Republic of the Philippines ENERGY REGULATORY COMMISSION Pasig City IN THE MATTER OF THE APPLICATION FOR APPROVAL OF UNPLANNED CAPITAL EXPENDITURE PROJECT FOR YEAR 2012, RE: INSTALLATION OF NEW 10 MVA SUBSTATION IN LAOAG CITY AND CONSTRUCTION OF 69 KV SUBTRANSMISSION LINE DUE TO UNEXPECTED SIGNIFICANT NEW LOAD, WITH PRAYER FOR PROVISIONAL AUTHORITY ERC CASE NO. 2012-094 RC ILOCOS NORTE ELECTRIC COOPERATIVE, INC. (INEC), Promulgated: Applicant. December 9, 2022 x x ORDER On 23 July 2012, Applicant Ilocos Norte Electric Cooperative, Inc. (INEC) filed an Application dated 25 June 2012 for the approval of its Unplanned Capital Expenditure (CAPEX) project. After acquiring jurisdiction over the subject matter of the instant case, several hearings were conducted by the Commission. INEC filed its Formal Offer of Evidence (FOE) on 25 April 2014. To facilitate the final evaluation of the instant Application, the Commission finds it necessary to require the Applicant INEC to submit additional documents. ACCORDINGLY, INEC is hereby DIRECTED to submit an update of its CAPEX Application and additional documents, using the attached Annex “A”, such as official receipts and Bill of Materials in excel file with corresponding receipt numbers, via the official electronic mail address of the Commission’s Central Records Division ERC Case No. 2012-094 RC Order /o9 December 2022 Page 2 0f5 (CRD) at docket@ere.ph. The Applicant is given ten (10) days from receipt of this Order to SUBMIT the aforementioned documents. FURTHER, INEC is hereby DIRECTED to file, through personal service, or ordinary or registered mail, or private courier, its compliance to the Commission’s CRD, within five (5) working days from the date its electronic filing is acknowledged by the CRD pursuant to the Commission’s Resolution No. 09, Series of 2020 dated 24 September 2020.! The Commission shall monitor compliance to the said directive and Applicant's failure to submit the required documents shall result to dismissal of the Application. SO ORDERED. Pasig City, 09 December 2022 FOR AND BY AUTHORITY OF THE COMMISSION: (ONALISA C. DIMALANTA Chairperson and CEO ERC iii *MC0-2022-12:510-0014" Bontonase ]BA/NLG/REM/LLG + A Resolution Adopting the Guidelines Governing Electronic Application, Filings and Virtual Hearings Before the Energy Regulatory Commission. ERC Case No. 2012-094 RC Order /o9 December 2022 Page 3 of 5 Copy Furnished: 1 6. 7 Dechaviez Lerios-Amboy and Evangelista Law Offices Counsel for INEC Unit 2068, Tycoon Centre Pearl Drive, Ortigas Center, Pasig City Ilocos Norte Electric Cooperative, Ine. Applicant Bray. Suyo, Dingras, locos Norte ineelegal20x8@yahoo.com National Grid Corporation of the Philippines (NGCP) Intervenor Office of the General Counsel Quezon Ave. corner BIR Road, Diliman, Quezon Ci regulatorycompliance@ngcp.ph Mr. Antonio Atendido Tan Intervenor Sta. Barbara (B-3), Sarrat, Hocos Norte Ilocos Norte Power Consumer Association (INCASSO) Intervenor ‘SMB, Barangay 2 Gen. Luna St. corner Ligo St., Laoag City, Tlocos Norte Regulatory Operations Service (ROS) Energy Regulatory Commission 17th Floor, Pacific Center Building, San Miguel Avenue, Pasig City Legal Service (LS) Energy Regulatory Commission asth Floor, Pacific Center Building, San Miguel ‘Avenue, Pasig City ERC Case No. 2012-094 RC Order /o9 December 2022 Page Ne nee ee 4o0f5 ANNEX “A” PENDING CAPEX APPLICATION UPDATE FORMAT Required Submissions: Actual number of customers connected at the 20 MVA Laoag Substation in 2012; Actual loading of SM Hypermarket, Puregold and VVH Realty; Relevant information of the old and new substation such as the age of the transformer, layout of the substation, distance of the new substation from the old substation; Actual loading (in MVA) of old and new Laoag Substation (2012 to present); Technical analysis of the proposed project; Problem Description et Syston Peroemaic Alternative | Description Without win, Project Alternative 1 Alternative 2 Alternative 3 Project ! 30-year economic analysis of the alternative project/s including the proposed project (in Excel File); Actual cost of the Project including official receipts, bidding documents, etc.; Bill of materials (BOM) for the actual/updated cost of the Project in excel file, using the table shown hereunder as reference: Item No.of | UnitCost |, DUS | |Project Materials Specs. | Tyits | (PHP/Unib | Reference | Ft ‘Total Updated Cost ERC Case No. 2012-094 RC Order /o9 December 2022 Page 5 0f 5 ii ten ie a 9. Date when Puregold and SM Hypermart were connected/tapped to the distribution system of INEC. 10. Actual loan incurred by INEC in implementing the proposed CAPEX project, if any; and 11. INEC’s RFSC cash flow (in excel file) for the years 2012 to 2021 per Audited Financial Statement using the template below. Particulars aoia moa Bou Total ‘Actual Energy sales, KWh ESC balance beginning per AFS, PhP >| FUND INFLOWS ‘Actual collection from RFSC Charge, PhP ‘Actual loan releases, PhP From general fund, ifany, PhP ‘Subsidy (any), PhP Interest Earned from RFSC deposit account =|] olo]e “Total Fund Inflows, PhP GBC ‘Available cash for disbursement We AG FUND OUTFLOWS ‘Payment for CAPEX project under this Application r Payment for Other CAPEX Project a ‘Payment of amortization/s for new loan, Hany (PhP) SEE T ‘Payment of amortization/s for previous loan (PhP) 1 Replenishment of General Fund account (PhP) M Permit Fee (PhP) N ‘Total Fund Outflows, PhP O= Teele MN [Fund balance ending, PhP, exeess/(ehorfall) P=H-O

You might also like