1050 kV
Rated power-frequency withstand voltage [Ud] 610 kV
Rated peak withstand current [Ip] 158 kA
Rated short-time withstand current [Ik] 63 kA
Rated duration of short-circuit [tk] 3 s
Rated short-circuit breaking current [Isc] 63 kA
DC component of the rated short-circuit breaking current [pcs] 51 %
Rated short-circuit making current [Ima] 158 kA
Rated transient recovery voltage 624 kV
Rate of rise of transient recovery voltage 2.0 kV/µs
First-pole-to-clear factor [kpp] 1.3 p.u.
Rated operating sequence O - 0.3 s - CO - 3 min - CO
Arc extinguishing medium SF6
Rated filling pressure for interruption [prm ] 0.70 MPa abs. at 20 °C
Minimum functional pressure for interruption [pmm] 0.60 MPa abs. at 20 °C
Insulating medium SF6
Rated filling pressure for insulation [pre] 0.70 MPa abs. at 20 °C
Minimum functional pressure for insulation [pme] 0.60 MPa abs. at 20 °C
Driving mechanism (type) spring drive
Number of poles 3
Number of units per pole 2
Rated opening time 21 ms
Rated closing time 65 ms
Rated supply voltage of opening device [Uop] 110 V d.c.
Rated supply voltage of closing device [Uop] 110 V d.c.
Rated supply voltage of auxiliary circuits [Ua] 110 V d.c.
Rated voltage of charging device 110 V d.c.
Rated supply voltage of anti-condensation heating 230 V a.c.
Rated frequency of supply voltage 50 Hz
Rated line-charging breaking current [Il] 600 A
Rated cable-charging breaking current [Ic] 400 A
Rated single capacitor bank breaking current [Isb] 400 A

Further data:
Temperature class -30 … +55 °C
Classification M2, C2
Minimum clearing time 46 ms

Essential characteristics: -

Remarks: -
16SE1611
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 6

List of Identified Drawings and Parts Lists

The manufacturer has submitted to the testing laboratory drawings and other data containing sufficient
information to unambiguously identify by type the essential details and parts of the test object presented
for test.
The drawings have been stamped and signed by the manufacturer in order to guarantee that the
drawings or data schedules truly represent the test object to be tested.
Further these drawings have been stamped and signed by PEHLA representatives and are kept
at the manufacturer.
with the test documents at the test laboratory.
The testing laboratory has checked that drawings and data schedules adequately represent the essential
details and parts of the test object to be tested, but is not responsible for the accuracy of the detailed
information.
The drawing(s) contained in this document are identical with the checked, stamped and signed drawings
and parts lists.

Drawing No. Rev.1) P/D Title Additional remarks


3HM 427-48800-002 A D Triple-pole circuit-breaker Sheet 1 2)
1HZ 594-48000-801 - D Triple-pole circuit-breaker Sheet 1
1HZ 594-48000-801 A P Triple-pole circuit-breaker Sheet 1, 2
1HG 427-48100-701 E D Double break assembly Sheet 1
1HG 427-48100-701 G P Double break assembly Sheet 1, 2, 3, 4
1HG 427-10350-005 K D Interrupter unit Sheet 1, 2
1HG 427-10350-005 N P Interrupter unit Sheet 1, 2
1HG 427-10390-005 N D Contact carrier, cpl. Sheet 1
1HG 427-10390-005 N P Contact carrier, cpl. Sheet 1, 2
2HG 427-10357-002 I D Socket, bottom, cpl. Sheet 1
2HG 427-10357-002 K P Socket, bottom, cpl. Sheet 1, 2
1HG 427-10365-002 Q D Moving contact Sheet 1
1HG 427-10365-002 R P Moving contact Sheet 1, 2, 3
1HG 427-48300-001 C D Column Sheet 1
1HG 427-48300-001 C P Column Sheet 1, 2, 3
2HG 427-07128-003 F D Drive rod Sheet 1
2HG 427-07128-003 F P Drive rod Sheet 1, 2
2HG 427-10360-002 L D Auxiliary gear Sheet 1
2HG 427-10360-002 L P Auxiliary gear Sheet 1, 2, 3
3HG 427-10270-003 G D Pin, cpl. Sheet 1
3HG 427-10270-003 G P Pin, cpl. Sheet 1, 2, 3
1HT 427-10338-001 M D Cover Sheet 1
Legend: P: Parts list, D: Drawing
1)
Remarks: Revision of P/D
2)
Included in this document
Continued on sheet 7

