Tel Estimation

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

1 2 3 4 5 6 7 11 12 13 14 15 16 17 18 19 20 21

TELEPHONE SYSTEM Auto (Refer to other sheet) Auto (This sheet) Input manually

ROOM DIMENSION TEL & LAN EQUIPMENT

Area/Room Name X Y S Ceilling or Max Height Nos/m2 TEL Set


TEL
PABX MDF

FL Set

(m) (m) (m2) (CH=) Fire Alarm Outlet (Key) (Single) MDF IDF
(Outlet (Outlet
wall for floor 16CO-
or LTG Level floor) type)
Level (H=) Wall 64extensi (150P)
H= on

1 I. OFFICE AREA 1FL,2FL

m
2 Entrance Hall 12 16 192 CH=3 192 1
3 Pantry 2 4 8 CH=3 ####
4 Guest RM A,B 10 6 60 CH=3 30 2

co
5 Meeting RM A,B 18 6 108 CH=3 54 2
6 Conference Rm 10 12 120 CH=3 120 1

.
7 WC (M,F) 28 4 112 CH=2.5 ####

ep
8 Corridor 36 2 72 CH=3 ####
9 Office Room ( For Administation) 18 20 440 CH=3 20 1 22 1 1 1 1 1
10 Office Room ( For Production Design) 42 12 504 CH=3 32 1 16 1

um
11 MD room 5 6 30 CH=3 30 1
12 SMD Room 5 6 30 CH=3 30 1
13 Server room 6 4 24 CH=3 24 1
14 Storage 6 4 24 CH=3 ####
ilie
15 Stair E,A,B CH=2.7 ####
16 Condensing Unit Yard 1 18 30 540 H=4 ####
17 Meeting RM C,D 18 6 108 CH=3 54 2
Ta

18 Document storage 9 4 36 CH=3 ####


19 WC 9 4 36 CH=2.5 ####
20 Pantry 2 4 8 CH=3 ####
21 Condensing Unit Yard 2 28 12 336 H=4 ####
22 Smoking RM 3 6 18 CH=3 ####
23 Corridor 22 2 44 CH=3 ####
24 Entrance Canopy 11 7 77 H=4 ####
25 ####
26 2927 ####
27 TOTAL OFFICE AREA 11 40 1 1 1 1 2
28 II. CANTEEN 2FL ####
29 Locker Room (F) 36 30 1080 CH=3 ####
1 2 3 4 5 6 7 11 12 13 14 15 16 17 18 19 20 21

TELEPHONE SYSTEM Auto (Refer to other sheet) Auto (This sheet) Input manually

ROOM DIMENSION TEL & LAN EQUIPMENT

Area/Room Name X Y S Ceilling or Max Height Nos/m2 TEL Set


TEL
PABX MDF

FL Set

(m) (m) (m2) (CH=) Fire Alarm Outlet (Key) (Single) MDF IDF
(Outlet (Outlet
wall for floor 16CO-
or LTG Level floor) type)
Level (H=) Wall 64extensi (150P)
H= on

30 Locker Room (M) 36 18 648 CH=3 ####

m
31 Canteen 28 60 1824 CH=3 1824 1
32 Kitchen 36 12 512 CH=3 ####
33 Kiosk 5 12 60 CH=3 ####

co
34 Dish washing 6 6 36 CH=3 ####
35 Corridor 4 70 280 CH=3 #### 1

.
36 WC(M,F)-1,2 10 4 40 CH=2.5 ####

ep
37 Stair C,D CH=3 ####
38 ####
39 4480 ####

um
40 Total CANTEEN 2FL 1 1
41 III. FACTORY & Utility ####
42 1 Factory area small Room ####
43 Factory Office 24 12 288 CH=3 72 4
ilie
44 Smoking RM 3 6 18 CH=3 ####
45 Production Engineering RM 28 12 336 CH=3 84 4
46 Driver RM 10 6 60 H=4 ####
Ta

47 Compressor RM-A 10 6 60 H=4 ####


48 First Aid RM 7 18 126 CH=3 126 1
49 Storage 7 14 98 H=4 ####
50 Generator 10 12 120 H=4 ####
51 MDB Room 8 9 72 H=4 ####
52 Compressor RM-B 6 9 54 H=4 ####
53 Mainternance RM 20 9 180 CH=3 180 1
54 WC1,2 9 6 54 CH=2.5 ####
55 Scap storage H=4 ####
56 1466 ####
57 Total Factory area small Room 10
58 2 Factory area Big Room
1 2 3 4 5 6 7 11 12 13 14 15 16 17 18 19 20 21

TELEPHONE SYSTEM Auto (Refer to other sheet) Auto (This sheet) Input manually

ROOM DIMENSION TEL & LAN EQUIPMENT

Area/Room Name X Y S Ceilling or Max Height Nos/m2 TEL Set


TEL
PABX MDF

FL Set

(m) (m) (m2) (CH=) Fire Alarm Outlet (Key) (Single) MDF IDF
(Outlet (Outlet
wall for floor 16CO-
or LTG Level floor) type)
Level (H=) Wall 64extensi (150P)
H= on

59 Factory area 135 120 16200 H=4 16200 1 1

m
60 Shipping Yard ####
61 Receiving Yard ####
62

co
63 16200
64 Total Factory area Big Room 1 1
11 1

.
65 TOTAL FACTORY & Utility

ep
66 IV. Other & Outdoor ####
67 Guard House1,2 14 8 112 H=4 56 2
68 Motorbike Parking 27 120 3240 H=4 ####

um
69
70
71
72 TOTAL Other & Outdoor 2
ilie
73 GRAND TOTAL 25 40 1 1 1 1 4
Ta

You might also like