Daftar Peralatan PDKB TM Berjarak
Daftar Peralatan PDKB TM Berjarak
Daftar Peralatan PDKB TM Berjarak
METODA BERJARAK
Page 1
HARGA SATUAN JUMLAH HARGA
NO NAMA PERALATAN JUMLAH SATUAN UKURAN
RP RP
8 Measuring Rod 1 set 1.80 m
9 Conductor Support Pole 1 bh L: 5.10m Æ 63 mm
10 Conductor Support Pole 3 bh L: 3.90m Æ 63 mm
11 Conductor Support Pole 3 bh L: 3.00m Æ 38 mm
12 Conductor Cover 6 bh
13 Pin Type Insulator Cover 3 bh
14 Door 3 bh
15 Cross Arm Cover 3 bh
16 Insulating Flexible Cover 3,5mm 5 lbr 92x92cm
17 Insulating Blanket Clamp 10 bh
18 By Pass jamper 3 bh 250 Amp L: 5m
19 By Pass jamper Connector 12 bh 190x160x60mm
20 Lift Type Saddle 2 bh 3.9kg 600 daN
21 Pole Type Saddle 7 bh 320daN
22 Saddle Extension 5 bh L: 0.085m 0.6 kg
23 Pole Clamp Saddle 0 63 4 bh
24 Pole Clamp Saddle 0 38 3 bh
25 Chain Binder 7 bh L: 0.90m 2.6kg
26 Insulating Flexible Cover 0,8mm 1 rol 25x1,30m
27 Insulating Blanket Clamp TR 25 bh
28 Live Line Connector 60 bh 34 s/d 150 mm2
29 All Angle Cog spanner Pole 1 bh L: 2,40 m
30 Wire holder 3 bh 250daN
31 Tension Link Pole 2 bh L; 1,20 m
32 Locating Pin 1 bh 140x105x20mm
33 Ratchet Spanner 1 bh 270x95x45mm
34 Spiral Type Slit Pin Remover 1 bh 130x60x35mm
35 Fine Point Type Split Pin remover 1 bh 130x70x20mm
36 Ball Socket Adjuster 1 bh 0,28 kg
37 Split Pin installer Remover 1 bh 235x120x25mm
38 Insulator Ball Guide 1 bh 170x65x35mm
39 Adjustable Insulator Fork 1 bh 1.15kg
40 Adjustable Pliers 1 bh 250x90x80mm
41 Pin Holder 1 bh 160x50x30mm
42 Tension Clamp Cover 6 bh 430x430x230mm
43 Tension String Cover 6 bh 700x670x270mm
44 Make Switch 3 bh Clos 200A,Open 90A
45 Machanical Protective Tobe 3 bh Dia : 51mm L:2,50m
46 By Pass Jumper 3 bh 250 Amp, L: 8 m
47 Auxiliary Arm 1 bh L : 2,60 m
48 Auxiliary Arm 1 bh L : 1,15 m
49 Flatform 1 bh l : 1,8 m
50 Offset Eye 2 bh 300 daN
Page 2
HARGA SATUAN JUMLAH HARGA
NO NAMA PERALATAN JUMLAH SATUAN UKURAN
RP RP
Catatan:
tan Ini Bisa Dipergunakan Untuk :
1 Har Isolator Penegang
2 Har Isolator Tumpu
3 Har Cross Arm
4 Har ABSW
5 Pasangan Baru
6 Har Jumper Trafo
7 Menyisip Tiang
8 Geser Jaringan
9 Merubah Konstruksi
10 Memasang Arester
11 Har Isolator Sudut Double Tumpu
12 Pemasangan H Compression Connector
13 Pemasangan Paralel Group
Page 3