52PE1608
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 7

List of Identified Drawings and Parts Lists

Drawing No. Rev.1) P/D Title Additional remarks


1HG 427-48200-001 A D Breaker base Sheet 1
1HG 427-48200-001 A P Breaker base Sheet 1, 2, 3
3HF 521-11520-710 A D CHAMBER INSULATOR Sheet 1
3HF 522-11520-710 - D SUPPORT INSULATOR Sheet 1
3HF 522-11522-710 - D SUPPORT INSULATOR Sheet 1
1HT 427-10264-001 N D Contact carrier Sheet 1, 2
2HT 427-10305-001 H D Terminal Sheet 1
3FR 950-36410 D D contact lamella D149,9 Sheet 1
2HT 427-10252-001 H D Heating cylinder Sheet 1
2HT 427-10322-001 A D Auxiliary nozzle Sheet 1
2HT 427-10320-002 D D Insulating nozzle Sheet 2, 3
2HT 427-10293-001 F D Contact Cage Sheet 1, 2
3HG 427-07292-002 m D Contact-tube Sheet 1
4HT 428-00288-001 N D Contact lamination Sheet 1
3HG 428-00715-008 R D Pin Sheet 8
3HG 428-00715-008 T P Pin Sheet 1, 2, 3
2HG 427-10330-002 I D Fixed contact Sheet 1
2HG 427-10330-002 I P Fixed contact Sheet 1, 2, 3
1HG 412-29303-212 O D Spring drive mechanism FA2 SMART, cpl Sheet 6
1HG 412-29303-212 Q P Spring drive mechanism FA2 SMART, cpl. Sheet 1, 2, 3, 4
4HT 412-10872-001 L D Compression spring 2kNm Sheet 2
4HT 412-10873-004 K D Compression spring 1,1kNm Sheet 1
2HD 427-48701 - D Reference mech travel characterstics Sheet 1-3
Legend: P: Parts list, D: Drawing
1)
Remarks: Revision of P/D

52aSE1608
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 8

Drawing of Test Object

Terminal 2
Terminal 1

317SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 9

Technical Data of Test Circuit


Synthetic Test using Voltage Injection

Test performed Terminal fault test, -


test duty T10
Test No. 1 - 33 -
Test object
Rated voltage kV 420 -
Rated frequency Hz 50 -
Short-circuit breaking current kA 37.8 -
Breaking units under test 2 -
Voltage distribution % 100 -
Test circuit
Circuit diagram see sheet 10 -
Number of phases 1 -
Power factor cos < 0.15 -
Frequency Hz 50 -
Earthing conditions see circuit diagram -
Auxiliary breaker
Type 3AT2 -
Number of breaking units 2 -
Arc extinguishing medium SF6 -
Grading capacitor per unit pF - -
Required Tested Required Tested
Test values
values 1) values values values
Transient recovery voltage
Evaluation of oscillogram No. - 14 - -
Charging voltage kV - 473 - -
Crest value uc kV 701 708 - -
Time t2 µs 701 475 - -
Time delay td µs 2 - 35 16 - -
Rate of rise u1/t1 kV/µs 3.00 3.07 - -
Voltage u1 kV 350 466 - -
Time t1 µs 117 152 - -

1)
Remarks: Required values for a voltage level of 440 kV

43bSE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 10

Circuit Diagram
Synthetic Test using Voltage Injection

QMB QMS LCL T High-voltage circuit

UCh

LRV QAB
RD

G RC

CD

UTO
QTO
UT

ITO

Essential elements of the test circuit: Recorded quantities:

G Generator UT Voltage across the transformer, identical


with the voltage in the current circuit
QMB Master breaker (capacitive divider)

