Republic of the Philippines
ENERGY REGULATORY COMMISSION
Pasig City
IN THE MATTER OF THE
APPLICATION FOR
APPROVAL OF
UNPLANNED CAPITAL
EXPENDITURE PROJECT
FOR YEAR 2012, RE:
INSTALLATION OF NEW
10 MVA SUBSTATION IN
LAOAG CITY AND
CONSTRUCTION OF 69 KV
SUBTRANSMISSION LINE
DUE TO UNEXPECTED
SIGNIFICANT NEW LOAD,
WITH PRAYER FOR
PROVISIONAL
AUTHORITY
ERC CASE NO. 2012-094 RC
ILOCOS NORTE ELECTRIC
COOPERATIVE, INC.
(INEC), Promulgated:
Applicant. December 9, 2022
x x
ORDER
On 23 July 2012, Applicant Ilocos Norte Electric Cooperative,
Inc. (INEC) filed an Application dated 25 June 2012 for the approval
of its Unplanned Capital Expenditure (CAPEX) project.
After acquiring jurisdiction over the subject matter of the instant
case, several hearings were conducted by the Commission. INEC filed
its Formal Offer of Evidence (FOE) on 25 April 2014.
To facilitate the final evaluation of the instant Application, the
Commission finds it necessary to require the Applicant INEC to submit
additional documents.
ACCORDINGLY, INEC is hereby DIRECTED to submit an
update of its CAPEX Application and additional documents, using the
attached Annex “A”, such as official receipts and Bill of Materials in
excel file with corresponding receipt numbers, via the official
electronic mail address of the Commission’s Central Records DivisionERC Case No. 2012-094 RC
Order /o9 December 2022
Page 2 0f5
(CRD) at docket@ere.ph. The Applicant is given ten (10) days from
receipt of this Order to SUBMIT the aforementioned documents.
FURTHER, INEC is hereby DIRECTED to file, through
personal service, or ordinary or registered mail, or private courier, its
compliance to the Commission’s CRD, within five (5) working days
from the date its electronic filing is acknowledged by the CRD pursuant
to the Commission’s Resolution No. 09, Series of 2020 dated 24
September 2020.!
The Commission shall monitor compliance to the said directive
and Applicant's failure to submit the required documents shall result
to dismissal of the Application.
SO ORDERED.
Pasig City, 09 December 2022
FOR AND BY AUTHORITY
OF THE COMMISSION:
(ONALISA C. DIMALANTA
Chairperson and CEO
ERC
iii
*MC0-2022-12:510-0014"
Bontonase
]BA/NLG/REM/LLG
+ A Resolution Adopting the Guidelines Governing Electronic Application, Filings and Virtual
Hearings Before the Energy Regulatory Commission.ERC Case No. 2012-094 RC
Order /o9 December 2022
Page 3 of 5
Copy Furnished:
1
6.
7
Dechaviez Lerios-Amboy and Evangelista Law Offices
Counsel for INEC
Unit 2068, Tycoon Centre
Pearl Drive, Ortigas Center, Pasig City
Ilocos Norte Electric Cooperative, Ine.
Applicant
Bray. Suyo, Dingras, locos Norte
ineelegal20x8@yahoo.com
National Grid Corporation of the Philippines (NGCP)
Intervenor
Office of the General Counsel
Quezon Ave. corner BIR Road, Diliman, Quezon Ci
regulatorycompliance@ngcp.ph
Mr. Antonio Atendido Tan
Intervenor
Sta. Barbara (B-3), Sarrat, Hocos Norte
Ilocos Norte Power Consumer Association (INCASSO)
Intervenor
‘SMB, Barangay 2 Gen. Luna St. corner Ligo St.,
Laoag City, Tlocos Norte
Regulatory Operations Service (ROS)
Energy Regulatory Commission
17th Floor, Pacific Center Building, San Miguel
Avenue, Pasig City
Legal Service (LS)
Energy Regulatory Commission
asth Floor, Pacific Center Building, San Miguel
‘Avenue, Pasig CityERC Case No. 2012-094 RC
Order /o9 December 2022
Page
Ne nee ee
4o0f5
ANNEX “A”
PENDING CAPEX APPLICATION UPDATE FORMAT
Required Submissions:
Actual number of customers connected at the 20 MVA Laoag
Substation in 2012;
Actual loading of SM Hypermarket, Puregold and VVH Realty;
Relevant information of the old and new substation such as the
age of the transformer, layout of the substation, distance of the
new substation from the old substation;
Actual loading (in MVA) of old and new Laoag Substation (2012
to present);
Technical analysis of the proposed project;
Problem
Description
et Syston Peroemaic
Alternative | Description Without win, Project
Alternative 1
Alternative 2
Alternative 3
Project !
30-year economic analysis of the alternative project/s including
the proposed project (in Excel File);
Actual cost of the Project including official receipts, bidding
documents, etc.;
Bill of materials (BOM) for the actual/updated cost of the
Project in excel file, using the table shown hereunder as
reference:
Item
No.of | UnitCost |, DUS | |Project
Materials Specs. | Tyits | (PHP/Unib | Reference | Ft
‘Total Updated CostERC Case No. 2012-094 RC
Order /o9 December 2022
Page 5 0f 5
ii ten ie a
9. Date when Puregold and SM Hypermart were connected/tapped
to the distribution system of INEC.
10. Actual loan incurred by INEC in implementing the proposed
CAPEX project, if any; and
11. INEC’s RFSC cash flow (in excel file) for the years 2012 to 2021
per Audited Financial Statement using the template below.
Particulars
aoia
moa
Bou
Total
‘Actual Energy sales, KWh
ESC balance beginning per AFS, PhP
>|
FUND INFLOWS
‘Actual collection from RFSC Charge, PhP
‘Actual loan releases, PhP
From general fund, ifany, PhP
‘Subsidy (any), PhP
Interest Earned from RFSC deposit account
=|] olo]e
“Total Fund Inflows, PhP
GBC
‘Available cash for disbursement We AG
FUND OUTFLOWS
‘Payment for CAPEX project under this Application r
Payment for Other CAPEX Project a
‘Payment of amortization/s for new loan, Hany (PhP) SEE T
‘Payment of amortization/s for previous loan (PhP) 1
Replenishment of General Fund account (PhP) M
Permit Fee (PhP) N
‘Total Fund Outflows, PhP
O= Teele MN
[Fund balance ending, PhP, exeess/(ehorfall)
P=H-O