QMS Making switch UTO Voltage across the test object


(resistive-damped capacitive divider)
LCL Current-limiting reactor
UCh Charging voltage of the voltage circuit
T Transformer
ITO Current through the test object (shunt)
RD, CD Damping elements

RC Reignition circuit

QAB Auxiliary breaker

QTO Test object: Circuit-breaker

LRV Reactor for generation of A.C. recovery


voltage

44-04cSE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 11

Test Results
No-load Operations

Test performed: Before terminal fault test, test duty T60


Date of test: June 02, 2017
Condition of test object before test: Prestressed with short-time withstand current and
peak withstand current tests (Document No. 17114 Bs) and
terminal fault test, test duty T10 (Document No. 17115 Bs)
Gas pressure (abs. rel. to 20 °C): 0.60 MPa (insulation and interruption)

Test No. 1 2 3 -
Operating sequence O-t-CO CO O -
Condition for operation MPa - - - - -
C-Operation Voltage of closing device V - 93.5 93.5 - -
Percent of rated voltage % - 85 85 - -
Closing time ms - 71.0 70.0 - -
O-Operation Voltage of opening device V 77.0 77.0 77.0 77.0 -
Percent of rated voltage % 70 70 70 70 -
Opening time ms 22.6 22.6 22.8 22.3 -

Test No. 4 5 1) 6 1) -
Operating sequence O-t-CO CO O -
Condition for operation MPa - - - - -
C-Operation Voltage of closing device V - 110 110 - -
Percent of rated voltage % - 100 100 - -
Closing time ms - 67.3 67.9 - -
O-Operation Voltage of opening device V 110 110 110 110 -
Percent of rated voltage % 100 100 100 100 -
Opening time ms 21.6 21.6 21.5 21.7 -

Legend: t = 0.3 s (dead time)

1)
Remarks: The mechanical behaviour corresponds to the established reference mechanical travel
characteristics, drawing-no. 2HD 427-48701 (see sheet 7)

57bSE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 12

Test Results
No-load Operations

Test performed: Before terminal fault test, test duty T60


Date of test: June 02, 2017
Condition of test object before test: -
Gas pressure (abs. rel. to 20 °C): 0.60 MPa (insulation and interruption)

Test No. 7 8 9 -
Operating sequence O-t-CO CO O -
Condition for operation MPa - - - - -
C-Operation Voltage of closing device V - 121 121 - -
Percent of rated voltage % - 110 110 - -
Closing time ms - 65.7 66.0 - -
O-Operation Voltage of opening device V 121 121 121 121 -
Percent of rated voltage % 110 110 110 110 -
Opening time ms 21.0 21.3 21.5 21.7 -

Legend: t = 0.3 s (dead time)

Remarks: -

57bSE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 13

Test Results
Basic Short-circuit Making and Breaking Tests

Test performed: Terminal fault test, test duty T60


Date of test: June 02, 2017
Condition of test object before test: -
Connection to test object: Terminal 1 connected to high-voltage side
(see sheet 8) Terminal 2 connected to earthed side
Gas pressure (abs. rel. to 20 °C): 0.60 MPa (insulation and interruption)

Test No. 1) 13 14 15 16 -
Operating sequence and time intervals OS OS OD-t-CDOS - t’ - CDOS -
Applied voltage / Voltage of current circuit kV 33.0 32.6 32.5 30.8 30.8 -
Test current Making current (peak) kA - - - 93.4 84.8 -
Breaking current (r.m.s.) kA 38.2 38.1 38.8 38.4 37.0 -
DC component at contact separation % < 20 < 20 < 20 < 20 < 20 -
Voltage injection Charging voltage kV 473 473 - 473 473 -
Ignition time after current zero µs 26 27 - 28 24 -
Recovery voltage ( r.m.s.) kV - 335 - 334 335 -
Transient recovery Voltage u1 kV - 466 - 465 465 -
voltage Time t1 µs - 152 - 151 150 -
TRV peak value uc kV - 708 - 707 708 -
Time t2 µs - 475 - 473 473 -
Time delay td µs - 16 - 14 14 -
Rate of rise u1/t1 kV/µs - 3.07 - 3.08 3.10 -
Condition for operation MPa - - - - - -
C-Operation Voltage of closing device V - - - 93.5 93.5 -
Closing time ms - - - 70.3 70.2 -
Pre-arcing time ms - - - 0.5 0.4 -
Make time ms - - - 69.8 69.8 -
O-Operation Voltage of opening device V 77.0 77.0 77.0 77.0 77.0 -
Opening time ms 22.4 22.4 22.6 22.5 22.7 -
3)
Arcing time ms 8.5 9.6 10.1 19.4 14.0 -
Break time ms 30.9 32.0 32.7 41.9 36.7 -
Emission of flame/gas/oil, occurrence of NSDD no no no no no -
Number of valid test 1 2 3 4 -
Test result (P/N) P 2) P P 3) P -
Legend: P: Passed in terms of the applied standard N: Not passed in terms of the applied standard
CD, OD: Direct test CS, OS: Synthetic test t = 0.3 s t’ = 7 min
1)
Remarks: Tests 10 - 12: Equipment tests, oscillograms are not included in this document
2)
Verification of minimum arcing time, determined in test 14
3)
Maximum arcing time out of upper tolerance. Passed according to IEC 62271-100,
table 12, test conditions related to standard were more severe

Condition of test object after test: -

36bSE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 14

Test Results
No-load Operations

Test performed: After terminal fault test, test duty T60


Date of test: June 02, 2017
Condition of test object before test: -
Gas pressure (abs. rel. to 20 °C): 0.60 MPa (insulation and interruption)

Test No. 17 18 19 -
Operating sequence O-t-CO CO O -
Condition for operation MPa - - - - -
C-Operation Voltage of closing device V - 93.5 93.5 - -
Percent of rated voltage % - 85 85 - -
Closing time ms - 71.1 71.7 - -
O-Operation Voltage of opening device V 77.0 77.0 77.0 77.0 -
Percent of rated voltage % 70 70 70 70 -
Opening time ms 23.2 23.0 23.2 22.7 -

Test No. 20 21 1) 22 1) -
Operating sequence O-t-CO CO O -
Condition for operation MPa - - - - -
C-Operation Voltage of closing device V - 110 110 - -
Percent of rated voltage % - 100 100 - -
Closing time ms - 68.3 68.6 - -
O-Operation Voltage of opening device V 110 110 110 110 -
Percent of rated voltage % 100 100 100 100 -
Opening time ms 21.8 22.3 22.2 22.2 -

Legend: t = 0.3 s (dead time)

1)
Remarks: No-load operations after tests show no significant changes to no-load operations before
tests

57bSE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 15

Test Results
No-load Operations

Test performed: After terminal fault test, test duty T60


Date of test: June 02, 2017
Condition of test object before test: -
Gas pressure (abs. rel. to 20 °C): 0.60 MPa (insulation and interruption)

Test No. 23 24 25 -
Operating sequence O-t-CO CO O -
Condition for operation MPa - - - - -
C-Operation Voltage of closing device V - 121 121 - -
Percent of rated voltage % - 110 110 - -
Closing time ms - 67.3 66.9 - -
O-Operation Voltage of opening device V 121 121 121 121 -
Percent of rated voltage % 110 110 110 110 -
Opening time ms 22.0 21.7 21.5 22.0 -

Legend: t = 0.3 s (dead time)

Remarks: -

57bSE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 16

Test Results
Measurement of the Resistance of the Main Circuit

Test performed: Terminal fault test, test duty T60


Date of test: June 02, 2017

Measurement Measurement
before test No. after test No.

1 25

Resistance of the main circuit µ 72 83

Ambient air temperature °C 24 24

Test current for measurement A (d.c.) 100

Measurement between points see sheet 8 Terminal 1 and Terminal 2

Remarks: -

Condition of test object after test:


The inspection after all tests shows:
Mechanical parts and insulators are essentially in the same condition as before the test duties. The silver-
coating at main contact area of closed position was intact. The condition of the contacts clearly shows
that the normal current carrying capacity is not affected (see photos on sheets 18 - 21).
Based on the condition after the tests the circuit-breaker was considered to be able of making, carrying
and breaking its rated normal current at the rated voltage.

33aSE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 17

Photos of Test Object

Test object before test

Test object after test

312SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 18

Nozzles of interrupter unit 1 after short-time withstand current and peak


withstand current tests (Document No. 17114 Bs) and
terminal fault tests, test duties T10 (Document No. 17115 Bs) and T60

Arcing contact of interrupter unit 1 after short-time withstand current and


peak withstand current tests (Document No. 17114 Bs) and
terminal fault tests, test duties T10 (Document No. 17115 Bs) and T60

311SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 19

Heating cylinder (main contact) of interrupter unit 1 after


short-time withstand current and peak withstand current tests
(Document No. 17114 Bs) and terminal fault tests, test duties T10
(Document No. 17115 Bs) and T60

Contact laminations (main contact) of interrupter unit 1 after


short-time withstand current and peak withstand current tests
(Document No. 17114 Bs) and terminal fault tests, test duties T10
(Document No. 17115 Bs) and T60

311SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 20

Nozzles of interrupter unit 2 after short-time withstand current and peak


withstand current tests (Document No. 17114 Bs) and terminal fault
tests, test duties T10 (Document No. 17115 Bs) and T60

Arcing contact of interrupter unit 2 after short-time withstand current and


peak withstand current tests (Document No. 17114 Bs) and terminal
fault tests, test duties T10 (Document No. 17115 Bs) and T60

311SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 21

Heating cylinder (main contact) of interrupter unit 2 after


short-time withstand current and peak withstand current tests
(Document No. 17114 Bs) and terminal fault tests, test duties T10
(Document No. 17115 Bs) and T60

Contact laminations (main contact) of interrupter unit 2 after


short-time withstand current and peak withstand current tests
(Document No. 17114 Bs) and terminal fault tests, test duties T10
(Document No. 17115 Bs) and T60

311SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 22

List of Symbols and Abbreviations used in Oscillograms

Oscillogram No.: 1 - 25

Abbreviation Description

U_TO_HS Voltage across the test object, high sample rate

U_TO_LS Voltage across the test object, low sample rate

U_T_LS Voltage across the transformer, low sample rate

I_TO_LS Current through the test object, low sample rate

Contact Contact of the test object

Travel_TO Travel recorder of the test object

C-Cmd_TO_I Current through the closing device

O-Cmd_TO_I Current through the opening device

Remarks: The amplitude scaling of the individual signals is apparent at the labels on the right
side of the oscillograms, as a value taken from the upper to the lower borderline of the
inner graphic area.
The expanded uncertainty of the complete measuring systems for determination of the
test values, related to the ratings to be assessed, is less than 5 %.

61SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 23

Oscillograms

Oscillogram No.: 1

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 24

Oscillogram No.: 2

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 25

Oscillogram No.: 3

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 26

Oscillogram No.: 4

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 27

Oscillogram No.: 5

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 28

Oscillogram No.: 6

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 29

Oscillogram No.: 7

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 30

Oscillogram No.: 8

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 31

Oscillogram No.: 9

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 32

Oscillogram No.: 13a

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 33

Oscillogram No.: 13b

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 34

Oscillogram No.: 14a

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 35

Oscillogram No.: 14b

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 36

Oscillogram No.: 15a

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 37

Oscillogram No.: 15b

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 38

Oscillogram No.: 16a

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 39

Oscillogram No.: 16b

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 40

Oscillogram No.: 17

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 41

Oscillogram No.: 18

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 42

Oscillogram No.: 19

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 43

Oscillogram No.: 20

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 44

Oscillogram No.: 21

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 45

Oscillogram No.: 22

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 46

Oscillogram No.: 23

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 47

Oscillogram No.: 24

316SE1602
GESELLSCHAFT FÜR ELEKTRISCHE HOCHLEISTUNGSPRÜFUNGEN
Report No.: 17116 Bs Sheet: 48

Oscillogram No.: 25

316SE1602

You might also like